You are on page 1of 122

KERALA STATE ELECTRICITY BOARD LTD

Name of work:Extension of Control room building of 66kV Substation ,


Mundakkayam as part of the upgradation work

ABSTRACT
PART I (CIVIL WORK)
Item
Quantity Unit Description Rate Unit Amount
No.

1 7.00 m3 #VALUE! 1272.35 m3 8,906.45

2 6.00 m3 #VALUE! 1505.35 m3 9,032.10

3 11.00 m3 #VALUE! 1518.40 m3 16,702.40

4 1.50 m3 #VALUE! 2196.05 m3 3,294.08

5 105.00 Kg #VALUE! 3.60 Kg 378.00


6 26.45 m2 #VALUE! 29.40 m2 777.63

7 5.25 No #VALUE! 238.30 no 1,251.08

8 4.16 no #VALUE! 326.70 no 1,359.07

9 105.00 m2 #VALUE! 47.60 no 4,998.00

10 5.00 m3 #VALUE! 251.20 m3 1,256.00

11 43.00 m3 #VALUE! 416.45 m3 17,907.35


12 2.00 m3 #VALUE! 428.95 m3 857.90

#VALUE!

13 10.00 m3 7322.00 m3 73,220.00

#VALUE!

14 7.50 m3 6788.10 m3 50,910.75

15 20.00 m3 #VALUE! 8165.10 m3 163,302.00

16 45.00 m2 #VALUE! 292.80 m2 13,176.00

17 425.00 m2 #VALUE! 571.60 m2 242,930.00

18 85.00 m2 #VALUE! 706.35 m2 60,039.75


19 5600.00 Kg #VALUE! 85.30 Kg 477,680.00

20 16.50 m #VALUE! 549.45 m 9,065.93

21 70.00 m3 #VALUE! 9431.10 m3 660,177.00

22 3.00 m3 #VALUE! 8969.75 m3 26,909.25

23 1.00 m3 #VALUE! 8278.10 m3 8,278.10

24 375.00 Kg #VALUE! 88.25 Kg 33,093.75

25 240.00 Kg #VALUE! 129.75 Kg 31,140.00


26 30.00 m2 #VALUE! 118.35 m2 3,550.50

27 200.00 m2 #VALUE! 326.40 m2 65,280.00

28 510.00 m2 #VALUE! 344.65 m2 175,771.50

29 33.00 m2 #VALUE! 73.75 m2 2,433.75

30 48.00 m3 #VALUE! 189.85 m3 9,112.80

31 10.00 m3 #VALUE! 6016.25 m3 60,162.50

32 16.00 m3 #VALUE! 7268.30 m3 116,292.80

33 22.00 m2 #VALUE! 254.75 m2 5,604.50


34 30.00 m3 #VALUE! 10296.80 m3 308,904.00

35 190.00 m2 #VALUE! 1690.40 m2 321,176.00

36 2850.00 Kg #VALUE! 99.35 Kg 283,147.50


37 80.00 Kg #VALUE! 580.50 Kg 46,440.00

38 15.00 Kg #VALUE! 671.70 Kg 10,075.50

39 4.50 m2 #VALUE! 1308.40 m2 5,887.80


40 4.00 m2 #VALUE! 1515.75 m2 6,063.00

41 20.00 m2 #VALUE! 1119.50 m2 22,390.00

42 50.00 m #VALUE! 94.30 m 4,715.00

43 1.00 no #VALUE! 542.00 no 542.00

44 1.00 no #VALUE! 103.10 no 103.10

45 10.00 no #VALUE! 70.53 no 705.30

46 4.00 no #VALUE! 183.82 no 735.28


47 96.00 no #VALUE! 38.15 no 3,662.40

48 24.00 no #VALUE! 63.82 no 1,531.68

49 180.00 m2 #VALUE! 162.75 10m2 2,929.50

50 85.00 m2 #VALUE! 131.85 m2 11,207.25

51 270.00 m2 #VALUE! 107.20 m2 28,944.00

52 460.00 m2 #VALUE! 227.45 m2 104,627.00

53 32.00 m2 #VALUE! 1081.55 m2 34,609.60

#VALUE!
54 65.00 m 10.80 m 702.00
#VALUE!

55 12.00 m2 1124.50 m2 13,494.00

56 10.00 m #VALUE! 356.85 m 3,568.50

#VALUE!

57 2.00 no 170.75 no 341.50

#VALUE!

58 1.00 m2 2780.15 m2 2,780.15

#VALUE!
59 #VALUE! no 572.65 no #VALUE!
#VALUE!

60 1.00 no 50.77 no 50.77

#VALUE!

61 50.00 45.80 no 2,290.00

#VALUE!

62 15.00 no 169.30 no 2,539.50

PART I TOTAL #VALUE!


PART 2 (ELECTRIFICATION)
Item
Quantity Unit Description Rate Unit Amount
No.

Wiring for light point/ fan point/ exhaust fan


point/ call bell point with 1.5 sq.mm FRLS
PVC insulated copper conductor single core
cable in surface / recessed medium class
PVC conduit, with modular switch, modular
plate, suitable GI box and earthing the point
with 1.5 sq.mm FRLS PVC insulated copper
conductor single core cable etc. as required.
1
10 /point Group A Point (short point) 827.37 /point 8274

7 /point Group B Point (medium point) 928.53 /point 6499.5

6857.4
6 /point Group C (long point) 1142.92 /point

Wiring for light/ power plug with 2X4 sq. mm


FRLS PVC insulated copper conductor
single core cable in surface/ recessed
medium class PVC conduit alongwith 1 No. 4 253.65 /metre 10146
sq. mm FRLS PVC insulated copper
conductor single core cable for loop earthing
2 40 /metre as required.

Wiring for circuit/ submain wiring alongwith


earth wire with the following sizes of 2 X 1.5
sq. mm + 1 X 1.5 sq. mm earth wire FRLS 169.1 /metre 7778.6
PVC insulated copper conductor, single core
cable in surface/ recessed medium class
3 46 /metre PVC conduit as required.
Supplying and drawing following 2 x 1.5 sq.
mm sizes of FRLS PVC insulated copper 55.86 /metre 2234
conductor, single core cable in the existing
surface/ recessed steel/ PVC conduit as
4 40 /metre required.

Supplying and fixing of following sizes of


medium class PVC conduit along with 86.06 /metre 3442.4
accessories in surface/recess including
painting in case of surface conduit, or cutting
the wall and making good the same in case
5 40 /metre of recessed conduit as required.

Supplying and fixing following size/ modules,


GI box alongwith modular base & cover plate
for modular switches in recess etc. as
6 required.

(a) 1 /each 4 Module (125 mmX75 mm) 309.51 /each 309.5

(b) 1 /each 6 Module (200 mmX75 mm) 389.53 /each 389.5

(c) 1 /each 8 Module (125 mmX125 mm) 448.41 /each 448.4

(d) 1 /each 12 Module (200 mmX150 mm) 519.35 /each 519.35


Supplying and fixing following way, single
pole and neutral, sheet steel, MCB
distribution board, 240 V, on surface/ recess,
complete with tinned copper bus bar, neutral
bus bar, earth bar, din bar, interconnections,
powder painted including earthing etc. as
required. (But without MCB/RCCB/Isolator)

7
(a) 1 /each 6 way, Double door 1422.23 /each 1422.2
(b) 1 /each 8 way, Double door 1601.9 /each 1601.9

Supplying and fixing 5 A to 32 A rating,


240/415 V, 10 kA, “C” curve, miniature circuit 2097
breaker suitable for inductive load of
following poles in the existing MCB DB
complete with connections, testing and
8 3 /each commissioning etc. as required. Double pole. 699.04 /each

Supplying and fixing following 40 A rating,


double pole, 240 V, isolator in the existing 335.2
MCB DB complete with connections, testing
9 1 /each and commissioning etc. as required. 335.18 /each
Supplying and fixing following rating,40 A
double pole, (single phase and neutral), 240
V, residual current circuit breaker (RCCB),
having a sensitivity current 30 mA in the
existing MCB DB complete with connections, 2595.35 /each 2595.35
testing and commissioning etc. as required.

10 1 /each
Supplying and fixing 3 pin, 5 amp ceiling
rose on the existing junction box/ wooden
block including connection etc as required. 69.45 /each 208.35

11 3 /each
Supplying and fixing stepped type electronic
fan regulator on the existing modular plate
switch box including connections but
excluding modular plate etc. as required. 434.82 /each 1304.4

12 3 /each
Installation, testing and commissioning of
pre-wired, fluorescent fitting / compact
fluorescent fitting of all types, complete with
all accessories and tube etc. directly on
ceiling/ wall, including connection with 1.5 150.98 /each 302
sq. mm FRLS PVC insulated, copper
conductor, single core cable and earthing
etc. as required.
13 2 /each
Installation, testing and commissioning of
pre-wired, fluorescent fitting / compact
fluorescent fitting of all types, complete with
all accessories and tube etc. including
supplying and fixing ball and socket
arrangement, 2 No. down rods of
20mmdiaX1.6mm thick steel conduit up to
30cm length, painting and wiring hte down 372.92 /each 3356.1
rods and connection with 1.5 sq. mm FRLS
PVC insulated, copper conductor, single core
cable and earthing etc. as required.

14 9 /each

Installation, testing and commissioning of


ceiling fan, including wiring the down rods of 158.53 /each 475.5
standard length (upto 30 cm) with 1.5 sq.
mm FRLS PVC insulated, copper conductor,
15 3 /each single core cable etc. as required.

Supply of double tube fittings suitable for 1127 /each 2254


celing fittings with tubes, electronic chokes,
of ISI marked good quality, with fixing ball
16 2 /each and socket arrangement (Market Rate)
Supply of Single 4 Feet, 16W LED tube light
fittings with LED tube and accessories of ISI 609.5 /each 5485.5
17 9 /each marked good quality (Market rate)

Supply of cieling fan of 1200 mm sweep with 1909 /each 5727


18 3 /each all fitting of ISI marked good quality

Supply of 50 W LED lights of reflector type 4738 /each 18952


19 4 /each for out door use

Uncoiling 5/4/3/2 core 4sqmm control


cable(armoured or un armoured) from cable
drums and laying through trench/pipe/cable 28.39 / metre 1135.6
tray neatly and carefully including for
providing loops wherever necessary and
cable marker at both ends of cable as per
20 40 / metre direction of departmental staff at site.
Termination of cables in panel by using cable
glands of fixing the cable rigidly by any
means as per direction of departmental staff
at site charges include for providing
necessary suitable hole in the gland plate 201.27 /each 805.08
etc.4/2 core 2.5 sq mm cable/4/2 core 4 sq
mm cable (using gland of size 16-22mm)

21 4 /each

Earthing with G.I earth pipe 4.5mtr long,


40mm dia including accessories, and
providing masonry enclosure with cover plate 5543.99 /each 11087.97
having locking arrangement and watering
pipe etc. , with charcoal/ coak and salt as
22 2 /each required.

Providing and laying earth connection from


earth electrode with 4.00 mm dia copper wire 274.78 / metre 4121.75
in 15 mm dia G.I. pipe from earth electrode
including connection with copper thimble
23 15 / metre excavation and re-filling as required.
PART 2 TOTAL 110166.41
Total of (PART1+PART2) #VALUE!
Add Provision for Tax @18% #VALUE!
Total #VALUE!

Unforseen items if any #VALUE!

GRAND TOTAL 4500000.00

Rupees Fourty Five Lakh only


- 3605951
#VALUE!
KERALA STATE ELECTRICITY BOARD LTD
Name of work:Extension of Control room building of 66kV Substation , Mundakkayam as part of the
upgradation work

DETAILS OF ESTIMATE
PART 1(CIVIL)

Item No. Description No. Length Breadth Height

Demolishing brick work manually/ by mechanical means


including stacking of serviceable material and disposal
of unserviceable material within 50 metres lead as per
direction of Engineer-in-charge In cement mortar
1 DSR 2016 Code/15.7.4
Front wall 1 8.5 0.23 3.65
Deduction for door -1 1.6 0.23 2.6
Deduction for windows -2 1.75 0.23 1.5
Hand rail pillar 1 0.25 0.25 0.7
sunshade edge wall 1 10.16 0.2 0.1
Parapet wall 1 10.16 0.23 0.6
Deduction for lintel -1 8.5 0.23 0.15
Add extra
Total

Demolishing cement concrete manually/ by mechanical


means including disposal of material within 50 metres
lead as per direction of Engineer - in- charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent
2 design mix) - DSR 2016/15.2.1
Belt concrete over RR work 1 10 0.55 0.05
Ramp-Concrete 1 0.6 2.1 0.4
Extension of existing power cable trench 1 4.1 1.8 0.25
Trench for drain 1 0.8 1.8 0.25
Control cable trench - front side 1 7.2 1.4 0.25

Total
Demolishing stone rubble masonry manually/ by
mechanical means including stacking of serviceable
material and disposal of unserviceable material within
50 metres lead as per direction of Engineer-in-charge :
In cement mortar
3 DSR 2016/15.9.2
Existing trench 2 7 0.55 1
Ramp-RR 1 3 2.1 0.4
Add extra
Total

Demolishing R.C.C. work manually/ by mechanical


means including stacking of steel bars and disposal of
unserviceable material within 50 metres lead as per
direction of Engineer - in- charge.
4 DSR 2016/15.3
sunshade 1 10.16 0.6 0.1
edge of roof slab for connection purpose 1 10.16 0.4 0.1
Lintel 1 8.5 0.23 0.15
Add extra
Total

