Quarterly price updates on the Web are free and automatic all during 2015. You'll be prompted when it's
time to collect the next update. A connection to the Web is required.
Download all of Craftsman's most popular costbooks for one low price with the Craftsman Site License.
http://www.craftsmansitelicense.com
Table of Contents
This book is dedicated to my daughter, Tami, and my grandchildren, Sophie and Cole.
I'd like to thank the following personnel (and dear friends) at Craftsman Book Company for their
involvement and assistance in producing this book. Christine Bruneau, production manager, Joan
Hamilton, layout, Ray Hicks, editor, Gary Moselle, producer and publisher, Jennifer Johnson, cover
design, iStock by Getty Images, cover photos.
I want to also thank my Lord and Savior, Jesus Christ, who gave me eyes to see, hands to type and a
mind to think.
Estimating concrete and masonry costs requires specialized skills. You can't price concrete and
masonry work the same way you would price carpentry, plumbing or electrical work. The proportion of
labor expense is greater. There's more risk because there are more variables and unknowns.
For example, the cost of laying block increases as wall height increases, even when lifting equipment is
on hand and is used to good advantage. Your crews are going to lay more block per hour when the wall
is 4 feet high than when the same wall tops out at 18 or 20 feet above ground level. It's poor practice to
assume the same labor productivity per block regardless of wall height. Masonry and concrete
estimates that don't consider changes in labor productivity as wall height increases are likely to miss
the mark by a wide margin.
If you're an experienced concrete and masonry estimator with too little time to scope out the last dime
of cost in every job, take heart. This book is for you. I've done most of the tedious work already. Use my
figures to save time, save effort, and eliminate most of the routine mistakes even seasoned estimators
make at least occasionally.
If you've had years of experience with concrete and masonry in the field, but little or no estimating
experience, this book is likely to be the best guide you'll find anywhere. Cost data in this manual was
compiled by a mathematician with almost three decades of estimating experience. Most of the cost
tables in this manual are for complete assemblies -- such as block, reinforcing, and grout -- all wrapped
up into one convenient package ready for use. Using these assembly costs will give you extra time to
estimate more jobs, run projects more effectively, and be a better manager for your growing business.
The sections that follow have detailed labor, material and equipment costs for nearly all common
concrete and masonry work. Emphasis will be on avoiding risk -- pricing pitfalls that can turn any
concrete and masonry job into a financial nightmare.
Throughout this book you'll find pictures and examples that make your work easier. It's nearly
impossible to estimate costs for work you can't visualize and don't understand.
Of course, the best price book for your company would be based on your actual cost experience -- work
done on your jobs with materials from your dealers and installed by your crews or subcontractors. Since
every contractor uses different crews, subcontractors and suppliers, every price book should be
different. And, of course, prices in the company price book should be revised regularly to reflect current
labor and material costs.
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 3 (part 2)
Once an estimate is finished in the National Estimator program and saved to disk, press Ctrl on your
keyboard and tap the letter j to convert the estimate into a proposal in Job Cost Wizard. You can't make
changes in the Job Cost Wizard screen. But it's easy to toggle back to the National Estimator program
(press Alt and tap the Tab key), make a change, and then press Ctrl-j once again.
Job Cost Wizard offers dozens of choices on what you show and don't show in written proposals. Your
bids can be long (full description for everything in the estimate) or short (only a summary of each
category). You can show or hide labor and material cost details. You can show or hide markup and
profit.
Once work begins, you'll want to monitor job expenses to be sure actual costs remain consistent with
estimated costs. If you use QuickBooks Pro to pay bills and figure payroll, let QuickBooks do the
comparisons for you. Job Cost Wizard exports the proposal to QuickBooks, where you can prepare
progress invoices and track expenses against estimates.
The National Estimator program lets you change anything in the costbook or even add your own
estimated costs. Let the National Concrete & Masonry Estimator costbook become your collection
point for all estimating and pricing information. Anything you add to the costbook shows up in red and
can be migrated to later editions of this manual when available. The National Concrete & Masonry
Estimator costbook starts out as your most useful estimating reference. What you add to that costbook
will make it even more valuable.
Add Delivery Expense to the material cost for other than local delivery of reasonably large quantities.
Cost of delivery varies with the distance from source of supply, method of transportation, and quantity to
be delivered. But most material dealers absorb the delivery cost on local delivery (5 to 15 miles) of larger
quantities to good customers. Add the expense of job site delivery when it is a significant part of the
material cost.
Add Sales Tax when sales tax will be charged to the contractor buying the materials. In some states,
contractors have to collect sales tax based on the contract price. No matter what your state (or county)
requires, National Estimator can handle the task. Click Edit on the National Estimator menu bar. Then
click Tax Rates.
Waste and Coverage loss is included in the installed material cost. The cost of many materials per
unit after installation is greater than the purchase price for the same unit because of waste, shrinkage or
coverage loss during installation. For example, 1.125 concrete block are needed to create a square foot
of wall. But it's good estimating practice to order about 5% more block than required for the job. Some
block will be broken before they can be set in place (waste). A few block will be pulled off the pile for
use as wheel stops or hold-downs (shrinkage). And some block will have to be cut to fit around corners,
doors and windows (coverage loss). There is no coverage loss with concrete. But it's common to need a
little extra concrete to accommodate over-excavation.
Costs in the "Material" column of this book assume normal waste and coverage loss. Small and
irregular jobs may require a greater waste allowance. Materials priced without installation (with no labor
cost) do not include an allowance for waste and coverage except as noted.
Labor Costs
Labor costs for installing the material or doing the work described are listed in the column headed
"Labor." The labor cost per unit is the labor cost per hour multiplied by the manhours per unit shown
after the @ sign in the "Craft@Hours" column. Labor cost includes the basic wage, the employer's
contribution to welfare, pension, vacation and apprentice funds and all tax and insurance charges based
on wages.
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 4 (part 2)
Supervision Expense to the general contractor is not included in the labor cost. The cost of
supervision and non-productive labor varies widely from job to job. Calculate the cost of supervision and
non-productive labor and add this to the estimate.
Payroll Taxes and Insurance are included in the labor cost. See the following section for more on the
"contractor's burden."
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 5
Manhours per Unit and the Craft performing the work are listed in the "Craft@Hrs" column. To find the
units of work done per man in an 8-hour day, divide 8 by the manhours per unit. To find the units done
by a crew in an 8-hour day, multiply the units per man per 8-hour day by the number of crew members.
Manhours Include all productive labor normally associated with installing the materials described. This
will usually include tasks such as:
Unloading and storing materials, tools and equipment on site.
Moving tools and equipment from a storage area or truck on site at the beginning of the day.
Returning tools and equipment to a storage area or truck on site at the end of the day.
Normal time lost for work breaks.
Planning and discussing the work to be performed.
Normal handling, measuring, cutting and fitting.
Keeping a record of the time spent and work done.
Regular cleanup of construction debris.
Infrequent correction or repairs required because of faulty installation.
Adjust the Labor Cost to the job you are figuring when your actual hourly labor cost is known or can be
estimated. The labor costs listed in the following section will apply within a few percent on many jobs.
But labor costs may be much higher or much lower on the job you are estimating.
If the hourly wage rates listed in the following section are not accurate, divide your known or estimated
cost per hour by the listed cost per hour. The result is your adjustment for any figure in the "Labor"
column for that craft.
Adjust for Unusual Labor Productivity. Costs in the labor column are for normal conditions:
experienced craftsmen working on reasonably well-planned and managed concrete and masonry
projects with fair to good productivity. Labor estimates assume that materials are standard grade,
appropriate tools are on hand, work done by other crafts is adequate, layout and installation are
relatively uncomplicated, and working conditions don't slow progress.
Working conditions at the job site have a major effect on labor cost. Estimating experience and careful
analysis can help you predict the effect of most changes in working conditions. Obviously, no single
adjustment will apply on all jobs. But the adjustments that follow should help you produce more
accurate labor estimates. More than one condition may apply on a job.
Add 10% to 15% when working temperatures are below 40 degrees or above 95 degrees.
Deduct 10% when the work is in an open area with excellent access and good light.
Add 5% to 50% for tradesmen with below average skills. Deduct 5% to 25% for highly motivated,
highly skilled tradesmen.
Deduct 10% to 20% when an identical task is repeated many times for several days at the same site.
Add 20% to 50% on small jobs where fitting and matching of materials is required, adjacent surfaces
have to be protected and the job site is occupied during construction.
Add 25% to 50% for work done following a major flood, fire, earthquake, hurricane or tornado while
skilled tradesmen are not readily available. Material costs may also be higher after a major disaster.
Add 10% to 35% for demanding specs, rigid inspections, unreliable suppliers, a difficult owner or an
inexperienced architect.
This manual has been compiled by and for concrete and masonry estimators, not engineers. Nothing in
this manual is intended to suggest approved or recommended engineering practice. Only an engineer
licensed to practice in your community can identify materials and procedures that meet code
requirements and accepted standards for reinforcing steel, structural concrete and structural masonry.
Use an Area Modification Factor from pages 8 through 11 if your material, hourly labor or equipment
costs are unknown and can't be estimated. Here's how: Use the labor and material costs in this manual
without modification. Then add or deduct the percentages shown for labor, material and equipment.
Equipment Costs for small tools and expendable supplies (such as towels and tape) are usually
considered overhead expense and are covered by your markup. Equipment costs for larger equipment
(such as a forklift or backhoe) should be based on the rental rate for the period needed. Equipment
costs are included in sections where heavy equipment may be needed.
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 5 (part 2)
Labor and Material Costs Change. These costs were compiled in the fall of 2014 and projected to
mid-2015 by adding a small percentage. This projection will be accurate for some materials and
inaccurate for others. No one can predict material price changes accurately.
How Accurate Are These Figures? As accurate as possible considering that the estimator who wrote
this book doesn't know your subcontractors or material suppliers, hasn't seen the plans or
specifications, doesn't know what building code applies or where the job is, had to project material
costs at least six months into the future, and had no record of how much work you crews can handle.
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 6
You wouldn't bid a job under those conditions. And I don't claim that all construction is done at these
prices.
Estimating Is an Art, not a science. On many jobs the range between high and low bid will be 20% or
more. There's room for legitimate disagreement on what the correct costs are, even when complete
plans and specifications are available, the date and site are established, and labor and material costs
are identical for all bidders.
No cost fits all jobs. Good estimates are custom made for a particular project and a single contractor
through judgment, analysis and experience.
This cost book is not a substitute for judgment, analysis and sound estimating practice. It's an aid in
developing an informed opinion of cost. If you're using this book as your sole cost authority for contract
bids, you're reading more into these pages than the author intends.
Use These Figures to compile preliminary estimates, to check your costs and subcontract bids and
when no actual costs are available. This book will reduce the chance of error or omission on bid
estimates, speed "ball park" estimates, and be a good guide when there's no time to get a quote.
Where Do These Figures Come From? From the same sources all professional estimators use:
material suppliers, material price services, analysis of plans, specifications, estimates and completed
project costs, and both published and unpublished cost studies compiled by both private and
government agencies.
Craftsman Will Answer Your Questions about any part of this cost book and explain how to apply
these costs. Free telephone assistance is available from 8 a.m. until 5 p.m. Pacific time Monday
through Friday except holidays. Phone 760-438-7828. Support personnel at Craftsman don't accept
collect calls and won't estimate the job for you. But if you need clarification on something in this
manual, help is available.
For example, at the top of page 23 you'll find estimates for installing common brick. The Craft@Hrs
column under 6'-0" high wall and opposite "Cost per square foot" shows:
B9@.272
That means we estimate the installation time for crew B9 at .232 manhours per square foot of wall.
That's the same as 23.2 manhours per 100 square feet.
The Craft Codes table below defines each of the craft codes used in this book. Notice that crew B9 is
composed of one bricklayer and one bricklayer's helper. To install 100 square feet of common brick in a
6'-0" high wall would require 23.2 manhours (11.6 hours for a crew of two).
Notice also in the table below that the cost per manhour for crew B9 is listed as $31.96. That's the
average for a bricklayer (listed at $36.70 per hour on page 7) and a helper (listed at $27.22 per hour).
Add $36.70 and $27.22 to get $63.92. Divide by 2 to get $31.96, the average cost per manhour for crew
B9.
Costs in the labor column of this book are the product of the installation time (in manhours) multiplied
by the cost per manhour. For example, on page 23 the labor cost listed for a 6'-0" high wall is $8.69 per
square foot. That's the installed time (.272 manhours) multiplied by $31.96, the average cost per
manhour for crew B9.
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 6 (part 2)
The next table shows hourly labor cost components - base wage, typical fringe benefits, payroll taxes,
insurance, and the total hourly cost.
1 2 3 4 5 6
Taxable Non-taxable
fringe fringe Total
Base benefits Insurance Insurance benefits hourly
wage (5.15% of and and (4.55% of cost
per base employer employer base used in
Craft hour wage) taxes(%) taxes($) wage) this book
Bricklayer $26.92 $1.39 25.34% $7.17 $1.22 $36.70
Bricklayer's Helper $19.96 $1.03 25.34% $5.32 $0.91 $27.22
Building Laborer $20.37 $1.05 32.73% $7.01 $0.93 $29.36
Carpenter $25.33 $1.30 31.63% $8.42 $1.15 $36.20
Cement Mason $25.61 $1.32 23.15% $6.23 $1.17 $34.33
Operating Engineer $30.30 $1.56 25.22% $8.04 $1.38 $41.28
Reinforcing Ironworker $27.22 $1.40 28.61% $8.19 $1.24 $38.05
Truck Driver $21.93 $1.13 26.22% $6.05 $1.00 $30.11
Hourly Labor Costs
It's important that you understand what's included in the figures in each of the six columns above. Here's
an explanation:
Column 1, the base wage per hour, is the craftsman's hourly wage. These figures are representative of
what many contractors will be paying craftsmen working on concrete and masonry jobs in 2015.
Column 2, taxable fringe benefits, includes vacation pay, sick leave and other taxable benefits. These
fringe benefits average 5.15% of the base wage for many construction contractors. This benefit is in
addition to the base wage.
Column 3, insurance and employer taxes in percent, shows the insurance and tax rate for construction
trades. The cost of insurance in this column includes workers' compensation and contractor's casualty
and liability coverage. Insurance rates vary widely from state to state and depend on a contractor's loss
experience. Note that taxes and insurance increase the hourly labor cost by 30 to 35% for most trades.
There is no legal way to avoid these costs.
Column 4, insurance and employer taxes in dollars, shows the hourly cost of taxes and insurance for
each construction trade. Insurance and taxes are paid on the costs in both columns 1 and 2.
Column 5, non-taxable fringe benefits, includes employer paid non-taxable benefits such as medical
coverage and tax-deferred pension and profit sharing plans. These fringe benefits average 4.55% of the
base wage for many construction contractors. The employer pays no taxes or insurance on these
benefits.
Column 6, the total hourly cost in dollars, is the sum of columns 1, 2, 4, and 5.
These hourly labor costs will apply within a few percent on many jobs. But wage rates may be much
higher or lower in the area where you do business. We recommend using your actual labor cost rather
than national averages. That's easy with the National Estimator program. When copying and pasting
any cost to your estimate, adjust the assumed hourly labor cost to your actual cost. You need do this
only once for each trade. And you can make this adjustment at any time. Any change you make is
applied to that trade throughout the estimate.
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 8
These percentages were compiled by comparing the construction cost of buildings in nearly 700
communities throughout the U.S. and Canada. Because these percentages are based on completed
project costs, they consider all construction cost variables, including labor, equipment and material
cost, labor productivity, climate, job conditions and markup.
Modification factors are listed alphabetically by state. Areas within each state are listed by the first
three digits of the postal zip code. For convenience, one representative city is identified in each zip code
or range of zip codes.
The percentages are composites of many costs and will not necessarily be accurate when estimating
the cost of any particular part of a building. But when used to modify costs for an entire structure, they
should improve the accuracy of your estimates.
Total
Wtd.
Location, Zip Material Labor Equip. Avg.
California Average 2 14 1 8%
Alhambra, 917-918 3 16 1 9%
Bakersfield, 932-933 0 7 0 3%
El Centro, 922 1 -3 0 -1%
Eureka, 955 1 -9 0 -4%
Fresno, 936-938 0 -3 0 -1%
Herlong, 961 2 -5 1 -1%
Inglewood, 902-905 3 17 1 9%
Irvine, 926-927 3 25 1 13%
Lompoc, 934 3 9 1 6%
Long Beach, 907-908 3 18 1 10%
Los Angeles, 900-901 3 15 1 8%
Marysville, 959 1 -3 0 -1%
Modesto, 953 1 -4 0 -1%
Mojave, 935 0 13 0 6%
Novato, 949 3 25 1 13%
Oakland, 945-947 3 38 1 19%
Orange, 928 3 23 1 12%
Oxnard, 930 3 5 1 4%
Pasadena, 910-912 3 17 1 9%
Rancho Cordova, 956-957 2 11 1 6%
Redding, 960 1 -8 0 -3%
Richmond, 948 2 39 1 19%
Riverside, 925 1 6 0 3%
Sacramento, 958 1 11 0 6%
Salinas, 939 3 3 1 3%
San Bernardino, 923-924 0 9 0 4%
San Diego, 919-921 3 12 1 7%
San Francisco, 941 3 58 1 28%
San Jose, 950-951 3 36 1 18%
San Mateo, 943-944 4 38 1 20%
Santa Barbara, 931 3 10 1 6%
Santa Rosa, 954 3 10 1 6%
Stockton, 952 1 0 0 1%
Sunnyvale, 940 3 41 1 20%
Van Nuys, 913-916 3 15 1 8%
Whittier, 906 3 15 1 8%
Colorado Average 2 0 1 1%
Aurora, 800-801 2 10 1 6%
Boulder, 803-804 3 4 1 3%
Colorado Springs, 808-809 2 -4 1 -1%
Denver, 802 2 11 1 6%
Durango, 813 1 -2 0 0%
Fort Morgan, 807 1 -8 0 -3%
Glenwood Springs, 816 2 6 1 4%
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 8 (part 3)
Delaware Average 1 4 0 2%
Dover, 199 1 -11 0 -5%
Newark, 197 2 12 1 7%
Wilmington, 198 0 11 0 5%
Illinois Average -1 11 0 5%
Arlington Heights, 600 2 32 1 16%
Aurora, 605 2 31 1 15%
Belleville, 622 -2 3 -1 0%
Bloomington, 617 1 1 0 1%
Carbondale, 629 -3 -8 -1 -5%
Carol Stream, 601 2 31 1 15%
Centralia, 628 -3 -4 -1 -3%
Champaign, 618 -1 1 0 0%
Chicago, 606-608 2 34 1 17%
Decatur, 623 -2 -16 -1 -8%
Galesburg, 614 -2 -10 -1 -6%
Granite City, 620 -3 9 -1 3%
Green River, 612 -2 12 -1 4%
Joliet, 604 0 35 0 16%
Kankakee, 609 -2 4 -1 1%
Lawrenceville, 624 -4 -8 -1 -6%
Oak Park, 603 3 38 1 19%
Peoria, 615-616 -1 17 0 7%
Peru, 613 0 7 0 3%
Quincy, 602 3 34 1 17%
Rockford, 610-611 -2 10 -1 4%
Springfield, 625, 627 -2 3 -1 0%
Urbana, 619 -3 -4 -1 -3%
Louisiana Average -1 1 -1 0%
Alexandria, 713-714 -3 -5 -1 -4%
Baton Rouge, 707-708 0 21 0 10%
Houma, 703 -2 16 -1 6%
Lafayette, 705 0 4 0 2%
Lake Charles, 706 -2 3 -1 0%
Mandeville, 704 0 -2 0 -1%
Minden, 710 -2 -11 -1 -6%
Monroe, 712 -2 -17 -1 -9%
New Orleans, 700-701 0 5 0 2%
Shreveport, 711 -2 -6 -1 -4%
Maryland Average 1 4 0 2%
Annapolis, 214 3 15 1 8%
Baltimore, 210-212 -1 18 0 8%
Bethesda, 208-209 3 25 1 13%
Church Hill, 216 2 -11 1 -4%
Cumberland, 215 -4 -17 -1 -10%
Elkton, 219 2 -6 1 -2%
Frederick, 217 1 9 0 5%
Laurel, 206-207 2 17 1 9%
Salisbury, 218 1 -14 0 -6%
Michigan Average -2 3 -1 1%
Battle Creek, 490-491 -3 2 -1 -1%
Detroit, 481-482 0 18 0 8%
Flint, 484-485 -3 -7 -1 -5%
Grand Rapids, 493-495 -1 4 0 1%
Grayling, 497 1 -19 0 -8%
Jackson, 492 -3 0 -1 -2%
Lansing, 488-489 0 4 0 2%
Marquette, 498-499 -1 4 0 1%
Pontiac, 483 -3 26 -1 10%
Royal Oak, 480 -2 20 -1 8%
Saginaw, 486-487 -2 -10 -1 -6%
Traverse City, 496 -1 -1 0 -1%
Minnesota Average 0 0 0 0%
Bemidji, 566 -1 -9 0 -5%
Brainerd, 564 0 -2 0 -1%
Duluth, 556-558 -2 5 -1 1%
Fergus Falls, 565 -1 -17 0 -8%
Magnolia, 561 0 -19 0 -9%
Mankato, 560 0 -6 0 -3%
Minneapolis, 553-555 1 25 0 12%
Rochester, 559 0 -4 0 -2%
St Cloud, 563 -1 11 0 5%
St Paul, 550-551 1 22 0 11%
Thief River Falls, 567 0 -2 0 -1%
Willmar, 562 -1 -5 0 -3%
Nevada Average 2 6 1 4%
Carson City, 897 2 -15 1 -6%
Elko, 898 1 45 0 21%
Ely, 893 2 -1 1 1%
Fallon, 894 2 2 1 2%
Las Vegas, 889-891 2 5 1 3%
Reno, 895 2 0 1 1%
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 11 (part 3)
Poughkeepsie, 125-126 0 4 0 2%
Queens, 110 4 50 1 25%
Rochester, 144-146 -3 7 -1 2%
Rockaway, 116 3 35 1 18%
Rome, 133-134 -3 -6 -1 -4%
Staten Island, 103 3 29 1 15%
Stewart, 127 -1 -6 0 -3%
Syracuse, 130-132 -3 7 -1 2%
Tonawanda, 141 -3 2 -1 -1%
Utica, 135 -4 -9 -1 -6%
Watertown, 136 -2 6 -1 2%
West Point, 109 1 19 0 9%
White Plains, 105-108 3 37 1 19%
Ohio Average -2 3 -1 0%
Akron, 442-443 -2 5 -1 1%
Canton, 446-447 -3 2 -1 -1%
Chillicothe, 456 -2 -6 -1 -4%
Cincinnati, 450-452 -1 10 0 4%
Cleveland, 440-441 -3 11 -1 3%
Columbus, 432 0 12 0 6%
Dayton, 453-455 -3 1 -1 -1%
Lima, 458 -3 -9 -1 -6%
Marietta, 457 -3 -5 -1 -4%
Marion, 433 -3 -4 -1 -3%
Newark, 430-431 -1 10 0 4%
Sandusky, 448-449 -2 0 -1 -1%
Steubenville, 439 -3 5 -1 1%
Toledo, 434-436 -1 14 0 6%
Warren, 444 -4 -3 -1 -3%
Youngstown, 445 -5 6 -2 0%
Zanesville, 437-438 -2 1 -1 -1%
Washington, 153 -4 23 -1 8%
Wilkes Barre, 186-187 -3 -4 -1 -3%
Williamsport, 177 -3 0 -1 -2%
York, 173-174 -3 7 -1 2%
Washington Average 1 -1 0 0%
Clarkston, 994 0 -13 0 -6%
Everett, 982 2 4 1 3%
Olympia, 985 2 -5 1 -1%
Pasco, 993 0 4 0 2%
Seattle, 980-981 3 23 1 12%
Spokane, 990-992 0 -6 0 -3%
Tacoma, 983-984 1 5 0 3%
Vancouver, 986 2 3 1 2%
Wenatchee, 988 1 -13 0 -5%
Yakima, 989 0 -9 0 -4%
Wisconsin Average -1 3 0 1%
Amery, 540 0 -1 0 0%
Beloit, 535 0 12 0 6%
Clam Lake, 545 -1 -12 0 -6%
Eau Claire, 547 -1 -5 0 -3%
Green Bay, 541-543 0 5 0 2%
La Crosse, 546 -2 1 -1 -1%
Ladysmith, 548 -2 4 -1 1%
Madison, 537 2 16 1 8%
Milwaukee, 530-534 0 16 0 7%
Oshkosh, 549 -1 8 0 3%
Portage, 539 0 9 0 4%
Prairie du Chien, 538 -2 -11 -1 -6%
Wausau, 544 -1 -3 0 -2%
Ontario Average 19 -8 8 7%
London 19 -7 8 7%
Thunder Bay 21 -11 9 6%
Toronto 18 -6 8 7%
Equipment Rental Rates Costs are for equipment in good condition but exclude accessories.
Includes the costs of damage waiver (about 10% of the rental cost) insurance, fuel, and oil. Add the cost
of an equipment operator, pickup, return to yard, and repairs if necessary. Delivery and pickup within 30
miles of the rental yard are usually offered at an additional cost of one day's rent. A rental "day" is
assumed to be one 8-hour shift and begins when the equipment leaves the rental yard. A "week" is 40
hours in five consecutive days. A "month" is 176 hours in 30 consecutive days.
Hydraulic scaffold
Running bond
Standard brick, running or stretcher bond, no headers, 3/8" joint, single wythe (6.55 Brick/SF)
Typical costs for standard brick walls, laid up in common or running bond with 3/8" horizontal and
vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal
waste, but no structural steel members, flashings or stirrups. Foundations are not included. See wall
foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the
thickness of the wall. Labor costs increase with increases in wall height. Equipment costs include
scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based
on the production rate of an 8-man crew.
Work the following examples to gain familiarity with this type of data.
Example 1: Determine the cost of a solid brick wall 420' long and 12' tall using standard brick, laid up
with a running bond with 3/8" mortar joints.
Solution:
Material = 420' x $44.00/LF = $18,480.00
Labor = 420' x $82.55 /LF = $34,671.00
Equipment = 420' x $1.20 = $504.00
Total Cost = $53,655.00
Example 2: Now determine the cost of the wall, assuming that there are three 3' x 7' door openings and
four 4' x 5' window openings in the wall.
Standard brick, common or American bond, header every 5th course, 3/8" joint, single wythe
(7.86 Brick/SF) Typical costs for standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in
the given bond with 3/8" horizontal and vertical joints. These costs include the bricks, mortar, typical
ladder reinforcing, wall ties and normal waste, but no backing wall, structural steel members, flashings
or stirrups. Foundations are not included. "Wythe" means the quantity of bricks in the thickness of the
wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding starting at
7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the production
rate of an 8-man crew.
