DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

202 Parklands - 2 Boreholes to 15 2 Boreholes drilled to a depth of 15 metres, including all Drilling, Logging, 2018
Metres Laboratory Testing, Factual and Engineering Reporting, Parklands, Nairobi

Beech Properties - Hurlingham - 3 3 Boreholes to 10 metres and 5 Trial Pits, including all Logging, Laboratory 2018
Boreholes and 5 Trial Pits Testing, Factual and Engineering Reporting, Nairobi, Kenya.

Pinnacle Tower (Highest Tower in 2 Boreholes to 30 Metres, 1 Borehole to 26 Metres, and 3 Boreholes to 6 2018
Africa) Phase 3 - 6 Boreholes 6-30 Metres including Logging and Laboratory Testing, Nairobi
Metres

Sogea - Satom Laboratory Testing Laboratory Testing as a follow up to a previous Site Investigation. 2018

Sony Holdings Laboratory Testing Laboratory Testing, Nairobi, Kenya 2018

Square Pharmaceuticals Kenya EPZ 8 8 Boreholes to 20 Metres and 10 Trial Pits to 3 Metres, including all Drilling, 2018
Boreholes to 20 Metres Site Testing, Logging, Laboratory Testing, Factual and Engineering
Reporting, Nairobi

Uhuru Highway Mall - 4 Boreholes to 4 Boreholes to 10 metres and 1 Borehole to 20 metres including all Drilling, 2018
10 Metres and 1 Borehole to 20 Site Testing, Logging, Laboratory Testing, Factual and Engineering
Metres Reporting, Nairobi, Kenya

Westgate Mall - 3 Large Diameter 3 Large Diameter Boreholes - coring and piling works, Nairobi 2018
Boreholes

Athi River - 3 Boreholes to 20 Metres 3 Boreholes to 20 Metres including Logging and Factual Reporting, Nairobi, 2017
Kenya

Bamburi 3 Boreholes to 10 Metres 3 Boreholes to 10 Metres and 5 Trial Pits including Logging, Nairobi, Kenya 2017
and 5 Trial Pits

Bamburi Mineral Exploration - 5 5 Boreholes drilled to a depth of 20 Metres each, Nairobi, Kenya. 2017
Boreholes to 20 Metres

Bamburi Plant Site Investigation (6 4 Boreholes to 20 Metres, 1 Borehole to 25 Metres and 1 Borehole to 15 2017
Boreholes) Metres, including all Site Testing and Logging, Athi River, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Gitaru Solar Power - 5 Boreholes to 5 Boreholes to 35 Metres depth, including all Site Testing and Logging. 2017
35 Metres Kenya

Greenfield Developers 2 Boreholes to 2 Boreholes to 30 metres, 2 Boreholes to 20 metres, 2 boreholes to 10 2017


30 Metres, 2 Boreholes to 20 Metres, metres including all Drilling, Laboratory Testing, Factual and Engineering
2 Boreholes to 10 Metres Reporting, Nairobi

Italian Embassy - 4 Boreholes to 15 New Italian Embassy Building in Nairobi - 4 Boreholes to a depth of 15 2017
Metres and 1 Borehole to 30 Metres Metres, 1 Borehole to 30 Metres

Kenya Breweries - 2 Boreholes to 10 2 Boreholes drilled to a depth of 10 Metres each, including all Logging, 2017
Metres Laboratory Testing and Factual and Engineering Reporting, Thika, Kenya.

Kenyatta Hospital - 5 Boreholes to 10 5 Boreholes drilled to a depth of 10 Metres, including all 2017
Metres

Kigoro Water Supply (Phase 2) - 3 1 Borehole to 22 Metres, 1 Borehole to 12 Metres, 1 Borehole to 6 Metres, 2017
Boreholes including all Driling, Site Testing, Logging and Factual Reporting, Thika,
Kenya.

Kisumu Breweries - 8 Boreholes to 8 Boreholes to various depths 2017


various depths

Kisumu Breweries Additional Laboratory Testing, Nairobi, Kenya. 2017


Laboratory Testing

Mineral Laboratory Testing Laboratory Testing for Mineral Exploration, Kenya 2017

Muthithi Road - 2 Boreholes to 10 2 Boreholes drilled to a depth of 10 Metres, including all Site Testing and 2017
Metres Logging, Nairobi, Kenya.

Nairobi West Hospital - 4 Boreholes 2 Boreholes to 19 Metres and 2 Boreholes to 27 Metres, including all 2017
(19 to 27 Metres depth) Logging, Laboratory Testing and Factual/Engineering Reporting, Nairobi,
Kenya.

National Cement - Mariakani - 5 5 Boreholes to 20 Metres, including all Drilling, Site Testing and Logging, 2017
Boreholes to 20 Metres Mariakani, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

National Cement - Nakuru - 6 6 Boreholes to a depth of 20 Metres including all Drilling, Site Testing and 2017
Boreholes to 20 Metres Logging, Nakuru, Kenya

Olkaria - 3 Boreholes to 30 Metres for 3 Boreholes drilled to 30 Metres, including all Site Testing, Piezometer 2017
Fichtner Installations, Logging, Laboratory Testing and Factual/Engineering
Reporting, Naivasha, Kenya.

Residential Development - Gilgil 3 3 Boreholes to 25 Metres including all Drilling, Site Testing, Laboratory 2017
Boreholes to 25 Metres Testing,

Rowan Properties - Garden Estates - 3 Boreholes to 10 Metres and 5 Trial Pits including Site Testing, Logging, 2017
3 Boreholes to 10 Metres and 5 Trial Laboratory Testing, Factual and Engineering Reporting, Nairobi, Kenya
Pits

Ruiru Dam II Phase 1 - 6 Boreholes to 6 Boreholes to 30-40 Metres depth, including all Logging, Laboratory Testing 2017
30-40 Metres and Factual Reporting, Ruiru, Kenya

Tatu City School 4 Boreholes to 10 4 Boreholes to 10 Metres and 1 Borehole to 5 Metres including all Site 2017
Metres, 1 Borehole to 5 MetresA Testing, Logging, Laboratory Testing and Factual and Engineering Reporting

Two Rivers Mall (New Parking Silo) 7 Boreholes to 30 Metres with 8 Trial Pits to 3 metres, all Logging, Laboratory 2017
Testing, Factual and Engineering Reporting, Nairobi.

Westlands - 5 Boreholes to 20 Metres 5 Boreholes drilled to a depth of 20-23 Metres, including all Site Testing, 2017
Logging, Laboratory Testing and Factual/Engineering Reporting, Westlands,
Kenya

Yatta Dam (Phase 1) 9 Boreholes ranging in depth between 25-40 Metres, included all Drilling, Site 2017
Testing, Logging, Laboratory Testing and all Factual Reporting, Kenya.

Yatta Dam (Phase 2) - 3 Boreholes up 1 Borehole to 35 Metres, and 2 Boreholes to 40 Metres, including all Logging, 2017
to a depth of 40 Metres Laboratory Testing and Factual Reporting, Kenya.

AAR 6 Boreholes to 10 Metres 6 Boreholes drilled to a depth of 10 metres, including all Site Testing, 2016
Laboratory Testing and Factual Reporting, Nairobi, Kenya.

Acacia Vale - 2 Boreholes to 10 2 Boreholes drilled to a depth of 10 Metres each, including all Logging, 2016
Metres Laboratory Testing and Factual/Engineering Reporting, Nairobi, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

AHCOF Mbaazi Lane 6 Boreholes of varying depth, included laboratory testing, and 2016
Factual/Engineering Reporting

Athi River - 2 Boreholes to 25 Metres, Drilling 4 Boreholes for a New Grain Silo facility, comprising all Drilling 2016
1 to 27 Metres and 1 to 15 Metres Works, Site Tests, Laboratory Testing, Factual and Engineering Reporting,
Kenya.

