CONTROL DE CEMENTO

INGRESO/ STOCK ALMACEN


FECHA Detalle
EGRESO

12-Oct-16 197.00 197 Ventas Carrion


13-Oct-16 -2.00 195 Lubricacion Bomba
13-Oct-16 -145.00 50 Vaceado Sra. Julia
14-Oct-16 60.00 110 Ferreteria Hormiguita
14-Oct-16 -1.00 109 Lubricacion Bomba
14-Oct-16 -70.00 39 Vaceado Sra. Julia
14-Oct-16 120.00 159 Ventas Carrion
14-Oct-16 -1.00 158 Lubricacion Bomba
15-Oct-16 -126.00 32 Vaceado Vecino
15-Oct-16 15.00 47 Ferreteria Hormiguita
15-Oct-16 -2.00 45 Rotos- Descarte
27-Oct-16 50.00 95 Ferreteria Hormiguita
28-Oct-16 -70.00 25 Techado Sr. Elmer lopez Ccanto
21.3 soles x bls

21.3 soles x bls

Se consttó 18 Bls. Según Ramos al termino del vaceado


DOSIFICACION PIEDRA

Concreto LAMP LAMP Total % concreto INGRESO/E


PIEDRA % ARENA Vendido FECHA
(m3) PIEDRA ARENA GRESO
(m3)

12-Sep-16 15.00
12-Oct-16 15.00
6 3.5 3.5 7 0.58 0.58 12 13-Oct-16 -7.00
6 2.8 4.2 7 0.47 0.70 12 13-Oct-16 -5.60
6 2.8 4.2 7 0.47 0.70 12 14-Oct-16 -5.60
15-Oct-16 18.00
6 2.8 4.2 7 0.47 0.70 19.5 15-Oct-16 -9.10
27-Oct-16 10.00
6 2.8 4.2 7 0.47 0.70 10 28-Oct-16 -4.67

65.5
2.8
ARENA

STOCK ALMACEN INGRESO/E STOCK ALMACEN Detalle


(M3) GRESO (M3)

15.00 0.00
30.00 30.00 30.00
23.00 -7.00 23.00 Cimiento Sra. Julia
17.40 -8.40 14.60 Cimiento Sra. Julia
11.80 -8.40 6.20 Cimiento Sra. Julia
29.80 33.00 39.20
20.70 -13.65 25.55 Techado Vecino
30.70 15.00 40.55
26.03 -7.00 33.55 Techado Sr. Elmer lopez Ccanto
26.03 33.55