Standard brick, common or American bond, full header every 6th course, 3/8" joint, single
wythe (7.64 Brick/SF) Typical costs for standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid
up in the given bond with 3/8" horizontal and vertical joints. These costs include the bricks, mortar,
typical ladder reinforcing, wall ties and normal waste, but no backing wall, structural steel members,
flashings or stirrups. Foundations are not included. See wall foundation costs in the section Concrete
Spread Footings. "Wythe" means the quantity of bricks in the thickness of the wall. Labor costs
increase with increases in wall height. Equipment costs include scaffolding starting at 7' and a boomlift
with a 30' reach starting at 13'. Equipment rental costs are based on the production rate of an 8-man
crew.
English bond
English, English cross, or Dutch bond, full header every other course, 3/8" joint, single wythe
(9.83 Brick/SF) Typical costs for standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in
the given bond with 3/8" horizontal and vertical joints. These costs include the bricks, mortar, typical
ladder reinforcing, wall ties and normal waste, but no backing wall, structural steel members, flashings
or stirrups. Foundations are not included. See wall foundation costs in the section Concrete Spread
Footings. "Wythe" means the quantity of bricks in the thickness of the wall. Labor costs increase with
increases in wall height. Equipment costs include scaffolding starting at 7' and a boomlift with a 30'
reach starting at 13'. Equipment rental costs are based on the production rate of an 8-man crew.
Flemish bond
Flemish bond, full header every other course, 3/8" joint, single wythe (8.71 Brick/SF) Typical
costs for standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in the given bond with 3/8"
horizontal and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties
and normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are
not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Flemish bond, full header every 6th course, 3/8" joint, single wythe (6.92 brick/sf) Typical costs
for standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in the given bond with 3/8"
horizontal and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties
and normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are
not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Double Flemish bond, full header every 3rd course, 3/8" joint, single wythe (7.21 brick/sf)
Typical costs for standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in the given bond with
3/8" horizontal and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall
ties and normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations
are not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means
the quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Standard brick, double headers (2 headers and a stretcher every 6th course) 3/8" joint, single
wythe (7.09 brick/sf) Typical costs for standard brick walls, laid up in common or running bond with
3/8" horizontal and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall
ties and normal waste, but no structural steel members, flashings or stirrups. Foundations are not
included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Standard brick, 8" wall, common bond, 3/8" joint, double wythe (13.10 brick sf) Typical costs for
standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in the given bond with 3/8" horizontal
and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and
normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. See wall foundation costs in the section Concrete Spread Footings. The wall thickness shown
is the nominal size based on using the type bricks described. "Wythe" means the quantity of bricks in
the thickness of the wall. Labor costs increase with increases in wall height. Equipment costs include
scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based
on the production rate of an 8-man crew.
Standard brick, 12" wall, common bond, 3/8" joint, triple wythe (15.28 brick/sf) Typical costs for
standard brick walls (3-3/4" wide x 2-1/4" high x 8" long), laid up in the given bond with 3/8" horizontal
and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and
normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. See wall foundation costs in the section Concrete Spread Footings. The wall thickness shown
is the nominal size based on using the type bricks described. "Wythe" means the quantity of bricks in
the thickness of the wall. Labor costs increase with increases in wall height. Equipment costs include
scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based
on the production rate of an 8-man crew.
Norman brick (3-1/2" wide x 2-1/4" high x 11-1/2" long), running bond, single wythe (brown or
burnt oak) (4.22 brick/sf) Typical costs for Norman brick laid up in the given bond with 3/8" horizontal
and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and
normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Norman brick (3-1/2" wide x 2-1/4" high x 11-1/2" long), running bond, single wythe (flashed or
red) (4.22 brick/sf) Typical costs for Norman brick laid up in the given bond with 3/8" horizontal and
vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal
waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Jumbo brick (3-1/2" wide x 3" high x 11-1/2" long), running bond, single wythe (fireplace,
cored) (3.13 brick/sf) Typical costs for jumbo brick laid up in the given bond with 3/8" horizontal and
vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal
waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Jumbo brick (3-1/2" wide x 3" high x 11-1/2" long), running bond, single wythe (fireplace, solid)
(3.13 brick/sf) Typical costs for jumbo brick laid up in the given bond with 3/8" horizontal and vertical
joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but
no backing wall, structural steel members, flashings or stirrups. Foundations are not included. See wall
foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the
thickness of the wall. Labor costs increase with increases in wall height. Equipment costs include
scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based
on the production rate of an 8-man crew.
Jumbo brick (3-1/2" wide x 3" high x 11-1/2" long), running bond, single wythe (mission, solid)
(3.13 brick/sf) Typical costs for jumbo brick laid up in the given bond with 3/8" horizontal and vertical
joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but
no backing wall, structural steel members, flashings or stirrups. Foundations are not included. See wall
foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the
thickness of the wall. Labor costs increase with increases in wall height. Equipment costs include
scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based
on the production rate of an 8-man crew.
Modular brick (3-1/2" wide x 3" high x 11-1/2" long), running bond, single wythe (red) (3.13
brick/sf) Typical costs for modular brick laid up in the given bond with 3/8" horizontal and vertical joints.
These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no
backing wall, structural steel members, flashings or stirrups. Foundations are not included. See wall
foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the
thickness of the wall. Labor costs increase with increases in wall height. Equipment costs include
scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based
on the production rate of an 8-man crew.
Modular brick (3-1/2" wide x 3" high x 11-1/2" long), running bond, single wythe (brown, burnt
oak or flashed) (3.13 brick/sf) Typical costs for modular brick laid up in the given bond with 3/8"
horizontal and vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties
and normal waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are
not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding starting at 7' and a boomlift with a 30' reach starting at 13'.
Equipment rental costs are based on the production rate of an 8-man crew.
Padre brick (4" wide x 3" high x 7-1/2" long), running bond, single wythe (cored) (4.20 brick/sf)
Typical costs for padre brick laid up in the given bond with 3/8" horizontal and vertical joints. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no backing
wall, structural steel members, flashings or stirrups. Foundations are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding
starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the
production rate of an 8-man crew.
Padre brick (4" wide x 3" high x 7-1/2" long), running bond, single wythe (solid) (4.20 brick/sf)
Typical costs for padre brick laid up in the given bond with 3/8" horizontal and vertical joints. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no backing
wall, structural steel members, flashings or stirrups. Foundations are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding
starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the
production rate of an 8-man crew.
Padre brick (4" wide x 3" high x 11-1/2" long), running bond, single wythe (cored) (2.80 brick/sf)
Typical costs for padre brick laid up in the given bond with 3/8" horizontal and vertical joints. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no backing
wall, structural steel members, flashings or stirrups. Foundations are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding
starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the
production rate of an 8-man crew.
Padre brick (4" wide x 3" high x 11-1/2" long), running bond, single wythe (solid) (2.80 brick/sf)
Typical costs for padre brick laid up in the given bond with 3/8" horizontal and vertical joints. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no backing
wall, structural steel members, flashings or stirrups. Foundations are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding
starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the
production rate of an 8-man crew.
Padre brick (4" wide x 3" high x 15-1/2" long), running bond, single wythe (cored) (2.10 brick/sf)
Typical costs for padre brick laid up in the given bond with 3/8" horizontal and vertical joints. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no backing
wall, structural steel members, flashings or stirrups. Foundations are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding
starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the
production rate of an 8-man crew.
Padre brick (4" wide x 3" high x 15-1/2" long), running bond, single wythe (solid) (2.10 brick/sf)
Typical costs for padre brick laid up in the given bond with 3/8" horizontal and vertical joints. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no backing
wall, structural steel members, flashings or stirrups. Foundations are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding
starting at 7' and a boomlift with a 30' reach starting at 13'. Equipment rental costs are based on the
production rate of an 8-man crew.
Roman brick
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 74
Commercial brick
Commercial brick (3-1/2" wide x 3-1/4" high x 10" long), running bond, single wythe (solid)
(3.60 brick/sf) Typical costs for commercial brick laid up in the given bond with 3/8" horizontal and
vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal
waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. "Wythe" means the quantity of bricks in the thickness of the wall. Labor costs increase with
increases in wall height. Equipment costs include scaffolding starting at 7' and a boomlift with a 30'
reach starting at 13'. Equipment rental costs are based on the production rate of an 8-man crew.
Commercial brick (3-1/2" wide x 3-1/4" high x 10" long), running bond, single wythe (cored)
(3.60 brick/sf) Typical costs for commercial brick laid up in the given bond with 3/8" horizontal and
vertical joints. These costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal
waste, but no backing wall, structural steel members, flashings or stirrups. Foundations are not
included. "Wythe" means the quantity of bricks in the thickness of the wall. Labor costs increase with
increases in wall height. Equipment costs include scaffolding starting at 7' and a boomlift with a 30'
reach starting at 13'. Equipment rental costs are based on the production rate of an 8-man crew.
Soldier course
Soldier course
Soldier bond, standard brick Typical costs for standard brick laid up in a soldier bond. These costs
include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no structural steel
members, flashings or stirrups. Foundations are not included.
Rowlock courses
Rowlock bond, standard brick Typical costs for standard brick laid up in a rowlock bond. These
costs include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no structural
steel members, flashings or stirrups. Foundations are not included. Each brick is assumed to be a full
brick.
Sailor courses
Sailor bond, standard brick Typical costs for standard brick laid up in a sailor bond. These costs
include the bricks, mortar, typical ladder reinforcing, wall ties and normal waste, but no structural steel
members, flashings or stirrups. Foundations are not included.
Brick columns
12" x 12" brick columns Prices include the labor and material necessary to build a solid 12" x 12"
brick column. Material includes standard brick laid up in a running bond with 3/8" mortar joints, mortar,
typical ladder reinforcing with normal waste, but no structural steel members, flashing or stirrups.
Foundations are not included. See wall foundation costs in the section Concrete Spread Footings.
Equipment costs include scaffolding, starting at 8'. All brick columns are solid brick.
16" x 16" brick columns Prices include the labor and material necessary to build a solid 16" x 16"
brick column. Material includes standard brick laid up in a running bond with 3/8" mortar joints, mortar,
typical ladder reinforcing with normal waste, but no structural steel members, flashing or stirrups.
Foundations are not included. See wall foundation costs in the section Concrete Spread Footings.
Equipment costs include scaffolding, starting at 8'. All brick columns are solid brick.
20" x 20" brick columns Prices include the labor and material necessary to build a solid 20" x 20"
brick column. Material includes standard brick laid up in a running bond with 3/8" mortar joints, mortar,
typical ladder reinforcing with normal waste, but no structural steel members, flashing or stirrups.
Foundations are not included. See wall foundation costs in the section Concrete Spread Footings.
Equipment costs include scaffolding, starting at 8'. All brick columns are solid brick.
24" x 24" brick columns Prices include the labor and material necessary to build a solid 24" x 24"
brick column. Material includes standard brick laid up in a running bond with 3/8" mortar joints, mortar,
typical ladder reinforcing with normal waste, but no structural steel members, flashing or stirrups.
Foundations are not included. See wall foundation costs in the section Concrete Spread Footings.
Equipment costs include scaffolding, starting at 8'. All brick columns are solid brick.
28" x 28" brick columns Prices include the labor and material necessary to build a solid 28" x 28"
brick column. Material includes standard brick laid up in a running bond with 3/8" mortar joints, mortar,
typical ladder reinforcing with normal waste, but no structural steel members, flashing or stirrups.
Foundations are not included. See wall foundation costs in the section Concrete Spread Footings.
Equipment costs include scaffolding, starting at 8'. All brick columns are solid brick.
32" x 32" brick columns Prices include the labor and material necessary to build a solid 32" x 32"
brick column. Material includes standard brick laid up in a running bond with 3/8" mortar joints, mortar,
typical ladder reinforcing with normal waste, but no structural steel members, flashing or stirrups.
Foundations are not included. See wall foundation costs in the section Concrete Spread Footings.
Equipment costs include scaffolding, starting at 8'. All brick columns are solid brick.
Brick arch
Arches with soldier courses Semicircular arches laid up with soldier courses. Typical costs for
standard brick walls, laid up in with 3/8" horizontal and vertical joints. These costs include the bricks,
mortar, typical ladder reinforcing, wall ties and normal waste, but no soffit forms, structural steel
members, flashings or stirrups. Equipment costs include scaffolding. Equipment rental costs are based
on the production rate of a single-man crew. Scaffolding costs increase with opening size, since more
scaffolding will be required. Data for the arches made up of two-courses also applies to two courses
made up of alternating soldier and rowlock courses. All brick columns are solid brick.
Arches with rowlock courses Semicircular arches laid up with rowlock courses. Typical costs for
standard brick walls, laid up in with 3/8" horizontal and vertical joints. These costs include the bricks,
mortar, typical ladder reinforcing, wall ties and normal waste, but no soffit forms, structural steel
members, flashings or stirrups. Equipment costs include scaffolding. Equipment rental costs are based
on the production rate of a single-man crew. Scaffolding costs increase with opening size, since more
scaffolding will be required.
Brick pavers placed over a 1" sand cushion laid in basketweave or other simple pattern with no
mortar joints. Costs include material and labor for installing the paver brick and sand cushion.
Equipment costs include a 24" 300 lb. gas-powered vibroplate compactor. Equipment costs for
herringbone pattern perimeter is a 2 HP masonry table saw.
Interlocking pavers placed over a 1" sand cushion with no mortar joints. Costs include material and
labor for installing the paver brick and sand cushion. Equipment costs include a 24" 300 lb. gas-powered
vibroplate compactor.
Interlocking pavers
Rectangular, 60 mm thick, Orion B9@.084 SF 2.00 2.69 0.71 5.40
Hexagonal, 80 mm thick, Omni B9@.086 SF 2.43 2.75 0.74 5.92
Multi-Angle, 80 mm thick, Venus B9@.082 SF 2.11 2.62 0.69 5.42
Concrete masonry grid pavers
(erosion control) B9@.062 SF 3.64 1.98 0.51 6.13
Interlocking pavers placed over a 2" sand cushion with no mortar joints. Costs include material and
labor for installing the paver brick and sand cushion. Equipment costs include a 24" 300 lb. gas-powered
vibroplate compactor.
Interlocking pavers
Rectangular, 60 mm thick, Orion B9@.085 SF 2.05 2.72 0.71 5.48
Hexagonal, 80 mm thick, Omni B9@.087 SF 2.48 2.78 0.74 6.00
Multi-Angle, 80 mm thick, Venus B9@.083 SF 2.15 2.65 0.69 5.49
Concrete masonry grid pavers
(erosion control) B9@.063 SF 3.69 2.01 0.54 6.24
Brick pavers placed over a 2" sand cushion laid in basketweave or other simple pattern with no
mortar joints. Costs include material and labor for installing the paver brick and sand cushion.
Equipment costs include a 24" 300 lb. gas-powered vibroplate compactor. Equipment costs for
herringbone pattern perimeter is a 2 HP masonry table saw.
Contemporary fireplace
Contemporary fireplaces with chimney corners in line with the base of the fireplace Prices
include labor and material required to build the fire box and smoke chamber using standard brick with
3/8" joints for the structure and fire brick laid up as shiners (wide face exposed) with 1/4" joints for the
hearth (flush with floor) and fire box walls. Prices also include a steel lintel angle for support, as well as
a damper. The main structure is assumed to be laid up as a double-wythe wall 16" wider than the fire
box opening width and 8" deeper than the fire box depth, laid vertically throughout the entire structure
with no taper to the flue. All voids in the fire box and smoke chamber are filled with brick; voids in the
chimney are filled with rubble or insulation. The smoke shelf is corbeled. The fore-hearth, ash pit, face
brick on the interior wall beyond the main structure and chimney cap are not included. Equipment
includes scaffolding. The machine excavation cost for the foundation assumes that the excavator is
already on the site, performing other excavations.
Rumford fireplace
Rumford-type fireplaces with log cabin chimneys Prices include labor and material required to
build the fire box and smoke chamber using standard brick with 3/8" joints for the structure and fire brick
laid as shiners (wide face exposed) with 1/4" joints for the hearth (flush with floor) and fire box walls.
Behind the fire brick is one-wythe course of standard brick laid up as shiners. The main exterior
structure is a 1-wythe wall laid up with a running bond and is assumed to be 2' wider than the fire box
opening width and 8" deeper than the fire box depth. All voids in the structure are filled with rubble or
insulating material. The front of the fireplace is laid up with standard brick with a running bond and
extends 1' beyond each side of the fire box opening to a height of 4'-8" above the hearth. The smoke
shelf is corbeled. The lower exterior portion of the structure tapers inward to meet a 1-wythe wall laid up
with a running bond surrounding the flue liner. Prices also include a steel lintel angle for support, as well
as a damper. The fore-hearth, ash pit and chimney cap are not included. Equipment includes
scaffolding. The machine excavation cost for the foundation assumes that the excavator is already on
the site, performing other excavations.
8" CMU foundation wall assemblies Includes mortar, 8% block waste, but no reinforcing. All cells
are grouted in walls 2 feet and higher. Grout is 3,000 lb. pump mix. Labor is assumed to be higher for
the first course than that for subsequent courses, due to the additional time required to lay out the first
course. Equipment includes a trailer-mounted 15-CY per hour concrete pump. Costs do not include
excavation.
12" CMU foundation wall assemblies Includes mortar, 8% block waste, but no reinforcing. All cells
are grouted in walls 2 feet and higher. Grout is 3,000 lb. pump mix. Labor is assumed to be higher for
the first course than that for subsequent courses, due to the additional time required to lay out the first
course. Equipment includes a trailer-mounted 15-CY per hour concrete pump. Costs do not include
excavation.
4" x 8" x 16" non-reinforced concrete block walls with scaffolding, 8-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of an 8-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
4" x 8" x 16" non-reinforced concrete block walls with scaffolding, 16-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of a 16-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
4" x 8" x 16" non-reinforced concrete block walls with scaffolding, boomlift, 8-man crew These
costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but
no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Equipment costs
for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based on the production
rate of an 8-man crew. Labor is assumed to increase with wall height, vertically. Costs per square foot
(SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell grout.
4" x 8" x 16" non-reinforced concrete block walls with scaffolding, boomlift, 16-man crew
These costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold erection, rental for one month and
dismantling. Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Equipment
costs are based on the production of a 16-person crew. Costs per square foot (SF) of wall are measured
on one face. Deduct material costs, only, from openings. Labor costs increase with increases in wall
height. For reinforcing costs, see the section on vertical cell grout.
6" x 8" x 16" non-reinforced concrete block walls with scaffolding, 8-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of an 8-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
6" x 8" x 16" non-reinforced concrete block walls with scaffolding, 16-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of a 16-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
6" x 8" x 16" non-reinforced concrete block walls with scaffolding, boomlift, 8-man crew These
costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but
no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Equipment costs
for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based on the production
rate of an 8-man crew. Labor costs increase with increases in wall height. Costs per square foot (SF) of
wall are measured on one face. For reinforcing costs, see the section on vertical cell grout.
6" x 8" x 16" non-reinforced concrete block walls with scaffolding, boomlift, 16-man crew
These costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold rental, erection and dismantling.
Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based
on the production rate of a 16-man crew. Labor costs increase with increases in wall height. Costs per
square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell
grout.
8" x 8" x 16" non-reinforced concrete block walls with scaffolding, 8-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of an 8-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
Work the following example to gain familiarity with this type of data.
Example: Determine the cost of an 8" CMU wall without door or window openings that's 400' long and
16' tall. Assume using an 8-man crew with scaffolding, only.
Solution: The total gross area of the wall is: 400' x 16' = 6,400 SF
Material = 6,400 SF x $2.21/SF = $14,144.00
Labor = 6,400 SF x $4.44/SF = $28,416.00
Equipment = 6,400 SF x $0.12 = $768.00
Total Cost = $43,328.00
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 123
8" x 8" x 16" non-reinforced concrete block walls with scaffolding, 16-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of a 16-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
8" x 8" x 16" non-reinforced concrete block walls with scaffolding, boomlift, 8-man crew These
costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but
no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Equipment costs
for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based on the production
rate of an 8-man crew. Labor costs increase with increases in wall height. Costs per square foot (SF) of
wall are measured on one face. For reinforcing costs, see the section on vertical cell grout.
Example: Before doing this example, first work example 5 on page 122, then work it using scaffolding,
a boomlift and an 8-man crew.
Solution:
Material = 6,400 SF x $2.21/SF = $14,144.00
Labor = 6,400 SF x $3.88/SF = $24,832.00
Equipment = 6,400 SF x $0.21 = $1,280.00
Total Cost = $40,256.00
8" x 8" x 16" non-reinforced concrete block walls with scaffolding, boomlift, 16-man crew
These costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold rental, erection and dismantling.
Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based
on the production rate of a 16-man crew. Labor costs increase with increases in wall height. Costs per
square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell
grout.
Example: Before doing this example, first work example 6 on page 128 then work it using scaffolding,
boomlift, and a 16-man crew.
Solution:
Material = 6,400 SF x $2.21/SF = $14,144.00
Labor = 6,400 SF x $3.88/SF = $24,832.00
Equipment = 6,400 SF x $0.13 = $832.00
Total Cost = $39,808.00
Example: Assuming 8% waste for the block and 15% waste for the mortar, determine the quantities of
block, mortar and sand required for the wall in Example 7. Remember that each block face is 8" x 16"
= 128 sq. in. Since there are 144 sq. inches per SF, 144/128=1.125. Therefore there are 1.125 blocks
per SF of area.
Solution: There are 1.125 regular block/ SF, so the number of blocks installed is:
6,400 SF x 1.125 blocks/ SF = 7,200 blocks
Including 8% waste, we will need:
7,200 blocks x 1.08 = 7,776 blocks
12" x 8" x 16" non-reinforced concrete block walls with scaffolding, 8-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of an 8-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
12" x 8" x 16" non-reinforced concrete block walls with scaffolding, 16-man crew These costs
include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of a 16-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
12" x 8" x 16" non-reinforced concrete block walls with scaffolding and boomlift, 8-man crew
These costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold rental, erection and dismantling.
Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based
on the production rate of an 8-man crew. Labor costs increase with increases in wall height. Costs per
square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell
grout.
12" x 8" x 16" non-reinforced concrete block walls with scaffolding and boomlift, 16-man crew
These costs include regular weight concrete block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold rental, erection and dismantling.
Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based
on the production rate of a 16-man crew. Labor costs increase with increases in wall height. Costs per
square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell
grout.
8" CMU walls with intermediate slabs, 8-man crew Includes the block, mortar, 6% block waste,
and horizontal reinforcing. Labor is assumed to increase from floor to floor and labor increases from the
lower half to the upper half of each floor. Equipment costs assume one stage of scaffolding erected on
the building interior at each floor level. A 30' boom lift is required between the top of the first floor
through the top of the third floor. A 40' boom lift is required for the fourth floor, a 50' boom lift is required
for the fifth floor and a 60' boom lift is required for the sixth floor. Equipment rental costs are based on
the production of an 8-man crew. For reinforcing costs, see the section on vertical cell grout.
1 floor
Cost per square foot B9@.111 SF 2.54 3.55 0.01 6.10
Cost per block B9@.099 Ea 2.26 3.16 0.01 5.43
Cost per linear foot of wall B9@1.11 LF 28.61 35.48 0.09 64.18
2 floors
Cost per square foot B9@.116 SF 2.54 3.71 0.26 6.51
Cost per block B9@.103 Ea 2.26 3.29 0.23 5.78
Cost per linear foot of wall B9@2.31 LF 56.54 73.83 5.13 135.50
3 floors
Cost per square foot B9@.122 SF 2.54 3.90 0.27 6.71
Cost per block B9@.109 Ea 2.26 3.48 0.24 5.98
Cost per linear foot of wall B9@3.66 LF 84.47 117.00 8.11 209.58
4 floors
Cost per square foot B9@.129 SF 2.54 4.12 0.28 6.94
Cost per block B9@.114 Ea 2.26 3.64 0.24 6.14
Cost per linear foot of wall B9@5.14 LF 140.32 164.30 10.95 315.57
5 floors
Cost per square foot B9@.135 SF 2.54 4.32 0.31 7.17
Cost per block B9@.120 Ea 2.26 3.84 0.27 6.37
6 floors
Cost per square foot B9@.143 SF 2.54 4.57 0.41 7.52
Cost per block B9@.127 Ea 2.26 4.06 0.37 6.69
Cost per linear foot of wall B9@8.56 LF 168.25 273.60 24.72 466.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 141
12" CMU walls with intermediate slabs, 8-man crew Includes the block, mortar, 6% block waste,
and horizontal reinforcing. Labor is assumed to increase from floor to floor and labor increases from the
lower half to the upper half of each floor. Equipment costs assume one stage of scaffolding erected on
the building interior at each floor level. A 30' boom lift is required between the top of the first floor
through the top of the third floor. A 40' boom lift is required for the fourth floor, a 50' boom lift is required
for the fifth floor and a 60' boom lift is required for the sixth floor. Equipment rental costs are based on
the production of an 8-man crew. For reinforcing costs, see the section on vertical cell grout.
1 floor
Cost per square foot B9@.149 SF 4.10 4.76 0.01 8.87
Cost per block B9@.132 Ea 3.65 4.22 0.01 7.88
Cost per linear foot of wall B9@1.49 LF 46.18 47.62 0.12 93.92
2 floors
Cost per square foot B9@.156 SF 4.10 4.99 0.35 9.44
Cost per block B9@.139 Ea 3.65 4.44 0.31 8.40
Cost per linear foot of wall B9@3.12 LF 91.24 99.72 6.93 197.89
3 floors
Cost per square foot B9@.164 SF 4.10 5.24 0.36 9.70
Cost per block B9@.146 Ea 3.65 4.67 0.32 8.64
Cost per linear foot of wall B9@4.92 LF 136.29 157.20 10.91 304.40
4 floors
Cost per square foot B9@.173 SF 4.10 5.53 0.37 10.00
Cost per block B9@.153 Ea 3.65 4.89 0.33 8.87
Cost per linear foot of wall B9@6.90 LF 226.41 220.50 14.71 461.62
5 floors
Cost per square foot B9@.181 SF 4.10 5.79 0.41 10.30
Cost per block B9@.161 Ea 3.65 5.15 0.37 9.17
Cost per linear foot of wall B9@9.08 LF 226.41 290.20 20.70 537.31
6 floors
Cost per square foot B9@.191 SF 3.98 6.10 0.55 10.63
Cost per block B9@.170 Ea 3.54 5.43 0.49 9.46
Cost per linear foot of wall B9@11.5 LF 263.17 367.50 33.15 663.82
8" CMU walls with intermediate slabs, 16-man crew Includes the block, mortar, 6% block waste,
and horizontal reinforcing. Labor is assumed to increase from floor to floor and labor increases from the
lower half to the upper half of each floor. Equipment costs assume one stage of scaffolding erected on
the building interior at each floor level. A 30' boom lift is required between the top of the first floor
through the top of the third floor. A 40' boom lift is required for the fourth floor, a 50' boom lift is required
for the fifth floor and a 60' boom lift is required for the sixth floor. Equipment rental costs are based on
the production of a 16-man crew. For reinforcing costs, see the section on vertical cell grout.
