Professional Documents
Culture Documents
Productivity:
I have exceeded the target in the execution of test cases. Executed x test cases/week, target was y
test cases/week
As my responsibilities also include many report generation , follow up and helping the team
members ,still I am able to maintain to achieve the target as an individual contributor along with
lead activities.
Always try to find out new ways to accomplish the work and thus be more productive. e.g - give few
examples.
Process Compliance:
Task Effectiveness:
Test Execution:
This year I worked on the following projects and always met the target date.
Core Components:
AU
MA with AU 7.0
Linux support for AU 7.0
License Reporting AU 7.0 SP1
Modules:
O release - WU as individual contributor and guiding OU module
Meeting Deadline:
Raised defects with all the details. Zero complaints from offshore and onsite team.
I have filed 69 issues in this year. Attached is the excel sheet. Among these 2 are not a bug and
hence actual count is 67.
Severity wise distribution is as follows.
Sev1 - 3
Sev2 - 24
Sev3 - 24
Sev4 - 16
QQ = 3x4+24x3+24x2+16x1=148
I have 2 bugs as invalid i.e 2/69=2.89% which is much below than the limit allowed
Verification of Defects:
Knowledge Sharing:
Imparted trainings to H(xplanner) and B(Test Director, team Track) by scheduled date
Gave inputs on AU Test cases to D and R who joined the team.
Shared environment set up with Dev team to help them to fix the issue. [Feedback from K can be
taken]
Helped Doc team to set up the environment from the scratch for some reference. [Feedback from V
can be taken]
Extra Achievement: