BOQ for construction of 1x5 MVA 33/11 KV Sub-station at Medical.

Sl No Description of Materials Unit Qty. Supply Errection


Total Amount for
supply & Erection
Rate(Rs) Amoun t (Rs) Rate(Rs) Amount (Rs)

1 2 3=(1X2) 4 5=(1X4) 6=(3+5)

1 33/0.4KV 100KVA station transformer No 1


33 KV VCB(3-pole, 1250 A, 50Hz, 25 KA ,
2 No 2
CT, CRP & Power Pack)
3 11 KV VCB with CT & CRPs with Power Pack No 2
4 33KV Post type insulator No 9
5 33KV LA 10 KA No 3
6 33KV 400A 3Pole AB Switch Set 1
7 33KV HG Fuse Set 1
Transportation from Southco store and
8 Km 0.3
Errection of 232 mm² AAA Conductor Will be supplied by Southco
9 11KV AB Switch 400 A 3-pole Set 5
10 11KV HG Fuse 400 A 3-pole Set 2
11 11KV LA (12 KV, 10 KA) No 6
12 11 KV Post type Insulator No 12
13 11 KV 45 KN Disc Insulator (T & C) No 84
14 Hard ware fitting (T & C) Set 42
Transportation from Southco store and
15 Km 0.5
Errection of100mm² AAA Conductor Will be supplied by Southco
16 Earthing Device No 27
17 50x6 mm GI flat Mtr. 100
18 25x6 GI flat Mtr. 130
19 Flexible earth Cu Band No 6
20 Pad Clamp suitable for 100mm² AAAC No 30
21 Pad Clamp suitable for 232mm² AAAC No 18
22 T Clamp suitable for 232/232 mm² AAAC No 12
23 33KV Danger Board No 5
24 11KV Danger Board No 10
25 LT Distribution Box No 1
26 250w Lamp fitting LS 6
27 95mm² 3 1/2 core cable Mtr. 50
200x100 mm RS Joist ( 9 mtr.-6 nos. &
28 Kg 3570
6.5mtr.-10 nos.)
29 100x50x6 mm MS Chanel Kg 708.4
30 75x40x6 mm MS Channel Kg 571.2
31 50x50x6mm MS Angle Kg 105.3
32 Fire Bucket LS 4
33 First Aid Box LS 1
34 Discharge Rod No 4
35 7core, 2.5mm², 1.1 KV Control cable Mtr. 60
36 4core, 2.5mm², 1.1 KV Control cable Mtr. 60
37 2core, 2.5mm², 1.1 KV Control cable Mtr. 250
38 Red Oxide Paint Ltr. 15
39 Al. Paint Ltr. 10
40 Black Paint Ltr. 2
41 Nut,Bolts and Washer(Different Size) Kg 100
Padding & concreting of poles
42 LS 16
(0.45x0.45x1.5)
43 Total

PART-8-Misc. works(FOR CIVIL WORKS FOR 33/11 KVS/S)


1 Metal spreading LS
Construction of 11 KV VCB foundation with
2 mounting No. 2
Construction of 33 KV VCB foundation with
3 mounting No. 2
Construction of plinth for 5MVA,33/11KV
4 Power Transformer with mounting No. 1
5 Earth pit with cover plate No. 27
6 Total
BOQ FOR CONSTRUCTION OF 7.5 K.M 33 KV LINE WITH 232
SQMM AAA CONDUCTOR (C-F).
Sl .No Description of Materials Unit Quantity Total Amount
Supply Errection
for Supply &
Rate(Rs) Amount (Rs) Rate (Rs) Amount (Rs) Errection
1 2 3=(1x2) 4 5=(1X4) 6=(3+5)
1 10 mtr long 150x150 mm RS Joist. No 300
100x50x6 mm MS Channel (9.2
2 Kg 9660
Kg/mtr)

75x40x6 mm MS Channel (6.8


3 Kg 7140
Kg/mtr)

50x50x6 mm Bracing Angle (4.5


4 Kg 6750
Kg/mtr)

5 33 KV Pin Insulator No 45
6 33 KV G.I Pin No 45
7 33 KV Disc Insulator B/S No 1485
33 KV HW Fitting (B & S Type) -
8 Set 405
Suspension Type
33 KV HW Fitting (B & S Type) -
9 Set 90
Tension Type
10 Earthing Coil Each 300
11 MS Nut ,Bolt & Washer Kg 480
Transportation from Southco Store
12 and errection of 232 sqmm AAA Km 23.50
Conductor Will be supplied by Southco.
PG Clamp for 232 Sq. mm AAA
13 No 78.75
Conductor
14 HT Stay Set Set 114
15 7/10 SWG stay wire Kg 1140
16 Stay insulator No 114
17 Stay clamp Pair 114
18 Cement Concreting of Stay Pit 114
19 Cement Concreting of Pole Each 300
20 Painting of MS Materials Ltr 100
BOQ of 11KV line 3ph with 55mm2 AAAC=0.5 KM
Sl. Description of Materials Unit
Quantity Total Amount
No Supply Errection
for Supply &
Rate(Rs) Amount (Rs) Rate (Rs) Amount (Rs) Errection
1 2 3=(1x2) 4 5=(1X4) 6=(3+5)
1 9mtr. Long 300kg. PSC Pole No 7
2 RCC Base plate No. 7
3 Padding and concreting material for
support No. 7
4 Earthing Support( Coil Type) No 7
5 11KV 'V' Cross Arm No. 6
6 Back Clamp No. 6
7 F-Clamp No. 6
8 11KV Pin Insulator No. 19
9 11KV G.I Pin No. 19
10 Disk Insulator (T&C type) No. 9
11 Hardware for Disk Insulator No. 9
12 HT Stay Set Set 2
13 Stay Wire (7/10 SWG) Kg 20
14 Stay Insulator No. 2
15 Stay Clamp Pair 2
16
Concrete material for stay anchor plate No. 2
17 Danger Plate No. 7
18 MS Channel (100x50x6)mm 9.2kg/mtr 33
for tapping point Kg
19 Transportation from Southco store & 1.50
errection of 1.5KM,55sqmm AAA Will be Supplied by
conductor km Southco
20 Paint Ltr 4
21 M.S. Bolts, Nuts & Washers of different Kg 13
size
BOQ for 2 Nos of 4 Pole Structure with 6 Nos AB Switch)( At Point F & G)