1 floor
Cost per square foot B9@.111 SF 2.54 3.55 -- 6.09
Cost per block B9@.099 Ea 2.26 3.16 -- 5.42
Cost per linear foot of wall B9@1.11 LF 28.61 35.48 0.04 64.13
2 floors
Cost per square foot B9@.116 SF 2.54 3.71 0.13 6.38
Cost per block B9@.103 Ea 2.26 3.29 0.11 5.66
Cost per linear foot of wall B9@2.31 LF 56.54 73.83 2.56 132.93
3 floors
Cost per square foot B9@.122 SF 2.54 3.90 0.14 6.58
Cost per block B9@.109 Ea 2.26 3.48 0.12 5.86
Cost per linear foot of wall B9@3.66 LF 84.47 117.00 4.05 205.52
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 142
4 floors
Cost per square foot B9@.129 SF 2.54 4.12 0.14 6.80
Cost per block B9@.114 Ea 2.26 3.64 0.12 6.02
Cost per linear foot of wall B9@5.14 LF 140.32 164.30 5.48 310.10
5 floors
Cost per square foot B9@.135 SF 2.54 4.32 0.15 7.01
Cost per block B9@.120 Ea 2.26 3.84 0.14 6.24
6 floors
Cost per square foot B9@.143 SF 2.54 4.57 0.21 7.32
Cost per block B9@.127 Ea 2.26 4.06 0.18 6.50
Cost per linear foot of wall B9@8.56 LF 168.25 273.60 12.36 454.21
12" CMU walls with intermediate slabs, 16-man crew Includes the block, mortar, 6% block waste,
and horizontal reinforcing. Labor is assumed to increase from floor to floor and labor increases from the
lower half to the upper half of each floor. Equipment costs assume one stage of scaffolding erected on
the building interior at each floor level. A 30' boom lift is required between the top of the first floor through
the top of the third floor. A 40' boom lift is required for the fourth floor, a 50' boom lift is required for the
fifth floor and a 60' boom lift is required for the sixth floor. Equipment rental costs are based on the
production of a 16-man crew. For reinforcing costs, see the section on vertical cell grout.
1 floor
Cost per square foot B9@.149 SF 4.10 4.76 0.01 8.87
Cost per block B9@.132 Ea 3.65 4.22 0.01 7.88
Cost per linear foot of wall B9@1.49 LF 46.18 47.62 0.06 93.86
2 floors
Cost per square foot B9@.156 SF 4.10 4.99 0.17 9.26
Cost per block B9@.139 Ea 3.65 4.44 0.15 8.24
Cost per linear foot of wall B9@3.12 LF 91.24 99.72 3.46 194.42
3 floors
Cost per square foot B9@.164 SF 4.10 5.24 0.18 9.52
Cost per block B9@.146 Ea 3.65 4.67 0.16 8.48
Cost per linear foot of wall B9@4.92 LF 136.29 157.20 5.46 298.95
4 floors
Cost per square foot B9@.173 SF 4.10 5.53 0.18 9.81
Cost per block B9@.153 Ea 3.65 4.89 0.16 8.70
Cost per linear foot of wall B9@6.90 LF 226.41 220.50 7.35 454.26
5 floors
Cost per square foot B9@.181 SF 4.10 5.79 0.21 10.10
Cost per block B9@.161 Ea 3.65 5.15 0.18 8.98
Cost per linear foot of wall B9@9.08 LF 226.41 290.20 10.35 526.96
6 floors
Cost per square foot B9@.191 SF 3.98 6.10 0.28 10.36
Cost per block B9@.170 Ea 3.54 5.43 0.25 9.22
Cost per linear foot of wall B9@11.5 LF 263.17 367.50 16.57 647.24
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 143
8" non-reinforced concrete block radius walls with scaffolding, 8-man crew These costs include
regular weight concrete half block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of an 8-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
8" non-reinforced concrete block radius walls with scaffolding, 16-man crew These costs
include regular weight concrete half block with normal (8%) waste, mortar for 3/8" concave joints but no
reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread Footings.
Wall heights 6' and above include the cost of scaffold rental, erection and dismantling. Rental costs are
based on the production rate of a 16-man crew. Labor costs increase with increases in wall height.
Costs per square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on
vertical cell grout.
8" non-reinforced concrete half block radius walls with scaffolding and boomlift, 8-man crew
These costs include regular weight concrete half block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold rental, erection and dismantling.
Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based
on the production rate of an 8-man crew. Labor costs increase with increases in wall height. Costs per
square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell
grout.
8" non-reinforced concrete half block radius walls with scaffolding and boomlift, 16-man crew
These costs include regular weight concrete half block with normal (8%) waste, mortar for 3/8" concave
joints but no reinforcing, grout or foundations. See wall foundation costs in the section Concrete Spread
Footings. Wall heights 6' and above include the cost of scaffold rental, erection and dismantling.
Equipment costs for walls over 10' tall also include a boomlift with a 30' reach. Rental costs are based
on the production rate of a 16-man crew. Labor costs increase with increases in wall height. Costs per
square foot (SF) of wall are measured on one face. For reinforcing costs, see the section on vertical cell
grout.
Cavity wall
8" regular block, standard brick, 8-man crew, cavity wall assemblies using scaffolding Typical
costs for smooth red clay brick and regular-weight concrete block, each one wythe wide. Both walls are
laid up with a running bond with 3/8" horizontal and vertical joints. These costs include the bricks, block,
mortar, wall ties and normal waste. Foundations and horizontal reinforcing in the block are not included.
See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of
bricks in the thickness of the wall. Labor costs increase with increases in wall height. Equipment costs
include scaffolding. Equipment rental costs are based on the production rate of an 8-man crew. For
reinforcing costs, see the section on vertical cell grout.
12" regular block, standard brick, 8-man crew, cavity wall assemblies using scaffolding Typical
costs for smooth red clay brick and regular-weight concrete block, each one wythe wide. Both walls are
laid up with a running bond with 3/8" horizontal and vertical joints. These costs include the bricks, block,
mortar, wall ties and normal waste. Foundations and horizontal reinforcing in the block are not included.
See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of
bricks in the thickness of the wall. Labor costs increase with increases in wall height. Equipment costs
include scaffolding. Equipment rental costs are based on the production rate of an 8-man crew. For
reinforcing costs, see the section on vertical cell grout.
8" regular block, standard brick, 16-man crew, cavity wall assemblies using scaffolding Typical
costs for smooth red clay brick and regular-weight concrete block, each one wythe wide. Both walls are
laid up with a running bond with 3/8" horizontal and vertical joints. These costs include the bricks, block,
mortar, wall ties and normal waste. Foundations and horizontal reinforcing in the block are not included.
See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the quantity of
bricks in the thickness of the wall. Labor costs increase with increases in wall height. Equipment costs
include scaffolding. Equipment rental costs are based on the production rate of a 16-man crew. For
reinforcing costs, see the section on vertical cell grout.
12" regular block, standard brick, 16-man crew, cavity wall assemblies using scaffolding
Typical costs for smooth red clay brick and regular-weight concrete block, each one wythe wide. Both
walls are laid up with a running bond with 3/8" horizontal and vertical joints. These costs include the
bricks, block, mortar, wall ties and normal waste. Foundations and horizontal reinforcing in the block are
not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe" means the
quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall height.
Equipment costs include scaffolding. Equipment rental costs are based on the production rate of a
16-man crew. For reinforcing costs, see the section on vertical cell grout.
8" regular block, standard brick, 8-man crew, cavity wall assemblies using scaffolding and
boomlift Typical costs for smooth red clay brick and regular-weight concrete block, each one wythe
wide. Both walls are laid up with a running bond with 3/8" horizontal and vertical joints. These costs
include the bricks, block, mortar, wall ties and normal waste. Foundations and horizontal reinforcing in
the block are not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe"
means the quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall
height. Equipment costs include scaffolding and a boomlift with a 30-ft reach. Equipment rental costs
are based on the production rate of an 8-man crew. For reinforcing costs, see the section on vertical cell
grout.
12" regular block, standard brick, 8-man crew, cavity wall assemblies using scaffolding and
boomlift Typical costs for smooth red clay brick and regular-weight concrete block, each one wythe
wide. Both walls are laid up with a running bond with 3/8" horizontal and vertical joints. These costs
include the bricks, block, mortar, wall ties and normal waste. Foundations and horizontal reinforcing in
the block are not included. See wall foundation costs in the section Concrete Spread Footings. "Wythe"
means the quantity of bricks in the thickness of the wall. Labor costs increase with increases in wall
height. Equipment costs include scaffolding and a boomlift with a 30' reach. Equipment rental costs are
based on the production rate of an 8-man crew. For reinforcing costs, see the section on vertical cell
grout.
8" regular block, standard brick, 16-man crew, cavity walls Typical costs for smooth red clay
brick and regular-weight concrete block, each one wythe wide. Both walls are laid up with a running
bond with 3/8" horizontal and vertical joints. These costs include the bricks, block, mortar, wall ties and
normal waste. Foundations and horizontal reinforcing in the block are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding and
a boomlift with a 30' reach. Equipment rental costs are based on the production rate of a 16-man crew.
For reinforcing costs, see the section on vertical cell grout.
12" regular block, standard brick, 16-man crew, cavity walls Typical costs for smooth red clay
brick and regular-weight concrete block, each one wythe wide. Both walls are laid up with a running
bond with 3/8" horizontal and vertical joints. These costs include the bricks, block, mortar, wall ties and
normal waste. Foundations and horizontal reinforcing in the block are not included. See wall foundation
costs in the section Concrete Spread Footings. "Wythe" means the quantity of bricks in the thickness
of the wall. Labor costs increase with increases in wall height. Equipment costs include scaffolding and
a boomlift with a 30' reach. Equipment rental costs are based on the production rate of the given crew
size. For reinforcing costs, see the section on vertical cell grout.
Dur-O-Wal horizontal concrete block reinforcing, 4" ladder type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 4" truss type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 6" ladder type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 6" truss type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 8" ladder type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 8" truss type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 10" ladder type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 10" truss type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 12" ladder type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Dur-O-Wal horizontal concrete block reinforcing, 12" truss type, galvanized Costs include the
material and labor required to install Dur-O-Wal reinforcing. The prices are based on installing
Dur-O-Wal at 16" on center, vertically, beginning at the top of the second course of block.
Vertical cell grout Costs include material and labor necessary to install a vertical reinforcing steel
"drop" and to fill concrete block Cells with grout. The equipment is based on using a trailer-mounted
15-CY per hour pump. The concrete is 3,000 lb. pump mix.
Shear wall grout Costs include the material and labor for pumping cells in a shear wall. The
equipment is based on using a trailer-mounted 15-CY per hour pump. The concrete is 3,000 lb. pump
mix.
4" precast material costs Price includes only the cost of the precast member. Reinforcing steel and
grout are not included.
6" precast material costs Price includes only the cost of the precast member. Reinforcing steel and
grout are not included.
8" precast material costs Price includes only the cost of the precast member. Reinforcing steel and
grout are not included.
12" precast material costs Price includes only the cost of the precast member. Reinforcing steel and
grout are not included.
Door openings in 4" concrete block walls - opening with no lintel Wall openings for doors usually
decrease the cost of masonry material. Less regular block and less mortar will be needed. But half
block will be required at the opening jambs. The following costs reflect the saving in regular block and
the additional expense of half block. Labor cost will be about the same whether the wall has door
openings or no door openings. Recommended procedure: Calculate the cost of the wall as though there
were no openings. Then use the figures below to deduct for each door opening. These figures assume
no lintel is required over the opening. Costs for door openings with lintels follow this section.
Window openings in 4" concrete block walls - opening with no lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed. But half block and a precast sill will be required at the opening. The following costs reflect the
saving in regular block and the additional expense of half block and sill. The labor is for setting the sill.
Recommended procedure: Calculate the cost of the wall as though there were no openings. Then use
the figures below to adjust for each window opening. These figures assume no lintel is required over the
opening. Costs for window openings with lintels follow this section.
Door openings in 6" concrete block walls - opening with no lintel Wall openings for doors usually
decrease the cost of masonry material. Less regular block and less mortar will be needed. But half
block will be required at the opening jambs. The following costs reflect the saving in regular block and
the additional expense of half block. Labor cost will be about the same whether the wall has door
openings or no door openings. Recommended procedure: Calculate the cost of the wall as though there
were no openings. Then use the figures below to deduct for each door opening. These figures assume
no lintel is required over the opening. Costs for door openings with lintels follow this section.
Window openings in 6" concrete block walls - opening with no lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed, but half block installed at the opening jambs, as well as a precast sill will be required. The labor
is for setting the sill. The following costs reflect the saving in regular block and the additional expense of
half block and sill. Recommended procedure: Calculate the cost of the wall as though there were no
openings. Then use the figures below to adjust for each window opening. These figures assume no lintel
is required over the opening. Costs for window openings with lintels follow this section.
Door openings in 8" concrete block walls - opening with no lintel Wall openings for doors
usually decrease the cost of masonry material. Less regular block and less mortar will be needed. But
half block will be required at the opening jambs. The following costs reflect the saving in regular block
and the additional expense of half block. Labor cost will be about the same whether the wall has door
openings or no door openings. Recommended procedure: Calculate the cost of the wall as though there
were no openings. Then use the figures below to deduct for each door opening. These figures assume
no lintel is required over the opening. Costs for door openings with lintels follow this section.
Window openings in 8" concrete block walls - opening with no lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed, but half block installed at the opening jambs and a precast sill will be required. The following
costs reflect the saving in regular block and the additional expense of half block and sill. The labor is for
setting the sill. Recommended procedure: Calculate the cost of the wall as though there were no
openings. Then use the figures below to adjust for each window opening. These figures assume no lintel
is required over the opening. Costs for window openings with lintels follow this section.
Door openings in 12" concrete block walls - opening with no lintel Wall openings for doors
usually decrease the cost of masonry material. Less regular block and less mortar will be needed, but
half block will be required at the opening jambs. The following costs reflect the saving in regular block
and the additional expense of half block. Labor cost will be about the same regardless of openings.
Recommended procedure: Calculate the cost of the wall as though there were no openings. Then use
the figures below to deduct for each door opening. These figures assume no lintel is required over the
opening. Costs for door openings with lintels follow this section.
Window openings in 12" concrete block walls - opening with no lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed, but half block installed at the opening jambs and a precast sill will be required. The following
costs reflect the saving in regular block and the additional expense of half block and sill. The labor is for
setting the sill. Recommended procedure: Calculate the cost of the wall as though there were no
openings. Then use the figures below to adjust for each window opening. These figures assume no lintel
is required over the opening. Costs for window openings with lintels follow this section.
Door openings in 4" concrete block walls - opening with lintel Wall openings for doors usually
decrease the cost of masonry material. Less regular block and less mortar will be needed. But half
block will be required at the opening jambs. The following material costs reflect the saving in regular
block and the additional expense of half block and a lintel. Recommended procedure: Calculate the cost
of the wall as though there were no openings. Then use the figures below to adjust for each door
opening. These figures include the cost of a lintel set over the opening. See the previous section for door
openings without a lintel.
Window openings in 4" concrete block walls - opening with lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed, but half block and a precast sill will be required at each opening. The following costs reflect the
saving in regular block and the additional expense of half block and the sill. The labor is for setting the
sill and lintel. Recommended procedure: Calculate the cost of the wall as though there were no
openings. Then use the figures below to adjust for each window opening. These figures assume a lintel
is required over the opening. See the previous section for the cost for window openings with no lintels.
Door openings in 6" concrete block walls - opening with lintel Wall openings for doors usually
decrease the cost of masonry material. Less regular block and less mortar will be needed. But half
block will be required at the opening jambs and a precast lintel may be required over the opening.
Reinforcing steel and grout will also be required in the lintel. The following costs reflect the saving in
regular block and the additional expense of half block, lintel, reinforcing steel and grout. Recommended
procedure: Calculate the cost of the wall as though there were no openings. Then use the figures below
to adjust for each door opening. These figures include the cost of a lintel set over the opening. See the
previous section for the cost of door openings without a lintel. Equipment cost is for grouting the lintel
with a trailer-mounted 15-CY per hour concrete pump.
Window openings in 6" concrete block walls - opening with lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed, but half block will be required at the opening jambs, as well as a precast lintel and sill.
Reinforcing steel and grout will also be required in the lintel. The following costs reflect the saving in
regular block and the additional expense of half block, the lintel and sill. The labor is for setting the sill
and lintel. Recommended procedure: Calculate the cost of the wall as though there were no openings.
Then use the figures below to adjust for each window opening. These figures assume a lintel is required
over the opening. See the previous section for the cost of window openings without a lintel. Equipment
cost is for grouting the lintel with a trailer-mounted 15-CY per hour concrete pump.
Door openings in 8" concrete block walls - opening with lintel Wall openings for doors usually
decrease the cost of masonry material. Less regular block and less mortar will be needed. But half
block will be required at the opening jambs. Reinforcing steel and grout will also be required in the lintel.
The following costs reflect the saving in regular block and the additional expense of half block, lintel,
reinforcing steel and grout. Recommended procedure: Calculate the cost of the wall as though there
were no openings. Then use the figures below to adjust for each door opening. These figures include the
cost of a lintel set over the opening. The equipment cost is for grouting the lintel with a trailer-mounted
15-CY per hour concrete pump. The equipment cost for setting heavy lintels assumes use of a 4,000 lb.
capacity forklift.
Window openings in 8" concrete block walls - opening with lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed. But half block and a sill will be required at the opening. Reinforcing steel and grout will also be
required in the lintel. The following costs reflect the saving in regular block and the additional expense of
half block, the lintel and sill. The labor is for setting the sill and lintel. Recommended procedure:
Calculate the cost of the wall as though there were no openings. Then use the figures below to adjust for
each window opening. These figures assume a lintel is required over the opening. See the previous
section for the cost of window openings without a lintel. The equipment cost is for grouting the lintel with
a trailer-mounted 15-CY per hour concrete pump.
Door openings in 12" concrete block walls - opening with lintel Wall openings for doors usually
decrease the cost of masonry material. Less regular block and less mortar will be needed. But half
block will be required at the opening jambs, as well as a precast lintel over the opening. Reinforcing
steel and grout will also be required in the lintel. The following costs reflect the saving in regular block
and the additional expense of half block, lintel, reinforcing steel and grout. Recommended procedure:
Calculate the cost of the wall as though there were no openings. Then use the figures below to adjust for
each door opening. These figures include the cost of a lintel set over the opening. See the previous
section for the cost of door openings without a lintel. The equipment cost is for grouting the lintel with a
trailer-mounted 15-CY per hour concrete pump. The equipment cost for setting heavy lintels assumes
use of a 4,000 lb. capacity forklift.
Window openings in 12" concrete block walls - opening with lintel Wall openings for windows
may increase or decrease the cost of masonry material. Less regular block and less mortar will be
needed, but half block will be required at the opening jambs, as well as a precast lintel and sill.
Reinforcing steel and grout will also be required in the lintel. The following costs reflect the saving in
regular block and the additional expense of half block and the lintel and sill. The labor is for setting the
sill and lintel. Recommended procedure: Calculate the cost of the wall as though there were no
openings. Then use the figures below to adjust for each window opening. These figures assume a lintel
is required over the opening. See the previous section for the cost of window openings without a lintel.
The equipment cost is for grouting the lintel with a trailer-mounted 15-CY per hour concrete pump. The
equipment cost for setting heavy lintels assumes use of a 4,000 lb. capacity forklift.
Lintel block
Lintel block, 8-man crew with scaffold Prices include the cost of material and labor required to
install the lintel block, reinforcing steel and grout. Labor costs are assumed to increase with wall height.
Equipment includes scaffolding and a 15-CY per hour pump with operator. Equipment costs are based
on the production of an 8-man crew.
Cavity caps
Lintel block, 16-man crew with scaffold Prices include the cost of material and labor required to
install the lintel block, reinforcing steel and grout. Labor costs are assumed to increase with wall height.
Equipment includes scaffolding and a 15-CY per hour pump with operator. Equipment costs are based
on the production of a 16-man crew.
Corner bars
Lintel block, 8-man crew with scaffold and boomlift Prices include the cost of material and labor
required to install the lintel block, reinforcing steel and grout. Labor costs are assumed to increase with
wall height. Equipment includes scaffolding and a 15-CY per hour pump with operator and a boomlift
with a 30' reach. Equipment costs are based on the production of an 8-man crew.
Lintel block, 16-man crew with scaffold and boomlift Prices include the cost of material and labor
required to install the lintel block, reinforcing steel and grout. Labor costs are assumed to increase with
wall height. Equipment includes scaffolding and a 15-CY per hour pump with operator and a boomlift
with a 30' reach. Equipment costs are based on the production of a 16-man crew.
8" x 8" x 8" half block columns with 1 No. 5 bar Costs include the material and labor necessary to
build the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in
the cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour capacity concrete pump with operator.
7'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.181 VLF 4.06 5.79 0.09 9.94
Cost per block B9@.121 Ea 2.71 3.87 0.06 6.64
Cost per column B9@1.33 Ea 29.80 42.51 0.68 72.99
8'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.185 VLF 4.06 5.91 0.09 10.06
Cost per block B9@.123 Ea 2.71 3.93 0.06 6.70
Cost per column B9@1.48 Ea 32.51 47.30 0.75 80.56
8'- 8" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.188 VLF 4.06 6.01 0.09 10.16
Cost per block B9@.125 Ea 2.71 4.00 0.06 6.77
Cost per column B9@1.63 Ea 35.22 52.09 0.82 88.13
9'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.190 VLF 4.06 6.07 0.09 10.22
Cost per block B9@.127 Ea 2.71 4.06 0.06 6.83
Cost per column B9@1.77 Ea 37.93 56.57 0.89 95.39
10'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.193 VLF 4.06 6.17 0.10 10.33
Cost per block B9@.128 Ea 2.71 4.09 0.06 6.86
Cost per column B9@1.93 Ea 40.64 61.68 0.96 103.28
10'- 8" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.194 VLF 4.06 6.20 0.13 10.39
Cost per block B9@.130 Ea 2.71 4.16 0.08 6.95
Cost per column B9@2.07 Ea 43.35 66.16 1.35 110.86
11'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.196 VLF 4.06 6.26 0.13 10.45
Cost per block B9@.131 Ea 2.71 4.19 0.09 6.99
Cost per column B9@2.22 Ea 46.05 70.95 1.44 118.44
12'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.197 VLF 4.06 6.30 0.13 10.49
Cost per block B9@.131 Ea 2.71 4.19 0.09 6.99
Cost per column B9@2.36 Ea 48.76 75.43 1.54 125.73
8" x 8" x 8" half block columns with 2 No. 5 bars Costs include the material and labor necessary to
build the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in
the cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.192 VLF 4.75 6.14 0.10 10.99
Cost per block B9@.128 Ea 3.17 4.09 0.06 7.32
Cost per column B9@1.41 Ea 34.80 45.06 0.70 80.56
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 218
8'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.194 VLF 4.75 6.20 0.10 11.05
Cost per block B9@.130 Ea 3.17 4.16 0.06 7.39
Cost per column B9@1.55 Ea 37.96 49.54 0.77 88.27
8'- 8" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.201 VLF 4.75 6.42 0.10 11.27
Cost per block B9@.134 Ea 3.17 4.28 0.07 7.52
Cost per column B9@1.74 Ea 41.13 55.61 0.85 97.59
9'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.202 VLF 4.75 6.46 0.10 11.31
Cost per block B9@.135 Ea 3.17 4.32 0.07 7.56
Cost per column B9@1.89 Ea 44.29 60.40 0.92 105.61
10'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.204 VLF 4.75 6.52 0.10 11.37
Cost per block B9@.136 Ea 3.17 4.35 0.07 7.59
Cost per column B9@2.04 Ea 47.46 65.20 0.99 113.65
10'- 8" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.205 VLF 4.75 6.55 0.13 11.43
Cost per block B9@.136 Ea 3.17 4.35 0.09 7.61
Cost per column B9@2.19 Ea 50.62 69.99 1.40 122.01
11'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.206 VLF 4.75 6.58 0.13 11.46
Cost per block B9@.137 Ea 3.17 4.38 0.09 7.64
Cost per column B9@2.33 Ea 53.78 74.47 1.50 129.75
12'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.207 VLF 4.75 6.62 0.13 11.50
Cost per block B9@.138 Ea 3.17 4.41 0.09 7.67
Cost per column B9@2.48 Ea 56.95 79.26 1.59 137.80
8" x 8" x 8" half block columns with 1 No. 7 bar Costs include the material and labor necessary to
build the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in
the cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.192 VLF 4.94 6.14 0.10 11.18
Cost per block B9@.128 Ea 3.30 4.09 0.06 7.45
Cost per column B9@1.41 Ea 36.25 45.06 0.70 82.01
8'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.194 VLF 4.94 6.20 0.10 11.24
Cost per block B9@.130 Ea 3.30 4.16 0.06 7.52
Cost per column B9@1.55 Ea 39.55 49.54 0.77 89.86
8'- 8" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.197 VLF 4.94 6.30 0.10 11.34
Cost per block B9@.131 Ea 3.30 4.19 0.06 7.55
Cost per column B9@1.71 Ea 42.85 54.65 0.84 98.34
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 219
9'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.198 VLF 4.94 6.33 0.10 11.37
Cost per block B9@.132 Ea 3.30 4.22 0.07 7.59
Cost per column B9@1.85 Ea 46.14 59.13 0.91 106.18
10'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.200 VLF 4.94 6.39 0.10 11.43
Cost per block B9@.133 Ea 3.30 4.25 0.07 7.62
Cost per column B9@2.00 Ea 49.44 63.92 0.98 114.34
10'- 8" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.201 VLF 4.94 6.42 0.13 11.49
Cost per block B9@.134 Ea 3.30 4.28 0.09 7.67
Cost per column B9@2.14 Ea 52.73 68.39 1.38 122.50
11'- 4" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.206 VLF 4.94 6.58 0.13 11.65
Cost per block B9@.137 Ea 3.30 4.38 0.09 7.77
Cost per column B9@2.33 Ea 56.03 74.47 1.50 132.00
12'- 0" high column using 8" x 8" x 8" half block
Cost per vertical linear foot of column B9@.207 VLF 4.94 6.62 0.13 11.69
Cost per block B9@.138 Ea 3.30 4.41 0.09 7.80
Cost per column B9@2.48 Ea 59.32 79.26 1.59 140.17
8" round block columns with 1 No. 5 bar Costs include the material and labor necessary to build the
column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the cells.
Labor includes the cost of laying the block, installing the reinforcing steel and grouting the column.
Labor costs increase with increases in column height. Equipment includes the cost of scaffolding and a
trailer-mounted 15-CY per hour concrete pump with operator.
