Professional Documents
Culture Documents
2017-2018
2.O. Consequent on the implementation of Goods & Service Tax (GST), the
Schedule of Rates Committee have decided to separate out the taxes, such as, Excise
Duty, TNVAT, Service Tax and all other taxes included in the Schedule of Rates 2Ot7-
2018 and to arrive the Basic Rates.
3.0, Hence, the Revised Standard Schedule of Rates with Basic Rates,
including Basic Rate of Steel and Cement exclusive of taxes, such as, Excise Duty,
TNVAT, Service Tax & all other taxes and also exclusive of GST for the year 2OL7-2018
approved by the Schedule of Rates Committee for adoption in the preparation of
estimates with effect from 21.10.2OL7 are herewith enclosed for taking necessary
action.
4.0. The receipt of Revised Standard Schedule of Rates for the year 2OL7-20t8
along with its enclosures may be acknowledged.
Encl,:
Revised Standard Schedule of Rates
with Basic Rates, 2OL7-18-1 Booklet
tL^'n9*tAY-,
2.oltol11
Engi neer-in-Chiet ( eu'llaings),
n&
t?"T ?',!?#51 i?,"1; j,li;';,l,B's
i o
" :ij
ro 91'\e
1. The Engineer-in-Chief, Water Resources Department, Chepauk, Chennai-5.
2. The Director General, Highways Department, 76, Sardar Patel Road, Guindy,
Chennai-25.
3. The Chief Engineer, WRD, Design Research and Construction Support, Chennai-5.
4. The Deputy Secretary to Government, Finance Department, Secretariat, Chennai-9.
Sub: Steel – Basic Rate for STEEL for adoption in the preparation
of estimates during the year 2017-2018 with effect from
21.10.2017 – Approved – Communication of – Regarding.
2.0. Consequent on the implementation of Goods & Service Tax (GST), the
Schedule of Rates Committee have decided to separate out the taxes, such as, Excise
Duty, TNVAT and all other taxes included in the Cost of Steel and to arrive the Basic
Rate.
3.0. Accordingly, the Basic Rate of Steel exclusive of taxes, such as, Excise
Duty, TNVAT & all other taxes and also exclusive of GST approved by the Schedule of
Rates Committee for adoption in the preparation of estimates during the year 2017-
2018 with effect from 21.10.2017 is given below:
4.0. The above Basic Rate is exclusive of all taxes, freight charges, etc., at
Stockyard / Dealer’s Godown. Necessary lead charges (i.e. excluding loading and
unloading charges), as applicable as per conveyance table, may be allowed from the
Stockyard / Dealer's Godown to the site of work, if duly certified by an officer not below
the rank of Assistant Executive Engineer.
5.0. However, in the case, if the source is specified as "Stockyard", the same
shall be decided and approved by the Superintending Engineers concerned.
rr-"*,_$),,
ldings),
Engineer-in-Chief ( Bui
ch i er i o n&
i?i'T ?;!il':j; ?%'l; :,H'ftts"s
ro 6s(-
1. The Engineer-in-Chief, Water Resources Department, Chepauk, Chennai-5.
2. The Director General, Highways Department, 76, Sardar Patel Road, Guindy,
Chen na i-25.
3. The Chief Engineer, WRD, Design Research and Construction Support, Chennai-S.
4. The Deputy Secretary to Government, Finance Department, Secretariat, Chennai-9.
Copy to the Chief Engineer (Buildings), PWD, Trichy Region, Trichy.
Copy to the Chief Engineer (Buildings), PWD, Madurai Region, Madurai.
Copy to All Superintending Engineers of Building Organisation.
Copy to the Secretary to Government, Public Works Department, Secretariat, Chennai-9.
Copy to the Secretary to Government, Municipal Administration and Water Supply
Department, Secretariat, Chennai-9.
Copy to the Secretary to Government, Rural Development and Local Administration,
Secretariat, Chennai-9.
Copy to All District Collectors.
Copy to the Commissioner, Corporation of Chennai, Chennai
Copy to the Engineering Director, TWAD Board, Chepauk, Chennai-5.
Copy to the Chief Engineer (Civil Design), TNEB, Anna Salai, Chennai-2.
Copy to the Chief Engineer, Tami! Nadu Housing Board, Nandanam, Chennai-35.
Copy to Chief Engineer (Civil Design), Tamil Nadu Slum Clearance Board, Chennai.
Copy to the Chief Engineer, PWD, Technical Education Circle, Guindy, Chennai-25.
Copy to the Chief Engineer, PWD, Fishing Harbour Project Circle, DMS Compound,
Chennai-6.
Copy to the Chief Engineer, Tamil Nadu State Police Housing Corporation, Chennai
Copy to the Joint Chief Engineer (General), PWD, Chennai-S.
Copy to the Joint Chief Engineer (Buildings), PWD, Chennai-5.
Copy to the Joint Chief Engineer (Irrigation), PWD, Chennai-5.
Copy to the Superintending Engineer, PWD, Planning and Designs Circle, Chennai-S.
Copy to the Deputy Chief Engineer (Buildings), PWD, Chennai-S.
Copy to All Executive Engineers, PWD, Building Organisation.
Copy to the Head Draughting Officer, O/o.EIC (B), CE (B) & CE (GL), PWD, CH-5.
Copy to All Assistant Executive Engineers, O/o.EIC (B), CE (B) & CE (GL), PWD, CH-5.
GOVERNMENT OF TAMIL NADU
PUBLIC WORKS DEPARTMENT
OFFICE OF THE ENGINEER-IN-CHIEF (BUILDINGS) &
CHIEF ENGINEER (BUILDINGS), CHENNAI REGION &
CHIEF ENGINEER (GENERAL), PWD., CHEPAUK, CHENNAI-5.
2.0. Consequent on the implementation of Goods & Service Tax (GST), the
Schedule of Rates Committee have decided to separate out the taxes, such as, Excise
Duty, TNVAT and all other taxes included in the Cost of Cement and to arrive the Basic
Rate.
3.0. Accordingly, the Basic Rate of Cement exclusive of taxes, such as, Excise
Duty, TNVAT & all other taxes and also exclusive of GST approved by the Schedule of
Rates Committee for adoption in the preparation of estimates during the year 2017-
2018 with effect from 21.10.2017 is given below:
4.0. The above Basic Rate is exclusive of all taxes, freight charges, etc., at
Stockyard / Dealer’s Godown. Necessary lead charges (i.e. excluding loading and
unloading charges), as applicable as per conveyance table, may be allowed from the
Stockyard / Dealer's Godown to the site of work, if duly certified by an officer not below
the rank of Assistant Executive Engineer.
5.0. However, in the case, if the source is specified as "Stockyard", the same
shall be decided and approved by the Superintending Engineers concerned.
rr-"*,_$),,
ldings),
Engineer-in-Chief ( Bui
ch i er i o n&
i?i'T ?;!il':j; ?%'l; :,H'ftts"s
ro 6s(-
1. The Engineer-in-Chief, Water Resources Department, Chepauk, Chennai-5.
2. The Director General, Highways Department, 76, Sardar Patel Road, Guindy,
Chen na i-25.
3. The Chief Engineer, WRD, Design Research and Construction Support, Chennai-S.
4. The Deputy Secretary to Government, Finance Department, Secretariat, Chennai-9.
Copy to the Chief Engineer (Buildings), PWD, Trichy Region, Trichy.
Copy to the Chief Engineer (Buildings), PWD, Madurai Region, Madurai.
Copy to All Superintending Engineers of Building Organisation.
Copy to the Secretary to Government, Public Works Department, Secretariat, Chennai-9.
Copy to the Secretary to Government, Municipal Administration and Water Supply
Department, Secretariat, Chennai-9.
Copy to the Secretary to Government, Rural Development and Local Administration,
Secretariat, Chennai-9.
Copy to All District Collectors.
Copy to the Commissioner, Corporation of Chennai, Chennai
Copy to the Engineering Director, TWAD Board, Chepauk, Chennai-5.
Copy to the Chief Engineer (Civil Design), TNEB, Anna Salai, Chennai-2.
Copy to the Chief Engineer, Tami! Nadu Housing Board, Nandanam, Chennai-35.
