CONCRETE COLUMNS AND PIERS REINFORCED TIES FOR CONCRETE COLUMNS, WALLS, BORED
OPTION: DOWELS TO TC-COL-01 TC-COL-02 COLUMN AND PIER CAST INTEGRALLY WITH WALL TC-COL-21 PROVISION FOR FUTURE CONCRETE COLUMN OR WALL TC-COL-31
MATCH VERTICALS U/N
AS COLUMNS CONCRETE PILES AND PIERS REINFORCED AS COLUMNS
167
100 (4") AT
AT SLAB
BEAMS
75 (3")
CLASS 'B' LAP "D" COLUMN (PIER), SEE PLAN OR SCHEDULE CL
128
"D" 048
"D"
048
75 (3")
862
H ℓd REINFORCING THROUGH; DRAPE ALTERNATIVE: FUTURE DOWELS H
"D"
"D"
CONSULTANT - SUB CONSULTANT:
048
048
BEHIND COLUMN (PIER) VERTICALS DISCONTINUE WALL REINFORCING
IF INTERFERING AND ADD MATCHING BARS (WITH
6712
TENSION COUPLERS
S/2 MAX
081
MAX 50 (2")
BOTTOM STEEL OR CLASS 'B' LAP EACH SIDE) THROUGH (SEE SPECIFICATIONS)
DRAPE
OR BEHIND COLUMN (PIER) CAGE TOP OF
564
MAX. S/2
WHENEVER SLAB OPENINGS EXIST ADJACENT
5603
4 BARS 6 BARS 8 BARS
FOR AEC)
TO COLUMNS, CARRY TIES THROUGH THE LOCATE CONSTRUCTION JOINT IN
(ZERO
25(1")
SLAB THICKNESS AS SHOWN FOR PERIMETER COLUMN 25 (1") BELOW SLAB / DROP / CAP.
CLASS
'B' LAP
COLUMNS EXCEPT FOR ARCHITECTURALLY EXPOSED
385
DROP (IF APPLICABLE) CORNER COLUMN "D"
9482
71
SEE TC-COL-01 FOR
a
289
TO BE AT U/S OF SLAB / DROP / CAP ADD TIES TO MATCH SIZE REBAR DETAILS AT
NOTED OTHERWISE (REFER TO CONSTRUCTION JOINT CONCRETE SPLICE BARS TO MATCH
DOWELS TO MATCH COLUMN VERTICALS OPTIONAL AND SPACING OF COLUMN TIES; TOPS OF COLUMNS
COLUMN SCHEDULE & NOTES)
"D"
WALL COLUMN / WALL VERTICALS
"D"
STAY FORM
647
(UNLESS OTHERWISE NOTED IN COLUMN
048
COMPRESSION LAP SPLICE
S/2 MAX
OMIT IF a ≤ 100 (4")
2401
CONSULTANT - SUB CONSULTANT:
SPACING) SEE
UNLESS NOTED SCHEDULE) FOR ALL BARS IN HATCHED
SCHEDULE
EXTERNAL PVC
AREAS EQ EQ
S (TIE
OTHERWISE (REFER TO WATERSTOP AT
243
06 048
167
6 SLOPE COLUMN SCHEDULE & BASEMENT WALLS
EQ EQ
350
75 (3") TO
NOTE:
PORTION
06
SLOPED
TOP OF
243
IF DIFFERENT CONCRETE MIXES ARE SPECIFIED FOR COLUMN (PIER) AND WALL, USE CONCRETE
06
10 BARS 12 BARS 12 BARS
DEC 2016
DEC 2016
OF HIGHER STRENGTH AND MORE STRINGENT EXPOSURE CLASSIFICATION FOR BOTH.
SLOPED PORTION
75 (3") TO TOP OF
≤S ALTERNATIVELY, PROVIDE STAY FORM AND POUR COLUMN AND WALL SEPARATELY.