8" round block columns with 2 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
8" round block columns with 1 No. 7 bar Costs include the material and labor necessary to build the
column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the cells.
Labor includes the cost of laying the block, installing the reinforcing steel and grouting the column.
Labor costs increase with increases in column height. Equipment includes the cost of scaffolding and a
trailer-mounted 15-CY per hour concrete pump with operator.
8" x 16" CMU column consisting of 1 regular with 2 No. 5 bars Costs include the material and
labor necessary to build the column. Material includes the cost of the block, mortar, reinforcing steel
and 3,000 lb. grout in the cells. Labor includes the cost of laying the block, installing the reinforcing
steel and grouting the column. Labor costs increase with increases in column height. Equipment
includes the cost of scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
L-shaped column
"L"-shaped CMU column consisting of 1 regular and 1 half block with 3 No. 5 Bars Costs include
the material and labor necessary to build the column. Material includes the cost of the block, mortar,
reinforcing steel and 3,000 lb. grout in the cells. Labor includes the cost of laying the block, installing
the reinforcing steel and grouting the column. Labor is assumed to increase with column height.
Equipment includes the cost of scaffolding and a trailer-mounted 15-CY per hour concrete pump with
operator.
12" square CMU columns with 2 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
12" square CMU columns with 4 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
12" round CMU column with 1 No. 5 bar Costs include the material and labor necessary to build the
column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the cells.
Labor includes the cost of laying the block, installing the reinforcing steel and grouting the column.
Labor costs increase with increases in column height. Equipment includes the cost of scaffolding and a
trailer-mounted 15-CY per hour concrete pump with operator.
12" round CMU column with 2 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour capacity concrete pump with operator.
12" round CMU column with 3 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour capacity concrete pump with operator.
12" round CMU column with 4 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
Half-round columns
12" half round CMU column (no reinforcing) Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
12" half round CMU column with 1 No. 5 bar Costs include the material and labor necessary to
build the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in
the cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
16" square CMU column with 2 regulars and 4 No. 5 bars Costs include the material and labor
necessary to build the column. Material includes the cost of the block, mortar, reinforcing steel and
3,000 lb. grout in the cells. Labor includes the cost of laying the block, installing the reinforcing steel
and grouting the column. Labor costs increase with increases in column height. Equipment includes the
cost of scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.424 VLF 15.10 13.55 0.32 28.97
Cost per block B9@.141 Ea 5.04 4.51 0.21 9.76
Cost per column B9@3.11 Ea 110.72 99.40 2.33 212.45
8'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.431 VLF 15.10 13.77 0.32 29.19
Cost per block B9@.144 Ea 5.04 4.60 0.21 9.85
Cost per column B9@3.45 Ea 120.79 110.30 2.56 233.65
8'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.436 VLF 15.10 13.93 0.32 29.35
Cost per block B9@.145 Ea 5.04 4.63 0.21 9.88
Cost per column B9@3.78 Ea 130.86 120.80 2.78 254.44
9'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.440 VLF 15.10 14.06 0.32 29.48
Cost per block B9@.147 Ea 5.04 4.70 0.22 9.96
Cost per column B9@4.11 Ea 140.91 131.40 3.01 275.32
10'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.444 VLF 15.10 14.19 0.32 29.61
Cost per block B9@.148 Ea 5.04 4.73 0.22 9.99
Cost per column B9@4.44 Ea 150.99 141.90 3.24 296.13
10'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.448 VLF 15.10 14.32 0.39 29.81
Cost per block B9@.149 Ea 5.04 4.76 0.26 10.06
Cost per column B9@4.78 Ea 161.06 152.80 4.21 318.07
11'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.451 VLF 15.10 14.41 0.40 29.91
Cost per block B9@.150 Ea 5.04 4.79 0.26 10.09
Cost per column B9@5.11 Ea 171.11 163.30 4.49 338.90
12'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.454 VLF 15.10 14.51 0.40 30.01
Cost per block B9@.151 Ea 5.04 4.83 0.27 10.14
Cost per column B9@5.45 Ea 181.18 174.20 4.77 360.15
12'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.465 VLF 15.10 14.86 0.40 30.36
Cost per block B9@.155 Ea 5.04 4.95 0.27 10.26
Cost per column B9@5.89 Ea 191.25 188.20 5.10 384.55
13'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.472 VLF 15.10 15.09 0.41 30.60
Cost per block B9@.157 Ea 5.04 5.02 0.27 10.33
Cost per column B9@6.29 Ea 201.31 201.00 5.41 407.72
14'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.481 VLF 15.10 15.37 0.41 30.88
Cost per block B9@.160 Ea 5.04 5.11 0.27 10.42
Cost per column B9@6.73 Ea 211.38 215.10 5.74 432.22
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 242
14'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.487 VLF 15.10 15.56 0.41 31.07
Cost per block B9@.163 Ea 5.04 5.21 0.28 10.53
Cost per column B9@7.14 Ea 221.45 228.20 6.06 455.71
15'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.495 VLF 15.10 15.82 0.42 31.34
Cost per block B9@.165 Ea 5.04 5.27 0.28 10.59
Cost per column B9@7.59 Ea 231.51 242.60 6.39 480.50
16'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.500 VLF 15.10 15.98 0.50 31.58
Cost per block B9@.167 Ea 5.04 5.34 0.33 10.71
Cost per column B9@8.00 Ea 241.58 255.70 7.96 505.24
16'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.507 VLF 15.10 16.20 0.50 31.80
Cost per block B9@.169 Ea 5.04 5.40 0.33 10.77
Cost per column B9@8.45 Ea 251.65 270.10 8.36 530.11
17'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.513 VLF 15.10 16.40 0.51 32.01
Cost per block B9@.171 Ea 5.04 5.47 0.34 10.85
Cost per column B9@8.89 Ea 261.70 284.10 8.76 554.56
18'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.516 VLF 15.10 16.49 0.51 32.10
Cost per block B9@.172 Ea 5.04 5.50 0.34 10.88
Cost per column B9@9.29 Ea 271.77 296.90 9.13 577.80
18'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.528 VLF 15.10 16.87 0.51 32.48
Cost per block B9@.176 Ea 5.04 5.63 0.34 11.01
Cost per column B9@9.85 Ea 281.84 314.80 9.61 606.25
19'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.538 VLF 15.10 17.19 0.52 32.81
Cost per block B9@.179 Ea 5.04 5.72 0.35 11.11
Cost per column B9@10.4 Ea 291.90 332.40 10.07 634.37
20'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.548 VLF 15.10 17.51 0.53 33.14
Cost per block B9@.183 Ea 5.04 5.85 0.35 11.24
Cost per column B9@11.0 Ea 301.97 351.60 10.55 664.12
16" square CMU column with 2 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.283 VLF 15.81 9.05 0.28 25.14
Cost per block B9@.189 Ea 10.55 6.04 0.19 16.78
Cost per column B9@2.07 Ea 115.96 66.16 2.07 184.19
8'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.287 VLF 15.81 9.17 0.28 25.26
Cost per block B9@.191 Ea 10.55 6.10 0.19 16.84
Cost per column B9@2.30 Ea 126.51 73.51 2.27 202.29
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 243
8'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.290 VLF 15.81 9.27 0.28 25.36
Cost per block B9@.194 Ea 10.55 6.20 0.19 16.94
Cost per column B9@2.51 Ea 137.06 80.22 2.47 219.75
9'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.293 VLF 15.81 9.36 0.29 25.46
Cost per block B9@.196 Ea 10.55 6.26 0.19 17.00
Cost per column B9@2.73 Ea 147.59 87.25 2.67 237.51
10'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.296 VLF 15.81 9.46 0.29 25.56
Cost per block B9@.197 Ea 10.55 6.30 0.19 17.04
Cost per column B9@2.96 Ea 158.14 94.60 2.87 255.61
10'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.299 VLF 15.81 9.56 0.33 25.70
Cost per block B9@.199 Ea 10.55 6.36 0.22 17.13
Cost per column B9@3.19 Ea 168.68 102.00 3.57 274.25
11'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.300 VLF 15.81 9.59 0.33 25.73
Cost per block B9@.200 Ea 10.55 6.39 0.22 17.16
Cost per column B9@3.40 Ea 179.22 108.70 3.79 291.71
12'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.303 VLF 15.81 9.68 0.34 25.83
Cost per block B9@.201 Ea 10.55 6.42 0.22 17.19
Cost per column B9@3.64 Ea 189.76 116.30 4.03 310.09
12'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.307 VLF 15.81 9.81 0.34 25.96
Cost per block B9@.205 Ea 10.55 6.55 0.23 17.33
Cost per column B9@3.89 Ea 200.31 124.30 4.28 328.89
13'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.311 VLF 15.81 9.94 0.34 26.09
Cost per block B9@.207 Ea 10.55 6.62 0.23 17.40
Cost per column B9@4.15 Ea 210.84 132.60 4.53 347.97
14'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.317 VLF 15.81 10.13 0.34 26.28
Cost per block B9@.211 Ea 10.55 6.74 0.23 17.52
Cost per column B9@4.44 Ea 221.39 141.90 4.80 368.09
14'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.321 VLF 15.81 10.26 0.34 26.41
Cost per block B9@.214 Ea 10.55 6.84 0.23 17.62
Cost per column B9@4.71 Ea 231.94 150.50 5.05 387.49
15'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.322 VLF 15.81 10.29 0.35 26.45
Cost per block B9@.216 Ea 10.55 6.90 0.23 17.68
Cost per column B9@4.94 Ea 242.47 157.90 5.29 405.66
16'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.326 VLF 15.81 10.42 0.40 26.63
Cost per block B9@.218 Ea 10.55 6.97 0.27 17.79
Cost per column B9@5.22 Ea 253.02 166.80 6.37 426.19
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 244
16'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.331 VLF 15.81 10.58 0.40 26.79
Cost per block B9@.221 Ea 10.55 7.06 0.27 17.88
Cost per column B9@5.51 Ea 263.57 176.10 6.68 446.35
17'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.333 VLF 15.81 10.64 0.40 26.85
Cost per block B9@.222 Ea 10.55 7.10 0.27 17.92
Cost per column B9@5.77 Ea 274.10 184.40 6.97 465.47
18'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.336 VLF 15.81 10.74 0.40 26.95
Cost per block B9@.224 Ea 10.55 7.16 0.27 17.98
Cost per column B9@6.05 Ea 284.65 193.40 7.27 485.32
18'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.341 VLF 15.81 10.90 0.41 27.12
Cost per block B9@.227 Ea 10.55 7.26 0.27 18.08
Cost per column B9@6.36 Ea 295.19 203.30 7.60 506.09
19'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.347 VLF 15.81 11.09 0.41 27.31
Cost per block B9@.231 Ea 10.55 7.38 0.27 18.20
Cost per column B9@6.71 Ea 305.73 214.50 7.95 528.18
20'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.352 VLF 15.81 11.25 0.41 27.47
Cost per block B9@.234 Ea 10.55 7.48 0.28 18.31
Cost per column B9@7.04 Ea 316.27 225.00 8.28 549.55
16" square CMU column with 4 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.303 VLF 17.18 9.68 0.29 27.15
Cost per block B9@.202 Ea 11.46 6.46 0.19 18.11
Cost per column B9@2.22 Ea 125.96 70.95 2.12 199.03
8'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.310 VLF 17.18 9.91 0.29 27.38
Cost per block B9@.207 Ea 11.46 6.62 0.19 18.27
Cost per column B9@2.48 Ea 137.42 79.26 2.33 219.01
8'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.312 VLF 17.18 9.97 0.29 27.44
Cost per block B9@.208 Ea 11.46 6.65 0.19 18.30
Cost per column B9@2.70 Ea 148.88 86.29 2.53 237.70
9'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.313 VLF 17.18 10.00 0.29 27.47
Cost per block B9@.209 Ea 11.46 6.68 0.19 18.33
Cost per column B9@2.92 Ea 160.32 93.32 2.72 256.36
10'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.319 VLF 17.18 10.20 0.29 27.67
Cost per block B9@.212 Ea 11.46 6.78 0.20 18.44
Cost per column B9@3.19 Ea 171.78 102.00 2.94 276.72
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 245
10'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.319 VLF 17.18 10.20 0.34 27.72
Cost per block B9@.213 Ea 11.46 6.81 0.23 18.50
Cost per column B9@3.40 Ea 183.23 108.70 3.67 295.60
11'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.320 VLF 17.18 10.23 0.34 27.75
Cost per block B9@.213 Ea 11.46 6.81 0.23 18.50
Cost per column B9@3.63 Ea 194.67 116.00 3.90 314.57
12'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.324 VLF 17.18 10.36 0.35 27.89
Cost per block B9@.216 Ea 11.46 6.90 0.23 18.59
Cost per column B9@3.89 Ea 206.13 124.30 4.15 334.58
12'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.327 VLF 17.18 10.45 0.35 27.98
Cost per block B9@.218 Ea 11.46 6.97 0.23 18.66
Cost per column B9@4.14 Ea 217.59 132.30 4.40 354.29
13'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.333 VLF 17.18 10.64 0.35 28.17
Cost per block B9@.222 Ea 11.46 7.10 0.23 18.79
Cost per column B9@4.44 Ea 229.03 141.90 4.67 375.60
14'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.336 VLF 17.18 10.74 0.35 28.27
Cost per block B9@.224 Ea 11.46 7.16 0.23 18.85
Cost per column B9@4.70 Ea 240.49 150.20 4.92 395.61
14'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.341 VLF 17.18 10.90 0.35 28.43
Cost per block B9@.227 Ea 11.46 7.26 0.24 18.96
Cost per column B9@5.00 Ea 251.94 159.80 5.19 416.93
15'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.345 VLF 17.18 11.03 0.36 28.57
Cost per block B9@.230 Ea 11.46 7.35 0.24 19.05
Cost per column B9@5.29 Ea 263.38 169.10 5.46 437.94
16'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.347 VLF 17.18 11.09 0.41 28.68
Cost per block B9@.231 Ea 11.46 7.38 0.27 19.11
Cost per column B9@5.55 Ea 274.84 177.40 6.58 458.82
16'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.351 VLF 17.18 11.22 0.41 28.81
Cost per block B9@.234 Ea 11.46 7.48 0.28 19.22
Cost per column B9@5.85 Ea 286.30 187.00 6.89 480.19
17'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.354 VLF 17.18 11.31 0.42 28.91
Cost per block B9@.236 Ea 11.46 7.54 0.28 19.28
Cost per column B9@6.14 Ea 297.74 196.20 7.20 501.14
18'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.356 VLF 17.18 11.38 0.42 28.98
Cost per block B9@.237 Ea 11.46 7.58 0.28 19.32
Cost per column B9@6.41 Ea 309.20 204.90 7.50 521.60
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 246
18'- 8" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.363 VLF 17.18 11.60 0.42 29.20
Cost per block B9@.242 Ea 11.46 7.73 0.28 19.47
Cost per column B9@6.77 Ea 320.66 216.40 7.86 544.92
19'- 4" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.368 VLF 17.18 11.76 0.42 29.36
Cost per block B9@.245 Ea 11.46 7.83 0.28 19.57
Cost per column B9@7.11 Ea 332.10 227.20 8.20 567.50
20'- 0" high 16" x 16" column using 8" x 8" x 16" block
Cost per vertical linear foot of column B9@.372 VLF 17.18 11.89 0.43 29.50
Cost per block B9@.248 Ea 11.46 7.93 0.28 19.67
Cost per column B9@7.44 Ea 343.55 237.80 8.53 589.88
16" round CMU column with 1 No. 5 bar Costs include the material and labor necessary to build the
column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the cells.
Labor includes the cost of laying the block, installing the reinforcing steel and grouting the column.
Labor costs increase with increases in column height. Equipment includes the cost of scaffolding and a
trailer-mounted 15-CY per hour concrete pump with operator.
16" round CMU column with 2 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
16" round CMU column with 3 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
16" round CMU column with 4 No. 5 bars Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
16" half round CMU column (no reinforcing) Costs include the material and labor necessary to build
the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in the
cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
16" half round CMU column with 1 No. 5 bar Costs include the material and labor necessary to
build the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in
the cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor costs increase with increases in column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour capacity concrete pump with operator.
2' x 2' column with 4 regulars and 4 No. 5 bars Costs include the material and labor necessary to
build the column. Material includes the cost of the block, mortar, reinforcing steel and 3,000 lb. grout in
the cells. Labor includes the cost of laying the block, installing the reinforcing steel and grouting the
column. Labor is assumed to increase at 6' intervals, vertically. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.752 VLF 18.87 24.03 0.52 43.42
Cost per block B9@.126 Ea 3.60 4.03 0.35 7.98
Cost per column B9@5.51 Ea 138.39 176.10 3.81 318.30
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 257
8'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.764 VLF 18.87 24.42 0.52 43.81
Cost per block B9@.127 Ea 3.60 4.06 0.35 8.01
Cost per column B9@6.11 Ea 150.97 195.30 4.19 350.46
8'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.777 VLF 18.87 24.83 0.53 44.23
Cost per block B9@.130 Ea 3.60 4.16 0.35 8.11
Cost per column B9@6.73 Ea 163.56 215.10 4.57 383.23
9'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.785 VLF 18.87 25.09 0.53 44.49
Cost per block B9@.131 Ea 3.60 4.19 0.35 8.14
10'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.796 VLF 18.87 25.44 0.53 44.84
Cost per block B9@.133 Ea 3.60 4.25 0.36 8.21
Cost per column B9@7.96 Ea 188.72 254.40 5.33 448.45
10'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.802 VLF 18.87 25.63 0.66 45.16
Cost per block B9@.134 Ea 3.60 4.28 0.44 8.32
Cost per column B9@8.55 Ea 201.30 273.30 7.05 481.65
11'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.810 VLF 18.87 25.89 0.66 45.42
Cost per block B9@.135 Ea 3.60 4.32 0.44 8.36
Cost per column B9@9.18 Ea 213.87 293.40 7.53 514.80
12'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.815 VLF 18.87 26.05 0.67 45.59
Cost per block B9@.136 Ea 3.60 4.35 0.44 8.39
Cost per column B9@9.78 Ea 226.46 312.60 8.00 547.06
12'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.836 VLF 18.87 26.72 0.68 46.27
Cost per block B9@.139 Ea 3.60 4.44 0.45 8.49
Cost per column B9@10.6 Ea 239.05 338.80 8.57 586.42
13'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.852 VLF 18.87 27.23 0.68 46.78
Cost per block B9@.142 Ea 3.60 4.54 0.46 8.60
Cost per column B9@11.4 Ea 251.62 364.30 9.12 625.04
14'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.868 VLF 18.87 27.74 0.69 47.30
Cost per block B9@.144 Ea 3.60 4.60 0.46 8.66
Cost per column B9@12.2 Ea 264.20 389.90 9.68 663.78
14'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.884 VLF 18.87 28.25 0.70 47.82
Cost per block B9@.147 Ea 3.60 4.70 0.47 8.77
Cost per column B9@13.0 Ea 276.79 415.50 10.25 702.54
15'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.896 VLF 18.87 28.64 0.70 48.21
Cost per block B9@.149 Ea 3.60 4.76 0.47 8.83
Cost per column B9@13.7 Ea 289.36 437.90 10.81 738.07
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 258
16'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.910 VLF 18.87 29.08 0.71 48.66
Cost per block B9@.151 Ea 3.60 4.83 0.47 8.90
Cost per column B9@14.6 Ea 301.95 466.60 11.38 779.93
16'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.920 VLF 18.87 29.40 0.72 48.99
Cost per block B9@.153 Ea 3.60 4.89 0.48 8.97
Cost per column B9@15.3 Ea 314.53 489.00 11.93 815.46
17'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.931 VLF 18.87 29.75 0.72 49.34
Cost per block B9@.155 Ea 3.60 4.95 0.48 9.03
Cost per column B9@16.1 Ea 327.10 514.60 12.50 854.20
18'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.940 VLF 18.87 30.04 0.73 49.64
Cost per block B9@.157 Ea 3.60 5.02 0.48 9.10
Cost per column B9@16.9 Ea 339.69 540.10 13.06 892.85
18'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.962 VLF 18.87 30.75 0.74 50.36
Cost per block B9@.160 Ea 3.60 5.11 0.49 9.20
Cost per column B9@18.0 Ea 352.28 575.30 13.73 941.31
19'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@.983 VLF 18.87 31.42 0.75 51.04
Cost per block B9@.164 Ea 3.60 5.24 0.50 9.34
Cost per column B9@19.0 Ea 364.85 607.20 14.41 986.46
20'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.00 VLF 18.87 31.96 0.75 51.58
Cost per block B9@.167 Ea 3.60 5.34 0.50 9.44
Cost per column B9@20.0 Ea 377.43 639.20 15.09 1,031.72
2' x 2' column with 4 regulars and one half block with 5 No. 5 bars Costs include the material and
labor necessary to build the column. Material includes the cost of the block, mortar, reinforcing steel
and 3,000 lb. grout in the cells. Labor includes the cost of laying the block, installing the reinforcing
steel and grouting the column. Labor costs increase with column height. Equipment includes the cost of
scaffolding and a trailer-mounted 15-CY per hour concrete pump with operator.
7'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.00 VLF 23.45 31.96 0.63 56.04
Cost per block B9@.134 Ea 4.72 4.28 0.42 9.42
Cost per column B9@7.36 Ea 171.97 235.20 4.65 411.82
8'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.02 VLF 23.45 32.60 0.64 56.69
Cost per block B9@.136 Ea 4.72 4.35 0.43 9.50
Cost per column B9@8.18 Ea 187.62 261.40 5.12 454.14
8'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.04 VLF 23.45 33.24 0.64 57.33
Cost per block B9@.139 Ea 4.72 4.44 0.43 9.59
Cost per column B9@8.99 Ea 203.26 287.30 5.59 496.15
9'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.05 VLF 23.45 33.56 0.65 57.66
Cost per block B9@.140 Ea 4.72 4.47 0.43 9.62
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 259
10'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.06 VLF 23.45 33.88 0.65 57.98
Cost per block B9@.141 Ea 4.72 4.51 0.43 9.66
Cost per column B9@10.6 Ea 234.52 338.80 6.51 579.83
10'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.07 VLF 23.45 34.20 0.65 58.30
Cost per block B9@.143 Ea 4.72 4.57 0.44 9.73
Cost per column B9@11.4 Ea 250.16 364.30 6.98 621.44
11'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.08 VLF 23.45 34.52 0.66 58.63
Cost per block B9@.144 Ea 4.72 4.60 0.44 9.76
Cost per column B9@12.2 Ea 265.78 389.90 7.45 663.13
12'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.09 VLF 23.45 34.84 0.66 58.95
Cost per block B9@.145 Ea 4.72 4.63 0.44 9.79
Cost per column B9@13.0 Ea 281.42 415.50 7.92 704.84
12'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.11 VLF 23.45 35.48 0.67 59.60
Cost per block B9@.148 Ea 4.72 4.73 0.44 9.89
Cost per column B9@14.0 Ea 297.07 447.40 8.44 752.91
13'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.13 VLF 23.45 36.11 0.67 60.23
Cost per block B9@.151 Ea 4.72 4.83 0.45 10.00
Cost per column B9@15.1 Ea 312.68 482.60 8.98 804.26
14'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.15 VLF 23.45 36.75 0.68 60.88
Cost per block B9@.153 Ea 4.72 4.89 0.45 10.06
Cost per column B9@16.1 Ea 328.33 514.60 9.52 852.45
14'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.17 VLF 23.45 37.39 0.69 61.53
Cost per block B9@.156 Ea 4.72 4.99 0.46 10.17
Cost per column B9@17.1 Ea 343.97 546.50 10.06 900.53
15'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.19 VLF 23.45 38.03 0.69 62.17
Cost per block B9@.158 Ea 4.72 5.05 0.46 10.23
Cost per column B9@18.2 Ea 359.59 581.70 10.59 951.88
16'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.20 VLF 23.45 38.35 0.70 62.50
Cost per block B9@.160 Ea 4.72 5.11 0.46 10.29
Cost per column B9@19.2 Ea 375.23 613.60 11.13 999.96
16'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.21 VLF 23.45 38.67 0.70 62.82
Cost per block B9@.162 Ea 4.72 5.18 0.47 10.37
Cost per column B9@20.2 Ea 390.87 645.60 11.66 1,048.13
17'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.23 VLF 23.45 39.31 0.70 63.46
Cost per block B9@.164 Ea 4.72 5.24 0.47 10.43
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 260
18'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.24 VLF 23.45 39.63 0.71 63.79
Cost per block B9@.165 Ea 4.72 5.27 0.47 10.46
Cost per column B9@22.3 Ea 422.13 712.70 12.73 1,147.56
18'- 8" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.27 VLF 23.45 40.59 0.72 64.76
Cost per block B9@.169 Ea 4.72 5.40 0.48 10.60
Cost per column B9@23.7 Ea 437.78 757.50 13.38 1,208.66
19'- 4" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.30 VLF 23.45 41.55 0.72 65.72
Cost per block B9@.173 Ea 4.72 5.53 0.48 10.73
Cost per column B9@25.0 Ea 453.40 799.00 14.00 1,266.40
20'- 0" high 2' x 2' column using 8" x 8" x 16" block
Cost per linear foot of column B9@1.32 VLF 23.45 42.19 0.73 66.37
Cost per block B9@.176 Ea 4.72 5.63 0.49 10.84
Cost per column B9@26.4 Ea 469.04 843.70 14.65 1,327.39
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 261
Retaining walls with one lintel block course and grouted and reinforced vertical cells at 16"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump, with
operator.
Retaining walls with one lintel block course and grouted and reinforced vertical cells at 32"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with
operator.
Retaining walls with one lintel block course and grouted and reinforced vertical cells at 48"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with
operator.
Retaining walls with two lintel block courses and grouted and reinforced vertical cells at 16"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with
operator.
Retaining walls with two lintel block courses and grouted and reinforced vertical cells at 32"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with
operator.
Retaining walls with two lintel block courses and grouted and reinforced vertical cells at 48"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with
operator.
Retaining walls with three lintel block courses and grouted and reinforced cells at 16" O.C.
Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses, or
higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with operator
and scaffolding starting at 6'.
Retaining walls with three lintel block courses and grouted and reinforced cells at 32" O.C.
Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses, or
higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with operator
and scaffolding starting at 6'.
Retaining walls with three lintel block course and grouted and reinforced vertical cells at 48"
O.C. Material costs include mortar, regular block, "U"-block, and inspection block for walls 6 courses,
or higher. Material also includes the grout, cavity caps and No. 5 reinforcing steel. Labor includes the
costs for installing all of these items. Equipment is a trailer-mounted 15-CY per hour pump with operator
and scaffolding starting at 6'.
Glass block
Glass block Prices include the material and labor required to install glass block manufactured by the
Pittsburgh Corning Corporation. Material includes block, spacers, anchors, horizontal reinforcing,
expansion strips and mortar. Metal angles and channels for large openings are not included. Since the
opening dimensions determine the amount of anchors, reinforcing and expansion strips, the following
are average costs.
