You are on page 1of 1

F

11 10 9 8 7 6 5 4 3 2 1

CONCRETE COLUMNS AND PIERS REINFORCED TIES FOR CONCRETE COLUMNS, WALLS, BORED
OPTION: DOWELS TO TC-COL-01 TC-COL-02 COLUMN AND PIER CAST INTEGRALLY WITH WALL TC-COL-21 PROVISION FOR FUTURE CONCRETE COLUMN OR WALL TC-COL-31
MATCH VERTICALS U/N
AS COLUMNS CONCRETE PILES AND PIERS REINFORCED AS COLUMNS

167

100 (4") AT
AT SLAB

BEAMS
75 (3")
CLASS 'B' LAP "D" COLUMN (PIER), SEE PLAN OR SCHEDULE CL
128
"D" 048
"D"
048

CARRY WALL HORIZONTAL

75 (3")
862
H ℓd REINFORCING THROUGH; DRAPE ALTERNATIVE: FUTURE DOWELS H

"D"

"D"
CONSULTANT - SUB CONSULTANT:

048

048
BEHIND COLUMN (PIER) VERTICALS DISCONTINUE WALL REINFORCING
IF INTERFERING AND ADD MATCHING BARS (WITH

6712
TENSION COUPLERS

S/2 MAX
081

MAX 50 (2")
BOTTOM STEEL OR CLASS 'B' LAP EACH SIDE) THROUGH (SEE SPECIFICATIONS)

DRAPE
OR BEHIND COLUMN (PIER) CAGE TOP OF

CLASS 'B' LAP


ROOF SLAB

564

MAX. S/2
WHENEVER SLAB OPENINGS EXIST ADJACENT

5603
4 BARS 6 BARS 8 BARS

FOR AEC)
TO COLUMNS, CARRY TIES THROUGH THE LOCATE CONSTRUCTION JOINT IN

(ZERO
25(1")
SLAB THICKNESS AS SHOWN FOR PERIMETER COLUMN 25 (1") BELOW SLAB / DROP / CAP.

CLASS
'B' LAP
COLUMNS EXCEPT FOR ARCHITECTURALLY EXPOSED

385
DROP (IF APPLICABLE) CORNER COLUMN "D"
9482

CONCRETE (AEC) COLUMNS, WHERE JOINT IS

71
SEE TC-COL-01 FOR

a
289

COMPRESSION LAP SPLICE 218

TO BE AT U/S OF SLAB / DROP / CAP ADD TIES TO MATCH SIZE REBAR DETAILS AT
NOTED OTHERWISE (REFER TO CONSTRUCTION JOINT CONCRETE SPLICE BARS TO MATCH
DOWELS TO MATCH COLUMN VERTICALS OPTIONAL AND SPACING OF COLUMN TIES; TOPS OF COLUMNS
COLUMN SCHEDULE & NOTES)

"D"
WALL COLUMN / WALL VERTICALS

"D"
STAY FORM

647
(UNLESS OTHERWISE NOTED IN COLUMN

048
COMPRESSION LAP SPLICE

S/2 MAX
OMIT IF a ≤ 100 (4")

2401
CONSULTANT - SUB CONSULTANT:

SPACING) SEE
UNLESS NOTED SCHEDULE) FOR ALL BARS IN HATCHED

SCHEDULE
EXTERNAL PVC
AREAS EQ EQ

S (TIE
OTHERWISE (REFER TO WATERSTOP AT
243

06 048

167
6 SLOPE COLUMN SCHEDULE & BASEMENT WALLS

MAX. S/2 583


1 NOTES)

EQ EQ
350
75 (3") TO
NOTE:

PORTION

06
SLOPED
TOP OF

243
IF DIFFERENT CONCRETE MIXES ARE SPECIFIED FOR COLUMN (PIER) AND WALL, USE CONCRETE

06
10 BARS 12 BARS 12 BARS

DEC 2016

DEC 2016
OF HIGHER STRENGTH AND MORE STRINGENT EXPOSURE CLASSIFICATION FOR BOTH.
SLOPED PORTION
75 (3") TO TOP OF

≤S ALTERNATIVELY, PROVIDE STAY FORM AND POUR COLUMN AND WALL SEPARATELY.

