Professional Documents
Culture Documents
SCHEDULER
THE COMPLETE
STRATEGIC MINE
PLANNING SYSTEM
Datmine’s NPV Scheduler provides a complete
strategic open pit mine planning system with
functionality spanning everything from pit
optimization, pushback generation,
cut-off grade optimization, scheduling, haulage
optimization and stockpile management.
All practitioners including mining engineers and geologists working on a wide range of open pit
studies that require pit optimization, pushback/cutback optimization, generating life of mine
plans, or cut-of-grade optimization.
MAXIMIZE
THE VALUE OF
YOUR MINE
key system features key system benefits
• Import data from various file formats • Optimized strategic mine plan with design
including sub-celled models and schedule contained in one system
• Compute most profitable processing • Ultimate pits are optimized for maximum
destination based on product prices, cash flow (base and precious metals) or
mining costs, processing costs, processing maximum reserve life (industrial minerals)
recoveries, dilution, etc.
• Pits are optimally sequenced to maximize
• Generate LG pits and nested shells NPV or achieve material blend
book a demo
To book a free demo of Datamine’s NPV Scheduler, contact your local Datamine office.
Global offices
AUSTRALIA | BRAZIL | CANADA | CHILE | CHINA | COLOMBIA | INDIA | KAZAKHSTAN | MEXICO | PERU | SOUTH AFRICA | UNITED KINGDOM | UNITED STATES OF AMERICA
sales@dataminesoftware.com | dataminesoftware.com
© 2014 Datamine