Bamburi Cement 4 Boreholes max 4 Boreholes with a maximum depth of 250 metres each, Kenya. 2016
Depth 150-250 Metres Each

Bidco Site - Nakuru - 2 Boreholes 2 Boreholes to 25 Metres, and 3 Trial Pits to 3 Metres, including all Site 2016
Testing, Laboratory Testing, Factual and Engineering Reporting, Nakuru,
Kenya

Buffalo Mall, Eldoret 6 Boreholes of valying depths, included all laboratory testing, and 2016
Factual/Engineering reporting, Eldoret.

Diocese of Maralal - 5 Boreholes 5 Boreholes to 16 Metres depth, includes all Site Tests, Laboratory Testing, 2016
Factual and Engineering Reporting, Nairobi, Kenya

Diocese of Maralal - 5 Boreholes to 5 Boreholes drilled to a depth of 16 Metres, including Laboratory Testing and 2016
16 Metres, Nairobi Factual and Engineering Reporting, Nairobi, Kenya.

German Embassy Borehole Cleaning Cleaning water well borehole (reaming and flushing), Nairobi, Kenya 2016

Kaptagat Road - 2 Boreholes to 15 2 Boreholes drilled to a depth of 15 Metres each, including all Logging, 2016
Metres Laboratory Testing and Factual/Engineering Reporting, Nairobi, Kenya

Kigoro Water Treatment Works, 19 Boreholes to approximately 10 metres including all Laboratory Testing and 2016
Muranga County Factual and Engineering Reporting, Thika, Kenya.

Kipkabus Development - 1 Borehole 1 Borehole to 10 Metres and 2 Trial Pits, Site Testing, Laboratory Testing, 2016
to 10 Metres and 2 Trial Pits Factual and Engineering Reporting, Nairobi, Kenya

Kisumu - 2 Boreholes to 20 Metres Drilling 2 Boreholes, and digging 4 Trial Pits - includes for all Site Testing, 2016
and 4 Trial Pits Laboratory Testing, Factual and Engineering Reporting, Kisumu, Kenya
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Kizingo Crest Development, 2 Boreholes percussion drilled and diamond cored adjacent to the ocean in 2016
Mombasa Mombasa, included for Laboratory Testing and Factual Reporting, Mombasa

Lake Plot - Nairobi - 3 Boreholes to 8 3 Boreholes to 8 metres as well as 4 Trial Pits, Site Testing, Laboratory 2016
Metres Testing, Factual and Engineering Reporting, Nairobi, Kenya

Lantana 9 Boreholes 9 Boreholes drilled to varying depths, includes all Logging, Laboratory 2016
Testing as well as Factual and Engineering Reporting, Nairobi, Kenya.

Mineral Exploration Phase 1-5 (20 20 Boreholes diamond cored at an angle to a depth of 100-175 Metres, 2016
Boreholes to 100-175 Metres) Kenya

Mineral Exploration Phase 6-7 18 Boreholes diamond cored to a depth of 60-175 metres, Kenya 2016

Muthangari Road - 3 Boreholes 1 Borehole to 10 Metres and 2 Boreholes to 8 Metres including all Laboratory 2016
Testing and Factual and Engineering Reporting, Nairobi

Muthangari Road Site Investigation 2 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, 2016
Boreholes Factual and Engineering Reporting, Nairob, Kenya

Olkaria (Phase 2) 1 Borehole to 30 1 Borehole to 30 Metres and 8 Boreholes to 15 metres - Drilling and Site 2016
Metres, and 8 Boreholes to 15 Metres Testing only, Naivasha, Kenya

Olkaria 1 - Unit 6 (6 Boreholes, 11 6 Boreholes to 30 Metres, 11 Dynamic Cone Tests, 8 Trial Pits in Hells Gate 2016
DCP's and 8 Trial Pits) National Park, Naivasha, Kenya. Project included all Drilling, Testing as well
as all Laboratory Testing and Factual and Engineering Reporting.

Olkaria Geothermal - 3 Boreholes to 3 Boreholes to 30 Metres including all Site Testing and Logging, Naivasha, 2016
30 Metres Kenya

Oserian, Naivasha - 4 Boreholes to 15 4 Boreholes drilled to a depth of 25 Metres including the digging of 15 Trial 2016
Metres and 15 Trial Pits Pits. The project included all Drilling, Logging, Laboratory Testing and
Factual and Engineering Reporting, Naivasha, Kenya.

Quarry Testing comprising Sample testing in the Laboratory for Quarry suitability and Factual Reporting, 2016
Laboratory Testng and Reporting Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Riverside Geotechnical Investigation 1 Borehole with site testing, laboratory testing and Factual and Engineering 2016
1 Borehole Reporting, Nairobi, Kenya

Rumuruti - 3 Boreholes to 10 Metres 28 Boreholes drilled, as well as Site Testing undertaken and Logging, 2016
and 25 Boreholes to 5 Metres for Rumuruti, Kenya
Solar Installation

Shimoni Resorts, Nairobi 2 Boreholes to 10 metres and Trial Pits including all Laboratory Testing and 2016
Factual and Engineering Reports, Nairobi, Kenya

Tatu City 3 Boreholes to 10 Metres and 17 Trial Pits, including all Laboratory Testing 2016
and Factual and Engineering Reporting, Kenya.

Thika Mall - 2 Boreholes to 10 Metres 2 Boreholes to 10 Metre, and 10 Trial Pits including all Laboratory Testing, 2016
and 10 Trial Pits Factual and Engineering Reporting, Thika, Kenya.

TILISI - 6 Boreholes to 9 Metres 6 Boreholes to 9 Metres including all Site Testing, Logging, Factual and 2016
Engineering Reporting, Nairobi, Kenya

Westgate Mall - 2 Boreholes to 10 2 Boreholes to 10 Metres, and 1 Borehole to 12 Metres, including all Site 2016
Metres and 1 Borehole to 12 Metres Testing, Logging and Factual Reporting, Nairobi, Kenya

Westland - 2 Boreholes to 10 Metres 2 Boreholes to a depth of 10 metres, plus trial pits as well as laboratory 2016
and Trial Pits testing, Factual and Engineering Reporting, Nairobi, Kenya

1 Milimani - Kisumu - 2 Boreholes to 2 Boreholes to a depth of 8 Metres as well as 3 Trial Pits. The project 2015
8 Metres and Trial Pits comprised of all Drilling Works, Site Testing Works, Logging and Factual and
Engineering Reporting, Nairobi, Kenya.

Athi River Mall - 4 Boreholes to 20 4 Boreholes to a depth of 20 Metres, and 3 Boreholes to 10 Metres. The 2015
Metres and 3 Boreholes to 10 Metres project included all Drilling Works, Site Testing, Logging, Laboratory Testing
and Factual and Engineering Reporting

DCP Testing French Embassy 45 DCP Tests for the French Embassy in Nairobi, Kenya 2015

Diamond Coring - Emali - 1200 28 Boreholes at various depth (up to 90 Metres), Emali, Kenya. 2015
Metres - 28 Boreholes
Eldama Ravine 1 Borehole to 10 1 Borehole to 10 Metres and 7 Trial Pits, includes for all Logging, Laboratory 2015
Metres and 7 Trial Pits Testing, Factual and Engineering Reporting, Nairobi, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Elgon Road 6 Boreholes in depth 6 Boreholes ranging from 18 to 31 metres in depth, including all Lab Testing 2015
from 18 to 31 Metres and Factual and Engineering Reporting

Fortis Plaza - Kisumu - 1 Borehole to 1 Borehole to 12 Metres as well as 5 Trial Pits. The project comprised of all 2015
12 Metres and 5 Trial Pits the Drilling Works, Site Testing, Logging, Laboratory Testing and Factual and
Engineering Reporting, Kenya.

