PLAN PIT SELATAN

OB = 139,687 BCM
CO = 15,000 MT
SR = 9.31

1. PT PWP
PRODUCTION PT.PWP 31 Mei 2018
> OB = 1,659 BCM
> SHIFT I = 196 BCM
> SHIFT II = 1,463 BCM
> COAL = 000.00 MT
> COAL Shift I = 000.00 MT
> COAL Shift II = 000.00 MT
> SR = #DIV/0!

TOTAL PRODUCTION PT.PWP 1 S/D 31 Mei 2018


> OB = 51,346 BCM = Ach 37%
> COAL = 1,295 MT = Ach 9%
> SR = 39.66