Sl. No Description of Materials Unit Qty


Supply Errection Total Amount
for Supply &
Rate(Rs) Amount (Rs) Rate (Rs) Amount (Rs) Errection

1 2 4 5=(1X4) 6=(3+5)
3=(1x2)

1 11 mtr long 350 K.G psc Pole No 8

2 33KV Disc Insulator B&S type No 126

3 33KV H/W fitting B&S type No 42

4 Earthing Of Support (Coil Type) No 8

Padding and concering material for


5 pair 8
support

6 M.S Bolts, Nuts & Washers kg 25

Transportation from Southco store


7 KM 0.2
and errection of 232 sqmm AAA Will be supplied by Southco
Conductor
8 Base plate for support No 8

100X50X6mm. MS Channel (2.8m


9 112
X32 pcs) (9.2Kg/mtr.
Angle for cross brasing of DP
10 50X50X6mm 5mtr long each, No 72
16Nos(4.5Kg/Mtr)

11 400A 33 KV 3 pole AB Switch Set 6

G.I Pipe Earthing 40mm Dia medium


12 No 4
gauge 2.5mtr long

13 No.6 G.I wire for earthing Kg 40


BOQ FOR UPRATING THE CONDUCTOR FROM 80 SQMM TO
100 SQMM (F-G).
Sl .No Description of Materials Unit Quantity Supply Errection Total Amount
for Supply &
Rate(Rs) Amount (Rs) Rate (Rs) Amount (Rs) Errection
1 2 3=(1x2) 4 5=(1X4) 6=(3+5)
10 mtr long 150x150 mm RS Joist.
1 No 12
With required painting
2 Earthing Coil Each 12
3 MS Nut ,Bolt & Washer Kg 25
Transportation from Southco store
4 and errection cost of 100 sqmm Km 9.89
AAA Conductor of 9.89KM

5 33 KV V-Cross Arm No. 12.00

6 Back Clamp for V-Cross Arm No. 12.00

7 Cement Concreting of Pole Each 12

8 Painting of MS Materials Ltr 10

9 Danger Plate Each 12

10 RCC Base Plate Each 12


BOQ FOR CONSTRUCTION OF 33 KV LINE WITH XLPE
CABLE (B-C).
Sl .No Description of Materials Unit Quantity Total Amount for
Supply Errection
Supply &
Rate(Rs) Amount (Rs) Rate (Rs) Amount (Rs) Errection
1 2 3=(1x2) 4 5=(1X4) 6=(3+5)

1 11 mtr long 150x150 mm RS Joist. No 4

2 100 X 50X6 mm MS Channel Mtr 24


3 75x40x6 mm MS Channel Mtr 24
4 50x50x6 mm MS Angle Mtr 10
5 HT Stay Set Set 4
6 7/10 SWG stay wire Kg 40
7 Stay insulator No 4
8 Stay clamp Pair 4
9 1X300 MMSQ 33 KV XLPE Cable Mtr 600
10 Cable jointing kit outdoor type Each 6
11 Cable Marker No 12
12 PVC 300 mmsq ' O ' Clamp Each 12
300 mm O PVC Pipe for supporting
13 of XLPE Cable in middle of D.P Mtr 30
Structure.
14 MS Nut ,Bolt & Washer Kg 50

15 33 KV Lightening arrestor No. 6

16 Earthing devicPit Each 4


GI Pipe Earthing 40mm dia
17 No. 10
medium gauge
18 GI flat 25X 6mm for earthing Kg 24
19 Coal & Salt Each 16

20 Cement Concreting of Stay 4


Pit

21 Cement Concreting of Pole Each 4

22 Painting of MS Materials Ltr 100


23 Caution Plate Each 4
24 Barbed wire Kg 30
BOQ FOR EARTH WORK FOR BORING AT 300 MM DIA CABLE
TRENCH WORKS AT KM594/1-2 & 594/3-4 IN BETWEEN
STATION JNP-BAM FOR PUSHING OF XLPE CABLE WITH
Sl .No Description of Materials Unit Quantity Supply Errection
Total Amount for
Rate(Rs) Amount (Rs) Rate (Rs) Amount (Rs) Supply & Errection
1 2 3=(1x2) 4 5=(1X4) 6=(3+5)
Booring of H type of 33 mm dia
1 with digging og 300 mm dia MS Mtr 43
Encasing pipe single ckt.
Cable looping chamber with Brick
2 wall including cement concreting LS 2
RCC Cover

3 300 mm Dia RCC Pipe Mtr 43


Earthing cutting, digging and filling
4 LS 1
from earth pit to DP structure
Extra works of Brick wall and sand
5 filling with arrangement of cable LS 1
from Earth pit to DP Structure

You might also like