Copy to Chief Engineer (Civil Design), Tamil Nadu Slum Clearance Board, Chennai.
Copy to the Chief Engineer, PWD, Technical Education Circle, Guindy, Chennai-25.
Copy to the Chief Engineer, PWD, Fishing Harbour Project Circle, DMS Compound,
Chennai-6.
Copy to the Chief Engineer, Tamil Nadu State Police Housing Corporation, Chennai
Copy to the Joint Chief Engineer (General), PWD, Chennai-S.
Copy to the Joint Chief Engineer (Buildings), PWD, Chennai-5.
Copy to the Joint Chief Engineer (Irrigation), PWD, Chennai-5.
Copy to the Superintending Engineer, PWD, Planning and Designs Circle, Chennai-S.
Copy to the Deputy Chief Engineer (Buildings), PWD, Chennai-S.
Copy to All Executive Engineers, PWD, Building Organisation.
Copy to the Head Draughting Officer, O/o.EIC (B), CE (B) & CE (GL), PWD, CH-5.
Copy to All Assistant Executive Engineers, O/o.EIC (B), CE (B) & CE (GL), PWD, CH-5.
INDEX
Sl.
Description Page
No.
GENERAL NOTE
For special nature of works, for which rates are not covered in the Schedule of Rates,
such as road works, water supply, drainage, etc., separate schedule of rates issued
Extra percentage other than those for the specified areas noted below, shall not be
allowed.
1. Corporation Limits:
An extra 10% on the Rates of Labour, Rates of Works and for Head Load shall be
(i) Erstwhile Chennai Corporation limits and the belt area of 32 km around erstwhile
Chennai Corporation limits (i.e.) prior to formation of Greater Chennai
Corporation.
(iii) Coimbatore Corporation limits and also for works in Hosur Taluk.
2. An extra 5% on the Rates of Labour, Rates of Works and for Head Load shall be
allowed for the works in Trichy, Salem, Tirunelveli, Tiruppur, Erode, Thoothukudi and
3. Restricted Areas :
(i) An extra 10% on the Rates of Labour and Rates of Works shall be allowed for
(ii) An extra 10% on the Rates of Labour, Rates of Works and Conveyance Charges
(iii) An extra 5% on the Rates of Labour, Rates of Works and Conveyance Charges
Conveyance Charges and Head Load shall be allowed for works in Reserve
Forest Areas.
As the transport facilities in most of the Hilly Areas are now considerably improved and
as there is no necessity for allowing extra percentage as hitherto followed, the Hilly
Areas are now again regrouped as detailed hereunder and the extra percentage
The conveyance table approved and furnished in the schedule of rates under the Head
(i) For works in Nilgiris District an extra 40% on the rates of labour, rates of
work, head load and an extra 25% on the rates of materials shall be allowed.
(ii) For works in Mudumalai Sanctuary, Shandy Nallah Sheep Farm, Dansandle
areas, an extra 40% over rates of labour, rates of work and head load and an
(iii) For works in Valparai Area an extra 40% on the rates of labour, rates of work,
head load and an extra 25% on the rates of materials shall be allowed.
on the Rates of Labour, Rates of Materials, Rates of Works and Head Load shall
be allowed.
Tirunelveli & Kanyakumari Districts an extra 20% on the Rates of Labour, Rates
2
(vi) (a) An extra 50% on the Rates of Labour for works in Thekkady shall
be allowed.
(b) Add 25% extra shall be allowable on the Rates of Materials which
(vii) An extra 60% shall be allowable on the Rates of Materials to be supplied for
Periyar Dam Site subject to the condition that there shall not be any extra on
applicable for Ghat Road, Cart Track, etc., as per schedule of rates is only
applicable.
(viii) An extra 100% on the Rates of Labour for works in Periyar Dam Site under
(ix) An extra 150% on the Rates of Labour for works in Periyar Dam Site under
(x) An extra 50% on the Rates of Labour, Rates of Materials, Rate of Works and
Head Load shall be allowed for the works at Lower Camp above Kuruvanthu
Bridge, Bodi Hills, Cumbam mettu, Sirumalai, Pachai Kamatchi Hills, Palani Hills,
Panchayat.
(xi) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for the works at
Kodaikanal.
(xii) An extra 25% on the Rates of Labour, Rates of Materials, Rates of Works and
Namakkal District.
3
(xiii) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for works in Kalrayan
Hills, Pachamalai Hills and Kolli Hills in Salem & Namakkal Districts.
(xiv) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for works in Jawadhu
(xv) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for works in Piranmalai
(xvi) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for works in Chitteri Hills,
(xvii) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for works in Kalrayan
(xviii) An extra 40% on the Rates of Labour, Rates of Works and Head Load and an
extra 25% over the Rates of Materials shall be allowed for works in Pachamalai
NOTE: Since the studies for allowing extra percentage for hilly areas was
worked out in the year 2002-2003, the Committee decided that the
hilly areas for the issue of Schedule of Rates from the next year
2017-2018 onwards.
4
5. ISLANDS in Ramanathapuram District :
An extra 25% on the Rates of Labour, Rates of Works and Head Load
shall be allowed.
Works, Conveyance Charges and Head Load shall be allowed for other
(2) Puleevilaichalli Island, (3) Aalaippar Island, (4) Valimunai Island, (5)
Appa Island, (6) Thalaiyari Island, (7) Valai Island, (8) Mullai Island, (9)
Manoli Island, (10) Minoliputti Island, (11) Nadu Island (12) Nallathannie
Island, (13) Pullivasal Island (14) Poomarichan Island, (15) Muyal Island,
Works, Conveyance Charges and Head Load shall be allowed for Van,
6. TUNNELS:
An extra 15% on the Rates of Labour and Rates of Works shall be allowed for
7. DAM SITES UNDER HANGING CONDITION (Other than Periyar Dam Site):
An extra 75% on the Rates of Labour employed for the items of works, which
may have to be executed by hanging from the top of Dam through slings
(or) rope ladders to work in dizzy height. (This will apply only for
5
8. GENERAL FOOT NOTE:
(i) The rates of labour means the labour rates fixed under the head, Rates of
Labour.
(ii) Rates of Works includes the labour for earthwork, refilling foundation,
dismantling, jungle clearance, head load, etc., also where human labour alone is
involved.
(iii) The percentage increase provided for the materials are applicable only for the
area.
