OBJETIVOS
Potencia de la bomba
Eficiencia de la bomba
P 28.687
B = B = * 100 7.753 %
PB 370
Presión atmosférica
(1.2 altitud lugar) (1.2 * 1735)
Patm = 10.33 - Patm = 10.33 - 8.248 m
1000 1000
Velocidad máxima
Q max 0.0005
V V 0.6217 m/s
* D2 * 0.0322
4 4
Perdidas locales
V2 0.62172
hl = K * hl = 0.95 * 0.0187
2g 19.6
VD 0.6217 * 0.032
Re = Re = 19894.4
0.000001
1 2.51 1 0.0000015 2.51
2 log 2 log
f 3.71D Re f f 3.71* 0.032 19894.4 f
LV 2 0.56 * 0.62172
hf = f * hf = 0.01508 * 0.0052 m
D2g 0.032 * 19.6
V2
NPSHD = hatm HEs - hps - hvl -
2g
NPSHD = 8.248 0.374 - (0.0052 0.0187) - 0.2339 - 0.0197 8.3445 m
Bomba 1
P 45.97
B = B = * 100 12.42 %
PB 370
Bomba 1
P 30.79
B = B = * 100 8.32 %
PB 370
CONCLUSIONES