105
≤S BOTTOM STEEL "D"

473
S/2 MAX

FOR AEC)

208
(ZERO
25(1")

≤S PERIMETER

74
REDUCED SIZE TIE

FOR AEC)
COLUMN
G PROVISION FOR FUTURE STEEL COLUMN CONCRETE COLUMN AND WALL PROTECTION G

(ZERO
25(1")
70

≤S EQ EQ
901

"D"
U/N OTHERWISE, PROVIDE MIN. THREE TIES AT 75

74
TC-COL-32 TC-COL-41 CONSULTANT - SUB CONSULTANT:

140
06 06

(3"), JUST BELOW SLOPED PORTION. OMIT WHERE


(OVER CONCRETE COLUMN) IN VEHICLE ACCESIBLE AREAS
053

71
CONSTRUCTION JOINT SLOPED PORTION STARTS MIN. 50 (2") ABOVE U/S
S (TIE SPACING)
SEE SCHEDULE

OF SLAB OR DROP. CARRY TIES THROUGH SLAB / 6 SLOPE


COMPRESSION DEVELOPMENT LENGTH DROP / BEAM. REDUCE SIZE AS 1 ADDITIONAL
COMPRESSION LAP SPLICE (MEASURED FROM UNDERSIDE OF SLAB / DROP) REQUIRED. CL SLOPE FOR
0541

UNLESS NOTED OTHERWISE FUTURE STEEL COLUMN DRAINAGE CONCRETE COLUMN ADDITIONAL SLOPE
IF COLUMN FACE OFFSET IS 75 (3") OR MORE CONSTRUCTION JOINT PERIMETER OR WALL CONCRETE
(REFER TO COLUMN (POURED FOR DRAINAGE
USE DOWEL SPLICE. CARRY ALL VERTICALS INTO COLUMN COLUMN OR WALL
SCHEDULE & NOTES) 12 (1/2")Ø VENT HOLE MONOLITICALLY
UPPER COLUMN WHERE POSSIBLE U/N OTHERWISE, PROVIDE MIN. 14 BARS IN CENTRE OF PLATE WITH SLAB)
SEALER ON ALL
SEALER ON ALL
SLOPED PORTION
75 (3") TO TOP OF

THREE TIES AT 75 (3"),


053

600 (24") MIN.


EXPOSED

150 450 (18") MIN


JUST BELOW SLOPED PORTION. EXPOSED
PLAN SURFACES

WHICHEVER IS GREATER. DOWEL

30 (1 1/4")
052

14 BARS
06

DOWELS TO MATCH REBARS IN 20 (3/4") THICK PLATE


MAX S/2

LENGTH TWICE THE REQUIRED


03

SURFACES

385
MAX. S/2
COLUMN ABOVE OR BELOW,

COMPRESSION LAP SPLICE

26
MAX 75 (3")
732

SIZE TO MATCH COLUMN BELOW SLAB ON

(TYP)

30 (1 1/4")
MEMBRANE
052

X X 600 (2'-0") CONSULTANT - SUB CONSULTANT:


"D" "D"
342

TOP OF GRADE
192

X X (TYP) REFER TO

LENGTH + 75 (3")
75(3") 743

08 08

ROOF SLAB ARCHITECTURAL

TYP
(6")
762

DRAWINGS
25
702

"D"

"D"

CLASS 'B' LAP


4125

048 048

6 SEE TC-COL-01 FOR REBAR 600 (2'-0") 192

DETAILS AT TOPS OF COLUMNS (TYP)


1 SLOPE OF BARS IF

THIS ZONE NOT


962

TIE SPACING IN
COLUMN FACE OFFSET
STANDARD HOOK OR REGLET AND SEALANT EXTEND SEALER TO TOP

TO EXCEED
293
651

WELDABLE REBAR (BY STRUCTURAL

8403
IS LESS THAN 75 (3") REFER TO ARCH DWGS OF FOOTING, TOP OF PIER FRAMED
STEEL) TO MATCH NUMBER AND

150 (6")
TIES NOT REQUIRED ONLY OR TOP OF PILE/PILE CAP SLAB
75 (3")

SIZE OF COLUMN VERTICALS;


MAX.

IN ZONE WHERE COLUMN WELD TO DEVELOP ALTERNATIVE


F LATERALLY SUPPORTED U/N OTHERWISE, PROVIDE MIN. THREE CONSTRUCTION F
72

BY BEAMS OR CONTINUOUS TIES AT 75 (3"), JUST BELOW SLOPED PORTION. (6") JOINT LOCATION SEAL:

MAX 75 (3")
IF BEAMS DO NOT EXIST AT ALL FOUR SIDES OF 50 RED
1083

≤S 761
DROPS ON ALL FOUR SIDES 1
COLUMN, PROVIDE TIES AS SHOWN FOR BEAMS MIN AGGE

OCT 2016

DEC 2016
REDUCED SIZE TIES AT PERIMETER COLUMNS BEAM (IF APPLICABLE) 16 BARS ST OUND
BARS NOT CONTINUED IN COLUMN ABOVE AR
"D"

062
CONSTRUCTION JOINT AT UNDERSIDE OF BEAMS "D" "D"
(TYP)
068

BEND ALL VERTICALS AT SAME LEVEL. DO NOT


U/N OTHERWISE, PROVIDE MIN. THREE TIES AT BEND VERTICALS IN ROUND COLUMNS IF COLUMN
75 (3"), JUST BELOW SLOPED PORTION. OMIT ABOVE IS THE SAME DIAMETER AND THE MINIMUM