Dismantling steel work in built up sections in angles,


tees, flats and channels including all gusset plates, bolts,
nuts, cutting rivets, welding etc. including
dismembering and stacking within 50metres lead.
5 DSR 2016/15.17.2
Fencing - Angles 3 2.6
Fencing - Angles (door) 2 2.3
Fencing - Angles (door) 2 1.2
Total
Weight of angle @6.80 Kg/m
Add extra
Total

Dismantling chainlink fabric fencing with G.I wire,


welding etc. including dismembering and stacking
within 50metres lead.
6 (Arrived data)
Fencing - wire mesh 1 11.5 2.3
Dismantling doors, windows and clerestory windows
(steel or wood) shutter including chowkhats, architrave,
holdfasts etc. complete and stacking within 50 metres
lead:
Of area 3 sq. metres and below
7 DSR 2016/15.12.1 2 1.75 1.5

Dismantling doors, windows and clerestory windows


(steel or wood) shutter including chowkhats, architrave,
holdfasts etc. complete and stacking within 50 metres
lead :
Of area beyond 3 sq. metres
8 DSR 2016/15.12.2 1 1.6 2.6

Dismantling tile work in floors and roofs laid in cement


mortar including stacking material within 50 metres
lead.
15.23.1 For thickness of tiles 10 mm to 25 mm
9 DSR 2016/15.23.1
Control room-Existing 1 8.5 10.3
Deduction for trench & control panel -1 6.4 2.45
Deduction for trench & control panel -1 6 1.4
Deduction for trench & control panel -1 4 1.4
Skirting 1 38 0.15
Corridor-Existing 1 1.5 6.5
Skirting 1 16 0.15
AE-room-Existing 1 3.25 3
Skirting 1 12.5 0.15
Duty room-Existing 1 3.25 3.1
Skirting 1 12.7 0.15
Add extra
Total

Earth work in excavation by mechanical means


(Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10
sqm on plan), including dressing of sides and ramming
of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m. (All kind of soil)
10 DSR 2016/2.8
Control cable trench - yard side 1 9.9 1.4 0.3
Add extra
Total
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over
areas(exceeding 30 cm in depth, 1.5 m in width as well
as 10 sqm on plan) including disposal of excavated
earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed. (Ordinary rock)
11 DSR 2016/2.9
Extension of existing power cable trench 1 3.1 1.8 0.7
Power cable trench - front side 1 9.15 1.4 0.5
Control cable trench - yard side 1 9.9 1.4 0.5
Connection from existing control cable trench to new tren 1 1.5 0.9 0.7
Footing F1 2 2 1.8 0.7
Footing F2 2 1.8 1.6 0.7
Footing F3 2 1.6 1.4 0.7
Footing F4 6 1.5 1.5 0.7
Footing F5 2 1.4 1.4 0.7
Between the existing structure and column C1 2 1.15 0.6 0.6
Between F1 & F2 2 1.55 0.6 0.6
Between F2 & F3 2 2.7 0.6 0.6
Between F3 & F4 2 0.77 0.6 0.6
Between F4 & F5 2 1.64 0.6 0.6
Between F4 & F4 - verandah 2 1.1 0.6 0.6
Between F4 & F5 - verandah 1 1.64 0.6 0.6
Between F5 & F5 - verandah 1 1.2 0.6 0.6
Add extra
Say (after deducting anticipated quantity of items 12 &
13)

Extra for excavating trenches for pipes, cables, etc. in


ordinary/hard rock exceeding 1.5 m in depth but not
exceeding 3 m. (Rate is over corresponding basic item
for depth upto 1.5 metre). (Ordinary rock)
12 DSR 2016/2.14
Excavation in hard rock using contractors non explosive
agent (chemical blasting) like ACCONEX or equivalent or
any other silmilar materials as per the directions of the
departmental officers without resorting to the use of
conventional explosive materials including drilling
necessary holes, wedging, picking, barring, removing
the soil and stacking at places pointed out by the deptl.
officers
13 Ref: Sanctioned Estimate No. 21/2014-15 of CE (TS)
Anticipated quantity

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :1:4:8 (1 Cement :
4 coarse sand : 8 graded stone aggregate 40 mm
nominal size)-for trench PCC
14 DSR 2016/4.1.8
Extension of existing power cable trench 1 3.1 1.8 0.1
Power cable trench - front side 1 9.15 1.4 0.1
Control cable trench - yard side 1 9.9 1.4 0.1
Connection from existing control cable trench to new tren 1 1.5 0.9 0.1
For footing F1 2 2 1.8 0.1
For footing F2 2 1.8 1.6 0.1
For footing F3 2 1.6 1.4 0.1
For footing F4 6 1.5 1.5 0.1
For footing F5 2 1.4 1.4 0.1
Add extra
Total

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :1:2:4 (1 Cement :
2 coarse sand : 4 graded stone aggregate 40mm
nominal size)- For Control room flooring
15 DSR 2016/4.1.4
Control room 1 8.75 11.25 0.2
Deduction for trench -1 5.69
Verandah & Porch 1 20.97 0.15
Ramp 1 1.8 2 0.1
Add extra
Total
Centering and shuttering including strutting, propping
etc. and removal of form for : Foundations, footings,
bases for columns
16 DSR 2016/4.3.1
Footing F1 2 1.8 1.6 0.55
Footing F2 2 1.6 1.4 0.55
Footing F3 2 1.4 1.2 0.55
Footing F4 6 1.3 1.3 0.55
Footing F5 2 1.2 1.2 0.55
Add extra
Total

Centering and shuttering including strutting, propping


etc. and removal of form for: Walls (any thickness)
including attached pilasters, butteresses, plinth and
17 string courses etc. DSR 2016/4.3.2
PB1 4 2.75 0.35
PB2 4 3.7 0.35
PB3 4 1.72 0.35
PB4 4 2.6 0.35
PB5 2 2.7 0.35
B1 2 2.75 0.30 0.33
B2 2 3.7 0.30 0.33
B3 2 1.72 0.30 0.33
B4 4 2.6 0.30 0.33
B5 2 2.7 0.30 0.33
B6 2 2.1 0.30 0.33
B7 3 9.4 0.30 0.63
Side wall of trench
Rebuilding demolished RR-existing trench-wall 4 6.5 0.7

Rebuilding demolished RR-existing trench-bottom 4 6.5 0.3


Extension of existing power cable trench 4 3.1 1
Control cable trench - front side 4 9.15 1
Control cable trench - yard side 4 9.9 1
Connection from existing control cable trench to new
trench near the existing front wall 4 1.5 0.5
Bottom slab of trench
Extension of existing power cable trench 2 3.1 0.2
Control cable trench - front side 2 9.15 0.2
Control cable trench - yard side 2 9.9 0.2
Connection from existing control cable trench to new
trench near the existing front wall 2 1.5 0.1
Roof slab-bottom-Control room and verandah area 1 10.3 14.57
Roof slab-side 1 10.3 14.57 0.12
Sunshade slab bottom 2 11.2 0.6
Sunshade slab sides 2 11.8 0.1
Add extra
Total

Centering and shuttering including strutting, propping


etc. and removal of form for : Columns, piers,
abutments, pillars, posts and struts
18 DSR 2016/4.3.3
Column C1 2 0.3 0.45 4.4
Column C2 2 0.3 0.45 4.4
Column C3 2 0.3 0.45 4.4
Column C4 6 0.3 0.3 4.1
Column C5 2 0.3 0.3 4.1
Add extra
Total

Steel reinforcement for R.C.C. work including


straightening, cutting, bending, placing in position and
binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or
19 more. DSR 2016/5.22.6
8mm bars
Column C1- Ties-1 23 1.66 2
Column C1- Ties-2 23 1.25 2
Column C2- Ties-1 23 1.66 2
Column C2- Ties-2 23 1.25 2
Column C3- Ties-1 23 1.66 2
Column C3- Ties-2 23 1.25 2
Column C4- Ties-1 21 1.66 6
Column C4- Ties-2 21 1.25 6
Column C5- Ties-1 23 1.36 2
Weight of 8mm @0.39Kg/m
10mm bottom bars
Footing F1-longl. 11 1.68 2
Footing F1-trnse. 11 1.48 2
Footing F2- longl. 9 1.48 2
Footing F2- trnse. 9 1.28 2
Footing F3- longl. 8 1.28 2
Footing F3- trnse. 8 1.08 2
Footing F4- longl. 7 1.18 6
Footing F4- trnse. 7 1.18 6
Weight of 10mm @ 0.62Kg/m3
8mm bars-Footing F5- longl. 7 1.08 2
8mm bars-Footing F5- trnse. 7 1.08 2
Weight of 8mm @ 0.39Kg/m3
Column main bars
C1- 20mm 4 5.7 2
Weight of 20mm @ 2.47 Kg/m3
C1-16mm 4 5.7 2
C2-16mm 8 5.7 2
C3-16mm 4 5.7 2
C4-16mm 4 5.7 6
Weight of 16mm @ 1.58 Kg/m3
C3-12mm 4 5.7 2
C5-12mm 4 5.7 2
Weight of 12mm @ 0.89 Kg/m3
Cable Trench reiforcement
10mm U bars-Extension of existing power cable trench 22 3.3 2
10mm U bars-Power cable trench - front side 62 3 2
10mm U bars-Control cable trench - yard side 67 3 2
Weight of 10mm @ 0.62 Kg/m3
8mm stirrups-Power cable trench - front side 20 9.15 2
8mm stirrups-Extension of existing power cable trench 22 3.1 2
8mm stirrups-Control cable trench - yard side 20 9.9 2
8mm Ubars-Connection from existing control cable trench 9 1.8 2
8mm stirrups-Connection from existing control cable trenc 10 1.5 2
Weight of 8mm @ 0.39 Kg/m3
Beams
B1 2 2.75 0.3 0.45
Reinforcement @110Kg/m3
B2 2 3.7 0.3 0.45
Reinforcement @110Kg/m3
B3 2 1.72 0.3 0.45
Reinforcement @110Kg/m3
B4 4 2.6 0.3 0.45
Reinforcement @110Kg/m3
B5 2 2.7 0.3 0.45
Reinforcement @110Kg/m3
B6 2 2.1 0.3 0.45
Reinforcement @110Kg/m3
B7 3 9.4 0.3 0.75
Reinforcement @110Kg/m3
Total steel for beams
Plinth beams
PB1 top bar - 16mm 2 3.4 2
Weight @ 1.58 Kg/m
PB1 bottom bar - 12mm 2 3.4 2
Extra bar - 12mm 1 2.04 2
Weight @ 0.89 Kg/m
PB2 top bar - 16mm 2 4 2
Weight @ 1.58 Kg/m
PB2 bottom bar - 12mm 2 4 2
Extra bar - 12mm 1 2.4 2
Weight @ 0.89 Kg/m
PB3 top bar - 16mm 2 2.32 2
Weight @ 1.58 Kg/m
PB3 bottom bar - 12mm 2 2.32 2
Weight @ 0.89 Kg/m
PB4 top bar - 16mm 2 3.1 2
Weight @ 1.58 Kg/m
PB4 bottom bar - 12mm 2 3.1 2
Extra bar - 12mm 1 1.86 2
Weight @ 0.89 Kg/m
PB5 top bar - 16mm 2 3
Weight @ 1.58 Kg/m
PB5 bottom bar - 12mm 2 3
Extra bar - 12mm 1 1.8
Weight @ 0.89 Kg/m
Weight of steel for plinth beams
Stirrups for plint beam 8mm bars
PB1 16 1.56
PB2 22 1.56
PB3 11 1.56
PB4 16 1.56
PB5 16 1.56
weight @ .39Kg/m
Roof slab
10mm bars longl. 98 10.25
10mm bars longl. 67 14.52
Weight @ 0.62 Kg/m3
Extra bar - 12mm 20%
Total
Sun shade & Lintel
10mm bars - lintel top 2 17
10mm-Sun shade -vertical-trns. 1 1.1 115
Weight of 10mm @ 0.62Kg/m
12mm bars - lintel bottom 1 17
Weight of 12mm @ 0.89Kg/m
8mm bars - stirrups-lintel 1 0.86 189
8mm-Sun shade -main 2 0.83 76
8mm-Sun shade -stirrups 2 11.2 4
8mm-Sun shade -vertical-longl 1 17.1 5
Weight of 8mm @ 0.39Kg/m
Total steel for sunshade & lintel
Grand Total for Steel Reiforcement
Add extra
Total

Providing and embedding 110mm HDPE pipe for for the


smooth entry of cables between trenches (As per
20 market rate)
Connection between trenches 3 5.5

Providing and laying in position specified grade of


reinforced cement concrete, excluding the cost of
centering, shuttering finishing and reinforcement -
All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
aggregate 20 mm nominal size)
21 DSR 2016/5.1.2
Footing F1 2 1.8 1.6 0.35
Footing F1-frustum((Base Area X height )/3) 2 1.8 1.6 0.5
Footing F2 2 1.6 1.4 0.35
Footing F2-frustum 2 1.6 1.4 0.5
Footing F3 2 1.4 1.2 0.35
Footing F3-frustum 2 1.4 1.2 0.5
Footing F4 6 1.3 1.3 0.35
Footing F3-frustum 6 1.3 1.3 0.5
Footing F5 2 1.2 1.5 0.35
Footing F5-frustum 2 1.2 1.2 0.5
PB-1 2 2.75 0.23 0.35
PB-2 2 3.7 0.23 0.35
PB-3 2 1.72 0.23 0.35
PB-4 2 2.6 0.23 0.35
PB-5 1 2.7 0.23 0.35
B1 2 2.75 0.3 0.33
B2 2 3.7 0.3 0.33
B3 2 1.72 0.3 0.33
B4 4 2.6 0.3 0.33
B5 2 2.7 0.3 0.33
B6 2 2.1 0.3 0.33
B7 3 9.4 0.3 0.63
Roof slab 1 11.2 14.57 0.12
Sun shade 2 11.2 0.6 0.1
Sun shade-vertical 1 17.1 0.6 0.08
Side wall of trench
Existing trench modification to match with new trench-wa 2 6.5 0.7 0.2
Existing trench modification to match with
new trench-bottom 2 6.5 0.45 0.3
Extension of existing power cable trench 2 3.1 1 0.2
Control cable trench - front side 2 9.15 1 0.2
Control cable trench - yard side 2 9.9 1 0.2
Connection from existing control cable trench to new tren 2 1.5 0.5 0.1
Bottom slab of trench
Extension of existing power cable trench 1 3.1 1.4 0.2
Control cable trench - front side 1 9.15 1.4 0.2
Control cable trench - yard side 1 9.9 1.4 0.2
Connection from existing control cable trench to new tren 1 1.5 0.7 0.1
Add extra
Total