105
≤S BOTTOM STEEL "D"
473
S/2 MAX
FOR AEC)
208
(ZERO
25(1")
≤S PERIMETER
74
REDUCED SIZE TIE
FOR AEC)
COLUMN
G PROVISION FOR FUTURE STEEL COLUMN CONCRETE COLUMN AND WALL PROTECTION G
(ZERO
25(1")
70
≤S EQ EQ
901
"D"
U/N OTHERWISE, PROVIDE MIN. THREE TIES AT 75
74
TC-COL-32 TC-COL-41 CONSULTANT - SUB CONSULTANT:
140
06 06
71
CONSTRUCTION JOINT SLOPED PORTION STARTS MIN. 50 (2") ABOVE U/S
S (TIE SPACING)
SEE SCHEDULE
UNLESS NOTED OTHERWISE FUTURE STEEL COLUMN DRAINAGE CONCRETE COLUMN ADDITIONAL SLOPE
IF COLUMN FACE OFFSET IS 75 (3") OR MORE CONSTRUCTION JOINT PERIMETER OR WALL CONCRETE
(REFER TO COLUMN (POURED FOR DRAINAGE
USE DOWEL SPLICE. CARRY ALL VERTICALS INTO COLUMN COLUMN OR WALL
SCHEDULE & NOTES) 12 (1/2")Ø VENT HOLE MONOLITICALLY
UPPER COLUMN WHERE POSSIBLE U/N OTHERWISE, PROVIDE MIN. 14 BARS IN CENTRE OF PLATE WITH SLAB)
SEALER ON ALL
SEALER ON ALL
SLOPED PORTION
75 (3") TO TOP OF
30 (1 1/4")
052
14 BARS
06
SURFACES
385
MAX. S/2
COLUMN ABOVE OR BELOW,
26
MAX 75 (3")
732
(TYP)
30 (1 1/4")
MEMBRANE
052
TOP OF GRADE
192
X X (TYP) REFER TO
LENGTH + 75 (3")
75(3") 743
08 08
TYP
(6")
762
DRAWINGS
25
702
"D"
"D"
048 048
TIE SPACING IN
COLUMN FACE OFFSET
STANDARD HOOK OR REGLET AND SEALANT EXTEND SEALER TO TOP
TO EXCEED
293
651
8403
IS LESS THAN 75 (3") REFER TO ARCH DWGS OF FOOTING, TOP OF PIER FRAMED
STEEL) TO MATCH NUMBER AND
150 (6")
TIES NOT REQUIRED ONLY OR TOP OF PILE/PILE CAP SLAB
75 (3")
BY BEAMS OR CONTINUOUS TIES AT 75 (3"), JUST BELOW SLOPED PORTION. (6") JOINT LOCATION SEAL:
MAX 75 (3")
IF BEAMS DO NOT EXIST AT ALL FOUR SIDES OF 50 RED
1083
≤S 761
DROPS ON ALL FOUR SIDES 1
COLUMN, PROVIDE TIES AS SHOWN FOR BEAMS MIN AGGE
OCT 2016
DEC 2016
REDUCED SIZE TIES AT PERIMETER COLUMNS BEAM (IF APPLICABLE) 16 BARS ST OUND
BARS NOT CONTINUED IN COLUMN ABOVE AR
"D"
062
CONSTRUCTION JOINT AT UNDERSIDE OF BEAMS "D" "D"
(TYP)
068
"D"
568
"D"
TOP OF FOUNDATION, NARROW COLUMN (OR WALL) ROUND CLIENT:
TOP OF FOUNDATION, PIER OR CAP
PIER OR CAP
h
UPPER BAR
384
1.5 B 0 E
AR D (1 1/2" NOTES: h
h 135° CLIENT REF. #:
IAM )
64
2. IF COLUMNS ARE CAST INTEGRALLY WITH SHEAR WALLS, ALL VERTICAL BARS TO HAVE LAPS AS
96
51
. HOOK PROJECT:
SPECIFIED FOR SHEAR WALL CONCENTRATED REINFORCEMENT. LOWER 1. DRAWINGS SHOW SIZE AND SPACING OF TIE SETS.
HOOP CIRCULAR TIE CROSS TIE
BAR "TIE" ON DRAWINGS MEANS TIE SET.
3. IF COLUMNS ARE CAST INTEGRALLY WITH SHEAR WALLS IN WHICH BENT CONCENTRATED 2. PROVIDE TIES FOR EVERY OTHER VERTICAL BAR.
3. IF CLEAR SPACING BETWEEN ADJACENT VERTICALS h=6 x TIE DIA., 60 (2 3/8") MIN. U/N
REINFORCEMENT IS PROHIBITED, PROVIDE DOWELS BETWEEN COLUMN LIFTS INSTEAD OF USING IF Rd ≥ 2.0 (SEE DESIGN DATA NOTES), INCREASE 'h' TO
OFFSET BENT VERTICALS. "D" IS MORE THAN 150 (6"), ADD TIES SHOWN DASHED.
R
100 (4") MIN FOR COLUMNS CAST INTEGRALLY WITH SHEAR TYPICAL DETAILS
VE
ALTERNATING FROM SIDE TO SIDE OF COLUMN / PIER. WALLS AND FOR SHEAR WALL ZONE REINFORCING.
4. INCREASE TIES ADDED BELOW SLOPED PORTION OF VERTICAL BARS TO 4-10 FOR 45 BARS, AND COVER
341
DEC 2016
ROUND COLUMNS WITH TYPICAL TIE SHAPES
JAN 2017
KEY PLAN:
D D
DISCLAIMER: COPYRIGHT:
THIS DRAWING AND DESIGN IS COPYRIGHT PROTECTED WHICH SHALL NOT BE USED, REPRODUCED OR
REVISED WITHOUT WRITTEN PERMISSION BY WSP CANADA INC. THE CONTRACTOR SHALL CHECK AND
VERIFY ALL DIMENSIONS AND UTILITY LOCATIONS AND REPORT ALL ERRORS AND OMISSIONS PRIOR TO
COMMENCING WORK.
THIS DRAWING IS NOT TO BE SCALED.
C C
B B
IS RE DATE DESCRIPTION
PROJECT NO: DATE:
Designer
DRAWN BY:
Author
CHECKED BY:
25mm
Checker
DISCIPLINE:
TITLE:
SHEET NUMBER:
S.4
SHEET #: OF
ISSUE: RV.#
DATE OF:
11 10 9 8 7 6 5 4 3 F 2 1
P:\Y126\temp\WSP - Typical details(Work in progress)\Revit\WSP_Structural_Typical Details_ 2015.rvt
1/24/2017 2:44:51 PM