French Embassy 4 Boreholes to 15 4 Boreholes to 15 Metres including all Logging, Laboratory Testing, Factual 2015
Metres and Engineering Reporting, Nairobi, Kenya.

Garden City - 6 Boreholes to 10 6 Boreholes to 10 Metres including all Logging, Laboratory Testing, Factual 2015
Metres and Engineering Reporting, Nairobi, Kenya

Garden City 4 Boreholes to 15 Metres 4 Boreholes to 15 Metres and 2 Boreholes to 10 Metres drilled, including all 2015
and 2 Boreholes to 10 Metres Site Testing, Logging, Laboratory Testing and Factual and Engineering
Reporting, Kenya.

Gateway 1 Borehole to 25 Metres and 1 Borehole to 25 Metres, 1 Borehole to 15 Metres and 4 Trial Pits, including 2015
1 Borehole to 15 Metres as well as 4 all Logging, Laboratory Testing, Factual and Engineering Reporting, Nairobi,
Trial Pits Kenya.

General Mathenge 2 Boreholes to 15 2 Boreholes to 15 Metres and 6 Trial Pits, Kenya. 2015
Metres and 6 Trial Pits

Hass Petroleum - 7 Boreholes with 7 Boreholes with Site Testing including Lugeon and Piezometer Installations 2015
335 Metres of Drilling as well as Logging, Kenya.

Hass Petroleum 2 - 335 Metrs of 7 Boreholes with 335 Metres of Drilling, includes all Logging, Nairobi, Kenya 2015
Drilling at Upperhill Nairobi

Holiday Inn - 2 Boreholes to 20 2 Boreholes to 20 Metres including all Site Testing and Logging, Kenya. 2015
Metres

JKIA Fuel Terminal Expansion - 2 2 Boreholes to 10 Metres, includes all Logging, Nariobi, Kenya 2015
Boreholes to 10 Metres

KEMRI Drilling 2 Boreholes to 6 2 Boreholes to 6 Metres including all Logging, Laboratory Testing, Factual 2015
Metres and Engineering Reporting, Nairobi, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Kwale - 5 Boreholes, 41 Metres of 41 Metres of Drilling plus 27 Trial Pits, includes all Logging, Laboratory 2015
Drilling and 27 Trial Pits to 2.5 Metres Testing, Factual and Engineering Reporting, Kwale, Kenya.

Lenana Road 2 Boreholes to 20 2 Borehole to 20 metres including Laboratory Testing and Engineering 2015
Metres Reporting, Kenya

Mariakani 5 Boreholes to 20 Metres 5 Boreholes to 20 Metres including all Logging, Laboratory Testing, Factual 2015
and Engineering Reporting, Mariakani, Kenya.

Mavoko 5 Boreholes to 15 Metres 5 Boreholes to 15 Metres, including all Factual Reporting, Athi River, Nairobi, 2015
Kenya.

Mbaazi Lane Site Investigation - 2 2 Boreholes to 10 Metres plus Trial Pits, including all Logging, Laboratory 2015
Boreholes to 10 metres and Trial Pits Testing, Factual and Engineering Reporting, Nairobi, Kenya.

Miritini Data Centre - 4 Boreholes and 4 Boreholes comprising of 1 Borehole to 20 Metres and 3 Boreholes to 6 2015
8 Trial Pits Metres, as well as 8 Trial Pits. The project included for all the Drilling Works,
Site Testing, Logging, Laboratory Testing and Factual and Engineering
Reporting, Kenya.

Mlolongo 4 Boreholes to 10 Metres 4 Boreholes to 10 Metres including all Logging, Laboratory Testing, Factual 2015
and Engineering Reporting, Mlolongo, Kenya.

Muguma Gardens on James Gichuru - 4 Boreholes to 10 metres including 4 Trial Pits. The project included all 2015
4 Boreholes to 10 Metres as well as 4 Drilling Works, Site Testing, Logging, Laboratory Testing and Factual and
Trial Pits Engineering Reporting, Kenya.

Mui Basin Kasarani Well - Coal 1 Borehole to 100 metres - mineral exploration Coal, Kitui, Kenya. 2015
Exploration

Nakuru 3 Boreholes to 10 Metres 3 Boreholes to 10 Metres including all Logging, Laboratory Testing, Factual 2015
and Engineering Reporting, Nakuru, Kenya.

Nakuru Grain Silos - 3 Boreholes to 3 Boreholes to a depth of 20 metres including all Site Testing and Logging, 2015
20 Metres Nakuru, Kenya.

Nanyuki for Kiloran 2 Boreholes 2 Boreholes one to 10 metres and another to 15 metres, including all 2015
Laboratory Testing and Engineering Reporting, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

National Cement Company - 10 10 Boreholes with 1200 metres of Diamond Coring for Mineral Exploration in 2015
Boreholes with 1200 metres of Emali, Kenya.
Drilling

Northern Tunnel (Phase 2) - 2 2 Boreholes with 60 Metres of Drilling including all Site Testing, Logging as 2015
Boreholes with 60 Metres of Drilling well as Factual Reporting, Kenya.

Northern Tunnel Project (Phase 1) 5 5 Boreholes with 110 metres of Drilling, included all Logging and Factual 2015
Boreholes with 110 metres of Drilling Reporting, Kenya.

Nyatike Dam - 14 Boreholes ranging 14 Boreholes ranging in depth from 20 to 100 Metres, included Lugeon 2015
in depth from 20 to 100 metres Testing, Logging, Laboratory Testing and Factual Reporting, Kenya.

Olkaria Phase 1 - 8 Boreholes to 30 8 Boreholes to 30 Metres including all Site Testing Works and Logging, 2015
Metres Kenya.

Olkaria Phase 2 - 1 Borehole to 30 150 Metres of Drilling as well as all the Site Testing and Logging, Olkaria, 2015
Metres and 8 Boreholes to 15 Metres Kenya.

Professional Way 2 Boreholes to 20 2 Boreholes to 20 Metres, Nairobi, Kenya.U 2015


Metres

RC Drilling - Emali (First Work Order) - 50 RC Boreholes with 1500 metres of Drilling, Emali, Kenya 2015
1500 Metres - 50 Boreholes
RC Drilling at Emali - 3,000 Metres of 46 Borehole in Emali - Reverse Circulation Drilled, Kenya 2015
Drilling (2nd Work Order)

Residenz - 3 Boreholes to 5 Metres 3 Boreholes to 5 Metres including all Site Testing, Logging as well as Factual 2015
and Engineering Reporting, Nairobi, Kenya.

Reverse Circulation Drilling 1 1 Reverse Circulation Borehole, Emali 2015


Borehole

Riara Road Development 8 Boreholes 8 Boreholes to 50 Metres each including all Logging, Laboratory Testing, 2015
to 50 Metres Factual and Engineering Reporting, Nairobi, Kenya.

Riverside 3 Boreholes to 13 Metres 3 Boreholes to 13 Metres including all Lab Testing and Engineering 2015
Reporting, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Safaricom Athi River 5 Boreholes ranging between 10 - 20 metres in depth, Kenya. 2015

Sarit Centre - 12 Boreholes to 20 12 Boreholes to 20 Metres included all Site Testing and Logging, Kenya 2015
Metres

Sheraton Runda - 3 Boreholes to 12 3 Boreholes to 12 Metres and 5 Trial Pits. The project comprised of Drilling 2015
Metres and 5 Trial Pits the Site, Site Testing, Insallation of a Piezometer, Logging, Laboratory
Testing, Factual and Engineering Reporting, Kenya.