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:1.5:3 (1 Cement: 1.5 coarse sand: 3 graded stone
aggregate 20 mm nominal size)
22 DSR 2016/4.1.2
Ramp 1 1.8 2 0.2
Steps-Tread 3 2.6 0.3 0.1
Step-Riser 3 2.6 0.05 0.1
Add extra
Total

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size)
23 DSR 2016/4.1.3
Misc. work 1 1 1 1

Structural steel work in single section, fixed with or


without connecting plate, including cutting, hoisting,
fixing in position and applying a priming coat of
approved steel primer all complete(As per drawing for
Cable tray).
24 DSR 2016/10.1
Power cable trench 15 3.65
Control cable trench - front side 10 1.85
Control cable trench - yard side 13 1.85
Total
Weight @ 3.8Kg/m
Add extra
Total

Steel work welded in built up sections/ framed work,


including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required.In gratings, frames,
guard bar, ladder, railings, brackets, gates
25 and similar works. DSR/10.25.2 (For window grills)
Window grill with frame-12mm dia rods 8 1.75 9
Weight @ 0.89Kg/m3
36x6mm Strips at boundary of grill- hor. for Win dow
grill 8 1.75 2
36x6mm Strips at boundary of grill- Ver. for Win dow
grill 8 1.5 4
Total
Weight @ 1.5Kg/m3
Add extra
Total

Painting with synthetic enamel paint of approved brand


and manufacture to give an even shade :
Two or more coats on new work- For steel work
26 DSR 2016/13.61.1
Power cable trench 15 3.65 0.2
Control cable trench - front side 10 1.85 0.2
Control cable trench - yard side 13 1.85 0.2
Window grill with frame-12mm dia rods 8 1.75 0.04 9
36x6mm Strips at boundary of grill- hor. for Win dow
grill 8 1.75 0.04 2
36x6mm Strips at boundary of grill- Ver. for Win dow
grill 8 1.5 0.04 4
Add extra
Total

CEMENT PLASTER WITH A FLOATING COAT


OF NEAT CEMENT
12 mm cement plaster of mix :
27 (1 cement: 4 fine sand) DSR 2016/13.7.2
Control room-interior-side walls 2 10.87 3.65
Control room-interior-front wall 1 8.5 3.65
Deduction for windows -8 1.75 1.5
Deduction for door -1 2.4 3.4
Power cable trench 1 11.1 3.8
Control cable trench - front side 1 9.15 3.6
Control cable trench - yard side 1 9.9 3.6
Connection from existing control cable trench to new
trench near the existing front wall 1 1.5 1.7
Add extra
Total

CEMENT PLASTER WITH A FLOATING COAT


OF NEAT CEMENT
12 mm cement plaster finished with a floating coat of
neat cement of mix : (1 cement: 3 fine sand)
28 DSR 2016/13.7.1
Control room ceiling 1 8.5 10.87
Roof slab bottom -verandah & porch area 1 3.4 10.3
Roof slab bottom -side's 2 0.6 11.2
Roof slab upper side 1 10 11
beam sides above slab 4 10 0.63 2
External wall 1 20.3 3.65
Column sides-External wall 3 0.22 3.65 2
Parapet wall outer 1 39.44 0.6
Parapet wall inner 1 38.24 0.6
Parapet wall top 1 38.24 0.2
Exterior pillars-verandah 3 0.3 0.3 3.65
Exterior pillars-porch 1 0.3 0.3 4.25
Sunshade edge wall-side 4 11.6 0.25
Sunshade edge wall-top 2 11.6 0.2
Sunshade slab bottom 2 11.2 0.6
Add extra
Total

ARTIFICIAL STONE PLASTER


Extra for lining out plaster to imitate stone or concrete
blocks walling.
29 DSR 2016/13.27
Wall with decorative finish 1 10.7 2.95
Add extra
total

Filling available excavated earth (excluding rock) in


trenches, plinth,sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50m and lift
upto 1.5 m.
30 DSR 2016/2.25
Control room 1 8.5 10.87 0.6
Deduction for trench -1 16.62 0.6
Add extra
Total
Random rubble masonry with hard stone in foundation
and plinth including levelling up with cement concrete
1:6:12 (1 cement mortar 1:6 (1 cement : 6 coarse sand)
31 DSR 2016-code: 7.1.1
Between the existing structure and column C1 2 1.15 0.6 0.6
Between F1 & F2 2 1.55 0.6 0.6
Between F2 & F3 2 2.7 0.6 0.6
Between F3 & F4 2 0.77 0.6 0.6
Between F4 & F5 2 1.64 0.6 0.6
Between F4 & F4 - verandah 2 1.1 0.6 0.6
Between F4 & F5 - verandah 1 1.64 0.6 0.6
Between F5 & F5 - verandah 1 1.2 0.6 0.6
Ramp-near front wall 1 4.3 0.6 0.6
Add extra
Total

Random rubble masonry with hard stone in


superstructure above plinth level and upto floor five
level, including leveling up with Cement mortar 1:6 (1
cement : 6 coarse sand) at window sills, ceiling level and
the like.
32 DSR 2016 Code:7.2.1
Rebuilding demolished RR-existing trench 2 5 0.45 0.8
Between the existing building and column C1 2 1.8 0.45 0.6
Between F1 & F2 2 2.75 0.45 0.6
Between F2 & F3 2 3.7 0.45 0.6
Between F3 & F4 2 1.72 0.45 0.6
Between F4 & F5 2 2.6 0.45 0.6
Between F4 & F4 - verandah 2 2.1 0.45 0.6
Between F4 & F5 - verandah 1 2.6 0.45 0.6
Between F5 & F5 - verandah 1 2.5 0.45 0.6
Ramp-near front wall 1 4 0.45 0.6
Add extra
Total

Pointing on stone work with cement mortar 1:3


(1 cement : 3 fine sand) : Flush/ Ruled pointing
33 DSR 2016/13.33.1
Rebuilding demolished RR-existing trench 2 5 0.45
Between the existing building and column C1 2 1.8 0.45
Between F1 & F2 2 2.75 0.45
Between F2 & F3 2 3.7 0.45
Between F3 & F4 2 1.72 0.45
Between F4 & F5 2 2.6 0.45
Between F4 & F4 - verandah 2 2.1 0.45
Between F4 & F5 - verandah 1 2.6 0.45
Between F5 & F5 - verandah 1 2.5 0.45
Add extra
Total

Providing and laying autoclaved aerated cement blocks


masonry with 150mm, 230mm, 300mm thick AAC
blocks in super structure above plinth level up to floor V
level in cement mortar 1:4 (1 cement : 4 coarse sand ).
The rate includes providing and placing in position 2
Nos 6 mm dia M.S. bars at every third course of
masonry work.
34 DSR 201/6.38
Wall between existing building and column C1 2 1.8 0.2 3.65
Side walls 2 10.87 0.2 3.65
Deduction for windows -6 1.75 0.2 1.5
Deduction for columns -6 0.3 0.2 3.65
Front wall 1 8.75 0.2 3.65
Deduction for windows -2 1.75 0.2 1.5
Deduction for door -1 2.4 0.2 3.4
Deduction for columns -1 0.3 0.2 3.65
Deduction for lintel -1 30.85 0.2 0.2
Parapet wall 1 40.34 0.2 0.6
Wall with decorative finish 1 11.2 0.2 2.75
Add extra
Total

Providing and laying vitrified floor tiles in different sizes


(thickness to be specified by the manufacturer) with
water absorption less than 0.08% and conforming to IS :
15622, of approved make, in all colours and shades, laid
on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand), including grouting the joints with white cement
and matching pigments etc.,complete.
Size of Tile 600x600 mm
35 DSR 2016/11.41.2
Control room 1 8.5 10.87
Deduction for trench -1 16.62
Skirting 1 38.74 0.15
Control room-Existing 1 8.5 10.3
Deduction for trench & control panel -1 6.4 2.45
Deduction for trench & control panel -1 6 1.4
Deduction for trench & control panel -1 4 1.4
Skirting 1 38 0.15
Corridor-Existing 1 1.5 6.5
Skirting 1 16 0.15
AE-room-Existing 1 3.25 3
Skirting 1 12.5 0.15
Duty room-Existing 1 3.25 3.1
Skirting 1 12.7 0.15
Add extra
Total

Steel work welded in built up sections/ framed work,


including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required. In stringers, treads,
landings etc. of stair cases, including use of chequered
plate wherever required, all complete. DSR
2016/10.25.1
(For trench covering in Control room)
Chanel-ISLC 125x65mm, 4.4mm thick
Angle ISA 65x65x6mm
36 Chequerd plate - 8mm thick

Power cable trench-Angle for frame ISA(65x65x6)mm 2 9.27 5.8

Power cable trench-Angle for frame


ISLC(125X65) 4.4mm thk 1 45.81 10.7
Control cable trench-front-Angle for frame
ISA(65x65x6)mm 2 8.5 5.8
Control cable trench-Angle for frame
ISLC(125X65) 4.4mm thk 1 36.7 10.7
Control cable trench-yard side-Angle for frame
ISA(65x65x6)mm 2 9.27 5.8
Control cable trench-yard side Angle for frame
ISLC(125X65) 4.4mm thk 1 41.81 10.7
Contol room-8mm thick chequered plates 1 16.62
Weight of chequered plates @68.09Kg/m2 68.09
Add extra
Total
Providing and fixing aluminium work for doors,
windows, ventilators and partitions with extruded built
up standard tubular sections/ appropriate Z sections
and other sections of approved make conforming to IS:
733 and IS: 1285, fixing with dash fasteners of required
dia and size, including necessary filling up the gaps at
junctions, i.e. at top, bottom and sides with required
EPDM rubber/ neoprene gasket etc. Aluminium sections
shall be smooth, rust free, straight, mitred and jointed
mechanically wherever required including cleat angle,
Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be paid
for separately) : For fixed portion
37 DSR 2016/21.1.1.2
Control room-Windows 8 10

For shutters of doors, windows & ventilators including


providing and fixing hinges/ pivots and making provision
for fixing of fittings wherever required including the cost
of EPDM rubber / neoprene gasket required (Fittings
shall be paid for separately)
Powder coated aluminium (minimum thickness of
powder
coating 50 micron)
DSR 2016/21.1.2.2

38
Control room-Door 1 15

Providing and fixing 12 mm thick prelaminated particle


board flat pressed three layer or graded wood particle
board conforming to IS: 12823 Grade l Type ll, in
panelling fixed in aluminum doors, windows shutters
and partition frames with C.P. brass / stainless steel
screws etc. complete as per architectural drawings and
directions of engineer-in-charge. Pre-laminated particle
board with decorative lamination on both sides
39 DSR 2016/21.2.2
Control room-Door 2 1.15 0.55
Control room-Door-upper panel 2 1.15 1.1
Add extra
Total

Providing and fixing glazing in aluminium door, window,


ventilator shutters and partitions etc. with EPDM rubber
/ neoprene gasket etc. complete as per the architectural
drawings and the directions of engineer-in-charge.
With float glass panes of 5.50 mm thickness- For door
DSR 2016/21.3.2
40
Control room-Door 2 1.15 1.45
Say

Providing and fixing glazing in aluminium door, window,


ventilator shutters and partitions etc. with EPDM rubber
/ neoprene gasket etc. complete as per the architectural
drawings and the directions of engineer-in-charge.
With float glass panes of 4 mm thickness- For window
DSR 2016/21.3.1

41
Control room-Windows 8 1.7 1.45
Say

Filling the gap in between aluminium frame & adjacent


RCC/ Brick/ Stone work by providing weather silicon
sealant over backer rod of approved quality as per
architectural drawings and direction of Engineer-in-
charge complete.
Upto 5mm depth and 5 mm width
42 DSR 2016/21.8.1
Control room-Door 1 2.4 3.65
Control room-Windows 8 1.75 1.5
Add extra
Total

Providing and fixing 100mm brass locks (best make of


approved quality) for aluminium doors including
necessary cutting and making good etc. complete.
DSR 2016/21.13
43
Control room-Door 1

Providing and fixing aluminium round shape handle of


outer dia 100 mm with SS screws etc. complete as per
direction of Engineerin-charge
Powder coated minimum thickness 50 micron
aluminium
DSR 2016/21.16.2
44
Control room-Door 1
Providing and fixing Anodised Aluminium butt hinges
125x75x4 mm with SS screws etc. complete as per
direction of Engineerin-charge
Ref: DSR 2016/0687
45
Control room-Windows 10

Providing and fixing Anodised Aluminium sliding door


bolt 300x16 mm with SS screws etc. complete as per
direction of Engineerin-charge
Ref: DSR 2016/0696
46
Control room-Door 4

