SCHEDULE OF COLUMNS "WARE HOUSE"

FOOTING THICKNESS REINFORCEMENT FOOTING TO 1ST SLAB 1ST SLAB TO 2ND SLAB/ TYPE - C
COLUMN NOS LEVEL TRUSS TIE LEVEL REMARKS
SIZE BOTH WAYS
T SIZE REINF. SIZE REINF.
F.G.L.

O.G.L.

SECTION

TYPICAL FOOTING PLAN OF COLUMN

MEDIUM SOIL = S.B.C.-25T/m2


REFERENCE IS CODES CONCRETE GRADE - M25 PROJECT
WIND SPEED:- 44m/sec 49 x DIA OF BAR
NOTES : 39 x DIA OF BAR
EARTQUAKE:- ZONE-III
ARCHITECT
= 50m.m.
TITLE
= 50m.m.
= 40m.m.
= 25m.m. JOB NO. DRG. NO. DATE OF
ISSUE DRN. DESIGN
4) ALL STEEL IS TOR STEEL OF GRADE Fe 500 N/mmSq.
= 25m.m.
5) S.B.C. OF SOIL ASSUMED IS 25 T/Sq M. = 40m.m.
6) COLUMNS AND FOOTINGS ARE DESIGNED
FOR REFER KEY ELEVATION.
= 25m.m. Sunil Mutalik & Associates
= 25m.m. STRUCTURAL CONSULTANTS
7) DESIGN OF CENTRING, SHUTTERING, AND CONCRETE MIX = 25m.m.
IS CONTRACTOR/CLIENTS/SITE RESPONSIBLITY. = 25m.m.
= 25m.m.
10) WE WILL NOT BE RESPONSIBLE FOR ANY LEGAL
KEY ELEVATION REVISION
OR APPROVAL REGARDING THE APPROVED
ARCHITECTURAL PLAN.

\\server\drawing\mumbai\idw\2017\pune (aundh)\rcc drawings\cad dwgs\details of column and footing.dwg

You might also like