Sun n Sand 4 Boreholes Ranging 4 Boreholes drilled together with all Site Testing, Logging, Laboratory Testing 2015
between 25 Metres and 30 Metres and Factual Reporting, Mombasa, Kenya.
Each

Turkana 6 Boreholes to 40 Metres 6 Boreholes to 40 Metres, Turkana. 2015

UN Drilling Training Course UN Training course for Water Drilling Professionals, Kenya 2015

Wangari Mathai Foundation 2 2 Boreholes to 10 Metres including all Logging, Laboratory Testing, Factual 2015
Boreholes to 10 Metres Karen and Engineering Reporting, Karen, Nairobi, Kenya.

Westlands Development 2 Boreholes 2 Boreholes to 15 Metres and 5 Trial Pits including all Logging, Laboratory 2015
to 15 Metres and 5 Trial Pits Testing, Factual and Engineering Reporting, Nairobi, Kenya.

20 Boreholes to a depth of 150 Mineral Exploration, 20 Boreholes to 150 metres, near Mwingi 2014
Metres near Mwingi

6 Sites throughout Nairobi each site 6 Sites each site has 2 Boreholes to 10 metres and 5 Trial Pits - project 2014
has 2 Boreholes to 10 metres and 5 included all Site Testing, Laboratory Testing and Factual and Engineering
Trial Pits Reporting, Kenya.

7 Projects for Britam (2 Boreholes 2 Boreholes at each site, including Laboratory Testing and Factual and 2014
and Trial Pits at each Site) Engineering Reporting, Kenya.

Aga Khan Media Centre - 4 Boreholes 4 Boreholes to 30 metres including Piezometer Installation, Westlands, 2014
to 30 Metres Nairobi, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Baba Dogo Site Investigation 2 Boreholes to 10 Metres and 4 Trial Pits, includes all Augering and Diamond 2014
Coring, Logging, Laboratory Testing and Factual and Engineering Reporting,
Kenya/

Canadian High Commission - Drilling and Removal of possible Diesel spillage, Kenya. 2014
Environmental Drilling

City Park - 6 Boreholes to 15 Metres 6 Boreholes to 15 metres including all Site Testing, Kenya 2014

Coral Propertiese Kileleshwa - 8 8 Boreholes to various depths, including all Site Testing and Factual and 2014
Boreholes Engineering Reporting, Nairobi, Kenya.

Eldoret to Kapenguria Road - 28 28 Boreholes to a maximum depth of 15 metres, includes all Site Testing, 2014
Boreholes Kenya

Elgon Road Site Investigation - 6 6 Boreholes to 35 metres each, comprising of augering and diamond coring, 2014
Boreholes to 35 Metres including all Logging, Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya.

Fidelity Bank - 2 Boreholes to 8 2 Boreholes to 8 Metres including all Site Testing, Kenya. 2014
Metres

French Embassy - Nairobi - 6 6 Boreholes to 15 metres, including all Augering and Diamond Coring, 2014
Boreholes to 15 Metres Logging, Laboratory Testing and Factual and Engineering Reporting, Nairobi,
Kenya

General Mathenge 2 Boreholes to 10 2 Boreholes to 10 metres including all Site Testing, Kenya. 2014
Metres

Gilani -2 Boreholes to a depth of 20 2 Boreholes to a depth of 20 and 25 metres, the project included all 2014
and 25 metres - Nakuru Laboratory Testing, Factual and Engineering Reporting.

GZI Sultan Hamud - 11 Boreholes and 11 Boreholes and 33 Trial Pits including all Site Testing, Laboratory Testing 2014
33 Trial Pits as well as Factual and Engineering Reporting, Kenya.

Hass Petroleum Head Quarters - 5 5 Boreholes to 30 Metres depth, including Augering and Diamond Coring, as 2014
Boreholes to 30 Metres well as Logging, Kenya
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

I & M New Bank Headquarters - 11 11 Boreholes with 197 metres of Drilling, including all Logging, Laboratory 2014
Boreholes with 197 metres of Drilling Testing, Factual and Engineering Reporting, Nairobi, Kenya

Isiolo Dam 12 Boreholes ranging up 12 Boreholes to varying depth, including all site testing, packers, laboratory 2014
to 100 Metres testing and Factual and Engineering Reporting, Isiolo, Kenya.

Karen Waterfront - 9 Boreholes to 10 9 Boreholes to 10 Metres depth, including all Augering and Diamond Coring 2014
Metres depth as well as Logging, Kenya.

Kileleshwa - 3 Boreholes to 20 Metres 3 Boreholes to 20 Metres including all Site Testing, Kenya. 2014

Kileleshwa Site Investigation - 6 6 Boreholes to metres each, comprising of Augering and Diamond Coring, 2014
Boreholes to 25 Metres including all Logging, Laboratory Testing, and Factual and Engineering
Reporting, Nairobi, Kenya

Kithatani Dam, Machakos - 3 3 Boreholes drilled to a depth of 30, 25 and 25 metres, project included 2014
Boreholes to a depth of 30, 25,25 Packer/Lugeon Testing, Laboratory Testing and Factual and Engineering
Metres Reports, Machakos, Kenya.

Lighthouse Site - Nine Fifty - 3 3 Boreholes as well as all Site Testing, Laboratory Testing, and Factual and 2014
Boreholes up to 20 Metres in Depth Engineering Reporting, Kenya.

Lukenya Site Investigation - 3 3 Boreholes to 10 metres each, comprising of Augering and Diamond Coring, 2014
Boreholes to 10 Metres and 20 Trial including all Logging, Laboratory Testing and Factual and Engineering
Pits Reports, Athi River, Kenya.

Mineral Exploration - Bamburi - Diani Mineral Exploration drilling for Limestone - Reverse Circulation Drilling 2014
Site

Mineral Exploration - Bamburi - Mineral Exploration drilling for Limestone - Reverse Circulation Drilling in 2014
Mombasa Site Mombasa

Mombasa, Kizingo Apartments 3 3 Boreholes Percussion Drilling just off the Indian Ocean to a depth of 37, 40 2014
Boreholes 37, 40 and 32 Metres and 32 Metres. Project included all Site Testing, Laboratory Testing as well
as Factual and Engineering Reporting, Mombasa, Kenya.

Mpaka Road - 3 Boreholes to 20 3 Boreholes to 10 metres, including all Laboratory Testing and Reporting, 2014
Metres and Trial Pits Nairobi, Kenya
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Mpaka Road 3 Boreholes to 20 3 Boreholes to 20 Metres and 6 Trial Pits as well as all Laboratory Testing, 2014
Metres and 6 Trial Pits and Factual and Engineering Reporting, Nairobi, Kenya.

Muthithi Road - 1 Borehole to 10 1 Borehole to 10 Metres and Trial Pits, including all Laboratory Testing and 2014
Metres and 6 Trial Pits Factual and Engineering Reporting, Nairobi, Kenya.

Mwanzi Road 5 Boreholes to 15 5 Boreholes to 15 Metres, including all Site Testing, Laboratory Testing, 2014
Metres Factual and Engineering Reports, Nairobi, Kenya.

Nanyuki Mall 2 Boreholes to 7 and 15 Metres in Nanyuki, Kenya. 2014

National Cement Company - 2 2 Boreholes to 100 metres each - Reverse Circulation Drilled - Emali, Kenya 2014
Borehoes to 100 Metres Reverse
Circulation Drilled

Ndovu Cement Geotechnical Drilling 3 Boreholes and various site tests, laboratory testing and Factual and 2014
3 Boreholes and Packer Testing Engineering Reporting, Nairobi, Kenya.