Providing and fixing Anodised Aluminium butt hinges


75x63x4 mm with SS screws etc. complete as per
direction of Engineerin-charge
Ref: DSR 2016/0692
47
Control room-Windows 8 12

Providing and fixing Anodised Aluminium Casement stay


250 mm for windows with SS screws etc. complete as
per direction of Engineerin-charge
Ref: DSR 2016/2465
48
Control room-Windows 8 3
White cement washing one coat to new pointed and
49 plastered surface
Control room-interior-side walls 2 10.87 3.65
Control room-interior-front wall 1 8.5 3.65
Deduction for windows -8 1.75 1.5
Deduction for door -1 2.4 3.4
Control room ceiling 1 8.5 10.87
Add extra
Total 1

Providing and applying white cement based putty of


average thickness 1mm, of approved brand and
manufacturer, over the plastered wall surface to
prepare the surface even and smooth complete.
DSR 2016/13.80
50
Control room-interior-side walls 2 10.87 3.65
Control room-interior-front wall 1 8.5 3.65
Deduction for windows -8 1.75 1.5
Deduction for door -1 2.4 3.4
Add extra
Total 1
Wall painting with premium acrylic emulsion paint of
interior grade, having VOC (Volatile Organic Compound )
content less than 50 grams/ litre of approved brand and
manufacture, including applying additional coats
wherever required to achieve even shade and
colour.Two or more coats.Complete as per the direction
of departmental officer at site.
51 DSR 2016/13.83.2
Control room ceiling 1 8.5 10.87
Control room-interior-side walls 2 10.87 3.65
Control room-interior-front wall 1 8.5 3.65
Deduction for windows -8 1.75 1.5
Deduction for door -1 2.4 3.4
Control room ceiling 1 8.5 10.87
Add extra
Total 1

Finishing walls with textured exterior paint of required


shade :New work (Two or more coats applied @ 3.28
ltr/10 sqm) over and including priming coat of exterior
primer applied @ 2.20kg/10 sqm
DSR 2016/13.45.1

52
Roof slab bottom -verandah & porch area 1 3.4 10.3
Roof slab bottom -side's 2 0.6 11.2
Roof slab upper side 1 10 11
beam sides above slab 4 10 0.63 2
External wall 1 20.3 3.65
Column sides-External wall 3 0.22 3.65 2
Parapet wall outer 1 39.44 0.6
Parapet wall inner 1 38.24 0.6
Parapet wall top 1 38.24 0.2
Exterior pillars-verandah 3 0.3 0.3 3.65
Exterior pillars-porch 1 0.3 0.3 4.25
Sunshade edge wall-side 4 11.6 0.2
Sunshade edge wall-top 2 11.6 0.2
Sunshade slab bottom 2 11.2 0.6
Wall with decorative finish 1 10.7 2.95
Add extra
Total
Chequerred precast cement concrete tiles 22 mm thick
in footpath & courtyard, jointed with neat cement slurry
mixed with pigment to match the shade of tiles,
including rubbing and cleaning etc. complete, on 20mm
thick bed of cement mortar 1:4 (1 cement: 4 coarse
sand).
Dark shade pigment using ordinary cement
53 (For Ramp, Verandah and Porch)
Verandah & Porch 1 20.97
Ramp 1 2 1.8
Step-Tread 3 2.6 0.3
Step-Riser 3 2.6 0.15
Skirting 1 9.1 0.15
Add extra
Total

12 mm thick plain cement mortar bands in cement


mortar 1:4 (1 cement: 4 fine sand) : Moulded Band
DSR 2016 13.28.4
54
Bottom edge of roof slab 1 10.2 14.87
Bottom edge of sunshade 2 10.2
Add extra
Total

Providing and fixing Ist quality ceramic glazed wall tiles


conforming to IS:15622 (thickness to be specified by the
manufacturer), of approved make, in all colours, shades
except burgundy, bottle green, black of any size as
approved by Engineer-in-Charge, in skirting, risers of
steps and dados, over 12 mm thick bed of cement
mortar 1:3 (1 cement : 3 coarse sand) and jointing with
grey cement slurry @ 3.3kg per sqm, including pointing
in white cement mixed with pigment of matching shade
complete.
DSR 2016/11.36

55
Exterior pillars-verandah 3 0.3 0.3 2.05
Exterior pillars-porch 1 0.3 0.3 2.65
Add extra
Total
Providing and fixing on wall face unplasticised Rigid PVC
rain water pipes conforming to IS : 13592 Type A,
including jointing with seal ring conforming to IS : 5382,
leaving 10 mm gap for thermal expansion, (i) Single
socketed
pipes. 110 mm diameter
DSR 2016/12.41.2
56
Rain water drain pipe 2 4.35
Add extra
Total

Providing and fixing on wall face unplasticised - PVC


moulded fittings/accessories for unplasticised Rigid PVC
rain water pipes conforming to IS : 13592 Type A,
including jointing with seal ring conforming to IS :5382,
leaving 10 mm gap for thermal expansion. 110 mm
bend
DSR 2016/12.42.5.2
57
Bend for rain water drain pipe 2 1

Supplying and fixing rolling shutters of approved make,


made of required size M.S. laths, interlocked together
through their entire length and jointed together at the
end by end locks, mounted on specially designed pipe
shaft with brackets, side guides and arrangements for
inside and outside locking with push and pull operation
complete, including the cost of providing and fixing
necessary 27.5 cm long wire springs manufactured from
high tensile steel wire of adequate strength conforming
to IS: 4454 -part 1 and M.S. top cover of required
thickness for rolling shutters.
80x1.20 mm M.S. laths with 1.20 mm thick top cover
58 DSR 2016/10.6.2 1 1

Providing and fixing ball bearing for rolling shutters.


59 DSR 2016/10.7 1 1

Supplying and pasting names of various sizes on doors


using coloured filim/stickers of approved quality and
shades as specified including cost of all materials and
labour charges etc complete. (Arrived data)
60 1 1
Painting letters or figures 6.5cm,8cm, or 10cm. Height
(Block,Roman, Italic or Indian) with Synthetic enamel
paint.
61 (Arrived data) 50 1

Providing and fixing M.S. fan clamp type I or II of 16 mm


dia M.S. bar, bent to shape with hooked ends in R.C.C.
slabs or beams during laying, including painting the
exposed portion of loop, all as per standard design
complete.

62 15 1
PART2 (ELECTRIFICATION)

Sl.no Description of item No. Length-m Quantity Remarks

Wiring for light point/ fan point/ exhaust fan point/ call
bell point with 1.5 sq.mm FRLS PVC insulated copper
conductor single core cable in surface / recessed
medium class PVC conduit, with modular switch,
modular plate, suitable GI box and earthing the point
with 1.5 sq.mm FRLS PVC insulated copper conductor
single core cable etc. as required.

1
Group A Point (short point) 10 10
Group B Point (medium point) 7 7
Group C (long point) 6 6

Wiring for light/ power plug with 2X4 sq. mm FRLS PVC
insulated copper conductor single core cable in surface/
recessed medium class PVC conduit alongwith 1 No. 4
sq. mm FRLS PVC insulated copper conductor single
core cable for loop earthing as required.

2 40 40

Wiring for circuit/ submain wiring alongwith earth wire


with the following sizes of 2 X 1.5 sq. mm + 1 X 1.5 sq.
mm earth wire FRLS PVC insulated copper conductor,
single core cable in surface/ recessed medium class PVC
conduit as required.
3
DB1 to SB1 18 18
SB1 to SB2 10 10
DB2 to SB3 18 18
Total 46
Supplying and drawing following 2 x 1.5 sq. mm sizes of
FRLS PVC insulated copper conductor, single core cable
in the existing surface/ recessed steel/ PVC conduit as
required.
4 40 40

Supplying and fixing of following sizes of medium class


PVC conduit along with accessories in surface/recess
including painting in case of surface conduit, or cutting
the wall and making good the same in case of recessed
conduit as required.
5 40 40
Supplying and fixing following size/ modules, GI box
alongwith modular base & cover plate for modular
switches in recess etc. as required.
6
(a) 4 Module (125 mmX75 mm) 1 1
(b) 6 Module (200 mmX75 mm) 1 1
(c) 8 Module (125 mmX125 mm) 1 1
(d) 12 Module (200 mmX150 mm) 1 1

Supplying and fixing following way, single pole and


neutral, sheet steel, MCB distribution board, 240 V, on
surface/ recess, complete with tinned copper bus bar,
neutral bus bar, earth bar, din bar, interconnections,
powder painted including earthing etc. as required. (But
7 without MCB/RCCB/Isolator)
(a) 6 way, Double door 1 1
(b) 8 way, Double door 1 1

Supplying and fixing 5 A to 32 A rating, 240/415 V, 10


kA, “C” curve, miniature circuit breaker suitable for
inductive load of following poles in the existing MCB DB
complete with connections, testing and commissioning
etc. as required. Double pole.
8 3 3
Supplying and fixing following 40 A rating, double pole,
240 V, isolator in the existing MCB DB complete with
connections, testing and commissioning etc. as
required.
9 1 1

Supplying and fixing following rating,40 A double pole,


(single phase and neutral), 240 V, residual current circuit
breaker (RCCB), having a sensitivity current 30 mA in the
existing MCB DB complete with connections, testing and
commissioning etc. as required.
10 1 1
Supplying and fixing 3 pin, 5 amp ceiling rose on the
existing junction box/ wooden block including
11 connection etc as required. 3 3
Supplying and fixing stepped type electronic fan
regulator on the existing modular plate switch box
including connections but excluding modular plate etc.
as required.
12 3 3

Installation, testing and commissioning of pre-wired,


fluorescent fitting / compact fluorescent fitting of all
types, complete with all accessories and tube etc.
directly on ceiling/ wall, including connection with 1.5
sq. mm FRLS PVC insulated, copper conductor, single
13 core cable and earthing etc. as required. 2 2

Installation, testing and commissioning of pre-wired,


fluorescent fitting / compact fluorescent fitting of all
types, complete with all accessories and tube etc.
including supplying and fixing ball and socket
arrangement, 2 No. down rods of 20mmdiaX1.6mm
thick steel conduit up to 30cm length, painting and
wiring hte down rods and connection with 1.5 sq. mm
FRLS PVC insulated, copper conductor, single core cable
and earthing etc. as required.

14 9 9

Installation, testing and commissioning of ceiling fan,


including wiring the down rods of standard length (upto
30 cm) with 1.5 sq. mm FRLS PVC insulated, copper
conductor, single core cable etc. as required.
15 3 3
Supply of double tube fittings suitable for celing fittings
with tubes, electronic chokes, of ISI marked good
quality, with fixing ball and socket arrangement (Market
Rate)
16 2 2
Supply of Single 4 Feet, 16W LED tube light fittings with
LED tube and accessories of ISI marked good quality
17 (Market rate) 9 9
Supply of cieling fan of 1200 mm sweep with all fitting
18 of ISI marked good quality 3 3
Supply of 50 W LED lights of reflector type for out door
19 use 4 4
Uncoiling 5/4/3/2 core 4sqmm control cable(armoured
or un armoured) from cable drums and laying through
trench/pipe/cable tray neatly and carefully including for
providing loops wherever necessary and cable marker
at both ends of cable as per direction of departmental
staff at site.
20 40 40

Termination of cables in panel by using cable glands of


fixing the cable rigidly by any means as per direction of
departmental staff at site charges include for providing
necessary suitable hole in the gland plate etc.4/2 core
2.5 sq mm cable/4/2 core 4 sq mm cable (using gland of
size 16-22mm)
21 4 4

Earthing with G.I earth pipe 4.5mtr long, 40mm dia


including accessories, and providing masonry enclosure
with cover plate having locking arrangement and
watering pipe etc. , with charcoal/ coak and salt as
required.
22 2 2

Providing and laying earth connection from earth


electrode with 4.00 mm dia copper wire in 15 mm dia
G.I. pipe from earth electrode including connection with
copper thimble excavation and re-filling as required.
23 15 15
kayam as part of the

Qnty. Unit

7.14 m3
-0.96 m3
-1.21 m3
0.04 m3
0.2 m3
1.4 m3
-0.29 m3
0.67 m3
7 m3

0.28 m3
0.5 m3
1.85 m3
0.36 m3
2.52 m3
0.5 m3
6 m3
7.7 m3
2.52 m3
0.78 m3
11 m3

0.61 m3
0.41 m3
0.29 m3
0.19 m3
1.5 m3

7.8 m
4.6 m
2.4 m
14.8 m
100.64 Kg
4.36 Kg
105 Kg

26.45 m2
5.25 m2

4.16 m2

87.55 m2
-15.68 m2
-8.4 m2
-5.6 m2
5.7 m2
9.75 m2
2.4 m2
9.75 m2
1.88 m2
10.08 m2
1.91 m2
5.67 m2
105 m2

4.16 m3
0.84 m3
5 m3
3.91 m3
6.41 m3
6.93 m3
0.95 m3
5.04 m3
4.03 m3
3.14 m3
9.45 m3
2.74 m3
0.83 m3
1.12 m3
1.94 m3
0.55 m3
1.18 m3
0.79 m3
0.59 m3
0.43 m3
4.97 m3

43 m3

2 m3
10 m3

0.56 m3
1.28 m3
1.39 m3
0.14 m3
0.72 m3
0.58 m3
0.45 m3
1.35 m3
0.39 m3
0.65 m3
7.5 m3

19.69 m3
-5.69 m3
3.15 m3
0.36 m3
2.86 m3
20 m3
7.48 m2 Formula: (=C108*(D108+E108)*2*F108)
6.6 m2
5.72 m2
17.16 m2
5.28 m2
2.76 m3
45 m2

