Engineering contract
the schedule dates for completing document for procurement, licensing, and construction or
manufacturing work should be included in the RFP for an engineering contract.
The integrated project schedule provides the schedule completion date for the package of
specifications and drawings produced by engineering contractors and included in the RFP’s for
engineering contract
The project schedule determines the dates when the design packages must be complete for
licensing submittals
If an owner performs the construction work or with a reimbursable contractor the owners
Engineering Group determines the specifications and drawings prepared by an engineering
contractor that are required to support the activities in the construction or manufacturing
schedule.
if there are multiple engineering contractors or the owners engineering performs a portion of
the design work, The owner’s Engineering Group defines the design interface information that is
required by an engineering contractor from other engineering contractors, suppliers, or the
owner.
Construction contracts
the project schedule it reminds the completion dates for all of the awards of the Construction
contract activities that restrain the start of work by a construction contractor.
the testing group prepares a testing schedule that indicates the sequence and duration of
testing activities
the integration of the construction and testing process schedule in the project schedule
determines the date for completion of the construction activities for each testing package
engineering contract
The scheduling system used by an engineering contractor should be compatible with the system
that the owner uses for the project schedule
the requirement for progress reports for a major engineering contractor to an owner are
Defined in the RFP for the engineering contract
The engineering contractor frequently required to attend. E progress pre-fill me things also may
be required to attend construction and testing progress review meetings to resolve design
issues that affect construction and testing activities
if the schedule performance reports indicate that work on specific specification and drawings is
complete after the first issue and this design documents have significant revision at a later date,
the schedule performance reports are misleading
Construction contract
Construction progress reports Contain a narrative description of work activities in progress and
recently completed as well as the problems.
this report contains a comparison of actual versus scheduled construction progress
if there are extensive testing requirements on a project, construction contractors and required
to meet with testing personal to coordinate the release of completed construction work to the
testing group
If Construction contract report schedule activities as complete after the physical work is done
but before the work has been inspected, schedule for the monitoring report are misleading if
rework is required
Monitoring requirements
the owner shoes independently verifies the status of the activities associated with learning in
incentive fees to assure that the contractor is not overly optimistic in its reporting of completion
status
The owner and the contractor conduct periodic meetings to review the status of the schedule
activities that must be completed prior to the incentive fees date in a contract
who knows and penalty schedule incentive fee contract
the RFP for a contract Define the conditions for determining the amount of bonus that
contractor earns for finishing ahead of a milestone schedule date or the amount of penalty that a
contractor pays for finishing Later than the Milestone dates