Nine Fifty Site Investigation 3 3 Boreholes to 15 Metres as well as 5 Trial Pits, included all Augering and 2014
Boreholes to 15 Metres and 5 Trial Diamond Coring, Logging, Laboratory Testing as well as Factual and
Pits Engineering Reporting, Nairobi, Kenya

Northwood - Parklands 6 Boreholes 6 Boreholes to 10 metres including all Site Testing, Kenya. 2014
to 10 metres

Ololua Site Investigation - 2 2 Boreholes to 10 metres each, comprising of Augering and Diamond Coring, 2014
Boreholes to 10 Metres and 12 Trial including all Logging, Laboratory Testing, as well as Factual and Engineering
Pits Reporting, Kenya.

Olooloitikosh 5 Boreholes 5 shallow boreholes to 5 metres including all Lab Testing, Factual and 2014
Engineering Reporting, Nairobi, Kenya

One Brookside Drive - 2 Boreholes 8 2 Boreholes to 8 and 15 metres depth including all Laboratory Testing, 2014
and 15 Metres - Nairobi Factual and Engineering Reporting, Nairobi, Kenya.

One Central Park - 3 Boreholes 2 Boreholes to 20 Metres, 1 Borehole to 15 Metres including all Laboratory 2014
Testing and Factual and Engineering Reporting, Nairobi, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

One General Mathenge - 3 Boreholes 3 Boreholes and 13 Trial Pits as well as all Site Testing, Laboratory Testing, 2014
and 13 Trial Pits Factual and Engineering Reporting, Kenya.

Orthodox Church - 3 Boreholes to 45 3 Boreholes to 45 metres, 4 Boreholes to 30 metres as well as 8 Trial Pits. 2014
metres - 4 Boreholes to 30 metres Project included all Drilling, Site Testing, Laboratory Testing, and Factual and
and 8 Trial Pits Engineering Reporting, Nairobi, Kenya

Palazzo 2 Boreholes to 20 Metres and 2 Boreholes to 20 Metres and various Trial Pits, Site Testing and Laboratory 2014
Trial Pits Testing as well as Factual and Engineering Reporting, Nairobi, Kenya.

Parkview Mwanzi Road 5 Boreholes 5 Boreholes to 15 metres, including all Laboratory Testing and Reporting, 2014
to 15 Metres Nairobi, Kenya

Pre-Stressed Concrete Factory - 7 Boreholes drilled to varying depth of 11 to 15 metres, includes all Augering 2014
Mavoko - 7 Boreholes to 11-15 Metres and Diamon Coring, Logging, Laboratory Testing and Factual and
Engineering Reporting.

Processional Way 2 Boreholes to 20 2 Boreholes to 20 Metres, Nairobi, Kenya. 2014


Metres

Rapid Kate 1 Borehole to 10 Metres 1 Borehole on Mombasa Road, Nairobi, Kenya. 2014

Riverside - 1 Borehole to 12 Metres 1 Borehole to 12 Metres and 1 Borehole to 10 Metres including all Site 2014
and 1 Borehole to 10 Metres Testing, Laboratory Testing, and Factual and Engineering Reporting, Kenya.

Runda - 8 Boreholes to 10 Metres 8 Boreholes to 10 Metres including all Site Testing, Kenya. 2014

Runda - Drilling 2 Boreholes to 10 Drilling 2 Boreholes one to 10 metres and one to 6 metres, Kenya. 2014
and 6 Metres
Rwabura and Thiririki Dam 4 Boreholes with a maximum depth of 80 metres, including all Lab Testing, 2014
Factual and Engineering Reporting, Machakos, Kenya.

Sarit Centre - 7 Boreholes to 15 7 Boreholes to 15 Metres each, Westlands, Nairobi, Kenya. 2014
Metres

Scientific Drilling in Magadi Scientific Drilling for the origins of man kind and climate change, Magadi 2014
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

South C - 1 Borehole to 10 Metres 1 Borehole to 10 Metres, Nairobi, Kenya 2014

South C - 2 Boreholes to 10 Metres 2 Boreholes to 10 metres as well as all Site Testing, Kenya. 2014

Tiara - Mugumo Road - 2 Boreholes 2 Boreholes to 15 metres including all Site Testing, Laboratory Testing, as 2014
to 15 metres well as Factual and Engineering Reporting, Nairobi

Two Rivers Shopping Mall Phase 3 8 Boreholes to various depth, including all Laboratory Testing and 2014
Factual Reporting, Nairobi, Kenya

Westgate Mall drilling through Bomb Various Boreholes and Site Tests at Westgate Mall, Nairobi, Kenya 2014
Damaged Site

Aga Khan Hospital Extension - 3 3 Boreholes plus Site Testing and Logging, Nairobi, Kenya. 2013
Boreholesto 16 metres

Al Jamea Campus - 8 Boreholes to 10 8 Boreholes plus all Site Testing and Logging, Nairobi, Kenya. 2013
metres

Broglio Space Centre - 9 Boreholes Geotechnical Site Investigation for 9 boreholes to 15 Metres, plus Lab 2013
to 15 Metres Testing, and Factual and Engineering Reporting. Project also included
Resistivity Testing and Reporting, Malindi, Kenya

Central Bank Annex - 4 Boreholes to 4 Boreholes to 35 Metres including all Laboratory Testing, Factual and 2013
30 Metres Engineering Reporting, Kenya.

Ewaso Ngiro 21 Boreholes to depth 21 Borehole, with SPT and U100s as well as Constant and Fallling Head 2013
of 20 - 400 metres Diamond Cored Tests and Packer Testing. Includes for Factual Reporting and Laboratory
Testing, Kenya

Hominin Sites (Baringo (Cored 228 m Scientific Drilling 2 Diamond Cored Boreholes 228 m and 265 m depth, 2013
depth) and Turkana (Cored 265 m Turkana and Baringo, Kenya.
depth)

Isiolo Airport - 15 Boreholes to 5 15 Boreholes to 3 metres, plus Site Testing, Lab Testing, Factual and 2013
Metres Engineering Reporting, Nairobi, Kenya
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Kamumu Dam 1 Borehole to 40 Metres and one Borehole to 15 Metres, including all 2013
Laboratory Testing and Factual and Engineering Reporting, Kenya.

Kibera 4 Boreholes to 10 Metres 4 Boreholes to 10 Metres including Site Testing, Laboratory Testing, and 2013
Factual/Engineering Reports, Nairobi, Kenya

Kitale Lane Site Investigation - 5 5 Boreholes to a depth of 10 Metres, including all Site Testing and Logging, 2013
Boreholes to 10 Metres Nairobi, Kenya

Mbagathi Way - 4 Boreholes to 10 4 Boreholes to 10 Metres, including Laboratory Testing, Factual and 2013
Metres Engineering Reports, Nairobi, Kenya.

Moru Ridge - 6 Boreholes to 8 metres 6 Boreholes to 8 metres depth, plus Logging, Laboratory Testing and 2013
Reporting, Nairobi.

Norfolk Towers Site Investigation - 3 3 Boreholes to 12 Metres including all Laboratory Testing, Factual and 2013
Boreholes to 12 Metres Engineering Reporting, Nairobi, Kenya.

Nzoia Dam 16 Boreholes to a depth of 16 Boreholes to a depth of 20 metres, including packers and constant head 2013
20 metres testing as well as laboratory testing and factual reporting, Kenya.

Pan Africa Insurance - 5 Boreholes 13- 5 Boreholes ranging in depth from 13-18 metres, plus Laboratory Testing, 2013
18 Metre Depth Factual and Engineering Reporting, Nairobi, Kenya.