3.85 m2
5.18 m2
2.41 m2
3.64 m2
1.89 m2
3.63 m2 Formula: (=F121*2*D121*C121)
4.88 m2
2.27 m2
6.86 m2
3.56 m2
2.77 m2
35.53 m2

18.2 m2

7.8 m2
12.4 m2
36.6 m2
39.6 m2

3 m2

1.24 m2
3.66 m2
3.96 m2

0.3 m2
150.07 m2
5.97 m2
13.44 m2
2.36 m2
49.91 m2 375.0864
425 m2

13.2 m2
13.2 m2
13.2 m2
29.52 m2
9.84 m2
6.04 m2
85 m2

76.36 m
57.5 m
76.36 m
57.5 m
76.36 m
57.5 m
209.16 m
157.5 m
62.56 m
324.01 Kg

36.96 m
32.56 m
26.64 m
23.04 m
20.48 m
17.28 m
49.56 m
49.56 m
158.77 Kg
15.12 m
15.12 m
11.79 Kg

45.6 m
112.63 Kg
45.6 m
91.2 m
45.6 m
136.8 m
504.34 Kg
45.6 m
45.6 m
81.17 Kg

145.2 m
372 m
402 m
569.9 Kg
366 m
136.4 m
396 m
32.4 m
30 m
374.71 Kg

0.74 m3
81.68 Kg
0.999 m3
109.89 Kg
0.46 m3
51.08 Kg
1.4 m3
154.44 Kg
0.73 m3
80.19 Kg
0.57 m3
62.37 Kg
6.35 m3
697.95 Kg
1237.6 Kg

13.6 m
21.49 Kg
13.6 m
4.08 m
15.74 Kg
16 m
25.28 Kg
16 m
4.8 m
18.51 Kg
9.28 m
14.66 Kg
9.28 m
8.26 Kg
12.4 m
19.59 Kg
12.4 m
3.72 m
14.35 Kg
6m
9.48 Kg
6m
1.8 m
6.94 Kg
154.3 Kg

24.96 m
34.32 m
17.16 m
24.96 m
24.96 m
49.28 Kg

1004.5 m
972.84 m
1225.95 Kg
245.19 Kg
1471.14 Kg

34 m
126.5 m
99.51 Kg
17 m
15.13 Kg
162.54 m
126.16 m
89.6 m
85.5 m
180.88 Kg
295.52 Kg
5345.17 Kg
254.83 Kg
5600 Kg

16.5 m

2.02 m3
0.96 m3
1.57 m3
0.75 m3
1.18 m3
0.56 m3
3.55 m3
1.69 m3
1.26 m3
0.48 m3
0.44 m3
0.6 m3
0.28 m3
0.42 m3
0.22 m3
0.54 m3
0.73 m3
0.34 m3
1.03 m3
0.53 m3
0.42 m3
5.33 m3
19.58 m3
1.34 m3
0.82 m3

1.82 m3
1.76 m3
1.24 m3
3.66 m3
3.96 m3
0.15 m3

0.87 m2
2.56 m2
2.77 m2
0.11 m2
4.48 m3
70 m3

0.72 m3
0.23 m3
0.04 m3
2.01 m3
3.00 m3

1 m3

54.75 m
18.5 m
24.05 m
97.3 m
369.74 Kg
5.26 Kg
375 Kg

126 m
112.14 Kg

28 m

48 m
76 m
114 Kg
13.86 Kg 226.14
240 Kg

10.95 m2
3.7 m2
4.81 m2
5.04 m2 5.04

1.12 m2

1.92 m2
2.46 m2 27.54
30 m2

79.35 m2
31.03 m2
-21 m2
-8.16 m2
42.18 m2
32.94 m2
35.64 m2
2.55 m2
5.47 m2
200 m2

92.4 m2
35.02 m2
13.44 m2
110 m2
50.4 m2
74.1 m2
4.82 m2
23.66 m2
22.94 m2
7.65 m2
13.14 m2 Formula: (=C369*(D369+E369)*2*F369)
5.1 m2
11.6 m2
4.64 m2
13.44 m2
27.66 m2
510 m2

31.57 m2
1.44 m2
33 m2

55.44 m3
-9.97 m3
2.54 m3
48 m3
0.83 m3
1.12 m3
1.94 m3
0.55 m3
1.18 m3
0.79 m3
0.59 m3
0.43 m3
1.55 m3
1.01 m3
10 m3

3.6 m3
0.97 m3
1.49 m3
2 m3
0.93 m3
1.4 m3
1.13 m3
0.7 m3
0.68 m3
1.08 m3
2.02 m3
16 m3

4.5 m2
1.62 m2
2.48 m2
3.33 m2
1.55 m2
2.34 m2
1.89 m2
1.17 m2
1.13 m2
2 m2
22 m2

2.63 m3
15.87 m3
-3.15 m3
-1.31 m3
6.39 m3
-1.05 m3
-1.63 m3
-0.22 m3
-1.23 m3
4.84 m3
6.16 m3
2.7 m3 27.3
30 m3

92.4 m2
-16.62 m2
5.81 m2
87.55 m2
-15.68 m2
-8.4 m2
-5.6 m2
5.7 m2
9.75 m2
2.4 m2
9.75 m2
1.88 m2
10.08 m2
1.91 m2
9.09 m2
190 m2

107.53 Kg

490.17 Kg

98.6 Kg

392.69 Kg

107.53 Kg

447.37 Kg
16.62 m2
1131.66 Kg
74.46 Kg
2850 Kg
80 Kg

15 Kg

1.27 m2
2.53 m2
0.71 m2
4.5 m2

3.34 m2
4 m2

19.72 m2
20 m2

9.7 m
38 m
2.3 m 47.7
50 m

1 No.

1 No.
10 No.

4 No.

96 No.

24 No.

79.35 m2
31.03 m2
-21 m2
-8.16 m2
92.4 m2
6.39 m2
180 m2

79.35 m2
31.03 m2
-21 m2
-8.16 m2
3.78 m2
85 m2
92.4 m2
79.35 m2
31.03 m2
-21 m2
-8.16 m2
92.4 m2
3.99 m2
270 m2

35.02 m2
13.44 m2
110 m2
50.4 m2
74.1 m2
4.82 m2
23.66 m2
22.94 m2
7.65 m2
13.14 m2 Formula: (=C530*(D530+E530)*2*530)
5.1 m2
9.28 m2
4.64 m2
13.44 m2
31.57 m2
40.8 m2 419.2
460 m2
20.97 m2
3.6 m2
2.34 m2
1.17 m2
1.37 m2
2.56 m2
32 m2

39.94 m
20.4 m
4.66 m 60.34
65 m

7.38 m2 Formula: (=C552*(D552+E552)*2*552)


3.18 m2
1.44 m2 10.56
12 m2
8.7 m
1.3 m
10 m

2 no

1 no

1 no

1 no
50 no

15 no
KERALA STATE ELECTRICITY BOARD LTD
Name of work:Extension of Control room building of 66kV Substation , Mundakkayam as part of the upgradation work
DATA-PART1 (CIVIL WORK)
Sl NoQuantity Unit Description Rate Unit Amt

Demolishing brick work manually/ by mechanical


means including stacking of serviceable material and
1 disposal of unserviceable material within 50 metres
lead as per direction of Engineer-in-charge In cement
mortar
1 m3 DSR 2016 Code/15.7.4 842.75 m3 842.75
Applying cost index @1.5098 1.5098 1,272.38
Say Rs. Rs.1272.35/m3 1,272.35

Demolishing cement concrete manually/ by


mechanical means including disposal of material within
50 metres lead as per direction of Engineer - in-
2 charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent
1 m3 design mix) - DSR 2016/15.2.1 997.05 m3 997.05
Applying cost index 1.5098 1,505.35
Say Rs. Rs.1505.35/m3 1,505.35

Demolishing stone rubble masonry manually/ by


mechanical means including stacking of serviceable
3 material and disposal of unserviceable material within
50 metres lead as per direction of Engineer-in-charge :
In cement mortar
1 m3 DSR 2016/15.9.2 1005.7 m3 1,005.70
Applying cost index 1.5098 1,518.41
Say Rs. Rs.1518.40/m3 1,518.40

Demolishing R.C.C. work manually/ by mechanical


means including stacking of steel bars and disposal of
unserviceable material within 50 metres lead as per
4 direction of Engineer - in- charge.
DSR 2016/15.3
1 m3 1454.55 m3 1,454.55
Applying cost index 1.5098 2,196.08
Say Rs. Rs.2196.05/m3 2,196.05

Dismantling steel work in built up sections in angles,


tees, flats and channels including all gusset plates,
5 bolts, nuts, cutting rivets, welding etc. including
dismembering and stacking within 50metres lead.
1 Kg DSR 2016/15.17.2 2.4 Kg 2.4
5

Applying cost index 1.5098 3.62


Say Rs. Rs.3.60/Kg 3.6

Dismantling chainlink fabric fencing with G.I wire,


welding etc. including dismembering and stacking
within 50metres lead.
6 (Arrived data)
0.4 10m2 Fitter grade 1 487 m2 194.8
Applying cost index 1.5098 294.11
Say Rs. 29.40/m2 29.4

Dismantling doors, windows and clerestory windows


(steel or wood) shutter including chowkhats,
architrave, holdfasts etc. complete and stacking within
7 50 metres lead:
Of area 3 sq. metres and below
1 no DSR 2016/15.12.1 157.85 no 157.85
Applying cost index 1.5098 238.32
Say Rs. 238.30/no. 238.3

Dismantling doors, windows and clerestory windows


(steel or wood) shutter including chowkhats,
architrave, holdfasts etc. complete and stacking within
8 50 metres lead :
Of area beyond 3 sq. metres
1 each DSR 2016/15.12.2 216.4 each 216.4
Applying cost index 1.5098 326.72
Say Rs. 326.70/each 326.7

Dismantling tile work in floors and roofs laid in cement


mortar including stacking material within 50 metres
lead.
9 15.23.1 For thickness of tiles 10 mm to 25 mm
1 m2 DSR 2016/15.23.1 31.55 m2 31.55
Applying cost index 1.5098 47.63
Say Rs. 47.60/each 47.6

Earth work in excavation by mechanical means


(Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10
10 sqm on plan), including dressing of sides and ramming
of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m. (All kind of soil)
1 m3 DSR 2016/2.8 166.4 m3 166.4
Applying cost index 1.5098 251.23
Say Rs. 251.20/m3 251.2
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over
areas(exceeding 30 cm in depth, 1.5 m in width as well
11 as 10 sqm on plan) including disposal of excavated
earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed. (Ordinary rock)
1 m3 DSR 2016/2.9 275.85 m3 275.85
Applying cost index 1.5098 416.48
Say Rs. 416.45/m3 416.45

Extra for excavating trenches for pipes, cables, etc. in


ordinary/hard rock exceeding 1.5 m in depth but not
12 exceeding 3 m. (Rate is over corresponding basic item
for depth upto 1.5 metre). (Ordinary rock)
1 DSR 2016/2.14 284.13 m3 284.13
Applying cost index 1.5098 428.97
Say Rs. 428.95/m3 428.95

Excavation in hard rock using contractors non explosive


agent (chemical blasting) like ACCONEX or equivalent
or any other silmilar materials as per the directions of
the departmental officers without resorting to the use
of conventional explosive materials including drilling
necessary holes, wedging, picking, barring, removing
the soil and stacking at places pointed out by the deptl.
officers
Ref: Sanctioned Estimate No. 21/2014-15 of CE (TS)
12 Kg Acconex 235.75 Kg 2829

15 Nos Drilling 32mm holes, 1.00 m deep using Jack hammer 83.03 Each 1245.45
13
12 Nos Drilling 32mm holes, 0.50 m deep using Jack hammer 41.52 Each 498.24
LS LS Dewatering 47
Total 4619.69

Wedging, picking, barring chiselling and stacking the


hard rock and depositing the debris in the convenient
1 m3 place 11155.5 10m3 1115.55
Applying cost index 50.98% 0.5098 568.71
TOTAL 6303.95
Add Water Charges @ 1% 63.039
TOTAL 6366.99
Add CPOH @ 15% 955.05
TOTAL 7322.03
cost of 1cum 7322.03
Say Rs.7322.00/1m3 ` 7322

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :1:4:8 (1 Cement
: 4 coarse sand : 8 graded stone aggregate 40 mm
14 nominal size)-for trench PCC
1 m3 DSR 2016/4.1.8 4478.15 4478.15
Applying cost index 1.5098 6,761.11
Extra for carriage of stone aggregate 40 mm and above
1 m3 nominal size (3x9.43) 9.43 2 18.86
0.47 Extra for carriage of coarse sand 8.68 2 8.16
Say Rs. 6788.10/m3 6,788.10

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :1:2:4 (1 Cement
: 2 coarse sand : 4 graded stone aggregate 40mm
15 nominal size)- For Control room flooring
1 m3 DSR 2016/4.1.4 5390.45 5390.45
Applying cost index 1.5098 8,138.50
Extra for carriage of stone aggregate 40 mm and above
1 m3 nominal size (3x9.43) 9.43 2 18.86
0.445 Extra for carriage of coarse sand 8.68 2 7.73
Say Rs. 8165.10/m3 8,165.10

Centering and shuttering including strutting, propping


etc. and removal of form for : Foundations, footings,
16 bases for columns
1 m2 DSR 2016/4.3.1 193.95 m2 193.95
Applying cost index 1.5098 292.83
Say Rs. 292.80/m2 292.8

