You are on page 1of 50

COMMISSIONNING REPORT

T60
T60 of Sondu (Therdibuoro)- Homa Bay
(Ndhiwa)- Awendo

NAME OF THE PROJECT : Sondu (Therdibuoro)- Homa


Bay (Ndhiwa)- Awendo
Electrification Project

CUSTOMER : Republic of Kenya- Ministry


2
of Energy

JOB NUMBER :

SITE : Kenya

3
GE Multilin Customer
Representative Representative
NAME Alicia Valero Masa

4
SIGNATURE

DATE

5
INDEX

1 GENERAL INFORMATION................................................................................3
1.1 RELAY DATA....................................................................................................3
1.1.1 T60 PROTECTION RELAY DATA........................................................................................ 3
2 INSPECTION TESTS T60..................................................................................4
3 INPUTS/OUTPUTS TESTS T60..........................................................................5
3.1 TERMINAL BLOCKS V&I CONNECTIONS...........................................................5
3.2 SUMMARY OF WIRED CONTACT OUTPUTS.......................................................5
3.3 SUMMARY OF WIRED CONTACT INPUTS..........................................................6
6
4 MEASUREMENTS VERYFICATION T60...............................................................7
4.1 UNBALANCED SYSTEM TO IDENTIFY PHASES..................................................7
4.2 BALANCED I SYSTEM......................................................................................8
5 PROTECTION FUNCTIONS TESTS T60A............................................................8
5.1 87A-5TA DIFFERENTIAL TRANSF......................................................................9
5.1.1 DIFFERENCIAL FIRST STEP.............................................................................................. 9
5.1.2 DIFFERENCIAL SECOND STEP........................................................................................ 10
5.1.3 DIFFERENCIAL FIRST STEP 2º HARMONIC BLOCK..........................................................10
5.1.4 DIFFERENCIAL FIRST STEP 5º HARMONIC BLOCK..........................................................10
5.2 RESTRICTED GROUND FAULT........................................................................11
5.3 INSTANTANEOUS OVERCURRENT IOC1..........................................................11
7
6 COMMENTS/OPEN POINTS............................................................................12
7 CONCLUSION...............................................................................................12

8
1 GENERAL INFORMATION

1.1 RELAY DATA


1.1.1 T60 PROTECTION RELAY DATA

MANUFACTURER GE MULTILIN
RELAY ORDER CODE T60-N03-HKH-F8N-H6P-M6N-P6C-U6D

9
SERIAL NUMBER ABHC16001537
FIRMWARE REVISION 6.0x
PROTECTION ELEMENTS 86A - 5TA, 81U, 81O, VTFF, 86A – 5TG.

10
2 INSPECTION TESTS T60

11
1. VISUAL INSPECTION

2. COMMUNICATION

3. CONFIGURATION FILE UPLOAD/DOWNLOAD


4. FIRMWARE

5. POWER SUPPLY

6. CONTACT INPUTS

7. CONTACT OUTPUTS

8. FLEXLOGIC

9. VOLTAGE AND CURRENT INPUTS METERING TESTS



.
10.PROTECTION AND FUNCTIONAL TESTS

12
13
3 INPUTS/OUTPUTS TESTS T60
3.1 TERMINAL BLOCKS V&I CONNECTIONS

HV SIDE CURRENT LV SIDE CURRENT

[F1-F3] [F5-F7]

A I-Dif A I-Dif

14
B B

C C

N N

3.2 SUMMARY OF WIRED CONTACT OUTPUTS

15
Contact
Description State Terminal/End Tested
ID
H1 Trip A TC1 NO GEN TRIP On (VO1) OK
H2 Trip B TC1 NO GEN TRIP On (VO1) OK
H3 Trip C TC1 NO GEN TRIP On (VO1) OK
H4 Trip A TC2 NO GEN TRIP On (VO1) OK
H5 Trip B TC2 NO GEN TRIP On (VO1) OK
H6 Trip C TC2 NO GEN TRIP On (VO1) OK

16
M1 TRIP K86 NO GEN TRIP On (VO1) OK
M2 TRIP CBF NC GEN TRIP On (VO1) OK
M3 CBF Init MV NO GEN TRIP On (VO1) OK
M4 LO RESET K86 NO RESET OP OK