(iv) The percentage increase provided for Rates of Works are allowable only on the
(v) The percentage increase provided for Conveyance Charges are allowable for the
(vi) The extra percentage allowable as specified above shall not be applicable for the
conveyance charges shall be allowed for the items covered under these two
(vii) While adopting source of any materials inside the special tracts viz., Corporation
limits, Reserve Forest Areas, Hilly Areas, Islands, Dam Sites etc., where extra
locally, it is the duty of the officer in charge of the work (not below the rank of
Assistant Executive Engineer), to analyse and confirm whether the finished cost
of such materials / works are higher if the materials are conveyed and brought to
the site from the areas outside the specified area, where such extra percentage
6
(viii) The necessity of inclusion of relevant footnotes in respect of the districts covered
under their region other than the general notes furnished above, if any, may be
Engineer (Buildings), Chennai Region & Chief Engineer (General), PWD, Chennai
(ix) As per Notification No.3112017- Central Tax(Rate) dated 13th October, 2Ot7 the
concessional rate of GST at t2o/o ICGST at 60lo* SGST at 60lo] is leviable for any
The contractor is eligible to get refund of excess tax paid over or liable to pay tax
(x) Further, for Works Contract services involving predominantly earth works (that is,
constituting more than 75olo of the value of the works contract) supplied to
No.31/2017 - Central Tax (Rate) dated 13th October, 2077. Therefore, for such
r-L.e,*-t rt,,
Engineer-in-Chief (eufl dings),
Chief Engineer (Buildings), Chennai Region &
Chief Engineer (General), PWD
%1"
7
STATEMENT SHOWING THE EXTRA PERCENTAGE ALLOWABLE
AS PER GENERAL NOTE TO REVISED SCHEDULE OF RATES FOR THE YEAR 2017-2018
(with effect from 21.10.2017)
Percentage extra allowable on
Rate of
Sl. work
Area
No. (where Head
Labour Material Conveyance
human load
labour
involved)
3 Restricted Areas
iv For works in Reserve Forest Areas 20% 20% 20% 20% 20%
4 Hills
Page 8
Percentage extra allowable on
Rate of
Sl. work
Area
No. (where Head
Labour Material Conveyance
human load
labour
involved)
x For works at Lower Camp above Kuruvanthu 50% 50% 50% - 50%
Bridge, Bodi Hills, Cumbam Mettu, Sirumalai,
Pachai Kamatchi Hills, Palani Hills,
Tiruparankundram Hills, Irdumban Hills,
Megamalai Panchayat and Thummakundu
Panchayat
xii For works at Yercaud Hills, Yercaud Sub- 25% 25% 25% - 25%
Taluk, Boothamalai, Aranuthumalai,
Sarugumalai and Tiruchengodu Hills in Salem
and Namakkal Districts
xiii For works at Kalrayan Hills, Pachamalai Hills, 40% 25% 40% - 40%
Kolli Hills in Salem and Namakkal Districts
xiv For works at Jawadhu Hills, Elagiri Hills, 40% 25% 40% - 40%
Kalrayan Hills, Nakkanamalai Hills,
Naickenneri Hills in Tiruvannamalai and
Vellore Districts
xvi For works at Chitheri Hills, Sittiling in Kalrayan 40% 25% 40% - 40%
Hills in Dharmapuri District
xvii For works at Kalrayan Hills in Cuddalore and 40% 25% 40% - 40%
Villupuram Districts
xviii For works at Pachamalai Hils in Trichy, Karur 40% 25% 40% - 40%
and Perambalur Districts
5 Islands
ii For works in other Islands, viz. Upputhannie, 125% 125% 125% 125% 125%
Puleevilaichalli, Alaiappar, Valimunai, Appa,
Thalaiyari, Valai, Mullai, Manoli, Minidiputti,
Nadu, Nallathannie, Pullivasal, Poomarichan,
Muyal, Singala, Kuruseedar Islands in
Ramanathapuram District
Page 9
Percentage extra allowable on
Rate of
sl.
Area
work
No. (where Head
Labour Material Conveyance
human !oad
labour
involved )
iii For works in Van, Kasuvar, Karaichalli and 725o/o \250/o L25o/o L25o/o l25o/o
Vilankurichi Islands in Thoothukudi District
6 Tunnels
i-1" 6-,?.-^^/tiYl
tu)Lto-[t )
Engineer-in-Chief ( Buildings),
Chief Engineer (Buildings), Chennai Region &
Chief Engineer (General), PWD, Chennai-5
rsl,.a)
ru./
U4X
Page 1O
ANNEXURE-I
RATES OF LABOUR
Page 11
Basic Rate approved for
Sl. Sch. Item
Description of Labour Unit the year 2017-2018
No. No.
(w.e.f. 21.10.2017)
Page 12
Basic Rate approved for
Sl. Sch. Item
Description of Labour Unit the year 2017-2018
No. No.
(w.e.f. 21.10.2017)
Technical Assistant
Page 13
Basic Rate approved for
sl. Sch. Item Description of Labour Unit the year 2OL7-2OL8
No. No.
(w.e.f. ZL.LO.2OL7)
Electrical Workers
The Basic Rate adopted under this Head, "Annexure-I Rates of Labour" is
Note: exclusive of all taxes and GST.
fk,s.ru^^,$YI.-
-'w- " r.-
73Jta/lr
Engineer-i n-Chief ( Buil"dings),
Chief Engineer (Buildings), Chennai Region &
Chief Engineer (General), PWD, Chennai-5
,:rS -Z
U6
\H/
Page 14
ANNEXURE-II
RATES OF MATERIALS
Sch. Basic Rate approved for
Sl.
Item Description of Materials Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
8 Flat Tiles
10 Brick Jelly
11 Pressed Tiles
12 Pan Tiles
Page 15
Sch. Basic Rate approved for
Sl.
Item Description of Materials Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
37 29a Cut Stone Pillar of size 0.15 x 0.15 x 2.1m Each 145.71
Page 16
Sch. Basic Rate approved for
Sl.
Item Description of Materials Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
47 36 Ashlar Arch Stone Fully Dressed to size all faces cum. 4266.67
48 38 Flooring Stone SS Size (Not less than 10cm thick) sqm. 312.38
51 40 Stone Slab for Culvert (3 faces two line dressed) cum. 4533.33
Page 17
Sch. Basic Rate approved for
Sl.
Item Description of Materials Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
82 49 b Quartz metal
Page 18
Sch. Basic Rate approved for
Sl.
Item Description of Materials Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
C. Lime
102 67 Freshly Slaked & Screened Burnt Lime Stone cum. 901.90
TW Scantlings
104 71 cum. 111091.70
(over 3m for joist and rafters) - Malabar
TW Scantlings
105 72 cum. 109257.64
(for Tiebeams and principal rafters) - Malabar
TW Scantlings
106 73 cum. 106375.55
(over 2m & below 3m in length) - Malabar
108 75 (i) TW Planks (over 45cm wide & 12mm thick) cum. 117292.58
110 iii TW Planks (30-45cm wide & 12-25mm thick) cum. 101921.40
114 vii TW Planks (15-30cm wide & 25-40mm thick) cum. 88733.62
115 viii TW Planks (upto 15cm wide & 12mm thick) cum. 86986.90
116 ix TW Planks (upto 15cm wide & 12-25mm thick) cum. 86986.90
Page 19
Sch. Basic Rate approved for
Sl.
Item Description of Materials Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
117 xiii TW Planks (upto 15cm wide & 25-40mm thick) cum. 82183.41
CW Scantling
122 77A cum. 34497.82
for tie beams & principal rafters for trusses
90 Casurina Poles
Page 20
Sch. Basic Rate approved for
sl. Item Description of Materials Unit the year 2OL7'2OLB
No. No. (w.e.f. ?L.LO.2OL7)
90.1 Eucalyptus Poles
142 a 13cm to 15cm dia RM 31 .53
L47 90.2 Eucalyptus Bullies 4cm to 5cm dia and cross ties RM 1 1.53
r,l--a,*fiG-Jp
chi ef Jl;:[:ii *ll'*:']L
n'll1::ru g io n a
Chief "Engineer (General), PWD, Chennai-5
=
Pase21 tr
ANNEXURE-III
RATES OF WORKS
B. Dismantling
11 11A Mud / sun dried brick walls under 3m high cum. 23.77
13 12 Brick / stone masonry in lime mortar walls under 3m high cum. 108.90
19 18 Cut stone slab over culverts upto 3.3m height below GL cum. 553.98
20 19 Cut stone slab over culverts over 3.3m height below GL cum. 577.65
Page 22
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
Flat & pan tiles or Manglore tile over flat tiles, with out
24 24 sqm. 13.21
roof timbers
30 32 Dry stones apron or revetment, stacking within 40m lead cum. 61.74
38 38C One course of pressed tile roof finish in Cement Mortar sqm. 12.12
39 38D One course of terrace bricks roof finish in Cement mortar sqm. 14.11
40 38E Two course of flat tiles roof finish in cement mortar sqm. 14.11
43 39 Hard rock measured in solid including blasting & stacking cum. 409.09
Page 23
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
45 40A Medium rock and dense medium rock requiring blasting cum. 209.28
D. Earth Work
Trimming the bed and the side slope of the bank in all
57 50B soils except hard rock upto a thickness of 7.5 cm and sqm. 9.94
making it ready to receive the concrete
Trimming the bed and the side slope of the bank in all
58 50C soils except hard rock upto a thickness of 7.5 cm to 15 sqm. 12.03
cm and making it ready to receive the concrete
Page 24
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
Page 25
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
Sinking well in hard stiff clay, light black cotton soil, hard
red earth, shales, murram, gravel, stoney earth, and
85 92C earth mixed with small size boulders and hard gravelly cum. 84.00
soil including bailing or pumping charges if necessary
etc., complete - First depth of 2 metres
Page 26
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
STATEMENT II
Add the basic rate for works 1.50m depth and upto 4.5m
96 1 cum. 60.98
depth below ground level
Page 27
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
Add the basic rate for works 4.50m depth and upto 9m
97 2 cum. 122.25
depth below ground level
Add the basic rate for works 1.50m depth and upto
99 1 cum. 40.91
4.50m depth below GL
Add the basic rate for works above 4.50m depth and upto
100 2 cum. 82.10
9.0m depth below GL
H. Concrete Vibrators
I. Plastering
105 319 Clean removal of lime plaster from walls sqm. 3.84
106 320 Clean removal of Cement plaster from walls sqm. 4.17
Page 28
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
115 357 E Removing old paint from iron surface with sand paper sqm. 4.55
L. Miscellaneous
369 B
118 Driving piles up to 15cm dia in river bed RM 14.02
(i)
Brush wood bundles one metre girth and one metre long one
121 375A 2.32
within an initial lead of 1.6 K.M. bundle
Extra for every additional lead of 1.6K.M (for the above one
122 375B 0.28
item) bundle
Page 29
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
Page 30
Sch. Basic Rate approved for
Sl .
