Content
• General principles
– High level in the Rules
Transverse framing
tc tc
tc
tas_built tas_built
tgr_off tgr_req
treq (net)
Corrosion model
During the initial years after ship’s delivery, as
coating condition is good, there is no corrosion Corrosion starts from this point
Intact Condition Elapsed Time
First it progresses
depth-wise
Depth of Corrosion
Then it spreads
Total
Tankers: 95
Corrosion analysis
• Corrosion Additions
– Diminution at 90% cumulative probability for 25 years
– Reserve thickness of 0.5 mm added to obtain total wastage
allowance:
• Approximately corresponds to corrosion diminution at 95%
cumulative probability for 25 years
Corrosion additions
Welding
Fillet welds scantlings requirements
• The scantlings of fillet welds in CSR-H are based on the
as-built thickness of the abutting member
• The gap in welds is limited to 2.0 mm.
• Minimum weld size criteria similar to CSR-OT are
adopted
• Welding in “highly stressed areas” is a topic of high
importance and covers:
• Areas with high tensile stresses or areas considered critical full or partial
penetration welds shall be used
• A list of critical locations where full penetration welds are mandatory
• Scantling criteria for fillet welds subject to high tensile/shear loads
Survey
Analysis
&
Revision
Ships in Operation
Principles and renewal criteria
Minimum survey requirements given in URZ10.2, Z10.4 and
Z10.5
Corrosion allowance concept during operation life:
• Principle : Assessment against new building (NB)
requirements not necessary, as same tc used for NB design (net
scantling approach) and ships in operation
• Assessment of local elements:
tc
tres
tm
Deck zone
Neutral axis
zone
0.9D
Bottom zone
September 2012 General Principles 30