Professional Documents
Culture Documents
GHE
TOWER-2
TOWER-4
PROJECT
OWNER
CONSULTANT ENGINEER
IFU IFU
NOTE
1. THIS DRAWING IS THE PROPERTY OF :
GULF HOUSE ENGINEERING, Architects, Engineers
2. REPRODUCING ITS CONTENTS IN ANY FORM EXCEPT FOR THE
PURPOSE OF WHICH IT IS INTENDED, IS PROHIBITED.
3. THIS DRAWING IS NOT TO BE SCALED, STATED DIMENSIONS
ARE ONLY TO BE CONSIDERED.
4. ALL DIMENSIONS ARE TO BE VERIFIED ON SITE AS PER
ACTUAL SITE CONDITION PRIOR TO COMMENCEMENT OF ANY
CONSTRUCTION WORK.
5. ANY DISCREPANCIES IN DIMENSIONS & OR INFORMATION
IFU IFU SHOULD BE BROUGHT TO THE ATTENTION OF THE
CONSULTANT IN WRITING.
6. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
STRUCTURAL, MEP AND INFRASTRUCTURE DRAWINGS etc.
7. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
SPECIFICATIONS, CONDITIONS OF CONTRACT, etc.
8. CONTRACTOR SHOULD CO-ORDINATE ALL WORKS WITH THE
ARCHITECTURAL,STRUCTURAL, LANDSCAPE,
INFRASTRUCTURE etc. DRAWINGS.
IFU IFU
ISSUE / REVISION
IFU IFU
KEY PLAN
NORTH
IFU IFU
SHEET TITLE
_ - _
_ _
NTS A1
FILE NAME:
RSH CK CK CK
AUG.2017 14-O059 00