Item Description of Works Unit the year 2017-2018
No.
No. (w.e.f. 21.10.2017)
Page 31
Sch. Basic Rate approved for
sl .
Item Description of Works Unit the year 2OL7-2OLB
No.
No. (w.e.f. 21.LO.2OL7)
Labour wrought and put up for Providing teak wood
158 23 sq m. ss3.98
weldmesh screen with frames 3"x3" (0.075m x 0.075m)
P. Breaking Metals
160 50A
Labour charges for breaking 40mm metal from cu m. 21L.17
departmental blasted stones
161 508
Labour charges for breaking 20mm metal from cu m. 315.34
departmental blasted stones
162 50c
Labour charges for breaking 50mm metal from cu m. 125.95
departmental blasted stones
Q. Cement Mortar
168 2 Iron works for trusess and record racks (labour only) Kg 26.52
Note: II""3:il [l*. udor."O under this Head. "Annexure-Ill - Rates of Works" is exclusive of all
11-''6;"1-^f*
\ . D ) ct lvv
*ltp lr:
n-Chief ( Bui lif ings),
Engi neer-i
Chief Engineer (Buildings), Chennai Region &
Chief Engineer (General), PWD, Chennai-5
q*
Page 32
G)
F
EE o a
E U
iEs
E6tr
o
C
C
E
C
o d|n
trr'E
a
F
6f,fi @ @ lo rO \o \o @ \o
o
(J 0)
x
.9
Elltr
lt q
r\.lD
LN a o oc
q,
r{ H EEE LO
(
LO
oi
LN
o;
LN
oi
LO
o; oi
LN
]'.
LO
o;
4F)
q do
A
n- '65
J G oE
LO
o
o (J o '^c tr\
ED
N
I
N
r{
ibq
O*r2
lz
U
o
q)
N tro
a\)
9=
o L\) .-tt -
-.L
F _9 .z
a
(
)xE oo,
N
L
f,
co f
E
-!l
/t2 o
.t; AA
?
o xG' \+b EE
tro
3R '=
>r{ P
L
4F
I.
o
.9 t? :o)
'=(9
EE
PO i8 o E
o
rd .F
6:
t- t{ OL o eO
^l-
o
o:
rF rl a: .C
ro
,Q'
6.tr o.= ;E
Y.3'6
o EN o t-tr trC,l
rFlE
9q ..Ei g @ @
q q q q q q q LO
o =
(,
o
qi
E
o 'FE t,4
oo !v r Ol
d U - UI
o o
J
o E
ej
\-/
!8il
- 6
I'
X t!P
T
.I.
cri
N
@
N 00 r'o no no 00 rn \f,
o
o- 3
o -o
a ;s0g
'= r{ \
r.l
G
llJ o o \) .- :b o)
+)
o
.9
o
!-
(JV
-\t
I P o)
G
d
ut
J <r,E'
tL.-
-iP
q !
o o
tr o
.9
ru
=
l^!-
o
J o QJ !o o
au I{ or o (u
t{ tr tro
E Eo U
c
\-d -o3 a
-C
o
fiH
rF
E3
r.l o co LO
00
U] a; ni !
oE \Ol q LN LN LN q lf) \@ sq o
qJ
m
-dS r()
rr; r; L..; LO rr;
r\J)
LN
rl (/)00 3
o
c
o m
O=
--
t;
00 o
o Eo U
il6
zuJ G
c)
l-
o (U+r
CO
UE
u0) 0)
o
o)
l-
t{-
o
a o
E,!
t!
z(J E '-E .C
U P
o
o
o
c)
.,9 oi o d
a a a a a r'l >@ C
o o o o o
z z z z z
I
ut P
F F
E E a =\-
o00 o)
z
?
:l f o
o o
o o
o oo O E
o o) LO
t-
P
U =
U
o o lrl o
= (o Q) rr o
I
o
(J r{ N
LO
rl N r{ o Eo E
OJ
l-
f
t- O Cr)
x
d OJ .9 -- q-N o
o E_,a o C
IL ciF j) JF)
o
o-{
o- q- JF)
c
o oX Eg +t
orI =
ul
F
3: ,t) @ a
t-
o tl-
o !u E
J-)
do
d i( -c 9. o ! =qo (u
E:i
f 0.) 1-)
U\ tr o) := :E
6 -ll (,)
tr o
-c E hz E .9
l-
o
>8 CC C C
o
o-
(,
C
f,
o
o9 C
o
P
IE
E
$co
9*,
glq t-
o
o
tr
o-
E
c C c) Eg o
!
t-
o
lts
o
T-
H qJ-Y
.U:zu
or---
-d3 .9
o
a
o
E
-o
P
o IP;
l+r (tr
0)
E
C
f
? 6E o)
E (u a
o
a
o J
?_ a lr-
o lc G) o
r-{
E(u
o tr t- I'- c
o bucc
JF)
co o-
*, eo., g 0.)
.l) Io o
o
EL
:z*
oYo) tr =
E o o
o) lo(9
llr v ! !
o
E o tr E o o
t-
I
o
L
co,qE
Vr
#,q6
-E
a
o o
a
a
(n a
c)
a-
O
o lE b o o
o
o
g -=\
- o
tcto
g d.go- tr a
o
t-
OJ
t- ll
U (J rl
l!
lc
I .- .-
o)
c (o
d
o
o-o '-:(o= o o- !-
o 1.,9') (J
6# g t- co
-U)(: oo o .9f, o(J .lF) C 1.9 ,n .= '6
.L
c'r..
r!-Z
,L)
c oi: ,-l o)
C
E() o o
(,
ll
C
c)
6o +) AJ
o
() Ist
lo-c
I
C
o .-
c0
o
o o !
U E l- (u
i,rh
ro o (o
O(J (J (u o .C
dd.a I Fc)
= (J E
=o -o
c0
l*
(J a z l-
LL lFe LL F
o
-:
o2ct Y-{ N 0r) $ lf) r-{ N C,O s:
o ogl
ll
tl:.A PE t-
-(U a
$iEEta aO
o-
(9
:!Eaei @
ro
N
@ oo O) O)
@ q q t
O o o
rr) rr) \o
=l
sl
Pui
oog)
E
c
o d
d o; o; o;
ub
-c a
*;iiEE
.Fo o = >Fr
ci c.i r{ Ot
co cr) 00 orl
cl qt -c
0)
x
o
-Ll lft
.9 'E
6 Eg gtr- orl
ol }
.=u cDtr
Otr
\ 0c
E
() -s :l
o.r o
Es
Oc
Eo
o n- Ul
,g| .-c9.tr0,
o.r
I
C o \ _.E .- c\
cl ? or
I
o -rE (u
l\l
.-
orl
cl
I
E
o EC
(J
.z /--
) of E3
\ S-
-rl u.r VI
c.-
oq)
a (Jr
ol
NI o o o
...l oc')
ol
I
(I,
(J
J
Ex Gae
\(o lr- AA
.t o o (n or ra
q
.-
o x EE o ).- SE
ol
I
q cn ul LN q
cn 0r) -cl o olo \-tr
r{
t{
@
C; @ oi o
d LO rn 00 rn
(JI ()
,.- o pa E& .9
$?
LO'
r{
N .=
ol I
c') o
P
o i(/, a .J-
.L
\'..i E.E
EgliiiEi
I
NI ]C a 'a C \-/
tts ql o o o -c. -P
C
'o
'o t-
!0
o
zl{ o
a
a
'ol
ol o
C
Ol
t-
o
v_
3 !CI
OU
o- co
*tr EE
3 dl :f -C
(J o
o)
E
OC(u .=
!
l.-
!Et '6
tr .=
E
J q,
o. ?{
)a
l- l,
Ps
+rl C
E] o
c'r J (r* o
o
UJ
?fr,2
o q-'
zt{ o
N
5 5t rf) Ol E
r]
.= o
C
E .P- o
P
tu0)
d U rt-,-\A
g?\
o o o E
o r\
t{
I
f!e \o dl
u:! 00 N
rJ)
O)
(o
o
q Ot
t
o o o
o'l cn \00 N E
rJ)
I
o Cf q =
;a
t.= -o
a .C(J"
(J
o o ! 3r r{ N d r; $ \r O)
00
oi
0r) N
o
E o
E l-
o -=
oa o
'=
d NL
(u
:TE-
eS N Ol C :f,
.= o a
!
o
l-
o
CO
o'tr
EO
G)
.r)
o
tr o c'l oo (Jtg
J
'iJ E E =
o
J o
Etr a x ! E o
ro
I--
o
tJI
J t{
E d.
?
P
IZ q) o ?_
a o o-
'5
o ib o
(J
c
E ga;H
L
o g = o Ul .C0)
o o- frE o
tF ]U 0r) o a oT
N t- !.E JF)
ta-
F o $
AH E'
d6- g --E _ E d o :J o
t- q)
lF) 8#
c= m
E o o z o Ex o C
LO
\o $ rn
-\,
-t- I T{ q \
00
00
rl
ol c'o rf) rl t-
-E (J
o o
il? lL o
o al- fiEsiEEte
qiEtPtl
LN
F{ oi \o d LO f\. l-.
N N
cd
N
o -o
E o a LN
o .9
o o) .l-l(.,
o
+)
oo
o-c o
E'I
rG
CL -c
€s a
3E t gE v
=il
ez
UJ
(J
z o
G
E =t- t- ot- CE
a
o
@l, o
(u
o
I
P
G E_,odfi o o o
o o o
:l
t-
t-
o roSo
a d
d (J c o'c
oE o
UJ l-
o -o U -C
z .9
o -*o . f; (J Pt- o
t- x o .E
Ol
xoE
t! =
o
o tr
u qEEFoe o 0) .C -C
o- P
t-
.C, ':E
rn -c
E
I
d
o eEf -fr: $
o
t{
ol
N
Ol
crl
sf
\o o q q q
rJ) rO \o lft
0r)
a s
g N o q-oo
o
t-
c)
P
d
V'=
\L
t-J
O
o) I
(..)
:f
lr d + + O) Ol o; a o :lo x
o 'i rr; 0r)
cr) no o o o t- C)
o tF o
UJ
F ig!iHE -C
c')
t-
(o
(J
=
o x
+)
o
(J
C
o
->
q.)
,-t
F V)
o)
--+t- jtt
=o:u tE6
C
d, (J s o o =
,Y (J do
c'l o o v.;E
C
+l' o ,+)
L',) C
o o
JF) EE g
I
(u
o o ca o N \f, N d Y-{
o
f a U o o -o Tl o= E
E o t- P=
e
? o c
v- (J EEE J
o o c
o .= .g t- JF) '=@
L t{ .r) 1F) q) t- E
P
o G
L
o o o a E
C
o
CI
.elHi
-cXo)
o
P
o-
E P a o o E -> o
ro o a
o
o
tl
x
o o
a c')
o t- x a a.) 6 o
f o_
t-
q-
o =uh o
:!ou
,A-!
L !
N O) o OJ
o U ro 1r CI
(J '9o o.l o,
.= L
P o E o U o C
o C
C
o i;oC o
o
u
c E E E Y -C og t- (I] 2 v-.-
J-) (J
o:fE- d
tr o o E V V Y o U E'r o= >+ o) a.)
-l)
c o L)
'6
G (, L Y o o o @ Ol E .= o 13 o LclO
+) o c tr l-
O N sf @ o .E o €= o _o
iE
tts o o J
o o
.9 T- q ocf
oI o P o (J a (J co
o t, o E o
rl
t,
I I I
o C o -Co l- q) t-r- OE CI
o
(J o
I
o
r{
o o
N $
-o o
J :) =ts z F i6 o
LL
o
TL
_c
l-
o ooc
LL LL-o o F
-:o
o> r{ r{ N o -o U E o $ LN (o rl N cr) sf La) (o
t-
o g?ro a
:.A o o
o)F x
IE
910 o=E
EE.=Qt
L O
.=
ql b6
(J(J
L)
o
o
\o \o @ @ $ IU >.
H ri( X oEZ u1
N \ qN q oo Ot c o).=
C (U o
:.8':;Efo @
La) @ d + .9 o d
#Edg:tt
.= G lt
r,i N N F{ r{ rl .C
U C
o
E+J
o(o
oE
o
,6 -1r|
.e.i
65 g Ptr--
\./
=;rt{
g,
lf-
o a
o
JF)
o co-
:lo E
f E,ltr
qc
N
\o o EA x A 0to
Ol
Ol
t-
(o
U
x co
(oC o tn .- .tr
C,| o9
-E c\
r{
lIn
Era
oo, d -c
(J
OJ
(ts a a
oo
,a ).- Efr
q o o)u (--=..tJ
t\
/e
a I
o +! + P
r{ E
*- o
ol
.=
o
v
=o l-c
(U<u
I
o'= .g=
90.
l iI
N
f-l E o
U; (/) -Cr
(J* AA
o o
c; E e fi ! o
q \o
ro
I
@
F{
(o
q q
sf, ro
o
+)
o
C
g) o
o -c
l- = crt
C=
.E
E
$qt
).-
).tr
gF
F{
ci o
JF)
=
o .=6
'jN ScEsEfE
il N r{
rr; c'o
r{ ! f, -C +-)
o =G) o \e
o Pg g R EP rrlU vP
J r|- G r-z'I .-,
F{
rr)
E
C
o
(J
Ol
o
E
:f
H.9
o'-
o
d $i
G'I E.g
6v
E tG EE =
a
J N
I
.E ,L)
Ol ! c uiU) -o ,(l)
H at >: ro o o o oo
o'c a r-
t
G)
I EE .= o
E
zl{ N
!
o
o f
J
u
E lts
,tF)
b.9o
-c.
o
t- 't.=c EE
t-
.= '6
E!
o
o o iait Ol E
o o u= 1-) lu P E ,').
o
r{
o
N .E
!
C
o a = o
o
o st
E
o
=
rts HEft,$
d r\ I
E:E
= rO $ @ o
a
J J
E
c'l o
.g
E E o
E
EE o E 6*<l
r{
o C) o!z !n
\o ffl t N o'l q @
q x
o o
(J(o
cd
o
(J
()
= o- =
() 38
o N E 'j
LO c";
rl
r-{
r-{ ol @ o a o = o ';= a o
L
J L o9 00
N o Ol o i- E ,rt
o
Jl{
t0d
G
o Et3
'= 'i C,
JF)
o
t- .E -c
p .lF)
o_
a
o
o (o.=
r',eb+,'
;i .I- C
o io z o J
t-
o JF) o
?SH ? o o Ex rr ol- HPE (J
P E -o o .a .C o cE o o ln
Eug t-
o
q- E ,rix H o o o a lf)
o ci=: a
o
f,t
o
ilz ti buI
0.)
to 3 Eg.;6 t =l-
o
P
t-
o a
o Xoro
A-!
r-I
o
d
E'l
IE
ci6 9 -'E - E
o N 6 o q (o N :l o E t- o o) o.
z=e o
t- tf) q cn q tf) \o (J
OJ
o o o
f, o t-
ooEf
cL EEsfEfiEe r.{ d lf) r"; N
r{
d (J o _o (J
E5 b
co
r{ r{ t- o U) o'=-
Uil -c ciEtgr.l
CL t- .r)
o
I5 i t''l gE
I
TE x a) =
o N
o o- o -C ;
.t)
z *, a d:.i=E3 I
t E6EfrE sO o
o
(J
G o
t-.1
N
t-
qJ o
o
t- -C
,iu9 t-
f
x
.9
a o
o
LJ
,L) =t9o o
d o
o IE
o)
Ol
o
o
=
o
l-
xo
qJ
(J
o
"i;3
.> -r'6 -
C
c
lI.
o
r0
-C
u
o C
(u q) E3€
UI o @ o
\ @ N
q
\o Ol -\z
U so o
f,r-|o d
F \r il LO
o
N no C o
G)
C 8PE -oo
d EEiiil 'j
P
l-
G
ct
c.i
rl o; @ N IZ
o
a
U P
JF)
E
t- tf)
o !o a C
t-
C
o Po
(J a ci r-(oP
o (u-c .v.l
I = E $E F5 E'
tr
G E
o
U
l-
o (J
-:z
E o
a t-o llo
l-
UE U
o=o)
o-J C
P
t-
(u
J
a >.E, 'rc
? E a o JF)o= _o ]f,!