Centering and shuttering including strutting, propping


etc. and removal of form for: Walls (any thickness)
17 including attached pilasters, butteresses, plinth and
1 m2 string courses etc. DSR 2016/4.3.2 378.6 m2 378.6
Applying cost index 1.5098 571.61
Say Rs. 571.6/m2 571.6

Centering and shuttering including strutting, propping


etc. and removal of form for : Columns, piers,
18 abutments, pillars, posts and struts
1 m2 DSR 2016/4.3.3 467.85 m2 467.85
Applying cost index 1.5098 706.36
Say Rs. 706.35/m2 706.35
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
19 binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or
1 Kg more. DSR 2016/5.22.6 56.5 Kg 56.5
1 Kg Applying cost index 1.5098 85.3
Say Rs. 85.30/Kg 85.3

Providing and embedding 110mm HDPE pipe for for


the smooth entry of cables between trenches (As per
market rate) -
MATERIAL: -
1 HDPE pipe 110mm dia (6Kgf/cm2)( Market Rate) 450 m 450
LABOUR: -
20
0.05 Man 368 day 18.4
Applying cost index 27.78
Total 477.78
CPOH @15% 71.67
Total 549.45
Say Rs. 549.45/m

Providing and laying in position specified grade of


reinforced cement concrete, excluding the cost of
centering, shuttering finishing and reinforcement -
All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
21 aggregate 20 mm nominal size)
1 m3 DSR 2016/5.1.2 6230.2 m3 6,230.20
Applying cost index 1.51 9,406.36
Extra for carriage of stone aggregate below 40 mm
1 m3 nominal size (8.68x3) 8.68 2 17.36
0.425 m3 Extra for carriage of stone coarse sand 8.68 2 7.38
Say Rs. 9431.10/m3 9,431.10

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:1.5:3 (1 Cement: 1.5 coarse sand: 3 graded stone
22 aggregate 20 mm nominal size)
1 m3 DSR 2016/4.1.2 5924.65 m3 5,924.65
Applying cost index 1.5098 8,945.04
Extra for carriage of stone aggregate below 40 mm
1 m3 nominal size (8.68x3) 8.68 2 17.36
0.425 Extra for carriage of coarse sand 8.68 2 7.38
Say Rs. 8969.75/m3 8,969.75
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size)
23 1 m3 DSR 2016/4.1.3 5466.3 m3 5,466.30
Applying cost index 1.5098 8,253.02
Extra for carriage of stone aggregate below 40 mm
1 m3 nominal size (8.68x3) 8.68 2 17.36
0.445 Extra for carriage of coarse sand 8.68 2 7.73
Say Rs. 8278.10/m3 8,278.10

Structural steel work in single section, fixed with or


without connecting plate, including cutting, hoisting,
fixing in position and applying a priming coat of
24 approved steel primer all complete(As per drawing for
Cable tray).
1 Kg DSR 2016/10.1 58.45 Kg 58.45
Applying cost index 1.5098 88.25
Say Rs. 88.25/Kg 88.25

Steel work welded in built up sections/ framed work,


25 including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required.In gratings, frames,
guard bar, ladder, railings, brackets, gates
1 Kg and similar works. DSR/10.25.2 (For window grills) 85.95 Kg 85.95
Applying cost index 1.5098 129.77
Say Rs. 129.75/Kg 129.75

Painting with synthetic enamel paint of approved


brand and manufacture to give an even shade :
26 Two or more coats on new work- For steel work
1 m2 DSR 2016/13.61.1 78.4 m2 78.4
Applying cost index 1.5098 118.37
Say Rs. 118.35/m2 118.35

CEMENT PLASTER WITH A FLOATING COAT


OF NEAT CEMENT
12 mm cement plaster of mix :
27 1 m2 (1 cement: 4 fine sand) DSR 2016/13.7.2 214.2 214.2
Applying cost index 1.5098 323.4
0.1152 Extra for carriage of coarse sand 8.68 3 3
Say Rs. 326.40/m2 326.4
CEMENT PLASTER WITH A FLOATING COAT
OF NEAT CEMENT
12 mm cement plaster finished with a floating coat of
28 neat cement of mix : (1 cement: 3 fine sand)
1 m2 DSR 2016/13.7.1 226.8 226.8
Applying cost index 1.5098 342.42
0.129 Extra for carriage of coarse sand 8.68 2 2.24
Say Rs. 344.65/m2 344.65

ARTIFICIAL STONE PLASTER


Extra for lining out plaster to imitate stone or concrete
29 blocks walling.
1 m2 DSR 2016/13.27 48.85 48.85
Applying cost index 1.5098 73.75
Say Rs. 73.75/m2 73.75

Filling available excavated earth (excluding rock) in


trenches, plinth,sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each
30 deposited layer by ramming and watering, lead up to
50m and lift upto 1.5 m.
1 m3 DSR 2016/2.25 125.75 m3 125.75
Applying cost index 1.5098 189.86
Say Rs. 189.85/m3 189.85

Random rubble masonry with hard stone in foundation


and plinth including levelling up with cement concrete
1:6:12 (1 cement mortar 1:6 (1 cement : 6 coarse sand)
31 1 m3 DSR 2016-code: 7.1.1 3965.85 m3 3,965.85
Applying cost index 1.5098 5,987.64
1.16 m3 Extra for Carriage of soling stone (3x17.36) 10.21 2 23.69
0.2829 m3 Extra for Carriage of sand (3x8.68) 8.68 2 4.91
Say Rs. 6016.25/m3 6016.25

Random rubble masonry with hard stone in


superstructure above plinth level and upto floor five
level, including leveling up with Cement mortar 1:6 (1
cement : 6 coarse sand) at window sills, ceiling level
32 and the like.
1 m3 DSR 2016 Code:7.2.1 4795.15 m3 4,795.15
Applying cost index @1.5098 1.5098 7,239.72
1.16 m3 Extra for Carriage of soling stone (3x17.36) 10.21 2 23.69
0.2829 m3 Extra for Carriage of sand (3x8.68) 8.68 2 4.91
Say Rs. 7268.30/m3 7,268.30

Pointing on stone work with cement mortar 1:3


(1 cement : 3 fine sand) : Flush/ Ruled pointing
1 m2 DSR 2016/13.33.1 168.45 m2 168.45
33
33
Applying cost index @1.5098 1.5098 254.33
0.0173 m3 Extra for Carriage of sand (3x8.68) 8.68 3 0.45
Say Rs. Rs.254.75/m2 254.75

Providing and laying autoclaved aerated cement blocks


masonry with 150mm, 230mm, 300mm thick AAC
blocks in super structure above plinth level up to floor
V level in cement mortar 1:4 (1 cement : 4 coarse
34 sand ). The rate includes providing and placing in
position 2 Nos 6 mm dia M.S. bars at every third course
of masonry work.
1 m3 DSR 201/6.38 6818.6 6,818.60
Applying cost index 1.5098 10,294.72
0.12 m3 Extra for Carriage of sand 8.68 2 2.08
Say Rs. Rs.10296.80/m3 10,296.80

Providing and laying vitrified floor tiles in different sizes


(thickness to be specified by the manufacturer) with
water absorption less than 0.08% and conforming to
IS : 15622, of approved make, in all colours and shades,
35 laid on 20mm thick cement mortar 1:4 (1 cement : 4
coarse sand), including grouting the joints with white
cement and matching pigments etc.,complete.
Size of Tile 600x600 mm
1 m2 DSR 2016/11.41.2 1,119.40 m2 1,119.40
Applying cost index 1.5098 1,690.07
0.0192 m3 Extra for Carriage of sand 8.68 2 0.33
Say Rs. 1690.40/m2 1,690.40

Steel work welded in built up sections/ framed work,


including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required. In stringers, treads,
36 landings etc. of stair cases, including use of chequered
plate wherever required, all complete. DSR
2016/10.25.1
(For trench covering in Control room)
Chanel-ISLC 125x65mm, 4.4mm thick
Angle ISA 65x65x6mm
1 Kg Chequerd plate - 8mm thick 65.8 Kg 65.8
Applying cost index 1.5098 99.34
Say Rs. 99.35/Kg 99.35
Providing and fixing aluminium work for doors,
windows, ventilators and partitions with extruded built
up standard tubular sections/ appropriate Z sections
and other sections of approved make conforming to IS:
37 733 and IS: 1285, fixing with dash fasteners of required
dia and size, including necessary filling up the gaps at
junctions, i.e. at top, bottom and sides with required
EPDM rubber/ neoprene gasket etc. Aluminium
sections shall be smooth, rust free, straight, mitred and
jointed mechanically wherever required including cleat
angle, Aluminium snap beading for glazing / paneling,
C.P. brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-
in-charge. (Glazing, paneling and dash fasteners to be
paid for separately) : For fixed portion
1 Kg DSR 2016/21.1.1.2 384.5 Kg 384.5
Applying cost index 1.5098 580.52
Say Rs. 580.50/Kg 580.5

For shutters of doors, windows & ventilators including


providing and fixing hinges/ pivots and making
provision for fixing of fittings wherever required
38 including the cost of EPDM rubber / neoprene gasket
required (Fittings shall be paid for separately)
Powder coated aluminium (minimum thickness of
powder
coating 50 micron)
1 Kg DSR 2016/21.1.2.2 444.9 Kg 444.9
Applying cost index 1.5098 671.71
Say Rs. 671.70/Kg 671.7

Providing and fixing 12 mm thick prelaminated particle


board flat pressed three layer or graded wood particle
39 board conforming to IS: 12823 Grade l Type ll, in
panelling fixed in aluminum doors, windows shutters
and partition frames with C.P. brass / stainless steel
screws etc. complete as per architectural drawings and
directions of engineer-in-charge. Pre-laminated
particle board with decorative lamination on both sides
1 m2 DSR 2016/21.2.2 866.6 m2 866.6
Applying cost index 1.5098 1,308.39
Say Rs. 1308.40/m2 1,308.40

Providing and fixing glazing in aluminium door,


window, ventilator shutters and partitions etc. with
EPDM rubber / neoprene gasket etc. complete as per
40 the architectural drawings and the directions of
engineer-in-charge.
With float glass panes of 5.50 mm thickness- For door
1 m2 DSR 2016/21.3.2 1,003.95 m2 1,003.95
Applying cost index 1.5098 1,515.76
Say Rs. 1515.75/m2 1,515.75

Providing and fixing glazing in aluminium door,


window, ventilator shutters and partitions etc. with
EPDM rubber / neoprene gasket etc. complete as per
41 the architectural drawings and the directions of
engineer-in-charge.
With float glass panes of 4 mm thickness- For window
1 m2 DSR 2016/21.3.1 741.5 m2 741.5
Applying cost index 1.5098 1,119.52
Say Rs. 1119.50/m2 1,119.50

Filling the gap in between aluminium frame & adjacent


RCC/ Brick/ Stone work by providing weather silicon
sealant over backer rod of approved quality as per
42 architectural drawings and direction of Engineer-in-
charge complete.
Upto 5mm depth and 5 mm width
1m DSR 2016/21.8.1 62.45 m 62.45
Applying cost index 1.5098 94.29
Say Rs. 94.30/m 94.3

Providing and fixing 100mm brass locks (best make of


approved quality) for aluminium doors including
43 necessary cutting and making good etc. complete.
1 no DSR 2016/21.13 359 no 359
Applying cost index 1.5098 542.02
Say Rs. 542/no. 542

Providing and fixing aluminium round shape handle of


outer dia 100 mm with SS screws etc. complete as per
direction of Engineerin-charge
44 Powder coated minimum thickness 50 micron
aluminium
1 no DSR 2016/21.16.2 68.3 no 68.3
Applying cost index 1.5098 103.12
Say Rs. 103.10/no. 103.1
Providing and fixing Anodised Aluminium butt hinges
125x75x4 mm with SS screws etc. complete as per
direction of Engineerin-charge
1 no Ref: DSR 2016/0687
45 10 no Anodised Aluminium butt hinges 125x75x4 mm 57 570
0.2 no Second class Fitter 448 89.6
Applying cost index 1.5098 135.28
Total 705.28
Say Rs. 70.53/no. 70.53

Providing and fixing Anodised Aluminium sliding door


bolt 300x16 mm with SS screws etc. complete as per
direction of Engineerin-charge
Ref: DSR 2016/0696
46 1 no Anodised Aluminium butt hinges 300x16 mm 150 150
0.05 no Second class Fitter 448 22.4
Applying cost index 33.82
Total 183.82
Say Rs. 183.82/no. 183.82

Providing and fixing Anodised Aluminium butt hinges


75x63x4 mm with SS screws etc. complete as per
direction of Engineerin-charge
Ref: DSR 2016/0692
47 10 no Anodised Aluminium butt hinges 125x75x4 mm 28 280
0.15 1no. Second class Fitter 448 67.2
Applying cost index 101.46
Total 381.46
Say Rs. 38.15/no. 38.15

Providing and fixing Anodised Aluminium Casement


stay 250 mm for windows with SS screws etc. complete
as per direction of Engineerin-charge
Ref: DSR 2016/2465
48
1 no Anodised Aluminium Casement stay 250 mm 30 30
0.05 no Second class Fitter 448 22.4
Applying cost index 33.82
Total 63.82
Say Rs. 63.82/no. 63.82
White cement washing one coat to new pointed and
10 m2 plastered surface
White cement washing one coat to new pointed and
1.48 Kg plasterd surface 11.2 Kg 16.58
0.12 No Special Man Mazdoor 407 Each 48.84
0.09 No Man 368 Each 33.12
49 Total 81.96
Applying cost index 1.5098 123.74
49

Ls Sundries 1.2
Total 141.52
15% CPOH 21.23
Total 162.75
Say Rs:162.75/10m2 162.75