Thinline Series
6" x 6" block
Dacora B9@.376 SF 34.90 12.02 -- 46.92
Delphi or IceScapes B9@.376 SF 35.84 12.02 -- 47.86
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 268
Premier Series
6" x 6" block
Dacora B9@.376 SF 22.85 12.02 -- 34.87
Dacora LX B9@.376 SF 47.37 12.02 -- 59.39
Argus B9@.376 SF 37.57 12.02 -- 49.59
Vue B9@.376 SF 34.80 12.02 -- 46.82
8" x 8" block
Dacora B9@.296 SF 23.56 9.46 -- 33.02
Dacora LX B9@.296 SF 34.15 9.46 -- 43.61
Argus or IceScapes B9@.296 SF 27.48 9.46 -- 36.94
Fluted, Vue, Essex or Spyra B9@.296 SF 25.17 9.46 -- 34.63
12" x 12" block
Vue B9@.211 SF 22.62 6.74 -- 29.36
Dacora B9@.211 SF 25.41 6.74 -- 32.15
Dacora LX B9@.211 SF 39.39 6.74 -- 46.13
Argus B9@.211 SF 23.52 6.74 -- 30.26
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 269
Mass gravity walls, plain finish The delivered price of gravity block can be expected to vary widely.
Costs include material and labor required to install 2.5' wide x 2.5' tall x 5' long Lock-Block® standard
units. Equipment costs include the cost of a 35' forklift with a 6,000 lb. lifting capacity.
2- 1/2' high
Cost per square foot BA@.027 SF 8.71 0.90 0.16 9.77
Cost per block BA@.336 Ea 108.82 11.20 2.04 122.06
Cost per linear foot of wall BA@.067 LF 21.66 2.23 0.41 24.30
5' high
Cost per square foot BA@.024 SF 8.71 0.80 0.15 9.66
Cost per block BA@.297 Ea 108.82 9.90 1.81 120.53
Cost per linear foot of wall BA@.119 LF 43.53 3.97 0.72 48.22
7- 1/2' high
Cost per square foot BA@.023 SF 8.71 0.77 0.14 9.62
Cost per block BA@.284 Ea 108.82 9.47 1.73 120.02
Cost per linear foot of wall BA@.171 LF 65.19 5.70 1.04 71.93
10' high
Cost per square foot BA@.022 SF 8.71 0.73 0.13 9.57
Cost per block BA@.278 Ea 108.82 9.27 1.69 119.78
Cost per linear foot of wall BA@.222 LF 87.06 7.40 1.35 95.81
12- 1/2' high
Cost per square foot BA@.022 SF 8.71 0.73 0.13 9.57
Cost per block BA@.274 Ea 108.82 9.13 1.67 119.62
Cost per linear foot of wall BA@.274 LF 108.82 9.13 1.67 119.62
15' high
Cost per square foot BA@.022 SF 8.71 0.73 0.13 9.57
Cost per block BA@.271 Ea 108.82 9.03 1.65 119.50
Cost per linear foot of wall BA@.326 LF 131.40 10.87 1.98 144.25
17- 1/2' high
Cost per square foot BA@.022 SF 8.71 0.73 0.13 9.57
Cost per block BA@.270 Ea 108.82 9.00 1.64 119.46
Cost per linear foot of wall BA@.378 LF 152.96 12.60 2.30 167.86
20' high
Cost per square foot BA@.022 SF 8.71 0.73 0.13 9.57
Cost per block BA@.268 Ea 108.82 8.93 1.63 119.38
Cost per linear foot of wall BA@.429 LF 173.50 14.30 2.61 190.41
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 270
Mass gravity walls, architectural finish The delivered price of gravity block can be expected to vary
widely. Costs include material and labor required to install 2.5' wide x 2.5' tall x 5' long. Lock-Block®
standard units. Equipment costs include the cost of a 35' forklift with a 6,000 lb. lifting capacity.
2- 1/2' high
Cost per square foot BA@.027 SF 10.88 0.90 0.16 11.94
Cost per block BA@.336 Ea 135.51 11.20 2.04 148.75
Cost per linear foot of wall BA@.067 LF 27.10 2.23 0.41 29.74
5' high
Cost per square foot BA@.024 SF 10.88 0.80 0.15 11.83
Cost per block BA@.297 Ea 135.51 9.90 1.81 147.22
Cost per linear foot of wall BA@.119 LF 54.51 3.97 0.72 59.20
7- 1/2' high
Cost per square foot BA@.023 SF 10.88 0.77 0.14 11.79
Cost per block BA@.284 Ea 135.51 9.47 1.73 146.71
Cost per linear foot of wall BA@.171 LF 81.72 5.70 1.04 88.46
10' high
Cost per square foot BA@.022 SF 10.88 0.73 0.13 11.74
Cost per block BA@.278 Ea 135.51 9.27 1.69 146.47
Cost per linear foot of wall BA@.222 LF 108.82 7.40 1.35 117.57
12- 1/2' high
Cost per square foot BA@.022 SF 10.88 0.73 0.13 11.74
Cost per block BA@.274 Ea 135.51 9.13 1.67 146.31
Cost per linear foot of wall BA@.274 LF 135.51 9.13 1.67 146.31
15' high
Cost per square foot BA@.022 SF 10.88 0.73 0.13 11.74
Cost per block BA@.271 Ea 135.51 9.03 1.65 146.19
Cost per linear foot of wall BA@.326 LF 164.26 10.87 1.98 177.11
17- 1/2' high
Cost per square foot BA@.022 SF 10.88 0.73 0.13 11.74
Cost per block BA@.270 Ea 135.51 9.00 1.64 146.15
Cost per linear foot of wall BA@.378 LF 189.92 12.60 2.30 204.82
20' high
Cost per square foot BA@.022 SF 10.88 0.73 0.13 11.74
Cost per block BA@.268 Ea 135.51 8.93 1.63 146.07
Cost per linear foot of wall BA@.429 LF 216.61 14.30 2.61 233.52
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 271
Stone work The delivered price of stone can be expected to vary widely. These costs include mortar,
based on 1/2" joints, but no scaffolding. Figures in parentheses show typical quantities installed per
8-hour day by a crew of two.
16" caisson foundations Drilled in stable soil, no shoring required, filled with reinforced concrete. Add
for belled bottoms, if required, from the following section. Equipment includes a truck-mounted
"A"-frame hoist and a power- operated auger. Concrete is 3,000 lb. regular mix with 1-1/2" aggregate
dumped from the chute of ready-mix trucks. Spiral caisson reinforcing is based on using 3/8" diameter
hot rolled steel spirals with main vertical bars as shown, job fabricated. Costs for waste disposal are
not included.
12' deep
Drilling BA@.554 Ea -- 18.46 3.02 21.48
Reinforcing steel RI@.492 Ea 348.14 18.72 8.11 374.97
Concrete placement BL@.482 Ea 109.94 14.15 -- 124.09
14' deep
Drilling BA@.624 Ea -- 20.80 3.40 24.20
Reinforcing steel RI@.574 Ea 406.16 21.84 9.47 437.47
Concrete placement BL@.540 Ea 124.33 15.85 -- 140.18
16' deep
Drilling BA@.694 Ea -- 23.13 3.79 26.92
Reinforcing steel RI@.656 Ea 464.19 24.96 10.82 499.97
Concrete placement BL@.598 Ea 138.72 17.56 -- 156.28
18' deep
Drilling BA@.764 Ea -- 25.46 4.17 29.63
Reinforcing steel RI@.738 Ea 522.21 28.08 12.17 562.46
Concrete placement BL@.656 Ea 153.10 19.26 -- 172.36
20' deep
Drilling BA@.834 Ea -- 27.80 4.55 32.35
Reinforcing steel RI@.820 Ea 580.23 31.20 13.52 624.95
Concrete placement BL@.714 Ea 167.49 20.96 -- 188.45
24" caisson foundations Drilled in stable soil, no shoring required, filled with reinforced concrete. Add
for belled bottoms, if required, from the following section. Equipment includes a truck-mounted
"A"-frame hoist and a power- operated auger. Concrete is 3,000 lb. regular mix with 1-1/2" aggregate
dumped from the chute of ready-mix trucks. Spiral caisson reinforcing is based on using 3/8" diameter
hot rolled steel spirals with main vertical bars as shown, job fabricated. Costs for waste disposal are
not included.
12' deep
Drilling BA@.756 Ea -- 25.20 4.12 29.32
Reinforcing steel RI@1.02 Ea 592.10 38.81 16.82 647.73
Concrete placement BL@1.02 Ea 244.96 29.95 -- 274.91
14' deep
Drilling BA@.840 Ea -- 28.00 4.58 32.58
Reinforcing steel RI@1.19 Ea 690.79 45.28 19.63 755.70
Concrete placement BL@1.15 Ea 277.33 33.76 -- 311.09
16' deep
Drilling BA@.924 Ea -- 30.80 5.04 35.84
Reinforcing steel RI@1.36 Ea 789.47 51.75 22.43 863.65
Concrete placement BL@1.28 Ea 309.70 37.58 -- 347.28
18' deep
Drilling BA@1.01 Ea -- 33.66 5.50 39.16
Reinforcing steel RI@1.53 Ea 888.15 58.22 25.23 971.60
Concrete placement BL@1.41 Ea 342.07 41.40 -- 383.47
20' deep
Drilling BA@1.09 Ea -- 36.33 5.96 42.29
Reinforcing steel RI@1.70 Ea 986.84 64.69 28.04 1,079.57
Concrete placement BL@1.55 Ea 374.44 45.51 -- 419.95
36" caisson foundations Drilled in stable soil, no shoring required, filled with reinforced concrete. Add
for belled bottoms, if required, from the following section. Equipment includes a truck-mounted
"A"-frame hoist and a power- operated auger. Concrete is 3,000 lb. regular mix with 1-1/2" aggregate
dumped from the chute of ready-mix trucks. Spiral caisson reinforcing is based on using 3/8" diameter
hot rolled steel spirals with main vertical bars as shown, job fabricated. Costs for waste disposal are
not included.
12' deep
Drilling BA@.960 Ea -- 32.00 5.24 37.24
Reinforcing steel RI@2.11 Ea 1,073.54 80.29 34.83 1,188.66
Concrete placement BL@2.05 Ea 493.12 60.19 -- 553.31
14' deep
Drilling BA@1.07 Ea -- 35.66 5.84 41.50
Reinforcing steel RI@2.46 Ea 1,252.47 93.60 40.64 1,386.71
Concrete placement BL@2.34 Ea 565.95 68.70 -- 634.65
16' deep
Drilling BA@1.18 Ea -- 39.33 6.44 45.77
Reinforcing steel RI@2.82 Ea 1,431.39 107.30 46.44 1,585.13
Concrete placement BL@2.64 Ea 638.78 77.51 -- 716.29
18' deep
Drilling BA@1.29 Ea -- 43.00 7.04 50.04
Reinforcing steel RI@3.17 Ea 1,610.31 120.60 52.25 1,783.16
Concrete placement BL@2.93 Ea 711.61 86.02 -- 797.63
20' deep
Drilling BA@1.40 Ea -- 46.66 7.64 54.30
Reinforcing steel RI@3.52 Ea 1,789.24 133.90 58.05 1,981.19
Concrete placement BL@3.23 Ea 784.44 94.83 -- 879.27
Concrete column pads Prices include the cost of labor and material required to excavate and form the
footing, as well as the installation of the reinforcing steel. Prices do not include layout. Material includes
3,000 lb. concrete dumped off the truck, Grade 60 reinforcing steel and plywood forms (3 uses).
Concrete waste when poured against the earth is assumed to be 1 additional inch of concrete at the
bottom of the pad, and 2" along the walls, and only 1 additional inch at the bottom of the pad when
poured into forms. When forms are used, the excavation is extended 18" beyond the forms. Equipment
costs are based on the use of a small tractor-loader backhoe, or other comparable excavator.
Excavation is assumed to be in medium soil. Add the cost of dowels, if required.
Pad specifications: 2' x 2' x 12" pad, 2 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.300 Ea -- 8.81 -- 8.81
Reinforcing steel RI@.115 Ea 3.90 4.38 -- 8.28
Concrete BL@.121 Ea 24.46 3.55 -- 28.01
Hand excavated, poured against forms
Excavation BL@2.53 Ea -- 74.28 -- 74.28
Formwork B2@1.00 Ea 7.92 33.92 -- 41.84
Reinforcing steel RI@.115 Ea 3.90 4.38 -- 8.28
Concrete BL@.090 Ea 18.12 2.64 -- 20.76
Machine excavated, poured against earth
Excavation B8@.020 Ea -- 0.71 0.31 1.02
Reinforcing steel RI@.115 Ea 3.90 4.38 -- 8.28
Concrete BL@.121 Ea 24.46 3.55 -- 28.01
Machine excavated, poured against forms
Excavation B8@.661 Ea -- 23.35 10.32 33.67
Formwork B2@1.04 Ea 7.92 35.28 -- 43.20
Reinforcing steel RI@.115 Ea 3.90 4.38 -- 8.28
Concrete BL@.090 Ea 18.12 2.64 -- 20.76
Pad specifications: 2' x 2' x 12" pad, 3 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.300 Ea -- 8.81 -- 8.81
Reinforcing steel RI@.164 Ea 5.85 6.24 -- 12.09
Concrete BL@.121 Ea 24.46 3.55 -- 28.01
Hand excavated, poured against forms
Excavation BL@2.53 Ea -- 74.28 -- 74.28
Formwork B2@1.00 Ea 7.92 33.92 -- 41.84
Reinforcing steel RI@.164 Ea 5.85 6.24 -- 12.09
Concrete BL@.090 Ea 18.12 2.64 -- 20.76
Machine excavated, poured against earth
Excavation B8@.020 Ea -- 0.71 0.31 1.02
Reinforcing steel RI@.164 Ea 5.85 6.24 -- 12.09
Concrete BL@.121 Ea 24.46 3.55 -- 28.01
Machine excavated, poured against forms
Excavation B8@.661 Ea -- 23.35 10.32 33.67
Formwork B2@1.04 Ea 7.92 35.28 -- 43.20
Reinforcing steel RI@.164 Ea 5.85 6.24 -- 12.09
Concrete BL@.090 Ea 18.12 2.64 -- 20.76
Pad specifications: 2' x 2' x 12" pad, 4 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.300 Ea -- 8.81 -- 8.81
Reinforcing steel RI@.213 Ea 7.80 8.11 -- 15.91
Concrete BL@.121 Ea 24.46 3.55 -- 28.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 280
Pad specifications: 3' x 3' x 12" pad, 3 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.660 Ea -- 19.38 -- 19.38
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.250 Ea 48.95 7.34 -- 56.29
Hand excavated, poured against forms
Formwork B2@1.51 Ea 11.88 51.22 -- 63.10
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.204 Ea 40.77 5.99 -- 46.76
Machine excavated, poured against earth
Excavation B8@.044 Ea -- 1.55 0.69 2.24
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.250 Ea 48.95 7.34 -- 56.29
Machine excavated, poured against forms
Excavation B8@.865 Ea -- 30.55 13.51 44.06
Formwork B2@1.51 Ea 11.88 51.22 -- 63.10
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.204 Ea 40.77 5.99 -- 46.76
Pad specifications: 3' x 3' x 12" pad, 4 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.660 Ea -- 19.38 -- 19.38
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.250 Ea 48.95 7.34 -- 56.29
Hand excavated, poured against forms
Formwork B2@1.51 Ea 11.88 51.22 -- 63.10
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.204 Ea 40.77 5.99 -- 46.76
Machine excavated, poured against earth
Excavation B8@.044 Ea -- 1.55 0.69 2.24
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.250 Ea 48.95 7.34 -- 56.29
Machine excavated, poured against forms
Excavation B8@.865 Ea -- 30.55 13.51 44.06
Formwork B2@1.51 Ea 11.88 51.22 -- 63.10
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.204 Ea 40.77 5.99 -- 46.76
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 281
Pad specifications: 3' x 3' x 12" pad, 6 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.660 Ea -- 19.38 -- 19.38
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.250 Ea 48.95 7.34 -- 56.29
Hand excavated, poured against forms
Formwork B2@1.51 Ea 11.88 51.22 -- 63.10
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.204 Ea 40.77 5.99 -- 46.76
Machine excavated, poured against earth
Excavation B8@.044 Ea -- 1.55 0.69 2.24
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.250 Ea 48.95 7.34 -- 56.29
Machine excavated, poured against forms
Excavation B8@.865 Ea -- 30.55 13.51 44.06
Formwork B2@1.51 Ea 11.88 51.22 -- 63.10
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.204 Ea 40.77 5.99 -- 46.76
Pad specifications: 3' x 3' x 16" pad, 3 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.880 Ea -- 25.84 -- 25.84
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.327 Ea 66.60 9.60 -- 76.20
Hand excavated, poured against forms
Excavation BL@4.71 Ea -- 138.30 -- 138.30
Formwork B2@1.51 Ea 15.83 51.22 -- 67.05
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.266 Ea 54.35 7.81 -- 62.16
Machine excavated, poured against earth
Excavation B8@.058 Ea -- 2.05 0.91 2.96
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.327 Ea 66.60 9.60 -- 76.20
Machine excavated, poured against forms
Excavation B8@1.16 Ea -- 40.97 18.10 59.07
Formwork B2@1.51 Ea 15.83 51.22 -- 67.05
Reinforcing steel RI@.278 Ea 8.78 10.58 -- 19.36
Concrete BL@.266 Ea 54.35 7.81 -- 62.16
Pad specifications: 3' x 3' x 16" pad, 4 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.880 Ea -- 25.84 -- 25.84
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.327 Ea 66.60 9.60 -- 76.20
Hand excavated, poured against forms
Excavation BL@4.71 Ea -- 138.30 -- 138.30
Formwork B2@1.51 Ea 15.83 51.22 -- 67.05
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.266 Ea 54.35 7.81 -- 62.16
Machine excavated, poured against earth
Excavation B8@.058 Ea -- 2.05 0.91 2.96
Reinforcing steel RI@.360 Ea 11.70 13.70 -- 25.40
Concrete BL@.327 Ea 66.60 9.60 -- 76.20
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 282
Pad specifications: 3' x 3' x 16" pad, 6 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@.880 Ea -- 25.84 -- 25.84
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.327 Ea 66.60 9.60 -- 76.20
Hand excavated, poured against forms
Excavation BL@4.71 Ea -- 138.30 -- 138.30
Formwork B2@1.51 Ea 15.83 51.22 -- 67.05
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.266 Ea 54.35 7.81 -- 62.16
Machine excavated, poured against earth
Excavation B8@.058 Ea -- 2.05 0.91 2.96
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@.327 Ea 66.60 9.60 -- 76.20
Machine excavated, poured against forms
Excavation B8@1.16 Ea -- 40.97 18.10 59.07
Formwork B2@1.51 Ea 15.83 51.22 -- 67.05
Reinforcing steel RI@.540 Ea 17.55 20.55 -- 38.10
Concrete BL@1.16 Ea 54.35 34.06 -- 88.41
Pad specifications: 4' x 4' x 12" pad, 4 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@1.18 Ea -- 34.64 -- 34.64
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.424 Ea 84.47 12.45 -- 96.92
Hand excavated, poured against forms
Excavation BL@4.47 Ea -- 131.20 -- 131.20
Formwork B2@2.34 Ea 15.84 79.37 -- 95.21
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.362 Ea 72.48 10.63 -- 83.11
Machine excavated, poured against earth
Excavation B8@.079 Ea -- 2.79 1.23 4.02
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.424 Ea 84.47 12.45 -- 96.92
Machine excavated, poured against forms
Excavation B8@1.08 Ea -- 38.15 16.88 55.03
Formwork B2@2.34 Ea 15.84 79.37 -- 95.21
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.362 Ea 72.48 10.63 -- 83.11
Pad specifications: 4' x 4' x 12" pad, 6 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@1.18 Ea -- 34.64 -- 34.64
Reinforcing steel RI@.753 Ea 23.40 28.65 -- 52.05
Concrete BL@.424 Ea 84.47 12.45 -- 96.92
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 283
Pad specifications: 4' x 4' x 12" pad, 8 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@1.18 Ea -- 34.64 -- 34.64
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.424 Ea 84.47 12.45 -- 96.92
Hand excavated, poured against forms
Excavation BL@4.67 Ea -- 137.10 -- 137.10
Formwork B2@2.34 Ea 15.84 79.37 -- 95.21
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.362 Ea 72.48 10.63 -- 83.11
Machine excavated, poured against earth
Excavation B8@.079 Ea -- 2.79 1.23 4.02
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.424 Ea 84.47 12.45 -- 96.92
Machine excavated, poured against forms
Excavation B8@1.08 Ea -- 38.15 16.88 55.03
Formwork B2@2.34 Ea 15.84 79.37 -- 95.21
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.362 Ea 72.48 10.63 -- 83.11
Pad specifications: 4' x 4' x 16" pad, 4 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@1.58 Ea -- 46.39 -- 46.39
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.547 Ea 113.44 16.06 -- 129.50
Hand excavated, poured against forms
Excavation BL@6.24 Ea -- 183.20 -- 183.20
Formwork B2@2.34 Ea 21.11 79.37 -- 100.48
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.466 Ea 96.62 13.68 -- 110.30
Machine excavated, poured against earth
Excavation B8@.105 Ea -- 3.71 1.64 5.35
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.547 Ea 113.44 16.06 -- 129.50
Machine excavated, poured against forms
Excavation B8@1.44 Ea -- 50.86 22.55 73.41
Formwork B2@2.34 Ea 21.11 79.37 -- 100.48
Reinforcing steel RI@.508 Ea 15.60 19.33 -- 34.93
Concrete BL@.466 Ea 96.62 13.68 -- 110.30
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 284
Pad specifications: 4' x 4' x 16" pad, 6 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@1.58 Ea -- 46.39 -- 46.39
Reinforcing steel RI@.753 Ea 23.40 28.65 -- 52.05
Concrete BL@.547 Ea 113.44 16.06 -- 129.50
Hand excavated, poured against forms
Excavation BL@6.24 Ea -- 183.20 -- 183.20
Formwork B2@2.34 Ea 21.11 79.37 -- 100.48
Reinforcing steel RI@.753 Ea 23.40 28.65 -- 52.05
Concrete BL@.466 Ea 96.62 13.68 -- 110.30
Machine excavated, poured against earth
Excavation B8@.105 Ea -- 3.71 1.64 5.35
Reinforcing steel RI@.753 Ea 23.40 28.65 -- 52.05
Concrete BL@.547 Ea 113.44 16.06 -- 129.50
Machine excavated, poured against forms
Excavation B8@1.44 Ea -- 50.86 22.55 73.41
Formwork B2@2.34 Ea 21.11 79.37 -- 100.48
Reinforcing steel RI@.753 Ea 23.40 28.65 -- 52.05
Concrete BL@.466 Ea 96.62 13.68 -- 110.30
Pad specifications: 4' x 4' x 16" pad, 8 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@1.58 Ea -- 46.39 -- 46.39
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.547 Ea 113.44 16.06 -- 129.50
Hand excavated, poured against forms
Excavation BL@6.24 Ea -- 183.20 -- 183.20
Formwork B2@2.34 Ea 21.11 79.37 -- 100.48
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.466 Ea 96.62 13.68 -- 110.30
Machine excavated, poured against earth
Excavation B8@.105 Ea -- 3.71 1.64 5.35
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.547 Ea 113.44 16.06 -- 129.50
Machine excavated, poured against forms
Excavation B8@1.44 Ea -- 50.86 22.55 73.41
Formwork B2@2.34 Ea 21.11 79.37 -- 100.48
Reinforcing steel RI@.753 Ea 31.21 28.65 -- 59.86
Concrete BL@.466 Ea 96.62 13.68 -- 110.30
Pad specifications: 5' x 5' x 24" pad, 8 No. 5 bars each way
Hand excavated, poured against earth
Excavation BL@3.70 Ea -- 108.60 -- 108.60
Reinforcing steel RI@1.29 Ea 39.01 49.08 -- 88.09
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Hand excavated, poured against forms
Excavation BL@12.0 Ea -- 352.30 -- 352.30
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@1.29 Ea 39.01 49.08 -- 88.09
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Machine excavated, poured against earth
Excavation B8@.246 Ea -- 8.69 3.84 12.53
Reinforcing steel RI@1.29 Ea 39.01 49.08 -- 88.09
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 285
Pad specifications: 5' x 5' x 24" pad, 8 No. 5 bars each way, two mats
Hand excavated, poured against earth
Excavation BL@3.70 Ea -- 108.60 -- 108.60
Reinforcing steel RI@2.59 Ea 39.01 98.55 -- 137.56
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Hand excavated, poured against forms
Excavation BL@12.0 Ea -- 352.30 -- 352.30
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@2.59 Ea 39.01 98.55 -- 137.56
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Machine excavated, poured against earth
Excavation B8@.246 Ea -- 8.69 3.84 12.53
Reinforcing steel RI@2.59 Ea 39.01 98.55 -- 137.56
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Machine excavated, poured against forms
Excavation B8@2.62 Ea -- 92.54 40.92 133.46
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@2.59 Ea 39.01 98.55 -- 137.56
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Pad specifications: 5' x 5' x 24" pad, 8 No. 6 bars each way
Hand excavated, poured against earth
Excavation BL@3.70 Ea -- 108.60 -- 108.60
Reinforcing steel RI@1.83 Ea 51.73 69.63 -- 121.36
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Hand excavated, poured against forms
Excavation BL@12.0 Ea -- 352.30 -- 352.30
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@1.83 Ea 51.73 69.63 -- 121.36
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Machine excavated, poured against earth
Excavation B8@.246 Ea -- 8.69 3.84 12.53
Reinforcing steel RI@1.83 Ea 51.73 69.63 -- 121.36
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Machine excavated, poured against forms
Excavation B8@2.62 Ea -- 92.54 40.92 133.46
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@1.83 Ea 51.73 69.63 -- 121.36
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Pad specifications: 5' x 5' x 24" pad, 8 No. 6 bars each way, two mats
Hand excavated, poured against earth
Excavation BL@3.70 Ea -- 108.60 -- 108.60
Reinforcing steel RI@3.65 Ea 51.73 138.90 -- 190.63
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 286
Pad specifications: 5' x 5' x 24" pad, 8 No. 8 bars each way
Hand excavated, poured against earth
Excavation BL@3.70 Ea -- 108.60 -- 108.60
Reinforcing steel RI@3.30 Ea 106.85 125.60 -- 232.45
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Hand excavated, poured against forms
Excavation BL@12.0 Ea -- 352.30 -- 352.30
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@3.30 Ea 106.85 125.60 -- 232.45
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Machine excavated, poured against earth
Excavation B8@.246 Ea -- 8.69 3.84 12.53
Reinforcing steel RI@3.30 Ea 106.85 125.60 -- 232.45
Concrete BL@1.24 Ea 256.44 36.41 -- 292.85
Machine excavated, poured against forms
Excavation B8@2.62 Ea -- 92.54 40.92 133.46
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@3.30 Ea 106.85 125.60 -- 232.45
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Pad specifications: 5' x 5' x 24" pad, 8 No. 8 bars each way, 2 mats
Hand excavated, poured against earth
Excavation BL@3.70 Ea -- 108.60 -- 108.60
Reinforcing steel RI@6.60 Ea 106.85 251.10 -- 357.95
Concrete BL@1.24 Ea 663.88 36.41 -- 700.29
Hand excavated, poured against forms
Excavation BL@12.0 Ea -- 352.30 -- 352.30
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@6.60 Ea 106.85 251.10 -- 357.95
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
Machine excavated, poured against earth
Excavation B8@.246 Ea -- 8.69 3.84 12.53
Reinforcing steel RI@6.60 Ea 106.85 251.10 -- 357.95
Concrete BL@1.24 Ea 663.88 36.41 -- 700.29
Machine excavated, poured against forms
Excavation B8@2.62 Ea -- 92.54 40.92 133.46
Formwork B2@3.77 Ea 39.60 127.90 -- 167.50
Reinforcing steel RI@6.60 Ea 106.85 251.10 -- 357.95
Concrete BL@1.09 Ea 226.50 32.00 -- 258.50
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 287
Concrete continuous spread footings Prices include the cost of labor and material required to
excavate and form the footing, as well as the installation of the reinforcing steel. Material includes 3,000
lb. concrete dumped off the truck, grade 60 reinforcing steel and board or plywood forms (3 uses).