+l' tr o P o f, C
o Y \o o o C(oO
EE=
Fr, cn q r{ t q
\f,
t @
N
$
\o
.E t-
o o
C ,L)
q) t-
q-Yc !
^l
-
d o .P
+ror J-)o
8'g
Yi
t{
G rl Ot @ N C o a E -l)o .Y
L E o o-
P o a o -cE =o !o
x E tr- 1r
o a o f
o a
o- o
l-
o
=g
|.l1 f,ol o
CI (J E tEo ru u.! o
.=o Po
L -l)
o C C
U
C 'tr ct, JF)
o
oE
(Jq, e E
:l t- o o .E (U
JF) o'- o
u^co d
trtr N o o E YE E E
Y Y o oJ
>= o ! co o P o- U
g6 I L \l
o O O o o @ oo E f, C :8 tnF
oCI
o= T-
o o Eg
C
o o E
a u U
ta- T- N \f, @ o co(,
o- oI t, (J ooP
o It
I I I
o +, oo) l- 0) oIf,
I
o o oO
I
N \r -o o -c (rl o o .C o
z tL LL I.L F
o o-c(J Fo
tL.C
-:
o2ct r.l N o -o (J E (u N rr) \r LO (o
ANNEXURE-VI
RATES OF OTHER CONSTRUCTION MATERIALS
No extra on cost, conveyance charges shall be allowed for all the items included
Note:
under this category. The rates approved therein are applicable at site of work
Page 36
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
Page 37
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
35 Polishing Stone
46 G.I. Screws
Page 38
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
58 G.I. "J" or "L" Bolts with nuts 6mm Dia Each 3.48
Page 39
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
73 Bolts and Nuts 10mm dia for false ceiling Each 5.10
Page 40
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
85 Teakwood beading
Page 41
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
Solid core Flush shutters with Teak ply on one side and
94 commercial ply on other side with teak wook lipping sqm. 1669.09
alround 35 mm thick
Page 42
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
FRP door Sutter with FRP door frames made out of FRP
Sheets of 3mm thick of over all size 65mm x 50mm
with rebate suitably reinforced using MS Angle / Flats,
97a cost of holdfasts and solid core FRP shutter Panel of sqm. 3113.05
5mm thick and hollow core frames of 3m wall
thickness for styles and rails etc., of sizes specified by
Engineers.
Page 43
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
105 Pin Headed / Fluted / Figured Glass 3mm thick sqm. 190.98
Page 44
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
119 G.I.Specials
A Union
B G.I. Elbow
C G.I. Bend
D G.I. TEE
E G.I. COUPLING
Page 45
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
F G.I. REDUCER
Page 46
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
125 Brass chromium plated shower Rose - 100mm Dia Each 171.57
Page 47
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
Page 48
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
A Plain Bend
Page 49
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
C Plain TEE
G COWL
Page 50
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
158 Colour designed glazed tiles 300 x 200 x 6mm Each 25.81
Page 51
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
164 Special clamp, teak wood plugs and screws Set 19.10
165 PVC clamp, teak wood plugs and screws Set 7.61
168 Manhole Cover 60 x 60cm (heavy duty) with frame Each 1645.80
170 Add for painting / tarring for Hex Nipple Each 2.45
171 Labour charges for fixing cuddapah slab to cup-board sqm 38.75
174 Stain Free Nano Polish Vitrified Tiles 600 x 600 x 8mm sqm. 574.48
175 Double Charged Vitrified Tiles 600 x 600 x 8mm sqm. 776.32
176 Double Charged Vitrified Tiles 800 x 800 x 10mm sqm. 931.59
Page 52
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
178 Supplying and fixing in position White / Colour Glazed Model Each 4269.77
Floor Mounted European Water Closet of best quality and
approved make with 100mm “P” or “S” trap connecting with
CI pipe of 100mm dia / PVC pipe of 110mm dia, double
flapped rigid PVC black seat and seat cover with CP brass
hinges including cost of white cement, cement for packing,
spun yarn, teak wood plugs, brass screws, etc., including
supplying and fixing 10 litres capacity PVC / 12.5 litres
capacity porcelin low level flushing tank with a pair of CI
brackets, etc., complete with all fittings, such as, 15mm
brass ball valve with polythene float with brass handle, union
coupling connected by means of 40mm white PVC flush hand
using indian adopter joint including all internal fittings, such
as, 15mm bras connections, 15mm GM wheel valve, 15mm
brass nipple (2 Nos.), 15mm nylon connection, TW plugs,
screws and also giving necessary connection to the PVC pipe
and painting the CI brackets with 2 coats of approved paint
over one coat of red oxide primer, dismantling the masonry
and re-doing the dismantled masonry to original condition,
etc., complete complying with standard specifications. (The
EWC and flushing tank with all accessories should be got
approved by the Executive Engineer before use on works)
Floor Fitting
179 Supplying and fixing in position White / Colour Special Delux Each 4657.93
Model Glazed Cascade Type Parryware / Hindware /
Equivalent Wall Mounted European Water Closet of best
quality and approved make with 100mm “P” or “S” trap
connecting with CI pipe of 100mm dia / PVC pipe of 110mm
dia, double flapped rigid PVC black seat and seat cover with
CP brass hinges including cost of white cement, cement for
packing, spun yarn, teak wood plugs, brass screws, etc.,
including supplying and fixing 10 litres capacity PVC / 12.5
litres capacity porcelin low level flushing tank with a pair of
CI brackets, etc., complete with all fittings, such as, 15mm
brass ball valve with polythene float with brass handle, union
coupling connected by means of 40mm white PVC flush hand
using indian adopter joint including all internal fittings, such
as, 15mm bras connections, 15mm GM wheel valve, 15mm
brass nipple (2 Nos.), 15mm nylon connection, TW plugs,
screws and also giving necessary connection to the PVC pipe
and painting the CI brackets with 2 coats of approved paint
over one coat of red oxide primer, dismantling the masonry
and re-doing the dismantled masonry to original condition,
etc., complete complying with standard specifications. (The
EWC and flushing tank with all accessories should be got
approved by the Executive Engineer before use on works)
with 10 litres capacity flushing tank with all internal dual
flush fittings with normal seat cover
Wall Fitting
Page 53
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
181 Manufacturing, Supplying and Fixing of Stainless Steel Hand sqm. 4657.93
rails for staircase using 50mm dia 304L Grade Stainless Steel
pipe of 1.60mm thick at required locations to a height of
900mm from finished floor level welded to 38mm dia
Stainless Steel pipe post of 1.00mm thick as vertical at
900mm centre with 2 Nos. of 25mm dia intermediate
horizontal stainless steel pipe of 1.60mm thick in between.