Peponi Road Site Investigation - 2 2 Boreholes to 10 metres and 2 Boreholes to 15 metres plus Logging, Kenya. 2013
Boreholes to 10 Metres and 2
Boreholes to 15 Metres

Runda Site Investigation 8 Boreholes to a maximum depth of 10 metres, Runda, Kenya 2013

SBI Quarry Site - 10 Boreholes to 20 10 Boreholes to 20 metres depth Diamond Cored, Kericho, Kenya. 2013
metres

Sheheena Development, Nyali 4 Boreholes to 35 Metres, including Laboratory Testing, Factual and 2013
Engineering Reporting, Kenya.

SWECO - Nzoia Dam - 14 Boreholes 14 Boreholes ranging in depth from 20-50 metres diamond cored, plus trial 2013
and 20 Trial Pits pits, Laboratory Testing and Factual Reporting, Kenya
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

The Hub - Karen - 2 Boreholes to 12 2 Boreholes to 12 metres, and 8 Trial Pits to 3 metres, plus Laboratory 2013
Metres and 8 Trial Pits Testing, Factual and Engineering Reporting, Nairobi, Kenya

Thwake Dam 25 Boreholes to a max depth of 110 metres, includes all Laboratory Testing, 2013
Factual and Engineering Reporting, Kitui, Kenya.

Tom Mboya Street Site Investigation - 1 Borehole to 15 Metres plus Site Testing and Logging, Nairobi, Kenya. 2013
1 Borehole to 15 Metres

TYPSA - 23 Boreholes up to a depth 23 Boreholes ranging in depth from 25 to 110 metres, Narok, Kenya 2013
of 110 Metres (Ewaso Ngiro Dams)

Wrigley 2 Sites ( 7 Boreholes and 20 Drilling 7 Boreholes, and digging 20 Trial Pits at two locations in Athi River, 2013
Trial Pits) includes all Laboratory Testing and Factual/Engineering Reporting, Kenya.

Arror Multipurpose Dam - 3 3 Boreholes to a max depth of 115 metres diamond cored plus Laboratory 2012
Boreholes Drilled to a max depth of Testing and Engineering Reporting, Kenya.
115 Metres Diamond Cored
Base Titanium, Geotechnical 9 Boreholes to 25 metres depth, Kwale. 2012
Instigation, Mukurumduzi Dam - 9
Drilled Boreholes 25 metres

British American Insurance 2 Boreholes to 30 metres, Nairobi. 2012


Company, 2 Boreholes Drilled to 30
Metres

Civicon - 2 Boreholes Drilled to 17 2 Boreholes to 17 metres, Nairobi. 2012


metres, Vitol

Civicon - Vitol Phase 2 - 2 Boreholes 2 Boreholes drilled to a max depth of 25 metres, plus Laboratory Testing and 2012
to a Max Depth of 25 Metres Reporting, Mombasa, Kenya.

Ewaso Ngiro 3 Dams 22 Boreholes 22 Boreholes ranging in depth from 20 - 400 metres diamond cored, plus 2012
with varying depth of 20 - 400 metres Lugeon Testing, Ewaso Ngiro
plus Lugeon Testing

General Mathenge Site Investigation - 3 Boreholes to 15 metres plus Trial Pits, Logging, Laboratory Testing and 2012
3 Boreholes to a depth of 15 metres Factual and Engineering Reporting, Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Greenfields Developers, 5 Boreholes 5 Boreholes to max depth of 21 metres, Laboratory Testing and Engineering 2012
up to 21 metres in Depth - Site Reporting, Nairobi.
Investigation

KIRDI 5 Boreholes to 25 metres 5 Boreholes to 25 metres depth, laboratory testing and factual and 2012
depth, Nairobi, Kenya enginaeering reports, Nairobi, Kenya.

Koru Dam 6 Boreholes to a depth of 6 Boreholes ranging in depth from 20-50 metres diamond cored, plus Lugeon 2012
20-50 metres plus Lugeon Testing Testing and pressure grouting. Includes Laboratory Testing and Factual
and Pressure Grouting Reporting, Kenya.

Magwagwa Dam - Phase 3 - 8 8 Boreholes to a max depth 0f 190 m Diamond Cored, Kenya. 2012
Boreholes Max Depth 190 M Diamond
Cored

Miritini 6 Boreholes depth 20-30 6 Boreholes to a depth of 20-30 metres percussion drilled and diamon cored, 2012
metres, Mombasa, Kenya Mombasa, Kenya.

Miritini Drilling 6 Boreholes to a 4 Boreholes to 20 metres and 2 Boreholes to 40 metres, plus site based 2012
depth of 20-40 metres testing and logging, Mombasa, Kenya

Nile Basin Maira Dam 2 Boreholes to 20 metres depth including packer testing, laboratory testing 2012
and factual and engineering reporting, Kenya.

Norken - Shimoni to Vanga to Lunga 6 Boreholes to a max depth of 20 metres including Laboratory Testing, and 2012
Lunga Site Investigation, 6 Boreholes Engineering Report, Kenya.
to max depth of 20 Metres

Olkaria I and II Site Investigation - 13 13 Boreholes drilled to a depth of 17 metres in Olkaria, Kenya 2012
Boreholes Drilled to 17 metres

Olorgesailie Scientific Drilling, one 1 Borehole to a depth of 166 metres for Scienfic Drilling and Sediment Core 2012
borehole to 166 metres Collection for Analysis, Kenya

Polaris Gas Exploration - 7 Boreholes 7 Boreholes to 100 metre depth for Gas Exploration Monitoring in Shimoni, 2012
to 100 metres, Shimoni, Kenya Kenya.

Project Tusker 5 Boreholes to 10-15 6 Boreholes diamond cored to a depth of 10 metres, plus 16 Trial Pits to 3 2012
Metres plus 7 Trial Pits metres, site based testing plus Logging, Laboratory Testing, Factual and
Engineering Report
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Smithonian Institute, USA - 3 3 Boreholes for Scientitic Drilling - 163 and 116 were diamond cored, and 2012
Boreholes for Scientific Drilling to a one borehole to 176 m was destructive drilled, near Magadi, Kenya.
depth of 163m, 116m and 176m

Ubora Group - 4 Boreholes Drilled to 4 Boreholes drilled a max depth of 15 metres, plus Laboratory Testing and 2012
15 metres Engineering Reporting.

Unilever Tea Factory Extension - 8 8 Boreholes drilled to a max depth of 25 metres, including Laboratory Testing 2012
Boreholes Drilled to a max depth of and Engineering Reporting, Kericho, Kenya.
25 Metres

United Millers, 2 Boreholes to 12 2 Boreholes to 12 metres depth, Kisumu. 2012


Metres, Kisumu

Vienna Court - 3 Boreholes Drilled to 3 Boreholes to 18 metres, including Laboratory Testing and Engineering 2012
18 metres - Site Investigation Report, Nairobi.

Africa Gas (Offshore Drilling), 7 7 Boreholes to 7 metres offshore in Mombasa, including Lab Testing and 2011
Boreholes Engineering Report, Mombasa, Kenya

AMS 3 Boreholes Drilled to 15 metres 3 Borehole to 15 metres, including lab testing and reporting, Westlands, 2011
Kenya

Aviva Mining Company, 1000 metres 1000 metres of Reverse Circulation Drilling near Kisumu. 2011
Reverse Circulation Drilling - Mining
Exploration

Aviva, 3 Boreholes Reverse 3 Boreholes to depth of 60-250 m depth, in Siaya, nr Kisumu for Gold 2011
Circulation Drilled and Diamond Exploration Drilling
Cored to 250 m Depth

Base Titanium, 168 Borehole to 9m- 168 Boreholes Drilled and Pressure Grouted to a depth of 9m-25m, Kwale, 2011
25m depth, Drilling and Grouting for Kenya
Dam Structure

British American Insurance 5 Boreholes to 15 metres depth, Lab Tests and Engineering Report, Nairobi, 2011
Company, 5 Boreholes, Site Kenya.
Investigation
Catholic Diocese of Kericho, Site 6 Boreholes to 30 Metres, plus Trial Pits, and Insitu Density Testing, 2011
Investigation Laboratory Testing and Engineering Report, Kericho, Kenya.