Concrete waste when poured against the earth is assumed to be 1 additional inch of concrete at the
bottom of the footing, and 2" along the walls, and only 1 additional inch at the bottom of the pad when
poured into forms. When forms are used, the excavation is extended 18" beyond the forms. Excavation
costs include the cost of backfilling around the footing and stem wall. The stem wall (not included in the
concrete costs) is assumed to be 12" wide. Equipment costs are based on the use of a small
tractor-loader backhoe, or other comparable excavator. Hand excavation labor is assumed to be in
average soil. The footing depth is the distance from the top of the excavation to the bottom of the
footing. (See the illustration on p. 294.) Add the cost of dowels, if required.
36" wide x 16" deep with 6 No. 5 bars, 2' deep, No. 4 transverse bars at 2' O.C.
Hand excavated, poured against earth
Excavation BL@.400 LF -- 11.74 -- 11.74
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.096 LF 19.72 2.82 -- 22.54
Hand excavated, poured against forms
Excavation BL@.882 LF -- 25.90 -- 25.90
Formwork B2@.337 LF 1.98 11.43 -- 13.41
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.089 LF 18.12 2.61 -- 20.73
Machine excavated, poured against earth
Excavation B8@.048 LF -- 1.70 0.13 1.83
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.096 LF 19.72 2.82 -- 22.54
Machine excavated, poured against forms
Excavation B8@.161 LF -- 5.69 0.44 6.13
Formwork B2@.337 LF 1.98 11.43 -- 13.41
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.089 LF 18.12 2.61 -- 20.73
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 294
36" wide x 16" deep with 6 No. 5 bars, 3' deep, No. 4 transverse bars at 2' O.C.
Hand excavated, poured against earth
Excavation BL@.624 LF -- 18.32 -- 18.32
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.096 LF 19.72 2.82 -- 22.54
Hand excavated, poured against forms
Excavation BL@1.35 LF -- 39.64 -- 39.64
Formwork B2@.337 LF 1.98 11.43 -- 13.41
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.089 LF 18.12 2.61 -- 20.73
Machine excavated, poured against earth
Excavation B8@.090 LF -- 3.18 0.25 3.43
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.096 LF 19.72 2.82 -- 22.54
Machine excavated, poured against forms
Excavation B8@.259 LF -- 9.15 0.72 9.87
Formwork B2@.337 LF 1.98 11.43 -- 13.41
Reinforcing steel RI@.108 LF 4.66 4.11 -- 8.77
Concrete BL@.089 LF 18.12 2.61 -- 20.73
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 295
Concrete continuous thickened edge footings with vertical walls Prices include the cost of labor
and material required to excavate and form the footing as well as the installation of the reinforcing steel.
The soil is assumed to be of average density. Backfilling labor is included when the footing is fully
formed. Material includes 3,000 PSI concrete placed by chute from the truck, grade 60 reinforcing steel
supported by continuous chairs placed at 4' centers, 2 x 4 edge forms (3 uses) if poured against the
earth, and plywood forms (3 uses) if the footing is fully formed. Concrete waste when poured against the
earth is assumed to be 1 additional inch of concrete at the bottom of the footing and 2 inches along the
walls. When poured against forms, concrete waste is assumed to be 1 additional inch at the bottom of
the footing. When forms are used, the excavation is assumed to extend 18" beyond the forms. The
depth of the footing is measured from the bottom of the footing to the bottom of the overlying slab.
Equipment costs are based on the use of a small tractor-loader backhoe or comparable excavator. Hand
excavation labor is assumed to be in average soil. Add the cost of dowels, if required.
Monolithic edge footing with a 45-degree inner wall and edge form
Concrete continuous thickened edge footings with one 45 degree wall and one vertical wall
Prices include the cost of labor and material required to excavate and form the footing, as well as the
installation of the reinforcing steel. The soil is considered to be of average density. Backfilling labor is
included when the footing is fully formed. Material includes 3,000 PSI concrete dumped off the truck,
grade 60 reinforcing steel supported by continuous chairs placed at 4' centers, 2 x 4 edge forms (3
uses) if poured against the earth, and plywood forms (3 uses) if the footing is fully formed. Concrete
waste when poured against the earth is assumed to be 1 additional inch of concrete at the bottom of the
footing, and 2" along the walls, and only 1 additional inch at the bottom of the footing when poured into
forms. When forms are used, the excavation is extended 18" beyond the forms. The depth of the footing
is measured from the bottom of the footing to the bottom of the overlying slab. Equipment costs are
based on the use of a small tractor-loader backhoe, or other comparable excavator. Hand excavation
labor is assumed to be in average soil. Add the cost of dowels, if required.
Concrete thickened slab footings Prices include the cost of labor and material required to excavate
the footing, as well as the installation of the reinforcing steel. Material includes 3,000 lb. concrete
placed from the chute of a truck and grade 60 reinforcing steel supported on continuous chairs set at 4'
centers. Length of the reinforcing is assumed to be the length of the footing. Concrete waste when
poured against the earth is assumed to be 1 additional inch of concrete at the bottom of the footing. The
depth of the footing is measured from the bottom of the footing to the bottom of the overlying slab.
Equipment costs are based on the use of a small tractor-loader backhoe or comparable excavator. Hand
excavation labor is assumed to be in average soil.
4" concrete slabs Material prices include 3,000 PSI concrete, 6" x 6" W1.4 x W1.4 (#10 x #10) mesh,
6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes hand grading
and placement of the vapor barrier, mesh, concrete, finishing and curing. Add the cost of slab footing
concrete and forms from pages 287 to 314. Prices do not include edge forms.
4" slab poured over 2" thick sand base, hand trowel finish
Fine grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.027 SF 1.86 0.86 -- 2.72
4" slab poured over 2" thick sand base, machine troweled
Fine grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 1.86 0.76 0.06 2.68
5" concrete slabs Material prices include 3,000 PSI concrete, 6" x 6" W1.4 x W1.4 (#10 x #10) mesh,
6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes hand grading
and placement of the vapor barrier, mesh, concrete, finishing and curing. Add the cost of slab footing
concrete and forms from pages 287 to 314. Prices do not include edge forms.
5" slab poured over 2" thick sand base, machine troweled
Fine grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 2.24 0.76 0.06 3.06
6" concrete slabs Material prices include 3,000 PSI concrete, 6" x 6" W1.4 x W1.4 (#10 x #10) mesh,
6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes hand grading
and placement of the vapor barrier, mesh, concrete, finishing and curing. Add the cost of slab footing
concrete and forms from pages 287 to 314. Prices do not include edge forms.
6" slab poured over 2" thick sand base, hand trowel finish
Fine grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.027 SF 2.62 0.86 -- 3.48
6" slab poured over 2" thick sand base, machine troweled
Fine grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 2.62 0.76 0.06 3.44
4" concrete slabs Material prices include 3,000 lb. pump mix concrete with short fiber polypropylene
additive, 6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes
hand grading and placement of the vapor barrier, mesh, concrete and the finishing and curing. Prices do
not include edge forms.
4" slab poured over 2" thick sand base, hand trowel finish
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 1.63 0.76 -- 2.39
4" slab poured over 2" thick sand base, machine troweled
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 1.63 0.76 0.05 2.44
5" concrete slabs Material prices include 3,000 lb. pump mix concrete with short fiber polypropylene
additive, 6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes
hand grading and placement of the vapor barrier, mesh, concrete and the finishing and curing. Prices do
not include edge forms.
5" slab poured over 2" thick sand base, hand trowel finish
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 2.00 0.76 -- 2.76
5" slab poured over 2" thick sand base, machine troweled
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.021 SF 2.00 0.67 0.05 2.72
6" concrete slabs Material prices include 3,000 lb. pump mix concrete with short fiber polypropylene
additive, 6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes
hand grading and placement of the vapor barrier, mesh, concrete and the finishing and curing. Prices do
not include edge forms.
6" slab poured over 2" thick sand base, hand trowel finish
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 2.38 0.76 -- 3.14
6" slab poured over 2" thick sand base, machine troweled
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.021 SF 2.38 0.67 0.05 3.10
4" concrete slabs Material prices include 3,000 lb. pump mix concrete with long fiber polypropylene
additive, 6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes
hand grading and placement of the vapor barrier, mesh, concrete and the finishing and curing. Prices do
not include edge forms.
4" slab poured over 2" thick sand base, hand trowel finish
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 1.63 0.76 -- 2.39
4" slab poured over 2" thick sand base, machine troweled
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 1.63 0.76 0.05 2.44
5" concrete slabs Material prices include 3,000 lb. pump mix concrete with long fiber polypropylene
fiber additive, 6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes
hand grading and placement of the vapor barrier, mesh, concrete and the finishing and curing. Prices do
not include edge forms.
5" slab poured over 2" thick sand base, hand trowel finish
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 2.01 0.76 -- 2.77
5" slab poured over 2" thick sand base, machine troweled
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.021 SF 2.01 0.67 0.05 2.73
6" concrete slabs Material prices include 3,000 lb. pump mix concrete with long fiber polypropylene
additive, 6-mil vapor barrier, curing compound and the specified stone or sand base. Labor includes
hand grading and placement of the vapor barrier, mesh, concrete and the finishing and curing. Prices do
not include edge forms.
6" slab poured over 2" thick sand base, hand trowel finish
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.024 SF 2.39 0.76 -- 3.15
6" slab poured over 2" thick sand base, machine troweled
Fine Grading BL@.010 SF 0.10 0.29 -- 0.39
Concrete placement and finishing B6@.021 SF 2.39 0.67 0.05 3.11
Dowels
1' x 2' dowels, No. 5, Grade 60 B6@.166 Ea 2.87 5.29 -- 8.16
1' x 3' dowels, No. 5, Grade 60 B6@.166 Ea 2.75 5.29 -- 8.04
1' x 4' dowels, No. 5, Grade 60 B6@.166 Ea 4.87 5.29 -- 10.16
1' x 5' dowels, No. 5, Grade 60 B6@.166 Ea 5.61 5.29 -- 10.90
4" concrete walls with one No. 5 bar 12" on center each way Materials include reinforcing steel,
form material, including bracing, and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped using pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
4" concrete walls with one No. 5 bar 8" on center each way Materials include reinforcing steel,
form material, including bracing and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping, and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
4" concrete walls with one No. 6 bar 12" on center each way Materials include reinforcing steel,
form material, including bracing, and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping, and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
4" concrete walls with 1 No. 6 bar 8" on center each way Materials include reinforcing steel, form
material, including bracing, and concrete. Material and labor costs are based on forming both sides of
the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump mix
concrete. Labor prices include installing reinforcing steel, forms, including stripping and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
6" concrete walls with one No. 5 bar 12" on center each way Materials include reinforcing steel,
form material, including bracing, and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
6" concrete walls with one No. 5 bar 8" on center each way Materials include reinforcing steel,
form material, including bracing, and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
6" concrete walls with one No. 6 bar 12" on center each way Materials include reinforcing steel,
form material, including bracing, and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping, and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
6" concrete walls with one No. 6 bar 8" on center each way Materials include reinforcing steel,
form material, including bracing, and concrete. Material and labor costs are based on forming both sides
of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped with pump
mix concrete. Labor prices include installing reinforcing steel, forms, including stripping and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
8" concrete walls with two mats of No. 5 bars 12" on center each way Materials include
reinforcing steel, form material, including bracing, and concrete. Material and labor costs are based on
forming both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are
pumped with pump mix concrete. Labor prices include installing reinforcing steel, forms, including
stripping, and concrete placement. Equipment costs are based on a crew of 8. Equipment costs include
scaffolding starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases
in wall height. Costs are per square foot or linear foot of wall measured on one side.
8" concrete walls with two mats of No. 5 bars at 8" on center each way Materials include
reinforcing steel, form material including bracing and concrete. Material and labor costs are based on
forming both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are
pumped with pump mix concrete. Labor prices include installing reinforcing steel, forms, including
stripping, and concrete placement. Equipment costs are based on a crew of 8. Equipment costs include
scaffolding starting at 6' high, and a boomlift for walls over 12' high. Labor costs increase with increases
in wall height. Costs are per square foot or linear foot of wall measured on one side.
8" concrete walls with two mats of No. 6 bars at 12" on center each way Materials include
reinforcing steel, form material, including bracing, and concrete. Material and labor costs are based on
forming both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are
pumped with pump mix concrete. Labor prices include installing reinforcing steel, forms, including
stripping and concrete placement. Equipment costs are based on a crew of 8. Equipment costs include
scaffolding starting at 6' high, and a boomlift for walls over 12' high. Labor costs increase with increases
in wall height. Costs are per square foot or linear foot of wall measured on one side.
8" concrete walls with two mats of No. 6 bars at 8" on center each way Materials include
reinforcing steel, form material, including bracing, and concrete. Material and labor costs are based on
forming both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are
pumped with pump mix concrete. Labor prices include installing reinforcing steel and forms, including
stripping and concrete placement. Equipment costs are based on a crew of 8. Equipment costs include
scaffolding starting at 6' high, and a boomlift for walls over 12' high. Labor costs increase with increases
in wall height. Costs are per square foot or linear foot of wall measured on one side.
8" concrete walls with one mat of No. 5 bars at 12" on center each way, and one mat of No. 6
bars at 12" on center each way Materials include reinforcing steel, form material, including bracing,
and concrete. Material and labor costs are based on forming both sides of the wall. Concrete for walls
up to 5' are dumped from the truck; higher walls are pumped with pump mix concrete. Labor prices
include installing reinforcing steel and forms, including stripping and concrete placement. Equipment
costs are based on a crew of 8. Equipment costs include scaffolding starting at 6' high, and a boomlift
for walls over 12' high. Labor costs increase with increases in wall height. Costs are per square foot or
linear foot of wall measured on one side.
10" concrete walls with two mats of No. 5 bars at 12" on center each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, stripping and concrete
placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding starting at
6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall height. Costs
are per square foot or linear foot of wall measured on one side.
10" concrete walls with two mats of No. 5 bars at 8" on center each way Materials include
reinforcing steel, form material, bracing, and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, including stripping, and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
10" concrete walls with two mats of No. 6 bars at 12" on center each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, form stripping and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high, and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
10" concrete walls with two mats of No. 6 bars at 8" on center each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, form stripping and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
10" concrete walls with one mat of No. 5 bars at 12" on center each way, and one mat of No. 6
bars at 12" on center each way Materials include reinforcing steel, form material, bracing and
concrete. Material and labor costs are based on forming both sides of the wall. Concrete for walls up to
5' are dumped from the truck; higher walls are pumped with pump mix concrete. Labor prices include
installing reinforcing steel, forms, form stripping, and concrete placement. Equipment costs are based
on a crew of 8. Equipment costs include scaffolding starting at 6' high and a boomlift for walls over 12'
high. Labor costs increase with increases in wall height. Costs are per square foot or linear foot of wall
measured on one side.
12" concrete walls with two mats of No. 5 bars at 12" on center each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, form stripping and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
12" concrete walls with two mats of No. 5 bars at 8" on center each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, form stripping and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
12" concrete walls with two mats of No. 6 bars at 12" on center each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, form stripping and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
12" concrete walls with two mats of No. 6 bars 8" on center, each way Materials include
reinforcing steel, form material, bracing and concrete. Material and labor costs are based on forming
both sides of the wall. Concrete for walls up to 5' are dumped from the truck; higher walls are pumped
with pump mix concrete. Labor prices include installing reinforcing steel, forms, form stripping and
concrete placement. Equipment costs are based on a crew of 8. Equipment costs include scaffolding
starting at 6' high and a boomlift for walls over 12' high. Labor costs increase with increases in wall
height. Costs are per square foot or linear foot of wall measured on one side.
12" concrete walls with one mat of No. 5 bars at 12" on center each way and one mat of No. 6
bars at 12" on center each way Materials include reinforcing steel, form material, bracing and
concrete. Material and labor costs are based on forming both sides of the wall. Concrete for walls up to
5' are dumped from the truck; higher walls are pumped with pump mix concrete. Labor prices include
installing reinforcing steel, forms, form stripping and concrete placement. Equipment costs are based on
a crew of 8. Equipment costs include scaffolding starting at 6' high and a boomlift for walls over 12' high.
Labor costs increase with increases in wall height. Costs are per square foot or linear foot of wall
measured on one side.
Sidewalk forms
Concrete sidewalks Prices include fine grading, setting and stripping forms, 6 x 6/10 - 10 mesh,
3,000 P.S.I. concrete dumped from the truck, 1/2" expansion joints each 30' and a scored control joint
each 6'. Add the cost of rough grading. Cost per square foot or linear foot of sidewalk.
Concrete sidewalks with turndown curbs Prices include fine grading, setting and stripping forms, 6
x 6/10 - 10 mesh, 3,000 P.S.I. concrete dumped from the truck, 1/2" expansion joints each 30' and a
scored control joint each 6'. Add the cost of rough grading. Cost per square foot or linear foot of
sidewalk. Equipment costs are based on using a small tractor-loader backhoe, or other comparable
equipment.
3' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per LF
Excavation B8@.059 LF -- 2.08 0.46 2.54
Formwork B2@.290 LF 1.85 9.84 -- 11.69
Reinforcing steel RI@.009 LF 1.27 0.34 -- 1.61
Concrete B6@.082 LF 8.03 2.61 -- 10.64
3' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per SF
Excavation B8@.020 SF -- 0.71 0.16 0.87
Formwork B2@.097 SF 0.62 3.29 -- 3.91
Reinforcing steel RI@.003 SF 0.42 0.11 -- 0.53
Concrete B6@.027 SF 2.68 0.86 -- 3.54
3' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per LF
Excavation B8@.182 LF -- 6.43 -- 6.43
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.018 LF 1.76 0.69 -- 2.45
Concrete B6@.076 LF 6.88 2.42 -- 9.30
3' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.061 SF -- 2.16 -- 2.16
Formwork B2@.076 SF 0.45 2.58 -- 3.03
Reinforcing steel RI@.006 SF 0.59 0.23 -- 0.82
Concrete B6@.025 SF 2.29 0.80 -- 3.09
3' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.045 LF -- 1.59 0.35 1.94
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.018 LF 1.76 0.69 -- 2.45
Concrete B6@.093 LF 6.88 2.96 -- 9.84
3' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.015 SF -- 0.53 0.12 0.65
Formwork B2@.076 SF 0.45 2.58 -- 3.03
Reinforcing steel RI@.006 SF 0.59 0.23 -- 0.82
Concrete B6@.025 SF 2.29 0.80 -- 3.09
4' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per SF
Excavation B8@.016 SF -- 0.57 0.12 0.69
Formwork B2@.073 SF 0.46 2.48 -- 2.94
Reinforcing steel RI@.003 SF 0.38 0.11 -- 0.49
Concrete B6@.025 SF 2.39 0.80 -- 3.19
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per LF
Excavation B8@.188 LF -- 6.64 -- 6.64
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.021 LF 2.01 0.80 -- 2.81
Concrete B6@.096 LF 8.41 3.06 -- 11.47
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.047 SF -- 1.66 -- 1.66
Formwork B2@.057 SF 0.34 1.93 -- 2.27
Reinforcing steel RI@.005 SF 0.50 0.19 -- 0.69
Concrete B6@.024 SF 2.10 0.76 -- 2.86
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.049 LF -- 1.73 0.38 2.11
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.021 LF 2.01 0.80 -- 2.81
Concrete B6@.096 LF 8.41 3.06 -- 11.47
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.012 SF -- 0.42 0.09 0.51
Formwork B2@.057 SF 0.34 1.93 -- 2.27
Reinforcing steel RI@.005 SF 0.50 0.19 -- 0.69
Concrete B6@.024 SF 2.10 0.76 -- 2.86
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per LF
Excavation B8@.194 LF -- 6.85 -- 6.85
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.023 LF 2.26 0.88 -- 3.14
Concrete B6@.116 LF 9.94 3.70 -- 13.64
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.039 SF -- 1.38 -- 1.38
Formwork B2@.046 SF 0.27 1.56 -- 1.83
Reinforcing steel RI@.005 SF 0.45 0.19 -- 0.64
Concrete B6@.023 SF 1.99 0.73 -- 2.72
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.054 LF -- 1.91 0.42 2.33
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.023 LF 2.26 0.88 -- 3.14
Concrete B6@.116 LF 9.94 3.70 -- 13.64
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.011 SF -- 0.39 0.09 0.48
Formwork B2@.046 SF 0.27 1.56 -- 1.83
Reinforcing steel RI@.005 SF 0.45 0.19 -- 0.64
Concrete B6@.023 SF 1.99 0.73 -- 2.72
6' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.033 SF -- 1.17 -- 1.17
Formwork B2@.038 SF 0.23 1.29 -- 1.52
Reinforcing steel RI@.004 SF 0.42 0.15 -- 0.57
Concrete B6@.023 SF 1.91 0.73 -- 2.64
6' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.059 LF -- 2.08 0.46 2.54
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Reinforcing steel RI@.026 LF 2.52 0.99 -- 3.51
Concrete B6@.136 LF 11.46 4.33 -- 15.79
6' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.010 SF -- 0.35 0.08 0.43
Formwork B2@.038 SF 0.23 1.29 -- 1.52
Reinforcing steel RI@.004 SF 0.42 0.15 -- 0.57
Concrete B6@.023 SF 1.91 0.73 -- 2.64
8' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.009 SF -- 0.32 0.07 0.39
Formwork B2@.028 SF 0.17 0.95 -- 1.12
Reinforcing steel RI@.004 SF 0.38 0.15 -- 0.53
Concrete B6@.022 SF 1.81 0.70 -- 2.51
Concrete sidewalks Prices include fine grading, setting and stripping forms, 3,000 psi pump mix
concrete with short polypropylene fiber additive, 1/2" expansion joints each 30' and a scored control joint
each 6'. Add the cost of rough grading. Cost per square foot or linear foot of sidewalk.
Concrete sidewalks with turndown curbs Prices include fine grading, setting and stripping forms,
3,000 psi pump mix concrete with short polypropylene fiber additive, 1/2" expansion joints each 30' and
a scored control joint each 6'. Add the cost of rough grading. Cost per square foot or linear foot of
sidewalk. Equipment costs are based on using a small tractor-loader backhoe, or other comparable
equipment.
3' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.015 SF -- 0.53 0.12 0.65
Formwork B2@.076 SF 0.45 2.58 -- 3.03
Concrete B6@.025 SF 2.41 0.80 -- 3.21
5' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per LF
Excavation B8@.069 LF -- 2.44 0.54 2.98
Formwork B2@.290 LF 1.85 9.84 -- 11.69
Concrete B6@.122 LF 11.64 3.89 -- 15.53
5' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per SF
Excavation B8@.014 SF -- 0.49 0.11 0.60
Formwork B2@.058 SF 0.37 1.97 -- 2.34
Concrete B6@.025 SF 2.33 0.80 -- 3.13
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per LF
Excavation B8@.194 LF -- 6.85 -- 6.85
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.116 LF 10.43 3.70 -- 14.13
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.039 SF -- 1.38 -- 1.38
Formwork B2@.046 SF 0.27 1.56 -- 1.83
Concrete B6@.023 SF 2.09 0.73 -- 2.82
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.054 LF -- 1.91 0.42 2.33
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.116 LF 10.43 3.70 -- 14.13
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.011 SF -- 0.39 0.09 0.48
Formwork B2@.046 SF 0.27 1.56 -- 1.83
Concrete B6@.023 SF 2.09 0.73 -- 2.82
6' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.059 LF -- 2.08 0.46 2.54
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.136 LF 12.04 4.33 -- 16.37
6' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.010 SF -- 0.35 0.08 0.43
Formwork B2@.038 SF 0.23 1.29 -- 1.52
Concrete B6@.023 SF 2.01 0.73 -- 2.74
10' wide sidewalks with 6" wide x 18" deep turndown curb, hand excavation, broom finish, per SF
Excavation BL@.030 SF -- 0.88 -- 0.88
Formwork B2@.029 SF 0.18 0.98 -- 1.16
Concrete B6@.022 SF 1.97 0.70 -- 2.67
10' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per LF
Excavation B8@.092 LF -- 3.25 0.72 3.97
Formwork B2@.290 LF 1.85 9.84 -- 11.69
Concrete B6@.224 LF 19.66 7.13 -- 26.79
10' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per SF
Excavation B8@.009 SF -- 0.32 0.07 0.39
Formwork B2@.029 SF 0.18 0.98 -- 1.16
Concrete B6@.022 SF 1.97 0.70 -- 2.67
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5, hand excavation, broom finish,
per LF
Excavation B8@.223 LF -- 7.88 -- 7.88
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.218 LF 18.46 6.94 -- 25.40
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.022 SF -- 0.78 -- 0.78
Formwork B2@.023 SF 0.14 0.78 -- 0.92
Concrete B6@.022 SF 1.85 0.70 -- 2.55
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.078 LF -- 2.76 0.61 3.37
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.218 LF 18.46 6.94 -- 25.40
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.008 SF -- 0.28 0.06 0.34
Formwork B2@.023 SF 0.14 0.78 -- 0.92
Concrete B6@.022 SF 1.85 0.70 -- 2.55
Concrete sidewalks Prices include fine grading, setting and stripping forms, 3,000 psi pump mix
concrete with long polypropylene fiber additive, 1/2" expansion joints each 30' and a scored control joint
each 6'. Add the cost of rough grading. Cost per square foot or linear foot of sidewalk.