The vertical pipe has to be welded to the 100 X 100 X 6mm
MS base plate encased in the base concrete. The rate is
inclusive of the charges for cutting, bending, welding,
grinding, polishing, conveyance, electrical charges, etc.
complete
Page 54
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
188 Designing the Semi Unitised Structural Glazing System with sqm. 4269.77
open groove joint as per design intent, preparation of shop
drawings for approval, supply, fabricate, erect as per
approved shop drawings at all floor levels and all floor
heights including conducting field test as per the test criteria
set out in the particular specification (Metholodgy should be
got approved by the Dept. Officials.) Design the framing
system (i.e. male & Female frame) to support vision panels,
spandrel panels either with glass or aluminium composite
panel, openable, window panels on a continuous framing
supported between floors. Also design the split framing
unutilized glazing system in case of strip or punched windows
with vision panel proposed with either insulated / Monolithic
glass, groove width in the system both in horizontal and
vertical shall not be more than 20mm. Glazing of panel shall
be done only at factory at the controlled atmosphere
Page 55
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
Page 56
Basic Rate approved for
Sl.
Name of Material Unit the year 2017-2018
No.
(w.e.f. 21.10.2017)
Page 57
Basic Rate approved for the year
2017-2018 (w.e.f. 21.10.2017)
Sl.
Description of Materials Unit WORKING PRESSURE
No.
1 PVC Pipes
A Coupler
B Elbow
Page 58
Basic Rate approved for the year
2017-2018 (w.e.f. 21.10.2017)
Sl.
Description of Materials Unit WORKING PRESSURE
No.
C Bend
D Tee
E End Cap
F Reducer
Page 59
Basic Rate approved for the year
2017-2018 (w.e.f. 21.10.2017)
Sl.
Description of Materials Unit WORKING PRESSURE
No.
G Reducer Tee
H Reducer Elbow
I Jet Nipple
Page 60
Basic Rate approved for
the year 2017-2018
Sl. (w.e.f. 21.10.2017)
Description of Materials Unit
No.
"O" Ring
By pasting
Jointing
A Elbow
B Door Elbow
C Tee
F Bend
Page 61
Basic Rate approved for
the year 2017-2018
Sl. (w.e.f. 21.10.2017)
Description of Materials Unit
No.
"O" Ring
By pasting
Jointing
G "Y"
L Reducer
Page 62
Basic Rate approved for
the year 2017-2018
Sl. (w.e.f. 21.10.2017)
Description of Materials Unit
No.
"O" Ring
By pasting
Jointing
M Shoe
N Vent Cowl
Page 63
Basic Rate approved for
the year 2017-2018
Sl. (w.e.f. 21.10.2017)
Description of Materials Unit
No.
"O" Ring
By pasting
Jointing
OTHER ITEMS :
203 PVC screw down tap heavy type 20mm dia Each 72.13
204 PVC screw down tap heavy type 15mm dia Each 55.79
Page 64
Basic Rate approved for
the year 2Ol7-2OLg
sl. Description of Materials Unit (w.e,f. 21.10.2OL7)
No.
"O" Ring By pasting
Jointing
e 40mm Dia RM 141.38
rk'r**,) ,,
Engineer-in-Chief (8fu ildings),
Chief Engineer (Buildings), Chennai Region &
Chief Engineer (General), PWD, Chennai-5
#\!
rd
Page 65
ANNEXURE-VII
No extra on cost, conveyance charges shall be allowed for all the items included
Note:
under this category. The rates approved therein are applicable at site of work.
I PART "A"
Page 66
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Page 67
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
l Orion Retro 45-1 x 45W 4U Retro CFL B22 Street Light Each 869.48 695.58
m Orion Nova CFL - 1 x 85W CFL E27 Street Light Each 1412.91 1130.33
n Orion Nova CFL 1 x 85W CFL B22 Street Light Each 1412.91 1130.33
q Crypton DD Series for T5 1 x 24W FTL T5 Street Light Each 1521.59 1217.27
r Crypton DD Series for T5 2 x 14W FTL T5 Street Light Each 1684.62 1347.70
s Crypton DD Series for T5 2 x 24W FTL T5 Street Light Each 1766.13 1412.91
Page 68
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Higher End
Lower End
Philips /
15 LED INDOOR FITTINGS (LIGHT EMITTING DIODE) Orbit /
Havells /
Equivalent
Equivalent
b 18W LED 3000K Square Type Recessed Fitting Each 1301.16 858.41
c 18W LED 3000K Round Type Recessed Fitting Each 1182.65 931.22
Higher End
16 LED OUTDOOR FITTINGS (LIGHT EMITTING DIODE) Philips / Havells /
Equivalent
Lower End
17 LED OUTDOOR FITTINGS (LIGHT EMITTING DIODE)
Orbit / Equivalent
Page 69
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
26 CALL BELLS
Page 70
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
II PART "B"
2 EXHAUST FANS
Page 71
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Higher End
Havells / Lower End
4 CEILING FAN Crompton / Almonard/
Usha / Equivalent
Equivalent
1 SWITCHES
100 Amps TPN Switch with HRC Fuses Sheet Steel Double
a Each 5294.52
Break
125 Amps TPN Switch with HRC Fuses Sheet Steel Double
b Each 5799.13
Break
200 Amps TPN Switch with HRC Fuses Sheet Steel Double
c Each 7491.51
Break
315 Amps TPN Switch with HRC Fuses Sheet Steel Double
d Each 10635.61
Break
400 Amps TPN Switch with HRC Fuses Sheet Steel Double
e Each 13694.32
Break
Page 72
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
i 100 Amps Metal Clad Switch with Re-wirable Fuse Units Each 5084.91
j 200 Amps Metal Clad Switch with Re-wirable Fuse Units Each 7716.64
Page 73
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
a 4 Way TPDB 16A / Way with Fuse & Neutral Link Each 1649.68
b 6 Way TPDB 16A / Way with Fuse & Neutral Link Each 2259.10
c 8 Way TPDB 16A / Way with Fuse & Neutral Link Each 2732.65
d 4 Way TPDB 32A / Way with Fuse & Neutral Link Each 2088.31
e 6 Way TPDB 32A / Way with Fuse & Neutral Link Each 2787.00
f 8 Way TPDB 32A / Way with Fuse & Neutral Link Each 3524.50
g 4 Way TPDB 63A / Way with Fuse & Neutral Link Each 4875.30
h 6 Way TPDB 63A / Way with Fuse & Neutral Link Each 6272.68
a 16 Amps Three Phase 500V 4 Pole Change Over Switch Each 1133.43
b 32 Amps Three Phase 500V 4 Pole Change Over Switch Each 1343.04
c 63 Amps Three Phase 500V 4 Pole Change Over Switch Each 2934.50
d 100 Amps Three Phase 500V 4 Pole Change Over Switch Each 4665.70
e 200 Amps Three Phase 500V 4 Pole Change Over Switch Each 8772.44
Page 74
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
1 Switches 6A - 230V
11 PUSH BUTTONS
Page 75
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
12 MOTOR STARTER
g Flush Box - 12/16 (2 row x 6) Module Metal Box Each 135.08 97.04
Page 76
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
IV PART "D"
b 5 Amps / 15 Amps 3 Pin Flush Type Wall Socket only Each 49.30
Page 77
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
V PART "E"
Page 78
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
3 CONDUCTOR
4 CABLE GLANDS
f Cable Gland suitable for 31/2 core 25 sq.mm. UG Cable Each 43.85
g Cable Gland suitable for 31/2 core 35 sq.mm. UG Cable Each 55.70
h Cable Gland suitable for 31/2 core 50 sq.mm. UG Cable Each 55.70
I Cable Gland suitable for 31/2 core 70 sq.mm. UG Cable Each 68.66
j Cable Gland suitable for 31/2 core 95 sq.mm. UG Cable Each 83.72
k Cable Gland suitable for 31/2 core 120 sq.mm. UG Cable Each 106.58
Page 79
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
l Cable Gland suitable for 31/2 core 150 sq.mm. UG Cable Each 140.28
m Cable Gland suitable for 31/2 core 185 sq.mm. UG Cable Each 165.93
n Cable Gland suitable for 31/2 core 240 sq.mm. UG Cable Each 165.93
o Cable Gland suitable for 31/2 core 300 sq.mm. UG Cable Each 198.10
p Cable Gland suitable for 31/2 core 400 sq.mm. UG Cable Each 282.75
q Cable Gland suitable for 31/2 core 500 sq.mm. UG Cable Each 329.31
VI PART "F"
1 MS ANGLES
Page 80
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
2 ALUMINIUM FLAT
3 COPPER FLAT
4 POWER CAPACITOR
Page 81
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
IX PART "I"
3 PVC COUPLES
Page 82
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
4 PVC TEES
5 PVC SADDLES
Roll /
a PVC Insulation Tape (19mm) 12.96
10 mtr.