17
3.3 SUMMARY OF WIRED CONTACT INPUTS

Contact
Description Tested
ID
(U1a) DC fail M2 OK
(U1c) BCPU Fail OK
(U3a) OL_Xmfr_Min OK
(U3c) OL_Xmfr_Max OK

18
(U4a) OL_OLTC_Min OK
(U4c) OL_OLTC_Max OK
(U5a) BucholzAlarm OK
(U5c) Oil Temp Ind OK
(U6a) WTI HV Alarm OK
(U6c) WTI LV Alarm OK
(M5a) Bucholz Trip OK
(M5c) Oil TempTrip OK

19
(M6a) WTI HV Trip OK
(M6c) WTI LV Trip OK
(M7a) OLTCRlayTrip OK
(M7c) PresOLTCTrip OK
(M8a) MechTFO Trip OK

20
21
4 MEASUREMENTS VERYFICATION T60
4.1 UNBALANCED SYSTEM TO IDENTIFY PHASES

5TA LV SIDE CURRENT


(TA13) ACTUAL VALUES
[F5-F7]

22
Phase I Mag I Angle I Mag I Angle RESULT DATE

A 1A 0º 499.7 A -0,2 OK 22/03/2017

B 2A -120º 998.77 A -120 OK 22/03/2017

C 3A -240º 1.499 A -240 OK 22/03/2017

METERING OK/NOT OK

5TA HV SIDE CURRENT ACTUAL VALUES


23
(TA1(6kV))
[F1-F3]
Phase I Mag I Angle I Mag I Angle RESULT DATE

A 1A 0º 149.98 0 OK 22/03/2017

B 2A -120º 299.6 -120.2 OK 22/03/2017

24
C 3A -240º 449.54 -240.2 OK 22/03/2017

METERING OK/NOT OK

LV SRC GROUND
ACTUAL VALUES
CURRENT
Phase I Mag I Angle I Mag I Angle RESULT DATE

25
G 1A 0º 499.85 -- OK 22/03/2017

METERING OK/NOT OK

4.2 BALANCED I SYSTEM

5TA HV SIDE CURRENT ACTUAL VALUES

26
[F1-F3]
Phase I Mag I Angle I Mag I Angle RESULT DATE

A 1A 0º 149.9 A 0 OK 22/03/2017

B 1A -120º 149.9 A -120.2 OK 22/03/2017

C 1A -240º 149.9 A -240 OK 22/03/2017

METERING OK/NOT OK
27
5TA LV SIDE CURRENT
ACTUAL VALUES
[F5-F7]
Phase I Mag I Angle I Mag I Angle RESULT DATE

A 1A 0º 499.7 0.5 OK 22/03/2017

28
B 1A -120º 499.6 -120.6 OK 22/03/2017

C 1A -240º 499.90 -240.7 OK 22/03/2017

METERING OK/NOT OK

29
30
5 PROTECTION FUNCTIONS TESTS T60A

31
5.1 87A-5TA DIFFERENTIAL TRANSF.
5.1.1 DIFFERENCIAL FIRST STEP

32
The following
graph shows
Total
Diferential
characteristic.

33
INJECTION
SETTING TESTED
Phase 5TA HV SIDE 5TA LV SIDE CONCLUSION
VALUE VALUE
CURRENT CURRENT
(132kV) (33kV)
[F1-F3] [F5-F7]
I Mag I I Mag I PKP & TIME PKP TIME RESUL DATE
Angle Angle T
A 0,67 A 150º 0,805 A 0º 0,3pu,
slope1=30%,
22/03/20
B 0,67 A 30º 0,805 A -120º brkp1=1,5pu, -- -- OK
brkp2=3pu, 17
C 0,67 A 270º 0,805 A 120º slope2=98%,
delay 0 sec

34
I Mag I I Mag I PKP & TIME PKP TIME RESUL DATE
Angle Angle T
A 0A 150º 0,24 A  0º 0,3pu,
slope1=30%,
brkp1=1,5pu, 0.3 22/03/20
B 0A 30º 0,24 A  -120º
brkp2=3pu, 35.1 ms OK
pu 17
slope2=98%,
C 0A 270º 0,24 A  120º delay 0 sec