Delta Corporation - Site Investigation 1 Boreholes to 10 m depth, plus Laboratory Testing and Engineering 2011
Reporting
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Delta Corporation, 1 Borehole Drilled 1 Borehole to 10 m depth, 6 Trial Pits, plus Laboratory Testing and 2011
to 10 m and 6 Trial Pits Engineering Reporting
Grand Falls Dam, 19 Boreholes 19 Boreholes, to a max depth of 70 metres, including Packer Testing, 2011
Drilled Laboratory Testing and Reporting, Mwingi, Kenya.

Gulfstream, 3 Boreholes Drilled 3 Boreholes to 15 metres, laboratory testing and Engineering Report, 2011
Mombasa, Kenya.

Howard Humphreys, Kenya Coal, 5 5 Boreholes to 15 metres depth, Lab Tests and Engineering Report, Kilifi, 2011
Boreholes Drilled Kenya.

Jupiter Real, Rhapta Rd 2 Boreholes to 10 m depth, plus Laboratory Testing and Factual Reporting, 2011
Investigation, 2 Boreholes Drilled to Nairobi, Kenya
10 metres
Kenya Association of Manufacturers, 2 Boreholes to 18 m depth, plus Laboratory Testing and Factual Reporting, 2011
2 Boreholes Drilled to 18 metres Nairobi, Kenya.

Lea Brothers and Blakeman, 2 2 Boreholes, laboratory testing and reporting, Nairobi, Kenya. 2011
Boreholes Drilled

Magwagwa Dam, Phase 2- 2 2 Boreholes to a depth of 100 m and 40 m, near Sondu, Kenya. 2011
Boreholes Drilled to 100 m and 40 m
Magwagwa Phase 2, 1 Borehole 2 Boreholes to depth of 180 and 190 m depth, diamond cored, Sondu, 2011
Diamond Cored to 180 m, and 1 Kenya.
Boreholed Diamond Cored to 190 m
Depth
Masalani Irrigation Scheme, Garissa, 2 Boreholes to 30 m depth, plus Factual Reporting, Garissa, Kenya. 2011
2 Boreholes Drilled to 30 metres

Mombasa Bypass, Overwater 1 Overwater borehole and 2 land based boreholes (in swamp), Mombasa, 2011
Boreholes for Katahira, Site Kenya
Investigation
Nzoia Dam, 8 Boreholes (depth 10-25 8 boreholes, packers, grouting, laboratory testing and reporting, Nzoia Dam, 2011
m) Drilled Kenya.

Ormat, Naivasha, 5 Boreholes Drilled 5 Boreholes to 15 metres depth, Naivasha, Kenya 2011

Red Rock Migori (Diamond Coring , 6 650 metres of Diamond Coring to a maximum depth of 125 metres, Migori, 2011
Boreholes) Kenya.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Red Rock Migori (Reverse Circulation 10 Boreholes to a max depth of 150 metres RC Drilled, Migori, Kenya. 2011
Drilling 10 Boreholes)

Stima Plaza for KenGen Retirement 3 Boreholes to 15 m depth, plus Laboratory Testing and Factual Reporting, 2011
Scheme - Site Investigation Nairobi, Kenya

Sun n Sand, Development, 3 3 Boreholes to 25 metres depth, Lab Tests, and Engineering Report, 2011
Boreholes to 25 Metres Drilled Kikambala, Kenya.

TYPSA, Phase 2, 13 Boreholesn 13 Boreholes, to max depth of 140 metres, plus laboratory testing, Nandi 2011
Diamond Cored and Reverse Dam, Kenya.
Circulation Drilled at Nandi Dam

1 Borehole and 6 Trial Pits, Nairobi 1 Borehole, 6 Trial Pits, Laboratory Testing and Engineering Report, Nairobi, 2010
Kenya.

19 Boreholes, Turkana Windfarm 19 Boreholes to 10 m each in remote areas of Turkana, Kenya 2010

20 Boreholes to 25 metres plus 37 20 Boreholes, plus 37 Trial Pits at Olkaria, Hells Gate National Park, 2010
Trial Pits, Olkaria including Laboratory Testing, and Engineering Report, Naivasha, Kenya

25 Boreholes to 22 metred depth, 25 Boreholes to a depth of 23-25 metres, plus Laboratory Testing and 2010
Vitol, Mombasa Engineering Report, Mombasa, Kenya

3 Boreholes and 10 Trial Pits, Nairobi Boreholes and Trial Pits plus Laboratory Testing and Engineering Report, 2010
Nairobi

4 Boreholes to 10 m, Riverside Park 4 Borehole to 10 metres, plus Laboratory Testing and Eng. Report, Nairobi. 2010

4 Reverse Circulation Boreholes and 4 RC Boreholes to depth of 45 metres, and 32 Percussion Boreholes to 2010
32 Percussion Boreholes depth up to 14 metres, Migori, Kenya

400 metres of Reverse Circulation 400 metres of Reverse Circulation Drilling in Migori, Kenya. Depth 50-80 2010
Boreholes metres.
AMS Kenyatta 1 Borehole to 8 metres, including Laboratory Testing and Eng. Report 2010
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

AMS Propertise, 5 Boreholes and 10 5 Boreholes, 10 Trial Pits, Nairobi plus Engineering Report 2010
Trial Pits

Bamburi Cement, Kitengela I 3 Boreholes, max depth 25 metres, Athi River, Kenya 2010

Bamburi Cement, Mavoko 3 Boreholes, max depth 25 metres, Athi River, Kenya 2010

Base Titanium, 4 Boreholes 4 Boreholes to 20 metres, Kwale, Kenya. 2010

Diamond Trust, 3 Boreholes 3 Boreholes to max depth of 10 metres, Gigiri, Kenya. 2010

Embu Quarry Site - 3 Boreholes to 20 3 Boreholes to 20 metres, Embu. 2010


metres

Kapsabet Water Supply 10 Boreholes to a depth of 5-7 metres, Kapsabet, Kenya 2010

Kasarani for Eng Plan - 3 boreholes 3 Boreholes and 4 Trial Pits, including Lab Test and Engineering Report, 2010
and 4 Trial Pits Kasarani, Kenya

Kendu Bay Drilling, 3 Boreholes 3 Boreholes to a maximum depth of 25 metres, Kendu Bay, Kenya. 2010

Mirima Hill Coal Exploration 2 Two Diamond Cored Boreholes 75 and 95 metre depths, Kwale, Kenya 2010
Diamond Cored Boreholes

Mirima Hill Coal Exploration 39 39 Reverse Circulation Boreholes depth 30-100 metres, Kwale 2010
Reverse Circulation Boreholes 30-
100 Metres Depth

Mombasa Bypass Project (Phase 2) 2 Boreholes overwater, as well as boreholes in swamp areas (drilled off the 2010
pontoon), and boreholes on tidal plains, Mombasa, Kenya Project included
all laboratory testing and Factual Reporting.
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Nandi Dam, 4 Boreholes to 30 Coring and RC Drilling at Nandi Dam, including Laboratory Testing and 2010
metres, 1 borehole to 280 metres and Reporting.
1 borehole to 250 metres

Olkaria Phase II - 4 Boreholes to 25 4 Boreholes to 25 metres including Lab Tests and Engineering Report, 2010
Metres Nairobi

Vaccinations Programme - 3 3 Boreholes to 10 metres, one in Meru, one in Kakamega and one in Garissa, 2010
Boreholes to 10 metres for Japanese Aid, Kenya.