Providing and applying white cement based putty of


average thickness 1mm, of approved brand and
50 manufacturer, over the plastered wall surface to
prepare the surface even and smooth complete.
1 no DSR 2016/13.80 87.35 87.35
Applying cost index 1.5098 131.88
Say Rs. 131.85/m2 131.85

Wall painting with premium acrylic emulsion paint of


interior grade, having VOC (Volatile Organic Compound
) content less than 50 grams/ litre of approved brand
51 and manufacture, including applying additional coats
wherever required to achieve even shade and
colour.Two or more coats.Complete as per the direction
of departmental officer at site.
1 m2 DSR 2016/13.83.2 71 m2 71
Applying cost index 1.5098 107.2
Say Rs. 107.20/m2 107.2

Finishing walls with textured exterior paint of required


shade :New work (Two or more coats applied @ 3.28
52 ltr/10 sqm) over and including priming coat of exterior
primer applied @ 2.20kg/10 sqm
1 m2 DSR 2016/13.45.1 150.65 m2 150.65
Applying cost index 1.5098 227.45
Say Rs. 227.45/m2 227.45

Chequerred precast cement concrete tiles 22 mm thick


in footpath & courtyard, jointed with neat cement
slurry mixed with pigment to match the shade of tiles,
including rubbing and cleaning etc. complete, on
53 20mm thick bed of cement mortar 1:4 (1 cement: 4
coarse sand).
Dark shade pigment using ordinary cement
1 m2 (For Ramp, Verandah and Porch) 716.35 m2 716.35
Applying cost index 1.5098 1,081.55
Say Rs. 1081.55/m2 1,081.55
12 mm thick plain cement mortar bands in cement
54 mortar 1:4 (1 cement: 4 fine sand) : Moulded Band
1m DSR 2016 13.28.4 7.15 m 7.15
Applying cost index 1.5098 10.8
Say Rs. 10.80/m 10.8

Providing and fixing Ist quality ceramic glazed wall tiles


conforming to IS:15622 (thickness to be specified by
the manufacturer), of approved make, in all colours,
shades except burgundy, bottle green, black of any size
as
55 approved by Engineer-in-Charge, in skirting, risers of
steps and dados, over 12 mm thick bed of cement
mortar 1:3 (1 cement : 3 coarse sand) and jointing with
grey cement slurry @ 3.3kg per sqm, including pointing
in white cement mixed with pigment of matching
shade complete.
1 m2 DSR 2016/11.36 744.8 m2 744.8
Applying cost index 1.5098 1,124.50
Say Rs. 1124.50/m2

Providing and fixing on wall face unplasticised Rigid


PVC rain water pipes conforming to IS : 13592 Type A,
including jointing with seal ring conforming to IS :
56 5382, leaving 10 mm gap for thermal expansion, (i)
Single socketed
pipes. 110 mm diameter
1m DSR 2016/12.41.2 236.35 m 236.35
Applying cost index 1.5098 356.84
Say Rs. 356.85/m 356.85

Providing and fixing on wall face unplasticised - PVC


moulded fittings/accessories for unplasticised Rigid
57 PVC rain water pipes conforming to IS : 13592 Type A,
including jointing with seal ring conforming to IS :5382,
leaving 10 mm gap for thermal expansion. 110 mm
bend
1 no DSR 2016/12.42.5.2 113.1 no 113.1
Applying cost index 1.5098 170.76
Say Rs. 170.75/no. 170.75
Supplying and fixing rolling shutters of approved make,
made of required size M.S. laths, interlocked together
through their entire length and jointed together at the
58 end by end locks, mounted on specially designed pipe
shaft with brackets, side guides and arrangements for
inside and outside locking with push and pull operation
complete, including the cost of providing and fixing
necessary 27.5 cm long wire springs manufactured
from high tensile steel wire of adequate strength
conforming to IS: 4454 -part 1 and M.S. top cover of
required thickness for rolling shutters.
80x1.20 mm M.S. laths with 1.20 mm thick top cover
1 m2 DSR 2016/10.6.2 1841.4 m2 1,841.40
Applying cost index 1.5098 2,780.15
Say Rs. 2780.15/m2 2780.15

Providing and fixing ball bearing for rolling shutters.


59 1 no DSR 2016/10.7 379.3 no 379.3
Applying cost index 1.5098 572.67
Say @ Rs. 572.65 /Each 572.65

Supplying and pasting names of various sizes on doors


using coloured filim/stickers of approved quality and
shades as specified including cost of all materials and
1 No labour charges etc complete. (Arrived data)
0.07 m2 Coloured filim/Stickers 225 m2 15.75
60 0.02 Nos Skilled assistant 775 Each 15.5
Applying cost index 15.5 23.4
LS Sundries for cutting and fixing LS 5
Total 44.15
Add CPOH 15% 44.15 6.62
Total 50.77
Say @ Rs. 50.75 /Each

Painting letters or figures 6.5cm,8cm, or 10cm. Height


(Block,Roman, Italic or Indian) with Synthetic enamel
paint.
1 No (Arrived data)
Details for 100 letters
0.45 Ltr Synthetic enamel paint 211 Ltr 94.95
4.5 Nos Painters 448 Each 2016
1.5 Nos Men 368 Each 552
61 applying Cost index 3877.17
61
LS Brushes etc. LS 5
LS Scaffolding charges LS 7.5
Total 3984.62
Add CPOH 15% 597.69
Total 4582.31
Hence Average cost for each letter 6.5cm, 8cm or 10cm
height 45.8
Say @ Rs. 45.80 /Each 45.8

Providing and fixing M.S. fan clamp type I or II of 16


mm dia M.S. bar, bent to shape with hooked ends in
62 R.C.C. slabs or beams during laying, including painting
the exposed portion of loop, all as per standard design
1 no complete. 112.15 no 112.15
Applying cost index 1.5098 169.32
Say @ Rs. 169.30 /Each 169.3
DATA- PART 2 (ELECTRIFICATION)
Sl.
No QuantitUnit Particulars Rate / Unit Amount per/unit

Wiring for light point/ fan point/ exhaust fan point/ call
bell point with 1.5 sq.mm FRLS PVC insulated copper
conductor single core cable in surface / recessed
medium class PVC conduit, with modular switch,
modular plate, suitable GI box and earthing the point
with 1.5 sq.mm FRLS PVC insulated copper conductor
1 1 / point single core cable etc. as required.
(a) Group A Point (short point) 548
Add cost index for kottayam @ 1.5098 548 827.37
Say @Rs.827.37/point
(b) Group B Point (medium point) 615
Add cost index for kottayam @ 1.5098 615 928.53
Say @ Rs.928.53/point
(c) Group C Point (long point) 757
Add cost index for kottayam @ 1.5098 757 1142.92
Say @ Rs.1142.92/point

Wiring for light/ power plug with 2X4 sq. mm FRLS PVC
insulated copper conductor single core cable in
surface/ recessed medium class PVC conduit alongwith
1 No. 4 sq. mm FRLS PVC insulated copper conductor
2 1 /metresingle core cable for loop earthing as required. 168
Add cost index for kottayam @ 1.5098 168 253.65
Say @ Rs.253.65/metre
Wiring for circuit/ submain wiring alongwith earth wire
with thefollowing sizes of FRLS PVC insulated copper
conductor, single core cable in surface/ recessed
3 1 /metremedium class PVC conduit as required.
2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire 112
Add cost index for kottayam @ 1.5098 112 169.1
Say @Rs.169.1/metre

Supplying and drawing following sizes of FRLS PVC


insulated copper conductor, single core cable in the
existing surface/ recessed steel/ PVC conduit as
4 1 /metrerequired.
2 x 1.5 sq. mm 37
Add cost index for kottayam @ 1.5098 37 55.86
Say @Rs.55.86/metre

Supplying and fixing of following sizes of medium class


PVC conduit along with accessories in surface/recess
including painting in case of surface conduit, or cutting
the wall and making good the same in case of recessed
5 1 /metreconduit as required.
20 mm dia 57
Add cost index for kottayam @ 1.5098 57 86.06
Say @Rs.86.06/metre

Supplying and fixing following size/ modules, GI box


alongwith modular base & cover plate for modular
6 switches in recess etc. as required.
(a) 1E 4 Module (125 mmX75 mm) 205
Add cost index for kottayam @ 1.5098 205 309.51
Say@ Rs.309.51 /Each
(b) 1E 6 Module (200 mmX75 mm) 258
Add cost index for kottayam @ 1.5098 258 389.53
Say@ Rs.389.53 /Each
(c) 1E 8 Module (125 mmX125 mm) 297
Add cost index for kottayam @ 1.5098 297 448.41
Say@ Rs.448.41 /Each
(d) 1E 12 Module (200 mmX150 mm) 344
Add cost index for kottayam @ 1.5098 344 519.37
Say @Rs.519.35/Each 519.35 /Each
Supplying and fixing following way, single pole and
neutral, sheet steel, MCB distribution board, 240 V, on
surface/ recess, complete with tinned copper bus bar,
neutral bus bar, earth bar, din bar, interconnections,
powder painted including earthing etc. as required.
7 1 /Each (But without MCB/RCCB/Isolator)
(a) 6 way, Double door 942
Add cost index for kottayam @ 1.5098 942 1422.23
Say@ Rs.1422.23/each
(b) 8 way, Double door 1061
Add cost index for kottayam @ 1.5098 1061 1601.9
Say@ Rs.1601.9/Each

Supplying and fixing 5 A to 32 A rating, 240/415 V, 10


kA, “C” curve, miniature circuit breaker suitable for
inductive load of following poles in the existing MCB
DB complete with connections, testing and
8 1 /Each commissioning etc. as required.
Double pole 463
Add cost index for kottayam @ 1.5098 463 699.04
Say @Rs.699.04/Each

Supplying and fixing following rating, double pole, 240


V, isolator in the existing MCB DB complete with
connections, testing and commissioning etc. as
9 1 /Each required.
40 A 222
Add cost index for kottayam @ 1.5098 222 335.18
Say @Rs.335.18/Each

Supplying and fixing following rating, double pole,


(single phase and neutral), 240 V, residual current
circuit breaker (RCCB), having a sensitivity current 30
mA in the existing MCB DB complete with connections,
10 1 /Each testing and commissioning etc. as required.
40 A 1719
Add cost index for kottayam @ 1.5098 1719 2595.35
Say @Rs.2595.35/Each

Supplying and fixing 3 pin, 5 amp ceiling rose on the


existing junction box/ wooden block including
11 1E connection etc as required. 46
Add cost index for kottayam @ 1.5098 46 69.45
Say@ Rs.69.45/each
Supplying and fixing stepped type electronic fan
regulator on the existing modular plate switch box
including connections but excluding modular plate etc.
12 1E as required. 288
Add cost index for kottayam @ 1.5098 288 434.82
Say@ Rs.434.82/Each

Installation, testing and commissioning of pre-wired,


fluorescent fitting / compact fluorescent fitting of all
types, complete with all accessories and tube etc.
directly on ceiling/ wall, including connection with 1.5
sq. mm FRLS PVC insulated, copper conductor, single
13 1E core cable and earthing etc. as required. 100
Add cost index for kottayam @ 1.5098 100 150.98
Say@ Rs.150.98/Each

Installation, testing and commissioning of pre-wired,


fluorescent fitting / compact fluorescent fitting of all
types, complete with all accessories and tube etc.
including supplying and fixing ball and socket
arrangement, 2 No. down rods of 20mmdiaX1.6mm
thick steel conduit up to 30cm length, painting and
wiring hte down rods and connection with 1.5 sq. mm
FRLS PVC insulated, copper conductor, single core
14 1E cable and earthing etc. as required. 247
Add cost index for kottayam @ 1.5098 247 372.92
Say @Rs.372.92/Each

Installation, testing and commissioning of ceiling fan,


including wiring the down rods of standard length
(upto 30 cm) with 1.5 sq. mm FRLS PVC insulated,
15 1E copper conductor, single core cable etc. as required. 105
Add cost index for kottayam @ 1.5098 105 158.53
Say @Rs.158.53/Each

Supply of double tube fittings suitable for celing


fittings with tubes, electronic chokes, of ISI marked
good quality, with fixing ball and socket arrangement
16 1E (Market Rate) 1127 1127 /Each

Supply of Single 4 Feet, 16W LED tube light fittings


with LED tube and accessories of ISI marked good
17 1E quality (Market rate) 609.5 609.5 /Each
Supply of cieling fan of 1200 mm sweep with all fitting
18 1E of ISI marked good quality 1909 1909 /Each
Supply of 50 W LED lights of reflector type for out door
19 use 4738 4738 /Each
Uncoiling 20/19 core 2.5sqmm, 12 core 4 sqmm
control cable (Armoured or un armoured) from cable
drums cutting to required length and laying through
trench/pipe/cable tray grouping the same neatly using
cable tie and carefully including for providing loop
wherever necessary and providing cable marker at
both ends of cable as per direction of departmental
20 staff at site.
Data for 20m
0.25 0.25 Wireman 447 111.75
0.83 0.83 Man mazdoor 368 305.44
Hire charges for T&P 50
Add 15% CP on Rs. 467.19 70.08
sub total 537.27
Add cost intex for kottayam @1.5098 537.27 811.17
TOTAL 811.17
Rate per metre Rs 40.56 / metre

Uncoiling 5/4/3/2 core 4sqmm control cable(armoured


or un armoured) from cable drums and laying through
trench/pipe/cable tray neatly and carefully including
for providing loops wherever necessary and cable
marker at both ends of cable as per direction of
departmental staff at site.