I Mag I I Mag I PKP & TIME PKP TIME RESUL DATE


Angle Angle T
A 1A 150º 0,84 A  0º 31ms OK

35
B 1A 30º 0,84 A  -120º 0,3pu, Idif=
slope1=30%, 0.36 22/03/20
C 1A 270º 0,84 A  120º brkp1=1,5pu, 17
brkp2=3pu, Irest
=1.2
CONTACT 22/03/20
H1, H2, H3, H4, H5, H6, M1, M2, M3 OK
OUTPUTS 17
ACTIVATED
22/03/20
LED LED 1 (XFMR PCNT DIFF OP) ON OK
17

36
5.1.2 DIFFERENCIAL SECOND STEP
5TA HV SIDE
CURRENT (132kV)
[F1-F3]

I Mag I Angle PKP & TEST TIME RESUL DATE


TIME T
A 6A 0º 8.00 pu
Instantan 22/03/201
B 6A -120º 6.7 A 42ms OK
eous 7
C 6A 120º (6.67A)

37
CONTACT 22/03/201
H1, H2, H3, H4, H5, H6, M1, M2, M3 OK
OUTPUTS 7
ACTIVATED
LED LED 2 (87I TRIP On (VO2)) ON OK 22/03/201
7

5.1.3 DIFFERENCIAL FIRST STEP 2º HARMONIC BLOCK


5TA LV SIDE RESULT DATE
CURRENT (33kV) th
Block 2 =20%fo
[F5-F7]

38
I Mag I Angle Freq. (Hz) Amplitude (A) at
100Hz
A 1A 0º
22/03/20
24% 100 Hz (no trip) OK
B 1A -120º 17

C 1A 120º

39
5.1.4 DIFFERENCIAL FIRST STEP 5º HARMONIC BLOCK
5TA LV SIDE RESULT DATE
CURRENT (33kV) th
Block 5 =10%fo
[F5-F7]

I Mag I Angle Freq. (Hz) Amplitude (A) at


100Hz
A 1A 0º OK 22/03/20
12% 250 17
B 1A -120º (no trip)
Hz
C 1A 120º

40
5.2 RESTRICTED GROUND FAULT

INJECTION
SETTING TESTED
CONCLUSION
Phase 5TA LV SIDE CURRENT VALUE VALUE
Auxiliary CT
I Mag I PKP & TIME PKP TIME RESULT DATE
Angle
A, B, C 0A 0º 59 ms ok

41
G 0,06 A  0º 0,08pu, 0.08 27/03/20
slope1=40%, 17
mA

A, B or C 80 mA 0º 0,08pu,
NO 27/03/20
slope1=40%, 0 mA OK
delay 0,02 sec TRIP 17
G 80 mA 0º

A, B or C 80 mA 0º 46 ms OK

42
0,08pu,
0.16 27/03/20
G 80 mA 180º slope1=40%,
delay 0,02 sec mA 17

CONTACT 27/03/20
H1, H2, H3, H4, H5, H6, M1, M2, M3
OUTPUTS 17
ACTIVATED
27/03/20
LED LED 3 (RESTD GND FT1 OP) ON 17

43
5.3 INSTANTANEOUS OVERCURRENT IOC1

Phase INJECTION
SETTING TESTED
CONCLUSION
5TA LV SIDE CURRENT VALUE VALUE
Auxiliary CT
I Mag I PKP & TIME PKP TIME RESULT DATE
Angle
0,17pu, 0,017 920 27/03/20
A, B or C 0,06 A  0º OK 17
delay 0,9 sec 1 ms

44
CONTACT 27/03/20
H1, H2, H3, H4, H5, H6, M1, M2, M3 OK
OUTPUTS 17
ACTIVATED
27/03/20
LED LED 4 (GROUND IOC1 OP) ON OK 17

45
46
6 COMMENTS/OPEN POINTS

47
48
7 CONCLUSION

49
GE Digital Energy Representative Customer Representative

NAME

SIGNATURE

DATE

50

You might also like