Roll /
b Empire Tape (12mm) 17.39
10 mtr.
Roll /
c Empire Tape (19mm) 20.88
10 mtr.
Page 83
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
X PART "J"
1000
e TW Plugs 11/2" x 1" x 2" 269.38
Nos.
100
f TW Round blocks 522.46
Nos.
XI PART "K"
Page 84
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Each
a Cable Route Indicator for LT Cable 60.94
Box
Each
b Cable Route Indicator for HT Cable 60.94
Box
XII PART "L"
1 BRASS SCREWS
3 CONDUIT SADDLES
Page 85
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
SODIUM VAPOUR LAMP FITTING SINGLE PIECE DIE CAST
ALUMINIUM HOUSING AND LAMP FOR HEAVY TRAFFIC
5
ROADS (PHILIPS / CROMPTON GREAVES / WIPRO /
BAJAJ / EQUIVALENT)
All other
Legrand
makes with
(MDS) /
PLUG AND SOCKETS IN SHEET STEEL ENCLOSURE ISI (Std.) /
7 Hager
WITHOUT MCBs HPL /
(L&T) /
Havell's /
Equivalent
Equivalent)
Page 86
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
8 RCCB / ELCB
10 HRC - FUSES
All other
Legrand
makes with
(MDS) /
ISI (Std.) /
11 MCB ISOLATORS Hager
HPL /
(L&T) /
Havell's /
Equivalent
Equivalent)
Page 87
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 1513.83 947.11
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
6 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 1878.70 1195.54
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c Each 2235.81 1443.96
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
d Each 3345.95 1979.62
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 2057.25 1630.28
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
6 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 2538.57 2065.02
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18
Page 88
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c Each 3043.18 2530.81
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
d Each 4494.91 3431.34
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 2398.84 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
6 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 2942.26 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c Each 3508.98 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
d Each 5348.86 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 5806.89 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
6 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 6986.90 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c Each 7639.01 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
d Each 10557.98 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
Page 89
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
VERTICAL THREE PHASE DISTRIBUTION BOARD WITH
MCBS
4 way / 8 way / 12 way vertical TPMCB sheet steel
All other
distribution boards flush type / surface type fitted with Legrand
makes with
bus bars and neutral links with single / three phase MCB (MDS) /
ISI (Std.) /
13 outgoings and separate 4 way provision for Hager
HPL /
accommodating One No. 4 pole incoming MCB / Isolator (L&T) /
Havell's /
and another separate 4 way provision for accommodating Equivalent
Equivalent)
One No. 4 pole ELCB / RCD with label holder and
provisions for taking up cable for size not less than 35
sq.mm.
1 Module Type with IP 20 Protection
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 4238.72 3082.00
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 5240.17 4130.03
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c Each 7623.48 5022.80
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 4921.88 4044.64
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 6233.87 4976.23
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB/Isolatore - 4
c Each 8306.65 6117.42
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 5938.86 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 7561.38 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
Page 90
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
12 ways 3 phase DB
No. of ways incomer MCB/Isolatore - 4
c Each 10053.37 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a Each 9183.89 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b Each 11085.88 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c Each 14882.10 --
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a No. of ways incomer ELCB / RCD - 4 Each 4572.54 --
No. of sub-incomers - 12
No. of outgoings ways - 12
6 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b No. of ways incomer ELCB / RCD - 4 Each 4906.36 --
No. of sub-incomers - 12
No. of outgoings ways - 18
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c No. of ways incomer ELCB / RCD - 4 Each 5209.12 --
No. of sub-incomers - 12
No. of outgoings ways - 24
Page 91
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
d No. of ways incomer ELCB / RCD - 4 Each 6008.73 --
No. of sub-incomers - 12
No. of outgoings ways - 36
4 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
a No. of ways incomer ELCB / RCD - 4 Each 4828.72 --
No. of sub-incomers - 12
No. of outgoings ways - 12
6 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
b No. of ways incomer ELCB / RCD - 4 Each 5457.54 --
No. of sub-incomers - 12
No. of outgoings ways - 18
8 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
c No. of ways incomer ELCB / RCD - 4 Each 6094.13 --
No. of sub-incomers - 12
No. of outgoings ways - 24
12 ways 3 phase DB
No. of ways incomer MCB / Isolator - 4
d No. of ways incomer ELCB / RCD - 4 Each 7755.46 --
No. of sub-incomers - 12
No. of outgoings ways - 36
Page 92
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Page 93
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
CREL / Rowsons /
1 TRANSFORMERS
(OEM)
Megawin/Pentagon/
2 11 KV INDOOR VACCUM CIRCUIT BREAKER
(OEM)
Megawin/Pentagon/
3 11 KV OUTDOOR VACCUM CIRCUIT BREAKER
(OEM)
Page 94
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Megawin / Voltech /
4 11 KV INDOOR RING MAIN GEAR (RMG)
(OEM)
Megawin / Voltech /
5 11 KV OUTDOOR RING MAIN GEAR (RMG)
(OEM)
Raychem RPG /
7 CABLES, ACCESSORIES AND KITS
Equivalent
Page 95
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Kirloskar /
3 GENERATORS Ashok Leyland /
Equivalent
Page 96
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Page 97
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
XV PART "O"
7.50 Metre Length Single Bracket Pole with Base Plate (250
x 250 x 6mm)
g 114.30mm OD x 5.40mm Thick x 4500mm Length, 88.90mm Each 10488.89
OD x 4.85mm Thick x 1500mm Length, 76.1mm OD x
3.25mm Thick x 1500mm Length
7.50 Metre Length Double Bracket Pole with Base Plate (250
x 250 x 6mm)
h 114.30mm OD x 5.40mm Thick x 4500mm Length, 88.90mm Each 11584.34
OD x 4.85mm Thick x 1500mm Length, 76.10mm OD x
3.25mm Thick x 1500mm Length
Page 98
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Page 99
Basic Rate approved
Item No. Details Per for the year 2017-18
(w.e.f. 21.10.2017)
Page 100
Basic Rate approved
Item No. Details Per for the year ?OL7-LB
(w.e.f. 21.10.2OL7)
c MOUNTING STRUCTURE
Supply of Standard / Special Mounting Structure of height Each 1863 L.73
4.5 mts. pipe, and 300 x 300 x Bmm MS plate, 3 mts.
48mm OD class C GI outer pipe,1.B mtr,3Bmm OD inner
pipe, for roof mounting on concrete base and with FRP
adapter
d DOWN CONDUCTOR
Supply and run of 25mm x 6mm GI Flat Down Condutor Mtr 108.69
with necessary clamps / supports on wall / floor / ground
for earth connection
e TEST LINK
Supply of Test Link Box for each Down conductor in order Each 4580.30
to disconnect the earth termination system to enable
measurement of resistance
f EARTH ELECTRODE
Supply and insallation maintenance free GI Earthing Each 8461.91
System comprising of 50mm dia and 2 mtr. long earth
electrode of low carbon steel rod with 100 micron
bonding and 25 kgs. of carbon based environment friendly
backfill compound and suitable clamp
I SURDGE PROTECTION
Supply and insallation Cabinet Type Class 1 and 2 Each L7777 .78
Combined Model SPD to arrest surges and overvoltages in
the power line due to lighning switching action etc. they
must be installed in the incoming MCC panel / DB of the
respective buling in parallel to the power circuit.
Model: PSV4-L2.5/4O0TT (3 phase power network)
Note: The Basic Rate adopted under this Head, "Annexure-Vll - Rates of Electrical Items of Works"
is exclusive of all taxes and GST.
fl- ^ ,4\^'-,
-
f:{.,..
a-t,, )i-'
Engineer-i n-Chief ( Buildi n9s),
Chief Engineer (Buildings), Chennai Region &
Chief Engineer (General), PWD, Chennai-5
X9oo
t-r u.,
Page 1O1