"D"
568

WHERE BEAMS EXIST AT ALL 4 SIDES OF CLEARANCE BETWEEN BARS INDICATED IN


COLUMN AND SLOPED PORTION STARTS MIN 50 SECTION X-X IS MET
06
(2") ABOVE U/S OF THE SHALLOWEST BEAM MAX S/2
06
MAX S/2

"D"
TOP OF FOUNDATION, NARROW COLUMN (OR WALL) ROUND CLIENT:
TOP OF FOUNDATION, PIER OR CAP
PIER OR CAP

WSP CANADA INC


INTERIOR COLUMN PERIMETER / CORNER COLUMN 135° HOOKS STD.90°
HOOK
135° HOOKS
NOTES: MIN
MORE THAN 16 BARS
LAR IMUM C
GE LE
E 1. SEE TC-COL-02 FOR TYPICAL TIE ARRANGEMENT. OR R OF 4 ARANC E

h
UPPER BAR

384
1.5 B 0 E
AR D (1 1/2" NOTES: h
h 135° CLIENT REF. #:
IAM )
64

2. IF COLUMNS ARE CAST INTEGRALLY WITH SHEAR WALLS, ALL VERTICAL BARS TO HAVE LAPS AS
96

51

. HOOK PROJECT:
SPECIFIED FOR SHEAR WALL CONCENTRATED REINFORCEMENT. LOWER 1. DRAWINGS SHOW SIZE AND SPACING OF TIE SETS.
HOOP CIRCULAR TIE CROSS TIE
BAR "TIE" ON DRAWINGS MEANS TIE SET.
3. IF COLUMNS ARE CAST INTEGRALLY WITH SHEAR WALLS IN WHICH BENT CONCENTRATED 2. PROVIDE TIES FOR EVERY OTHER VERTICAL BAR.
3. IF CLEAR SPACING BETWEEN ADJACENT VERTICALS h=6 x TIE DIA., 60 (2 3/8") MIN. U/N
REINFORCEMENT IS PROHIBITED, PROVIDE DOWELS BETWEEN COLUMN LIFTS INSTEAD OF USING IF Rd ≥ 2.0 (SEE DESIGN DATA NOTES), INCREASE 'h' TO
OFFSET BENT VERTICALS. "D" IS MORE THAN 150 (6"), ADD TIES SHOWN DASHED.
R

100 (4") MIN FOR COLUMNS CAST INTEGRALLY WITH SHEAR TYPICAL DETAILS
VE

4. PLACE SUCCESSIVE CROSS TIES WITH 135° HOOKS


CO

ALTERNATING FROM SIDE TO SIDE OF COLUMN / PIER. WALLS AND FOR SHEAR WALL ZONE REINFORCING.
4. INCREASE TIES ADDED BELOW SLOPED PORTION OF VERTICAL BARS TO 4-10 FOR 45 BARS, AND COVER
341

5. ALTERNATE TIE ARRANGEMENTS MAY BE ACCEPTABLE


C
O
V
E
R

TO 4-15 FOR 55 BARS.

DEC 2016
ROUND COLUMNS WITH TYPICAL TIE SHAPES
JAN 2017

SUBJECT TO THE CONSULTANT'S REVIEW.


5. FOR COLUMNS IN MOMENT FRAMES, ALL VERTICAL BARS TO HAVE CLASS 'B' TENSION LAP SPLICES
SECTION X - X CIRCULAR TIES 6. SEE COLUMN SCHEDULE FOR SPECIAL TIE ARRANGEMENTS.

KEY PLAN:

D D

DISCLAIMER: COPYRIGHT:
THIS DRAWING AND DESIGN IS COPYRIGHT PROTECTED WHICH SHALL NOT BE USED, REPRODUCED OR
REVISED WITHOUT WRITTEN PERMISSION BY WSP CANADA INC. THE CONTRACTOR SHALL CHECK AND
VERIFY ALL DIMENSIONS AND UTILITY LOCATIONS AND REPORT ALL ERRORS AND OMISSIONS PRIOR TO
COMMENCING WORK.
THIS DRAWING IS NOT TO BE SCALED.

ISSUED FOR - REVISION:

C C

B B

IS RE DATE DESCRIPTION
PROJECT NO: DATE:

Project Number Issue Date


ORIGINAL SCALE:
IF THIS BAR IS NOT
1 : 100 25mm LONG, ADJUST
YOUR PLOTTING SCALE.
DESIGNED BY:

Designer
DRAWN BY:

Author
CHECKED BY:
25mm
Checker
DISCIPLINE:

TITLE:

03-CONCRETE COLUMNS TYPICAL DETAILS


A A

SHEET NUMBER:

S.4
SHEET #: OF
ISSUE: RV.#

DATE OF:

11 10 9 8 7 6 5 4 3 F 2 1
P:\Y126\temp\WSP - Typical details(Work in progress)\Revit\WSP_Structural_Typical Details_ 2015.rvt
1/24/2017 2:44:51 PM

You might also like