You are on page 1of 5

Costo de Preventivo Correctivo Costo Mano Costo Red

Semana Mantenimiento de Obra Neuronal


1 350 5.5 3.3 413.7953606 385.4377
2 460 7.5 3.3 363.8451816 385.4427
3 350 8 3 329.1183496 352.0128
4 430 8 4.5 440.3147858 459.8995
5 350 6.8 3 359.088457 394.7756
6 380 7.5 4 415.7368519 392.8528
7 430 4.5 3 416.5311629 438.6064
8 470 6.4 3.7 420.9701631 385.4401
9 450 7 3.5 391.1589179 422.9835
10 490 5 4 478.1745756 489.9205
11 340 7.2 3.5 386.1639 385.4407
12 300 7.9 3.2 346.4420501 385.4449
13 440 5.9 4 455.6969951 396.6749
14 450 5 3.5 441.1090969 448.408
15 300 7 2.7 331.8541519 350.2217
b0 Preventivo corectivo MSE MSE NEURONAL
Costo 306.5261932837 -24.97509 74.1309575 1802.220431 2106.970154049
42.45256684 45.9017445643

300 4.5 2.7


490 8 4.5
0.2631578947 0.28571429 0.33333333
0.8421052632 0.85714286 0.33333333
0.2631578947 1 0.16666667
0.6842105263 1 1
0.2631578947 0.65714286 0.16666667
0.4210526316 0.85714286 0.72222222
0.6842105263 0 0.16666667
0.8947368421 0.54285714 0.55555556
0.7894736842 0.71428571 0.44444444
1 0.14285714 0.72222222
0.2105263158 0.77142857 0.44444444
0 0.97142857 0.27777778
0.7368421053 0.4 0.72222222
0.7894736842 0.14285714 0.44444444
0 0.71428571 0
Costo de M ante nim ie nto
Costo de Mantenimiento
Preventivo Correctivo Preventivo
600
500
Costo de Man 1 400
300
Resumen Preventivo -0.44327318 1 200
Correctivo 0.55631986 0.03043758 1 100
Estadísticas de la regresión 0
4 4.5 5 5.5
Coeficiente de cor 0.722134292

Co sto d e M ante n im ie nto


Coeficiente de de 0.521477936
R^2 ajustado 0.441724259
Error típico 47.46341263
Observaciones 15 Correctivo
600
500
ANÁLISIS DE VARIANZA
400
Grados de libertad
Suma de cuadrados
Promedio de los cuadradosF Valor crítico de F 300
Regresión 2 29460.0269 14730.0134 6.53860679 0.01200637 200
100
Residuos 12 27033.3065 2252.77554 0
2.6 2.8 3 3.2
Total 14 56493.3333

Coeficientes Error típico Estadístico t Probabilidad Inferior 95% Superior 95%


Intercepción 306.5261933 114.253894 2.68285118 0.01993159 57.5883445 555.464042
Preventivo -24.97508952 10.8321251 -2.30565002 0.03978846 -48.5762627 -1.37391636
Correctivo 74.13095749 25.9673179 2.85477914 0.01449363 17.5530321 130.708883

Análisis de los residuales

Observación
Pronóstico Costo de Mantenimiento
Residuos
1 413.7953606 -63.7953606
2 363.8451816 96.1548184
3 329.1183496 20.8816504
4 440.3147858 -10.3147858
5 359.088457 -9.08845703
6 415.7368519 -35.7368519
7 416.5311629 13.4688371
8 420.9701631 49.0298369
9 391.1589179 58.8410821
10 478.1745756 11.8254244
11 386.1639 -46.1639
12 346.4420501 -46.4420501
13 455.6969951 -15.6969951
14 441.1090969 8.89090309
15 331.8541519 -31.8541519
Costo de M ante nim ie nto

Preventivo Curva de regresión ajustada


600
500
400
300 Costo de Mantenimiento
200 Pronóstico Costo de
100 Mantenimiento
0
4 4.5 5 5.5 6Preventivo
6.5 7 7.5 8 8.5
Co sto d e M ante n im ie nto

Correctivo Curva de regresión ajustada


600
500
400
300 Costo de Mantenimiento
200 Pronóstico Costo de
100 Mantenimiento
0
2.6 2.8 3 3.2 3.4 3.6 3.8 4 4.2 4.4 4.6
Correctivo

Inferior 95.0%Superior 95.0%


57.5883445 555.464042
-48.5762627 -1.37391636
17.5530321 130.708883

You might also like