70% rate of above item 28.39 / metre

Termination of cables in panel by using cable glands of


fixing the cable rigidly by any means as per direction of
departmental staff at site charges include for providing
21 necessary suitable hole in the gland plate etc.
4/2 core 2.5 sq mm cable/4/2 core 4 sq mm cable
(using gland of size 16-22mm)
0.16 E Wireman 447 71.52
LS Charges for providing necessary holes etc 8
1E Cable gland 33.5 33.5
Lathe work 2.9
Add 15% CP on Rs. 115.92 17.39
sub total 133.31
Add cost intex for kottayam @1.5098 133.31 201.27
TOTAL 201.27 /Each
Earthing with G.I earth pipe 4.5mtr long, 40mm dia
including accessories, and providing masonry
enclosure with cover plate having locking arrangement
and watering pipe etc. , with charcoal/ coak and salt as
22 1 Set required. 3672
Applying cost index 5543.99 /Each

Providing and laying earth connection from earth


electrode with 4.00 mm dia copper wire in 15 mm dia
G.I. pipe from earth electrode including connection
with copper thimble excavation and re-filling as
23 1M required. 182
Applying cost index 274.78 M
he upgradation work
DSR-16
Code

1.10.1

1.10.2

1.10.3

1.12
1.14
1.14.1

1.17.2

1.21.1

1.27.3

1.27.4

1.27.5

1.27.6
2.3.1

2.3.2

2.10.3

2.12.1

2.14.2

1.33
1.25

1.41

1.42

1.44
Trn data
Item: 53

Trn data
Item: 56

Trn data
Item:
58©
Dsr 16
CODE 5.2

Dsr 16
CODE
5.13
KERALA STATE ELECTRICITY BOARD LTD

Name of work:Extension of Control room building of 66kV Substation , Mundakkayam as part of the
upgradation work
SUBDATA-PART 1(CIVIL WORK)
Wedging, picking, barring chiselling and
stacking the hard rock and depositing the
debris in the convenient place as per the
direction of departmental officers ai site.

1 10 m3
133 Quarry man day 5.3 487 2581.1
134 Hammer man day 12.3 368 4526.4
134 Stone cutter day 2 368 736
114 Men for removing blasted rubble day 3 368 1104
114 Women day 6 368 2208
TOTAL 11155.5
Say 11155.5
SUB DATA-PART2 (ELECTRIFICATION)

Sl No QTY Particulars Rate CPOH@15%


Index @15%
Amount
Supply of double tube fittings suitable for
celing fittings with tubes, electronic chokes,
of ISI marked good quality, with fixing ball
and socket arrangement (Market Rate)

1 1No 980 147 1 1127


Supply of Single 4 Feet, 16W LED tube light
fittings with LED tube and accessories of ISI
marked good quality (Market rate)
2 1No 530 79.5 1 609.5
Supply of cieling fan of 1200 mm sweep with
all fitting of ISI marked good quality
3 1No 1660 249 1 1909
Supply of Exhaust fan of 300 mm with all
fitting of ISI marked good quality
4 1No 1360 204 1 1564
Supply of 50 W LED lights of reflector type for
out door use
5 1No 4120 618 1 4738
Supply and instalation of , 12W LED Celing
mount light fittings and accessories of ISI
marked good quality (Market rate)
6 1No 700 105 1 805
KERALA STATE ELECTRICITY BOARD LTD

Name of work:Extension of Control room building of 66kV Substation ,


Mundakkayam as part of the upgradation work
CONVEYANCE STATEMENT
No of
Kilometers to
Sl No Material site Place of availability

1 Manufactured Sand 7 Km Poovanchi

2 20 mm Brocken Stone 7 Km Poovanchi


3 40 mm Brocken Stone 7 Km Poovanchi
4 Rouble 7 Km Poovanchi
4 Cement 3Km Mundakkayam
5 Steel 3Km Mundakkayam
6 MS Angle 3Km Mundakkayam
measurements

Excavation
Sl No Foundation Steel bottom centering 1.2.4 1st step-
1.4.8 mat 0.35h

F1,A5,C1 Page: 5 Page: 11 Page 13 Page 19 Page 20

F1,A4,C1 Page: 10 Page: 11 Page 13 Page 19 Page 20

Row 1

F2,A3,C3 Page: 10 Page: 11 Page 13 Page 19 Page 20

F3,A2,C2 Page: 5 Page: 10 Page: 11 Page 13 Page 19 Page 20

F3,A1,C4 Page: 5 Page: 11 Page 13 Page 19 Page 20

Page 111
F1,D5,C1 Page: 8 Page: 12 Page 13 Page 19 Page 20
measurements

F1,D5,C1 Page: 8 Page: 12 Page 13 Page 19 Page 20

F1,D4,C1 Page: 8 Page: 12 Page 13 Page 19 Page 20

F2,D3,C3 Page: 8 Page: 12 Page 13 Page 19 Page 20

F3,D2,C2 Page: 8 Page: 12 Page 13 Page 19 Page 20

F3,D1,C4 Page: 8 Page: 12 Page: 13 Page: 19 Page: 20

F3,B2,C3 Page: 6 Page: 12 Page 13 Page 19 Page 20

Page 112
measurements

F3,C2,C3 Page: 7 Page: 12 Page: 13 Page: 19 Page: 20

F3,B1,C5 Page: 5 Page: 12 Page: 13 Page: 19 Page: 20

F3,C1,C5 Page: 7 Page: 12 Page: 13 Page: 19 Page: 20

Page 113
measurements

centering for
centering for 1.2.4 2nd extension
1.2.4 2nd step- 1.2.4 2nd step- for
centering 0.4,0.25,0.25 centering 0.4,0.25,0.25 10no step- ext- 4 no
foundation ext 0.4,0.25,0.25 foundation ext

Page 21 Page 22 Page 23 Page 24

Page 21 Page 22 Page 23 Page 24

Page 21 Page 22 Page 23 Page 24 Page 29 Page 30

Page 21 Page 22 Page 23 Page 24 Page 29 Page 30

Page 21 Page 22 Page 23 Page 24 Page 29 Page 30

Page 114
Page 21 Page 22 Page 23 Page 24
measurements

Page 21 Page 22 Page 23 Page 24

Page 21 Page 22 Page 23 Page 24 Page 33

Page 21 Page 22 Page 23 Page 24 Page 29 Page 30 Page 33

Page 21 Page 22 Page 23 Page 24 Page 29 Page 30 Page 33

Page: 21 Page: 22 Page: 23 Page: 24 Page: 29 Page: 30 Page 33

Page 21 Page 22 Page 23 Page 24 Page 29 Page 30

Page 115
measurements

Page: 21 Page: 22 Page: 23 Page: 24 Page: 29 Page: 30

Page: 21 Page: 22 Page: 23 Page: 24 Page: 29 Page: 30

Page: 21 Page: 22 Page: 23 Page: 24 Page: 29 Page: 30

Page 116
measurements

1st measurement reinforcement 2nd measurement


1.2.4 2nd
Extension

2.05 1No 3.25 1No


0.4
2.05 1No 3.25 1No
20mm Ts 4no Page no 15 20mm Ts
2.05 1No 3.25 1No
0.4
2.05 1No 3.25 1No
1.6
2.05 1No 3.05 1No
0.35
2.05 1No 3.05 1No
16mm Ts 4no Page no 14 16mm Ts
2.05 1No 2.4 1No
2.05 1No 2.4 1No
2.01 1No 3.25 1No
0.4
2.01 1No 3.25 1No
20mm Ts 4no Page no 15 20mm Ts
2.01 1No 3.25 1No
0.4
2.01 1No 3.25 1No
1.6
2.01 1No 3.15 1No
0.35
2.01 1No 3.15 1No
16mm Ts 4no Page no 14 16mm Ts
2.01 1No 2.4 1No
2.01 1No 2.4 1No
1.95 1No 3.15 1No
0.3
1.95 1No 3.15 1No
16mm Ts 4no Page no 15 16mm Ts
1.95 1No 3.15 1No
0.25
1.95 1No 3.15 1No
1.6
1.95 1No 3.05 1No
0.25
1.95 1No 3.05 1No
12mm Ts 4no Page no 16 12mm Ts
1.95 1No 3.05 1No
0.35
1.95 1No 2.4 1No
2.01 1No 3.05 1No
0.35
2.01 1No 3.05 1No
2.01 1No 3.05 1No
0.25
2.01 1No 3.05 1No
12mm Ts 8No Page no 17 1.65 12mm Ts
2.01 1No 3.05 1No
0.25
2.01 1No 3.05 1No
2.01 1No 2.4 1No
0.35
2.01 1No 2.4 1No
2.01 1No 0.35 3.05 1No
2.01 1No 0.25 3.05 1No
12mm Ts 4no Page no 18 1.65 12mm Ts
2.01 1No 0.25 2.4 1No
2.01 1No 0.35 2.4 1No
2.04 1No 3.25 1No
0.4
2.04 1No 3.25 1No
20mm Ts 4no Page no 15 20mm Ts

Page 117
1.6
measurements
20mm Ts 4no Page no 15 20mm Ts
2.04 1No 3.25 1No
0.4
2.04 1No 2.4 1No
1.6
2.04 1No 3.15 1No
0.35
2.04 1No 3.15 1No
16mm Ts 4no Page no 15 16mm Ts
2.04 1No 3.15 1No
2.04 1No 3.15 1No
2.33 1No 3.25 1No
0.375
2.33 1No 3.25 1No
20mm Ts 4no Page no 15 20mm Ts
2.33 1No 3.25 1No
0.4
2.33 1No 3.25 1No
Page 35 1.975
2.33 1No 3.15 1No
0.4
2.33 1No 3.15 1No
16mm Ts 4no Page no 14 16mm Ts
2.33 1No 3.15 1No
0.35
2.33 1No 3.15 1No
2.55 1No 0.51 3.15 1No
2.55 1No 0.3 3.15 1No
16mm Ts 4no Page no 15 16mm Ts
2.55 1No 3.15 1No
0.25
2.55 1No 3.15 1No
Page 35 2.11
2.55 1No 3.05 1No
0.25
2.55 1No 3.05 1No
12mm Ts 4no Page no 16 12mm Ts
2.55 1No 3.05 1No
0.35
2.55 1No 3.05 1No
2.51 1No 0.1 3.05 1No
2.51 1No 0.35 3.05 1No
2.51 1No 3.05 1No
0.25
2.51 1No 3.05 1No
Page 35 12mm Ts 8No Page no 17 1.75 12mm Ts
2.51 1No 3.05 1No
0.25
2.51 1No 3.05 1No
2.51 1No 3.05 1No
0.35
2.51 1No 2.4 1No
2.60 1No 0.45 3.05 1No
2.60 1No 0.25 3.05 1No
Page 35 12mm Ts 4no Page no 18 1.75 12mm Ts
2.60 1No 0.25 3.05 1No
2.60 1No 0.35 3.05 1No
2.08 1No 3.15 1No
0.35
2.08 1No 3.15 1No
16mm Ts 4no Page no 16 16mm Ts
2.08 1No 3.15 1No
0.25
2.08 1No 3.15 1No
1.65
2.08 1No 3.05 1No
0.25
2.08 1No 3.05 1No
12mm Ts 4no Page no 16 12mm Ts
2.08 1No 3.05 1No
0.35
2.08 1No 3.05 1No

Page 118
measurements
2.09 1No 3.15 1No
0.35
2.09 1No 3.15 1No
16mm Ts 4no Page no 16 16mm Ts
2.09 1No 3.15 1No
0.25
2.09 1No 3.15 1No
1.65
2.09 1No 3.05 1No
0.25
2.09 1No 3.05 1No
12mm Ts 4no Page no 16 12mm Ts
2.09 1No 3.05 1No
0.35
2.09 1No 3.05 1No
2.08 1No 0.35 3.15 1No
2.08 1No 0.25 3.15 1No
16mm Ts 4no Page no 18 1.65 16mm Ts
2.08 1No 0.25 2.40 1No
2.08 1No 0.35 2.40 1No
2.10 1No 0.35 3.15 1No
2.10 1No 0.25 3.15 1No
16mm Ts 4no Page no 18 1.65 16mm Ts
2.10 1No 0.25 3.15 1No
2.10 1No 0.35 3.15 1No

Page 119
measurements
1.1.5.3
centering 1.1.5.3
2nd measurement for column
concrete concrete

0.4
4no
0.4
Page no 34
0.35
4no

Page 44-
Page 43 2m
0.4
4no
0.4
Page no 42
0.35
4no

0.3
4no
0.25
Page 53-
Page no 48 Page 51 2m
0.25
4no
0.35

0.35

0.25
Page no Page 53-
8No Page 51
48,49 2m
0.25

0.35

0.35
0.25 Page 53-
4no Page no 49 Page 51
0.25 2m
0.35
0.4
4no Page no 65

Page
page 68- 120
Page 67 2m
measurements
4no Page no 65
0.4
page 68-
Page 67 2m
0.35
4no Page no 65

0.375
4no
0.4
page 68-
Page no 66 page 67 2m
0.4
4no
0.35

0.51
0.3
4no Page no 65
0.25
page 68-
Page 67 2m
0.25
4no Page no 65
0.35

0.1
0.35

0.25
Page 64-
8No Page no 54 Page56 2m
0.25

0.35

0.45
0.25 page 68-
4no Page no 66 page 67
0.25 2m
0.35
0.35
4no
0.25
Page 53-
Page no 49 Page 51 2m
0.25
4no
0.35

Page 121
measurements

0.35
4no
0.25
Page64-
Page no 54 Page 56 2m
0.25
4no
0.35

0.35
0.25 Page 53-
4no Page no 49 Page 51
0.25 2m
0.35
0.35
0.25 Page 64-
4no Page no 54 Page 56
0.25 2m
0.35