Xenecon 4 boreholes to 15 metres 4 Boreholes and 10 Trial Pits, plus Lab Testing and Engineering Report, 2010
Nairobi, Kenya

4 Boreholes Gigiri and 9 Trial Pits, 4 Boreholes, 9 Trial Pits as well as Laboratory Testing and Engineering 2009
plus Laboratory Testing and Report, Nairobi, Kenya
Reporting

7 Boreholes to 10-20 metres depth, 7 Boreholes to depth of 10-20 metres in Nairobi, including Laboratory Testing 2009
plus Laboratory Testing and and Engineering Reporting, Nairobi, Kenya
Engineering Report
Container Terminal, Mombasa for 14 Boreholes ranging in depth from 10 m to 60 m in Mombasa, Kenya 2009
Multiple Hauliers

Dason Industries 1 Borehole to 10 metres with laboratory testing and Geotechnical Report, 2009
Nairobi.

Delta Resources, 3 Boreholes to 15 3 Boreholes to 15 metres including Laboratory Testing, and Engineering 2009
metres Report, Nairobi

Embu Water Reservoir and Dam, 6 6 Boreholes to a depth of 10 metres, Embu, Kenya 2009
Boreholes to 10 Metre Depth
General Mathenge, Aga Khan Trial Pits and testing, Nairobi, Kenya 2009

Gulfstream Project for Surtech 3 Boreholes to 15 metres, Mombasa, Kenya. 2009

Imperial Court Westlands 2 Boreholes to 12 metres, Nairobi, Kenya. 2009


DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Karen Trial Pits 16 Trial Pits in Karen plus Laboratory Testing and Reporting, Karen, Kenya 2009

Loita House, Nairobi 2 Boreholes to 10 metres, plus laboratory testing and Geotechnical Report, 2009
Nairobi.

Metha Plaza, Nairobi 5 Boreholes to 20 metres, Nairobi, Kenya. 2009

Moi Avenue 1 Borehole, CBD Nairobi, Kenya. 2009

Mombasa By-Pass Project 2 Boreholes over water, 4 boreholes adjacent to ocean, depth 25-35 metres, 2009
Mombasa, Kenya

Nairobi Missing Links 5 Boreholes and 14 Trial Pits, Nairobi, Kenya 2009

Nzoia Levees 6 Borehole 6 Boreholes to 8 metres, plus piezometer installation and trial pits, as well as 2009
Piezometers Factual and Geotechnical Reports

Ralphe Bunch Road, Upper Hill 2 Boreholes to 15 metres, Nairobi, Kenya 2009

Rotrite, off Waiyaki Way 2 Boreholes to 14 metres, Nairobi, Kenya 2009

Sangoro Power Plant 9 Boreholes to 15 metres, Nairobi, Kenya. 2009

Sarit Centre - 6 Boreholes to 15 6 Boreholes to 15 metres, including all laboratory testing, Nairobi, Kenya 2009
metres

Upper Hill Development, 1 Boreholes Borehole, Trial Pits and Reporting, Upper Hill, Nairobi 2009
to 5 Metres and Trial Pits
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Westgate Mall 5 Boreholes plus Piezometer Installations, Nairobi, Kenya. 2009

10 Boreholes to 15 metres - Park Ten boreholes to a depth of 15 metres, at Westlands, Nairobi, Kenya. 2008
Plaza, Nairobi Project includes laboratory testing, factual and engineering reports.

11 Boreholes to 30 Metres, Bamburi 11 Boreholes drilled to 30 metres at Athi River. Project is undertaken to 2008
Cement - Mineral Exploration (Phase Bamburi Cement to determine Pozzolan deposits, Kenya.
2)

17 Boreholes to 30 M at Bamburi 17 Boreholes to 30 metres in depth at Athi River, Nairobi, Kenya 2008
Cement - Mineral Exploration

Bamburi - Kataani Phase 2 - 30 Thirty boreholes to a depth of 15 metres, Kataani, LuKenya, Kenya 2008
Boreholes to 15 metres

Bamburi - Shilunge - 7 boreholes to 7 Borehole to various depth to establish pozzolan viability in Athi River, 2008
various depth Kenya

Bamburi (Mombasa) Reverse Thirteen boreholes to approximately 18 metres, Mombasa, Kenya 2008
Circulation Drilling

Bamburi Kaatani Phase 1 LuKenya - 15 Boreholes to 15 metres, in LuKenya for Mineral Exploration, Kenya 2008
15 Boreholes

Bamburi Kaatani Site 11 Boreholes to 15 metres, Kaatani, Nairobi, Kenya 2008

Bamburi Ngurunga Pozzolan Fourteen boreholes to a depth of 30 metres, in Ngurunga, Athi River, Kenya 2008
Exploration - 14 holes to 30 metres

Bamburi RC Drilling at Diani 27 Boreholes to a depth of 15-21 metres. Drilled using Reverse Circulation 2008
Drilling, Diani, Kenya.

Bamburi Reverse Circulation Drilling - 29 boreholes drilled to 16-21 metre depth during a period of 10 days, 2008
Mombasa, Vipingo - 29 holes in 10 Vipingo, Kenya
Days
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

BMW Showroom for Simba Colt 2 Boreholes to 10 metres, including Factual and Engineering Reports, 2008
Nairobi, Kenya

Coal Power Station, Mombasa 8 boreholes to a depth of 20 metres, including laboratory testing and 2008
reporting.

Mombasa Container Terminal 6 Boreholes to 10-15 metres, Mombasa, Kenya. 2008

Mt Elgon Site Investigation 10 Boreholes to 8 metres, Nairobi, Kenya. Includes for Laboratory Testing 2008
and Reporting.

Ngong Windmill Site Investigation 3 Boreholes to 8-15 metres, for a Geotechnical Investigation at Ngong Hills, 2008
Kenya

Rabai Power Station Site Investigation for Power Station at Rabai near Mombasa, Kenya. 2008
Includes drilling, piezometer installation and site testing, Kenya

Ralph Bunche Road, for Triad Three boreholes to eight metres plus lab tests, and reporting, Nairobi, Kenya 2008
Architects

Swahili Centre, Mombasa - 3 Holes to Three boreholes to five metres, Mombasa, Kenya. 2008
5m

Syotuvali Bridge - 4 Boreholes 4 Boreholes for a new Bridge Construction some 60 km from Kitui. Includes 2008
laboratory testing and Engineering Report.

TMS - Delta Resources, 1 Borehole to Drilling of one 20 metre borehole in Central Nairobi 2008
20 Metres, Uhuru Highway

UAP Insurance - Upper Hill 2 Borehole to 15 metres, Nairobi, Kenya. 2008

Uhuru Highway Development 1 Borehole to 20 metres, including Factual and Engineering Report, Nairobi, 2008
Kenya
DPI Projects Undertaken Between 2010 - 2018

Name Description Completion Date

Uhuru Highway Development - 5 Five boreholes to 15 metres including Laboratory Testing and Reporting, 2008
holes to 15 metres Kenya.

Westlands Development - 6 6 Boreholes to 15 metres, Westlands, Kenya 2008


boreholes to 15 metres

Woodvale Grove, Westlands 4 Boreholes to 10 metres, Nairobi, Kenya. 2008