Concrete sidewalks with turndown curbs Prices include fine grading, setting and stripping forms,
3,000 psi pump mix concrete with long polypropylene fiber additive, 1/2" expansion joints each 30' and a
scored control joint each 6'. Add the cost of rough grading. Cost per square foot or linear foot of
sidewalk. Equipment costs are based on using a small tractor-loader backhoe, or other comparable
equipment.
4' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per LF
Excavation B8@.064 LF -- 2.26 0.50 2.76
Formwork B2@.290 LF 1.85 9.84 -- 11.69
Concrete B6@.125 LF 10.23 3.98 -- 14.21
4' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per SF
Excavation B8@.016 SF -- 0.57 0.12 0.69
Formwork B2@.073 SF 0.46 2.48 -- 2.94
Concrete B6@.025 SF 2.56 0.80 -- 3.36
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per LF
Excavation B8@.188 LF -- 6.64 -- 6.64
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.096 LF 9.00 3.06 -- 12.06
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.047 SF -- 1.66 -- 1.66
Formwork B2@.057 SF 0.34 1.93 -- 2.27
Concrete B6@.024 SF 2.25 0.76 -- 3.01
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.049 LF -- 1.73 0.38 2.11
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.096 LF 9.00 3.06 -- 12.06
4' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.012 SF -- 0.42 0.09 0.51
Formwork B2@.057 SF 0.34 1.93 -- 2.27
Concrete B6@.024 SF 2.25 0.76 -- 3.01
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.054 LF -- 1.91 0.42 2.33
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.116 LF 10.63 3.70 -- 14.33
5' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.011 SF -- 0.39 0.09 0.48
Formwork B2@.046 SF 0.27 1.56 -- 1.83
Concrete B6@.023 SF 2.13 0.73 -- 2.86
8' wide sidewalks with 6" wide x 18" deep turndown curb, hand excavation, broom finish, per SF
Excavation BL@.036 SF -- 1.06 -- 1.06
Formwork B2@.036 SF 0.23 1.22 -- 1.45
Concrete B6@.023 SF 2.10 0.73 -- 2.83
8' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per LF
Excavation B8@.083 LF -- 2.93 0.65 3.58
Formwork B2@.290 LF 1.85 9.84 -- 11.69
Concrete B6@.183 LF 16.77 5.83 -- 22.60
8' wide sidewalks with 6" wide x 18" deep turndown curb, machine excavation, broom finish, per SF
Excavation B8@.010 SF -- 0.35 0.08 0.43
Formwork B2@.036 SF 0.23 1.22 -- 1.45
Concrete B6@.023 SF 2.10 0.73 -- 2.83
8' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per LF
Excavation B8@.211 LF -- 7.45 -- 7.45
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.177 LF 15.54 5.64 -- 21.18
8' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.026 SF -- 0.92 -- 0.92
Formwork B2@.028 SF 0.17 0.95 -- 1.12
Concrete B6@.022 SF 1.94 0.70 -- 2.64
8' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.068 LF -- 2.40 0.53 2.93
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.177 LF 15.54 5.64 -- 21.18
8' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.009 SF -- 0.32 0.07 0.39
Formwork B2@.028 SF 0.17 0.95 -- 1.12
Concrete B6@.022 SF 1.94 0.70 -- 2.64
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, hand excavation, broom
finish, per SF
Excavation B8@.022 SF -- 0.78 -- 0.78
Formwork B2@.023 SF 0.14 0.78 -- 0.92
Concrete B6@.022 SF 1.88 0.70 -- 2.58
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per LF
Excavation B8@.078 LF -- 2.76 0.61 3.37
Formwork B2@.228 LF 1.35 7.73 -- 9.08
Concrete B6@.218 LF 18.81 6.94 -- 25.75
10' wide sidewalks with 6" wide x 12" deep turndown curb with 1 No. 5 bar, machine excavation, broom
finish, per SF
Excavation B8@.008 SF -- 0.28 0.06 0.34
Formwork B2@.023 SF 0.14 0.78 -- 0.92
Concrete B6@.022 SF 1.88 0.70 -- 2.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 431
8" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include of a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
8" with 3 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.081 VLF 3.81 3.08 0.05 6.94
Concrete formwork B1@.163 VLF 4.01 5.34 0.05 9.40
Concrete placement B3@.006 VLF 1.96 0.19 -- 2.15
8" with 3 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.081 VLF 3.81 3.08 1.41 8.30
Concrete formwork B1@.163 VLF 4.01 5.34 1.42 10.77
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 3 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.081 VLF 3.81 3.08 1.38 8.27
Concrete formwork B1@.163 VLF 4.01 5.34 1.39 10.74
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 3 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.070 VLF 3.16 2.66 0.04 5.86
Concrete formwork B1@.163 VLF 4.01 5.34 0.05 9.40
Concrete placement B3@.006 VLF 1.96 0.19 -- 2.15
8" with 3 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.070 VLF 3.16 2.66 1.22 7.04
Concrete formwork B1@.163 VLF 4.01 5.34 1.42 10.77
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 432
8" with 3 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.070 VLF 3.16 2.66 1.19 7.01
Concrete formwork B1@.163 VLF 4.01 5.34 1.39 10.74
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 3 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.066 VLF 2.83 2.51 0.04 5.38
Concrete formwork B1@.163 VLF 4.01 5.34 0.05 9.40
Concrete placement B3@.006 VLF 1.96 0.19 -- 2.15
8" with 3 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.066 VLF 2.83 2.51 1.15 6.49
Concrete formwork B1@.163 VLF 4.01 5.34 1.42 10.77
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 3 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.066 VLF 2.83 2.51 1.13 6.47
Concrete formwork B1@.163 VLF 4.01 5.34 1.39 10.74
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.108 VLF 4.43 4.11 0.07 8.61
Concrete formwork B1@.163 VLF 4.01 5.34 0.05 9.40
Concrete placement B3@.006 VLF 1.96 0.19 -- 2.15
8" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.108 VLF 4.43 4.11 1.88 10.42
Concrete formwork B1@.163 VLF 4.01 5.34 1.42 10.77
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.108 VLF 4.43 4.11 1.84 10.38
Concrete formwork B1@.163 VLF 4.01 5.34 1.39 10.74
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.094 VLF 3.78 3.58 0.06 7.42
Concrete formwork B1@.163 VLF 4.01 5.34 0.05 9.40
Concrete placement B3@.006 VLF 1.96 0.19 -- 2.15
8" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.094 VLF 3.78 3.58 1.64 9.00
Concrete formwork B1@.163 VLF 4.01 5.34 1.42 10.77
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.094 VLF 3.78 3.58 1.60 8.96
Concrete formwork B1@.163 VLF 4.01 5.34 1.39 10.74
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
8" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.088 VLF 3.45 3.35 0.06 6.86
Concrete formwork B1@.163 VLF 4.01 5.34 0.05 9.40
Concrete placement B3@.006 VLF 1.96 0.19 -- 2.15
8" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.088 VLF 3.45 3.35 1.53 8.33
Concrete formwork B1@.163 VLF 4.01 5.34 1.42 10.77
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 433
8" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.088 VLF 3.45 3.35 1.50 8.30
Concrete formwork B1@.163 VLF 4.01 5.34 1.39 10.74
Concrete placement B3@.006 VLF 1.96 0.19 0.03 2.18
10" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
10" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.112 VLF 4.91 4.26 0.07 9.24
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.112 VLF 4.91 4.26 1.95 11.12
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.112 VLF 4.91 4.26 1.91 11.08
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.096 VLF 4.10 3.65 0.06 7.81
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.096 VLF 4.10 3.65 1.67 9.42
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.096 VLF 4.10 3.65 1.64 9.39
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.090 VLF 3.70 3.43 0.06 7.19
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.090 VLF 3.70 3.43 1.57 8.70
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.090 VLF 3.70 3.43 1.53 8.66
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.139 VLF 5.95 5.29 0.09 11.33
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 434
10" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.139 VLF 5.95 5.29 2.42 13.66
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.139 VLF 5.95 5.29 2.37 13.61
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.123 VLF 5.14 4.68 0.08 9.90
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.123 VLF 5.14 4.68 2.14 11.96
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.123 VLF 5.14 4.68 2.10 11.92
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.117 VLF 4.74 4.45 0.07 9.26
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.117 VLF 4.74 4.45 2.04 11.23
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.117 VLF 4.74 4.45 2.00 11.19
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.164 VLF 8.11 6.24 0.10 14.45
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.164 VLF 8.11 6.24 2.86 17.21
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.164 VLF 8.11 6.24 2.80 17.15
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.149 VLF 7.30 5.67 0.09 13.06
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 435
10" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.149 VLF 7.30 5.67 2.60 15.57
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.149 VLF 7.30 5.67 2.54 15.51
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.143 VLF 6.90 5.44 0.09 12.43
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.143 VLF 6.90 5.44 2.49 14.83
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.143 VLF 6.90 5.44 2.44 14.78
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.204 VLF 8.91 7.76 0.13 16.80
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.204 VLF 8.91 7.76 3.56 20.23
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.204 VLF 8.91 7.76 3.48 20.15
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.189 VLF 8.10 7.19 0.12 15.41
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
10" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.189 VLF 8.10 7.19 3.29 18.58
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.189 VLF 8.10 7.19 3.22 18.51
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.183 VLF 7.70 6.96 0.11 14.77
Concrete formwork B1@.179 VLF 4.37 5.87 0.06 10.30
Concrete placement B3@.009 VLF 3.06 0.29 -- 3.35
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 436
10" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.183 VLF 7.70 6.96 3.19 17.85
Concrete formwork B1@.179 VLF 4.37 5.87 1.56 11.80
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
10" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.183 VLF 7.70 6.96 3.12 17.78
Concrete formwork B1@.179 VLF 4.37 5.87 1.53 11.77
Concrete placement B3@.009 VLF 3.06 0.29 0.05 3.40
12" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
12" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.116 VLF 5.40 4.41 0.07 9.88
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.116 VLF 5.40 4.41 2.02 11.83
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.116 VLF 5.40 4.41 1.98 11.79
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.099 VLF 4.43 3.77 0.06 8.26
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.099 VLF 4.43 3.77 1.73 9.93
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.099 VLF 4.43 3.77 1.69 9.89
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.092 VLF 3.94 3.50 0.06 7.50
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.092 VLF 3.94 3.50 1.60 9.04
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.092 VLF 3.94 3.50 1.57 9.01
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 437
12" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.143 VLF 6.44 5.44 0.09 11.97
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.143 VLF 6.44 5.44 2.49 14.37
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.143 VLF 6.44 5.44 2.44 14.32
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.126 VLF 5.47 4.79 0.08 10.34
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.126 VLF 5.47 4.79 2.20 12.46
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.126 VLF 5.47 4.79 2.15 12.41
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.119 VLF 4.98 4.53 0.07 9.58
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.119 VLF 4.98 4.53 2.07 11.58
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.119 VLF 4.98 4.53 2.03 11.54
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.168 VLF 8.60 6.39 0.11 15.10
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.168 VLF 8.60 6.39 2.93 17.92
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.168 VLF 8.60 6.39 2.87 17.86
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 438
12" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.152 VLF 7.63 5.78 0.10 13.51
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.152 VLF 7.63 5.78 2.65 16.06
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.152 VLF 7.63 5.78 2.59 16.00
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.145 VLF 7.14 5.52 0.09 12.75
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.145 VLF 7.14 5.52 2.53 15.19
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.145 VLF 7.14 5.52 2.47 15.13
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.208 VLF 9.40 7.91 0.13 17.44
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.208 VLF 9.40 7.91 3.63 20.94
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.208 VLF 9.40 7.91 3.55 20.86
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
12" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.191 VLF 8.43 7.27 0.12 15.82
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.191 VLF 8.43 7.27 3.33 19.03
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.191 VLF 8.43 7.27 3.26 18.96
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 439
12" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.185 VLF 7.94 7.04 0.12 15.10
Concrete formwork B1@.203 VLF 4.86 6.65 0.06 11.57
Concrete placement B3@.013 VLF 4.41 0.41 -- 4.82
12" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.185 VLF 7.94 7.04 3.22 18.20
Concrete formwork B1@.203 VLF 4.86 6.65 1.77 13.28
Concrete placement B3@.013 VLF 4.41 0.41 0.08 4.90
12" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.185 VLF 7.94 7.04 3.16 18.14
Concrete formwork B1@.203 VLF 4.86 6.65 1.73 13.24
Concrete placement B3@.013 VLF 4.41 0.41 0.07 4.89
14" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
14" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.119 VLF 5.89 4.53 0.07 10.49
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.119 VLF 5.89 4.53 2.07 12.49
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.119 VLF 5.89 4.53 2.03 12.45
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.101 VLF 4.75 3.84 0.06 8.65
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.101 VLF 4.75 3.84 1.76 10.35
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.101 VLF 4.75 3.84 1.72 10.31
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.094 VLF 4.18 3.58 0.06 7.82
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.094 VLF 4.18 3.58 1.64 9.40
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 440
14" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.094 VLF 4.18 3.58 1.60 9.36
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.146 VLF 6.93 5.56 0.09 12.58
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.146 VLF 6.93 5.56 2.54 15.03
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.146 VLF 6.93 5.56 2.49 14.98
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.128 VLF 5.79 4.87 0.08 10.74
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.128 VLF 5.79 4.87 2.23 12.89
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.128 VLF 5.79 4.87 2.18 12.84
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.121 VLF 5.22 4.60 0.08 9.90
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.121 VLF 5.22 4.60 2.11 11.93
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.121 VLF 5.22 4.60 2.06 11.88
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.172 VLF 9.09 6.55 0.11 15.75
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.172 VLF 9.09 6.55 3.00 18.64
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 441
14" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.172 VLF 9.09 6.55 2.93 18.57
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.154 VLF 7.95 5.86 0.10 13.91
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.154 VLF 7.95 5.86 2.68 16.49
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.154 VLF 7.95 5.86 2.63 16.44
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.147 VLF 7.38 5.59 0.09 13.06
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.147 VLF 7.38 5.59 2.56 15.53
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.147 VLF 7.38 5.59 2.51 15.48
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.212 VLF 9.89 8.07 0.13 18.09
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.212 VLF 9.89 8.07 3.70 21.66
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.212 VLF 9.89 8.07 3.62 21.58
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.194 VLF 8.75 7.38 0.12 16.25
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.194 VLF 8.75 7.38 3.38 19.51
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 442
14" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.194 VLF 8.75 7.38 3.31 19.44
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.187 VLF 8.18 7.12 0.12 15.42
Concrete formwork B1@.220 VLF 5.71 7.21 0.07 12.99
Concrete placement B3@.017 VLF 6.01 0.54 -- 6.55
14" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.187 VLF 8.18 7.12 3.26 18.56
Concrete formwork B1@.220 VLF 5.71 7.21 1.92 14.84
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
14" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.187 VLF 8.18 7.12 3.19 18.49
Concrete formwork B1@.220 VLF 5.71 7.21 1.88 14.80
Concrete placement B3@.017 VLF 6.01 0.54 0.10 6.65
16" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
16" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.123 VLF 6.38 4.68 0.08 11.14
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.123 VLF 6.38 4.68 2.14 13.20
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.123 VLF 6.38 4.68 2.10 13.16
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.104 VLF 5.08 3.96 0.07 9.11
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.104 VLF 5.08 3.96 1.81 10.85
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.104 VLF 5.08 3.96 1.77 10.81
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.096 VLF 4.43 3.65 0.06 8.14
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 443
16" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.096 VLF 4.43 3.65 1.67 9.75
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.096 VLF 4.43 3.65 1.64 9.72
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.150 VLF 7.42 5.71 0.09 13.22
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.150 VLF 7.42 5.71 2.61 15.74
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.150 VLF 7.42 5.71 2.56 15.69
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.131 VLF 6.12 4.99 0.08 11.19
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.131 VLF 6.12 4.99 2.28 13.39
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.131 VLF 6.12 4.99 2.23 13.34
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.123 VLF 5.47 4.68 0.08 10.23
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.123 VLF 5.47 4.68 2.14 12.29
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.123 VLF 5.47 4.68 2.10 12.25
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.176 VLF 9.58 6.70 0.11 16.39
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 444
16" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.176 VLF 9.58 6.70 3.07 19.35
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.176 VLF 9.58 6.70 3.00 19.28
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.157 VLF 8.28 5.97 0.10 14.35
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.157 VLF 8.28 5.97 2.74 16.99
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.157 VLF 8.28 5.97 2.68 16.93
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.149 VLF 7.63 5.67 0.09 13.39
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.149 VLF 7.63 5.67 2.60 15.90
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.149 VLF 7.63 5.67 2.54 15.84
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.216 VLF 10.38 8.22 0.14 18.74
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.216 VLF 10.38 8.22 3.76 22.36
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.216 VLF 10.38 8.22 3.68 22.28
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.197 VLF 9.08 7.50 0.12 16.70
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 445
16" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.197 VLF 9.08 7.50 3.43 20.01
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.197 VLF 9.08 7.50 3.36 19.94
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.189 VLF 8.43 7.19 0.12 15.74
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.189 VLF 8.43 7.19 3.29 18.91
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.189 VLF 8.43 7.19 3.22 18.84
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.247 VLF 8.86 9.40 0.15 18.41
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.247 VLF 8.86 9.40 4.31 22.57
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.247 VLF 8.86 9.40 4.21 22.47
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.208 VLF 7.56 7.91 0.13 15.60
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.208 VLF 7.56 7.91 3.63 19.10
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.208 VLF 7.56 7.91 3.55 19.02
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.193 VLF 6.91 7.34 0.12 14.37
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 446
16" with 8 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.193 VLF 6.91 7.34 3.36 17.61
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.193 VLF 6.91 7.34 3.29 17.54
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.301 VLF 10.94 11.45 0.19 22.58
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.301 VLF 10.94 11.45 5.25 27.64
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.301 VLF 10.94 11.45 5.13 27.52
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.262 VLF 9.64 9.97 0.16 19.77
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.262 VLF 9.64 9.97 4.57 24.18
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.262 VLF 9.64 9.97 4.47 24.08
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.247 VLF 8.99 9.40 0.15 18.54
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.247 VLF 8.99 9.40 4.31 22.70
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.247 VLF 8.99 9.40 4.21 22.60
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.352 VLF 15.26 13.39 0.22 28.87
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 447
16" with 8 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.352 VLF 15.26 13.39 6.14 34.79
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.352 VLF 15.26 13.39 6.00 34.65
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.313 VLF 13.96 11.91 0.20 26.07
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.313 VLF 13.96 11.91 5.46 31.33
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.313 VLF 13.96 11.91 5.34 31.21
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.298 VLF 13.31 11.34 0.19 24.84
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.298 VLF 13.31 11.34 5.19 29.84
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.298 VLF 13.31 11.34 5.08 29.73
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.432 VLF 16.86 16.44 0.27 33.57
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.432 VLF 16.86 16.44 7.53 40.83
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.432 VLF 16.86 16.44 7.37 40.67
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.393 VLF 15.56 14.95 0.25 30.76
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 448
16" with 8 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.393 VLF 15.56 14.95 6.85 37.36
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.393 VLF 15.56 14.95 6.70 37.21
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.378 VLF 14.91 14.38 0.24 29.53
Concrete formwork B1@.228 VLF 6.22 7.47 0.07 13.76
Concrete placement B3@.023 VLF 7.85 0.73 -- 8.58
16" with 8 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.378 VLF 14.91 14.38 6.59 35.88
Concrete formwork B1@.228 VLF 6.22 7.47 1.99 15.68
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
16" with 8 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.378 VLF 14.91 14.38 6.45 35.74
Concrete formwork B1@.228 VLF 6.22 7.47 1.94 15.63
Concrete placement B3@.023 VLF 7.85 0.73 0.13 8.71
18" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
18" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.127 VLF 6.86 4.83 0.08 11.77
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.127 VLF 6.86 4.83 2.21 13.90
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.127 VLF 6.86 4.83 2.17 13.86
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.107 VLF 5.40 4.07 0.07 9.54
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.107 VLF 5.40 4.07 1.87 11.34
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.107 VLF 5.40 4.07 1.82 11.29
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 449
18" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.098 VLF 4.67 3.73 0.06 8.46
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.098 VLF 4.67 3.73 1.71 10.11
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.098 VLF 4.67 3.73 1.67 10.07
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.154 VLF 7.90 5.86 0.10 13.86
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.154 VLF 7.90 5.86 2.68 16.44
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.154 VLF 7.90 5.86 2.63 16.39
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.134 VLF 6.44 5.10 0.08 11.62
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.134 VLF 6.44 5.10 2.34 13.88
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.134 VLF 6.44 5.10 2.29 13.83
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.125 VLF 5.71 4.76 0.08 10.55
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.125 VLF 5.71 4.76 2.18 12.65
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.125 VLF 5.71 4.76 2.13 12.60
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 450
18" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.180 VLF 10.06 6.85 0.11 17.02
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.180 VLF 10.06 6.85 3.14 20.05
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.180 VLF 10.06 6.85 3.07 19.98
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.159 VLF 8.60 6.05 0.10 14.75
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.159 VLF 8.60 6.05 2.77 17.42
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.159 VLF 8.60 6.05 2.71 17.36
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.151 VLF 7.87 5.75 0.09 13.71
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.151 VLF 7.87 5.75 2.63 16.25
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.151 VLF 7.87 5.75 2.58 16.20
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.220 VLF 10.86 8.37 0.14 19.37
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.220 VLF 10.86 8.37 3.83 23.06
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.220 VLF 10.86 8.37 3.75 22.98
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 451
18" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.199 VLF 9.40 7.57 0.12 17.09
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.199 VLF 9.40 7.57 3.47 20.44
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.199 VLF 9.40 7.57 3.39 20.36
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.191 VLF 8.67 7.27 0.12 16.06
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.191 VLF 8.67 7.27 3.33 19.27
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.191 VLF 8.67 7.27 3.26 19.20
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.254 VLF 9.34 9.67 0.16 19.17
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.254 VLF 9.34 9.67 4.43 23.44
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.254 VLF 9.34 9.67 4.33 23.34
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.213 VLF 7.88 8.11 0.13 16.12
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.213 VLF 7.88 8.11 3.71 19.70
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.213 VLF 7.88 8.11 3.63 19.62
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 452
18" with 8 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.197 VLF 7.15 7.50 0.12 14.77
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.197 VLF 7.15 7.50 3.43 18.08
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.197 VLF 7.15 7.50 3.36 18.01
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.308 VLF 11.42 11.72 0.19 23.33
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.308 VLF 11.42 11.72 5.37 28.51
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.308 VLF 11.42 11.72 5.25 28.39
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.267 VLF 9.96 10.16 0.17 20.29
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.267 VLF 9.96 10.16 4.65 24.77
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.267 VLF 9.96 10.16 4.55 24.67
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.251 VLF 9.23 9.55 0.16 18.94
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.251 VLF 9.23 9.55 4.37 23.15
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.251 VLF 9.23 9.55 4.28 23.06
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 453
18" with 8 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.360 VLF 15.74 13.70 0.23 29.67
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.360 VLF 15.74 13.70 6.27 35.71
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.360 VLF 15.74 13.70 6.14 35.58
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.319 VLF 14.28 12.14 0.20 26.62
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.319 VLF 14.28 12.14 5.56 31.98
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.319 VLF 14.28 12.14 5.44 31.86
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.302 VLF 13.55 11.49 0.19 25.23
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.302 VLF 13.55 11.49 5.26 30.30
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.302 VLF 13.55 11.49 5.15 30.19
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.439 VLF 17.34 16.70 0.27 34.31
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.439 VLF 17.34 16.70 7.65 41.69
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.439 VLF 17.34 16.70 7.49 41.53
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 454
18" with 8 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.398 VLF 15.88 15.14 0.25 31.27
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.398 VLF 15.88 15.14 6.94 37.96
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.398 VLF 15.88 15.14 6.79 37.81
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
18" with 8 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.382 VLF 15.15 14.54 0.24 29.93
Concrete formwork B1@.236 VLF 7.07 7.74 0.07 14.88
Concrete placement B3@.029 VLF 9.93 0.92 0.01 10.86
18" with 8 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.382 VLF 15.15 14.54 6.66 36.35
Concrete formwork B1@.236 VLF 7.07 7.74 2.06 16.87
Concrete placement B3@.029 VLF 9.93 0.92 0.17 11.02
18" with 8 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.382 VLF 15.15 14.54 6.52 36.21
Concrete formwork B1@.236 VLF 7.07 7.74 2.01 16.82
Concrete placement B3@.029 VLF 9.93 0.92 0.16 11.01
20" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
20" with 4 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.131 VLF 7.35 4.99 0.08 12.42
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.131 VLF 7.35 4.99 2.28 14.62
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.131 VLF 7.35 4.99 2.23 14.57
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.109 VLF 5.73 4.15 0.07 9.95
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.109 VLF 5.73 4.15 1.90 11.78
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 455
20" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.109 VLF 5.73 4.15 1.86 11.74
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.101 VLF 4.91 3.84 0.06 8.81
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.101 VLF 4.91 3.84 1.76 10.51
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.101 VLF 4.91 3.84 1.72 10.47
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.158 VLF 8.39 6.01 0.10 14.50
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.158 VLF 8.39 6.01 2.75 17.15
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.158 VLF 8.39 6.01 2.69 17.09
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 6 bars, hoops at 12" O.C. (from 10' high)
Reinforcing steel RI@.136 VLF 6.77 5.18 0.09 12.04
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.136 VLF 6.77 5.18 2.37 14.32
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.136 VLF 6.77 5.18 2.32 14.27
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.127 VLF 5.95 4.83 0.08 10.86
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.127 VLF 5.95 4.83 2.21 12.99
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 456
20" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.127 VLF 5.95 4.83 2.17 12.95
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.184 VLF 10.55 7.00 0.12 17.67
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.184 VLF 10.55 7.00 3.21 20.76
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.184 VLF 10.55 7.00 3.14 20.69
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.162 VLF 8.93 6.16 0.10 15.19
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.162 VLF 8.93 6.16 2.82 17.91
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.162 VLF 8.93 6.16 2.76 17.85
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.153 VLF 8.11 5.82 0.10 14.03
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.153 VLF 8.11 5.82 2.67 16.60
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.153 VLF 8.11 5.82 2.61 16.54
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.224 VLF 11.35 8.52 0.14 20.01
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.224 VLF 11.35 8.52 3.90 23.77
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 457
20" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.224 VLF 11.35 8.52 3.82 23.69
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.202 VLF 9.73 7.69 0.13 17.55
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.202 VLF 9.73 7.69 3.52 20.94
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.202 VLF 9.73 7.69 3.45 20.87
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.193 VLF 8.91 7.34 0.12 16.37
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.193 VLF 8.91 7.34 3.36 19.61
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.193 VLF 8.91 7.34 3.29 19.54
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.262 VLF 9.83 9.97 0.16 19.96
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.262 VLF 9.83 9.97 4.57 24.37
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.262 VLF 9.83 9.97 4.47 24.27
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.218 VLF 8.21 8.30 0.14 16.65
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.218 VLF 8.21 8.30 3.80 20.31
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 458
20" with 8 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.218 VLF 8.21 8.30 3.72 20.23
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.201 VLF 7.39 7.65 0.13 15.17
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.201 VLF 7.39 7.65 3.50 18.54
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.201 VLF 7.39 7.65 3.43 18.47
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.316 VLF 11.91 12.02 0.20 24.13
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.316 VLF 11.91 12.02 5.51 29.44
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.316 VLF 11.91 12.02 5.39 29.32
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.272 VLF 10.29 10.35 0.17 20.81
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.272 VLF 10.29 10.35 4.74 25.38
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.272 VLF 10.29 10.35 4.64 25.28
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.255 VLF 9.47 9.70 0.16 19.33
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.255 VLF 9.47 9.70 4.44 23.61
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 459
20" with 8 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.255 VLF 9.47 9.70 4.35 23.52
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.367 VLF 16.23 13.96 0.23 30.42
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.367 VLF 16.23 13.96 6.40 36.59
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.367 VLF 16.23 13.96 6.26 36.45
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.324 VLF 14.61 12.33 0.20 27.14
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.324 VLF 14.61 12.33 5.65 32.59
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.324 VLF 14.61 12.33 5.53 32.47
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.306 VLF 13.79 11.64 0.19 25.62
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.306 VLF 13.79 11.64 5.33 30.76
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.306 VLF 13.79 11.64 5.22 30.65
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.447 VLF 17.83 17.01 0.28 35.12
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.447 VLF 17.83 17.01 7.79 42.63
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 460
20" with 8 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.447 VLF 17.83 17.01 7.62 42.46
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.403 VLF 16.21 15.33 0.25 31.79
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.403 VLF 16.21 15.33 7.02 38.56
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.403 VLF 16.21 15.33 6.87 38.41
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.386 VLF 15.39 14.69 0.24 30.32
Concrete formwork B1@.246 VLF 8.26 8.06 0.08 16.40
Concrete placement B3@.035 VLF 12.26 1.11 0.01 13.38
20" with 8 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.386 VLF 15.39 14.69 6.73 36.81
Concrete formwork B1@.246 VLF 8.26 8.06 2.14 18.46
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
20" with 8 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.386 VLF 15.39 14.69 6.58 36.66
Concrete formwork B1@.246 VLF 8.26 8.06 2.10 18.42
Concrete placement B3@.035 VLF 12.26 1.11 0.20 13.57
24" round concrete columns Material costs include sonotube and bracing, reinforcing steel and
concrete. Labor costs include setting and bracing the sonotube, as well as stripping the tube. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting in place and placing
concrete. Equipment costs include scaffolding and a boomlift with a 30' reach for columns up to 15' tall,
and one with a 40' reach for columns up to 20' tall. Equipment costs also include a trailer-mounted
concrete pump with a 15-CY per hour pumping capacity.
24" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.135 VLF 8.32 5.14 0.08 13.54
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.135 VLF 8.32 5.14 2.35 15.81
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.135 VLF 8.32 5.14 2.30 15.76
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.112 VLF 6.38 4.26 0.07 10.71
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 461
24" with 4 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.112 VLF 6.38 4.26 1.95 12.59
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.112 VLF 6.38 4.26 1.91 12.55
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.100 VLF 5.40 3.81 0.06 9.27
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.100 VLF 5.40 3.81 1.74 10.95
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.100 VLF 5.40 3.81 1.71 10.92
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.162 VLF 9.36 6.16 0.10 15.62
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.162 VLF 9.36 6.16 2.82 18.34
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.162 VLF 9.36 6.16 2.76 18.28
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.139 VLF 7.42 5.29 0.09 12.80
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.139 VLF 7.42 5.29 2.42 15.13
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.139 VLF 7.42 5.29 2.37 15.08
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.127 VLF 6.44 4.83 0.08 11.35
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 462
24" with 4 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.127 VLF 6.44 4.83 2.21 13.48
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.127 VLF 6.44 4.83 2.17 13.44
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.188 VLF 11.52 7.15 0.12 18.79
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.188 VLF 11.52 7.15 3.28 21.95
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.188 VLF 11.52 7.15 3.21 21.88
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.164 VLF 9.58 6.24 0.10 15.92
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.164 VLF 9.58 6.24 2.86 18.68
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.164 VLF 9.58 6.24 2.80 18.62
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 7 bars, hoops at 16" O.C. (from 10' high)
Reinforcing steel RI@.153 VLF 8.60 5.82 0.10 14.52
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.153 VLF 8.60 5.82 2.67 17.09
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.153 VLF 8.60 5.82 2.61 17.03
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.227 VLF 12.32 8.64 0.14 21.10
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 463
24" with 4 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.227 VLF 12.32 8.64 3.96 24.92
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.227 VLF 12.32 8.64 3.87 24.83
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.204 VLF 10.38 7.76 0.13 18.27
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.204 VLF 10.38 7.76 3.56 21.70
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.204 VLF 10.38 7.76 3.48 21.62
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 4 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.193 VLF 9.40 7.34 0.12 16.86
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 4 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.193 VLF 9.40 7.34 3.36 20.10
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 4 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.193 VLF 9.40 7.34 3.29 20.03
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 5 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.270 VLF 10.80 10.27 0.17 21.24
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 5 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.270 VLF 10.80 10.27 4.71 25.78
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 5 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.270 VLF 10.80 10.27 4.60 25.67
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 5 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.224 VLF 8.86 8.52 0.14 17.52
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 464
24" with 8 No. 5 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.224 VLF 8.86 8.52 3.90 21.28
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 5 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.224 VLF 8.86 8.52 3.82 21.20
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 5 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.200 VLF 7.88 7.61 0.13 15.62
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 5 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.200 VLF 7.88 7.61 3.49 18.98
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 5 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.200 VLF 7.88 7.61 3.41 18.90
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 6 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.324 VLF 12.88 12.33 0.20 25.41
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 6 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.324 VLF 12.88 12.33 5.65 30.86
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 6 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.324 VLF 12.88 12.33 5.53 30.74
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 6 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.277 VLF 10.94 10.54 0.17 21.65
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 6 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.277 VLF 10.94 10.54 4.83 26.31
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 6 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.277 VLF 10.94 10.54 4.72 26.20
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 6 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.254 VLF 9.96 9.67 0.16 19.79
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 465
24" with 8 No. 6 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.254 VLF 9.96 9.67 4.43 24.06
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 6 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.254 VLF 9.96 9.67 4.33 23.96
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 7 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.375 VLF 17.20 14.27 0.23 31.70
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 7 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.375 VLF 17.20 14.27 6.54 38.01
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 7 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.375 VLF 17.20 14.27 6.40 37.87
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 7 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.329 VLF 15.26 12.52 0.21 27.99
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 7 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.329 VLF 15.26 12.52 5.73 33.51
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 7 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.329 VLF 15.26 12.52 5.61 33.39
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 7 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.306 VLF 14.28 11.64 0.19 26.11
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 7 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.306 VLF 14.28 11.64 5.33 31.25
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 7 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.306 VLF 14.28 11.64 5.22 31.14
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 8 bars, hoops at 8" O.C. (to 10' high)
Reinforcing steel RI@.455 VLF 18.80 17.31 0.28 36.39
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 466
24" with 8 No. 8 bars, hoops at 8" O.C. (from 10' - 15' high)
Reinforcing steel RI@.455 VLF 18.80 17.31 7.93 44.04
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 8 bars, hoops at 8" O.C. (from 15' - 20' high)
Reinforcing steel RI@.455 VLF 18.80 17.31 7.76 43.87
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 8 bars, hoops at 12" O.C. (to 10' high)
Reinforcing steel RI@.408 VLF 16.86 15.52 0.26 32.64
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 8 bars, hoops at 12" O.C. (from 10' - 15' high)
Reinforcing steel RI@.408 VLF 16.86 15.52 7.11 39.49
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 8 bars, hoops at 12" O.C. (from 15' - 20' high)
Reinforcing steel RI@.408 VLF 16.86 15.52 6.96 39.34
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
24" with 8 No. 8 bars, hoops at 16" O.C. (to 10' high)
Reinforcing steel RI@.385 VLF 15.88 14.65 0.24 30.77
Concrete formwork B1@.268 VLF 10.05 8.79 0.08 18.92
Concrete placement B3@.051 VLF 17.65 1.61 0.01 19.27
24" with 8 No. 8 bars, hoops at 16" O.C. (from 10' - 15' high)
Reinforcing steel RI@.385 VLF 15.88 14.65 6.71 37.24
Concrete formwork B1@.268 VLF 10.05 8.79 2.34 21.18
Concrete placement B3@.051 VLF 17.65 1.61 0.30 19.56
24" with 8 No. 8 bars, hoops at 16" O.C. (from 15' - 20' high)
Reinforcing steel RI@.385 VLF 15.88 14.65 6.57 37.10
Concrete formwork B1@.268 VLF 10.05 8.79 2.29 21.13
Concrete placement B3@.051 VLF 17.65 1.61 0.29 19.55
8" square concrete columns Material costs include plywood forms and bracing (3 uses), reinforcing
steel and concrete. Labor costs include setting and bracing the forms, as well as stripping the forms.
Labor costs also include the cost of building the reinforcing steel cage on site, lifting in place and
placing concrete. Equipment costs include scaffolding and a boomlift with a 30' reach. Equipment costs
also include a trailer-mounted concrete pump with a 15-CY per hour pumping capacity.
8" with 4 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.076 VLF 4.96 2.89 0.05 7.90
Concrete formwork B1@.248 VLF 6.73 8.13 0.08 14.94
Concrete placement B3@.007 VLF 2.50 0.22 -- 2.72
8" with 4 No. 5 bars, ties at 8" O.C. (from 12' - 18' high)
Reinforcing steel RI@.092 VLF 4.96 3.50 1.60 10.06
Concrete formwork B1@.275 VLF 6.73 9.02 2.40 18.15
Concrete placement B3@.008 VLF 2.50 0.25 0.05 2.80
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 467
8" with 4 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.099 VLF 4.96 3.77 1.76 10.49
Concrete formwork B1@.289 VLF 6.73 9.47 2.56 18.76
Concrete placement B3@.009 VLF 2.50 0.29 0.05 2.84
8" with 4 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.073 VLF 4.13 2.78 0.05 6.96
Concrete formwork B1@.248 VLF 6.73 8.13 0.08 14.94
Concrete placement B3@.007 VLF 2.50 0.22 -- 2.72
8" with 4 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.085 VLF 4.13 3.23 1.48 8.84
Concrete formwork B1@.275 VLF 6.73 9.02 2.40 18.15
Concrete placement B3@.008 VLF 2.50 0.25 0.05 2.80
8" with 4 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.091 VLF 4.13 3.46 1.61 9.20
Concrete formwork B1@.289 VLF 6.73 9.47 2.56 18.76
Concrete placement B3@.009 VLF 2.50 0.29 0.05 2.84
8" with 4 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.071 VLF 3.72 2.70 0.04 6.46
Concrete formwork B1@.248 VLF 6.73 8.13 0.08 14.94
Concrete placement B3@.007 VLF 2.50 0.22 -- 2.72
8" with 4 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.083 VLF 3.72 3.16 1.45 8.33
Concrete formwork B1@.275 VLF 6.73 9.02 2.40 18.15
Concrete placement B3@.008 VLF 2.50 0.25 0.05 2.80
8" with 4 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.089 VLF 3.72 3.39 1.58 8.69
Concrete formwork B1@.289 VLF 6.73 9.47 2.56 18.76
Concrete placement B3@.009 VLF 2.50 0.29 0.05 2.84
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 468
8" with 4 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.103 VLF 6.00 3.92 0.06 9.98
Concrete formwork B1@.248 VLF 6.73 8.13 0.08 14.94
Concrete placement B3@.007 VLF 2.50 0.22 -- 2.72
8" with 4 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.121 VLF 6.00 4.60 2.11 12.71
Concrete formwork B1@.275 VLF 6.73 9.02 2.40 18.15
Concrete placement B3@.008 VLF 2.50 0.25 0.05 2.80
8" with 4 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.130 VLF 6.00 4.95 2.31 13.26
Concrete formwork B1@.289 VLF 6.73 9.47 2.56 18.76
Concrete placement B3@.009 VLF 2.50 0.29 0.05 2.84
8" with 4 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.100 VLF 5.17 3.81 0.06 9.04
Concrete formwork B1@.248 VLF 6.73 8.13 0.08 14.94
Concrete placement B3@.007 VLF 2.50 0.22 -- 2.72
8" with 4 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.115 VLF 5.17 4.38 2.00 11.55
Concrete formwork B1@.275 VLF 6.73 9.02 2.40 18.15
Concrete placement B3@.008 VLF 2.50 0.25 0.05 2.80
8" with 4 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.123 VLF 5.17 4.68 2.18 12.03
Concrete formwork B1@.289 VLF 6.73 9.47 2.56 18.76
Concrete placement B3@.009 VLF 2.50 0.29 0.05 2.84
8" with 4 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.098 VLF 4.76 3.73 0.06 8.55
Concrete formwork B1@.248 VLF 6.73 8.13 0.08 14.94
Concrete placement B3@.007 VLF 2.50 0.22 -- 2.72
8" with 4 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.113 VLF 4.76 4.30 1.97 11.03
Concrete formwork B1@.275 VLF 6.73 9.02 2.40 18.15
Concrete placement B3@.008 VLF 2.50 0.25 0.05 2.80
8" with 4 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.121 VLF 4.76 4.60 2.15 11.51
Concrete formwork B1@.289 VLF 6.73 9.47 2.56 18.76
Concrete placement B3@.009 VLF 2.50 0.29 0.05 2.84
12" square concrete columns Material costs include plywood forms and bracing (3 uses), reinforcing
steel and concrete. Labor costs include setting and bracing the forms and stripping the forms. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting the cage in position and
placing concrete. Equipment costs include scaffolding and a boomlift with a 30' reach. Equipment costs
also include a trailer-mounted 15-CY per hour concrete pump.
12" with 4 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.078 VLF 6.20 2.97 0.05 9.22
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 469
12" with 4 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.094 VLF 6.20 3.58 1.64 11.42
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.101 VLF 6.20 3.84 1.79 11.83
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.074 VLF 4.96 2.82 0.05 7.83
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.087 VLF 4.96 3.31 1.52 9.79
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.093 VLF 4.96 3.54 1.65 10.15
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.072 VLF 4.34 2.74 0.05 7.13
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.084 VLF 4.34 3.20 1.46 9.00
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.091 VLF 4.34 3.46 1.61 9.41
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.105 VLF 7.24 4.00 0.07 11.31
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.124 VLF 7.24 4.72 2.16 14.12
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.133 VLF 7.24 5.06 2.36 14.66
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.101 VLF 6.00 3.84 0.06 9.90
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 470
12" with 4 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.117 VLF 6.00 4.45 2.04 12.49
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.125 VLF 6.00 4.76 2.22 12.98
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.099 VLF 5.38 3.77 0.06 9.21
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.114 VLF 5.38 4.34 1.99 11.71
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.123 VLF 5.38 4.68 2.18 12.24
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.131 VLF 9.40 4.99 0.08 14.47
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.152 VLF 9.40 5.78 2.65 17.83
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.163 VLF 9.40 6.20 2.89 18.49
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.127 VLF 8.16 4.83 0.08 13.07
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.145 VLF 8.16 5.52 2.53 16.21
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.155 VLF 8.16 5.90 2.75 16.81
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.125 VLF 7.54 4.76 0.08 12.38
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 471
12" with 4 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.142 VLF 7.54 5.40 2.48 15.42
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.152 VLF 7.54 5.78 2.70 16.02
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.171 VLF 10.20 6.51 0.11 16.82
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.197 VLF 10.20 7.50 3.43 21.13
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.210 VLF 10.20 7.99 3.73 21.92
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.166 VLF 8.96 6.32 0.10 15.38
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.190 VLF 8.96 7.23 3.31 19.50
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.202 VLF 8.96 7.69 3.58 20.23
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
12" with 4 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.164 VLF 8.34 6.24 0.10 14.68
Concrete formwork B1@.354 VLF 8.93 11.60 0.11 20.64
Concrete placement B3@.015 VLF 5.62 0.48 -- 6.10
12" with 4 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.187 VLF 8.34 7.12 3.26 18.72
Concrete formwork B1@.393 VLF 8.93 12.88 3.42 25.23
Concrete placement B3@.016 VLF 5.62 0.51 0.09 6.22
12" with 4 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.200 VLF 8.34 7.61 3.55 19.50
Concrete formwork B1@.416 VLF 8.93 13.64 3.69 26.26
Concrete placement B3@.017 VLF 5.62 0.54 0.10 6.26
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 472
16" square concrete columns Material costs include plywood forms and bracing (3 uses), reinforcing
steel and concrete. Labor costs include setting and bracing the forms and stripping the forms. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting the cage in position and
placing concrete. Equipment costs include scaffolding and a boomlift with a 30' reach. Equipment costs
also include a trailer-mounted 15-CY per hour concrete pump.
16" with 4 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.080 VLF 7.44 3.04 0.05 10.53
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.097 VLF 7.44 3.69 1.69 12.82
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.105 VLF 7.44 4.00 1.86 13.30
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.075 VLF 5.79 2.85 0.05 8.69
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.089 VLF 5.79 3.39 1.55 10.73
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.095 VLF 5.79 3.62 1.69 11.10
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.073 VLF 4.96 2.78 0.05 7.79
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.086 VLF 4.96 3.27 1.50 9.73
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.092 VLF 4.96 3.50 1.63 10.09
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.107 VLF 8.48 4.07 0.07 12.62
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.127 VLF 8.48 4.83 2.21 15.52
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 473
16" with 4 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.136 VLF 8.48 5.18 2.41 16.07
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.102 VLF 6.83 3.88 0.06 10.77
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.119 VLF 6.83 4.53 2.07 13.43
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.127 VLF 6.83 4.83 2.25 13.91
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.100 VLF 6.00 3.81 0.06 9.87
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.116 VLF 6.00 4.41 2.02 12.43
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.124 VLF 6.00 4.72 2.20 12.92
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.133 VLF 10.64 5.06 0.08 15.78
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.155 VLF 10.64 5.90 2.70 19.24
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.166 VLF 10.64 6.32 2.95 19.91
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.128 VLF 8.99 4.87 0.08 13.94
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.147 VLF 8.99 5.59 2.56 17.14
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 474
16" with 4 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.157 VLF 8.99 5.97 2.79 17.75
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.126 VLF 8.16 4.79 0.08 13.03
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.144 VLF 8.16 5.48 2.51 16.15
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.154 VLF 8.16 5.86 2.73 16.75
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.172 VLF 11.44 6.55 0.11 18.10
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.200 VLF 11.44 7.61 3.49 22.54
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.214 VLF 11.44 8.14 3.80 23.38
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.168 VLF 9.79 6.39 0.11 16.29
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.192 VLF 9.79 7.31 3.35 20.45
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 4 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.204 VLF 9.79 7.76 3.62 21.17
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 4 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.165 VLF 8.96 6.28 0.10 15.34
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 4 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.189 VLF 8.96 7.19 3.29 19.44
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 475
16" with 4 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.201 VLF 8.96 7.65 3.57 20.18
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.145 VLF 9.92 5.52 0.09 15.53
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.170 VLF 9.92 6.47 2.96 19.35
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.182 VLF 9.92 6.93 3.23 20.08
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.141 VLF 8.27 5.37 0.09 13.73
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.162 VLF 8.27 6.16 2.82 17.25
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.172 VLF 8.27 6.55 3.05 17.87
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.138 VLF 7.44 5.25 0.09 12.78
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.158 VLF 7.44 6.01 2.75 16.20
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.170 VLF 7.44 6.47 3.02 16.93
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.199 VLF 12.00 7.57 0.12 19.69
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.230 VLF 12.00 8.75 4.01 24.76
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 476
16" with 8 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.245 VLF 12.00 9.32 4.35 25.67
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.195 VLF 10.35 7.42 0.12 17.89
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.222 VLF 10.35 8.45 3.87 22.67
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.236 VLF 10.35 8.98 4.19 23.52
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.192 VLF 9.52 7.31 0.12 16.95
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.218 VLF 9.52 8.30 3.80 21.62
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.233 VLF 9.52 8.87 4.13 22.52
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.251 VLF 16.32 9.55 0.16 26.03
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.286 VLF 16.32 10.88 4.98 32.18
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.305 VLF 16.32 11.61 5.41 33.34
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.246 VLF 14.67 9.36 0.15 24.18
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.278 VLF 14.67 10.58 4.85 30.10
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 477
16" with 8 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.296 VLF 14.67 11.26 5.25 31.18
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.244 VLF 13.84 9.28 0.15 23.27
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.275 VLF 13.84 10.46 4.79 29.09
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.293 VLF 13.84 11.15 5.20 30.19
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.330 VLF 17.92 12.56 0.21 30.69
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.375 VLF 17.92 14.27 6.54 38.73
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.399 VLF 17.92 15.18 7.08 40.18
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.326 VLF 16.27 12.40 0.20 28.87
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.367 VLF 16.27 13.96 6.40 36.63
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
16" with 8 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.390 VLF 16.27 14.84 6.92 38.03
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
16" with 8 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.323 VLF 15.44 12.29 0.20 27.93
Concrete formwork B1@.361 VLF 11.22 11.83 0.11 23.16
Concrete placement B3@.027 VLF 9.99 0.85 0.01 10.85
16" with 8 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.364 VLF 15.44 13.85 6.34 35.63
Concrete formwork B1@.361 VLF 11.22 11.83 3.15 26.20
Concrete placement B3@.028 VLF 9.99 0.89 0.16 11.04
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 478
16" with 8 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.387 VLF 15.44 14.73 6.87 37.04
Concrete formwork B1@.361 VLF 11.22 11.83 3.20 26.25
Concrete placement B3@.029 VLF 9.99 0.92 0.17 11.08
20" square concrete columns Material costs include plywood forms and bracing (3 uses), reinforcing
steel and concrete. Labor costs include setting and bracing the forms and stripping the forms. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting the cage in position and
placing concrete. Equipment costs include scaffolding and a boomlift with a 30' reach. Equipment costs
also include a trailer-mounted 15-CY per hour concrete pump.
20" with 4 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.082 VLF 8.68 3.12 0.05 11.85
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.101 VLF 8.68 3.84 1.76 14.28
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.109 VLF 8.68 4.15 1.93 14.76
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.076 VLF 6.61 2.89 0.05 9.55
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.091 VLF 6.61 3.46 1.59 11.66
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.098 VLF 6.61 3.73 1.74 12.08
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.074 VLF 5.58 2.82 0.05 8.45
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.088 VLF 5.58 3.35 1.53 10.46
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.095 VLF 5.58 3.62 1.69 10.89
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 479
20" with 4 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.109 VLF 9.72 4.15 0.07 13.94
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.131 VLF 9.72 4.99 2.28 16.99
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.141 VLF 9.72 5.37 2.50 17.59
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.103 VLF 7.65 3.92 0.06 11.63
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.121 VLF 7.65 4.60 2.11 14.36
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.130 VLF 7.65 4.95 2.31 14.91
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.101 VLF 6.62 3.84 0.06 10.52
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.118 VLF 6.62 4.49 2.06 13.17
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.127 VLF 6.62 4.83 2.25 13.70
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.135 VLF 11.88 5.14 0.08 17.10
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.159 VLF 11.88 6.05 2.77 20.70
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.171 VLF 11.88 6.51 3.03 21.42
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 480
20" with 4 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.129 VLF 9.81 4.91 0.08 14.80
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.150 VLF 9.81 5.71 2.61 18.13
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.160 VLF 9.81 6.09 2.84 18.74
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.127 VLF 8.78 4.83 0.08 13.69
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.146 VLF 8.78 5.56 2.54 16.88
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.157 VLF 8.78 5.97 2.79 17.54
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.174 VLF 12.68 6.62 0.11 19.41
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.203 VLF 12.68 7.72 3.54 23.94
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.218 VLF 12.68 8.30 3.87 24.85
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 4 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.169 VLF 10.61 6.43 0.11 17.15
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.194 VLF 10.61 7.38 3.38 21.37
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.207 VLF 10.61 7.88 3.67 22.16
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 481
20" with 4 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.166 VLF 9.58 6.32 0.10 16.00
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 4 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.190 VLF 9.58 7.23 3.31 20.12
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 4 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.204 VLF 9.58 7.76 3.62 20.96
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.147 VLF 11.16 5.59 0.09 16.84
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.173 VLF 11.16 6.58 3.02 20.76
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.186 VLF 11.16 7.08 3.30 21.54
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.142 VLF 9.09 5.40 0.09 14.58
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.164 VLF 9.09 6.24 2.86 18.19
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.175 VLF 9.09 6.66 3.10 18.85
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.139 VLF 8.06 5.29 0.09 13.44
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.161 VLF 8.06 6.13 2.81 17.00
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.172 VLF 8.06 6.55 3.05 17.66
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 482
20" with 8 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.201 VLF 13.24 7.65 0.13 21.02
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.233 VLF 13.24 8.87 4.06 26.17
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.250 VLF 13.24 9.51 4.44 27.19
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.196 VLF 11.17 7.46 0.12 18.75
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.224 VLF 11.17 8.52 3.90 23.59
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.239 VLF 11.17 9.09 4.24 24.50
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.193 VLF 10.14 7.34 0.12 17.60
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.220 VLF 10.14 8.37 3.83 22.34
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.236 VLF 10.14 8.98 4.19 23.31
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.253 VLF 17.56 9.63 0.16 27.35
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.290 VLF 17.56 11.03 5.05 33.64
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.309 VLF 17.56 11.76 5.48 34.80
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 483
20" with 8 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.247 VLF 15.49 9.40 0.15 25.04
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.281 VLF 15.49 10.69 4.90 31.08
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.299 VLF 15.49 11.38 5.31 32.18
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.245 VLF 14.46 9.32 0.15 23.93
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.277 VLF 14.46 10.54 4.83 29.83
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.295 VLF 14.46 11.22 5.23 30.91
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.332 VLF 19.16 12.63 0.21 32.00
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.379 VLF 19.16 14.42 6.61 40.19
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.404 VLF 19.16 15.37 7.17 41.70
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
20" with 8 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.327 VLF 17.09 12.44 0.20 29.73
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.370 VLF 17.09 14.08 6.45 37.62
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.393 VLF 17.09 14.95 6.97 39.01
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 484
20" with 8 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.324 VLF 16.06 12.33 0.20 28.59
Concrete formwork B1@.399 VLF 13.56 13.08 0.12 26.76
Concrete placement B3@.042 VLF 15.62 1.33 0.01 16.96
20" with 8 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.366 VLF 16.06 13.93 6.38 36.37
Concrete formwork B1@.442 VLF 13.56 14.49 3.85 31.90
Concrete placement B3@.043 VLF 15.62 1.36 0.25 17.23
20" with 8 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.390 VLF 16.06 14.84 6.92 37.82
Concrete formwork B1@.467 VLF 13.56 15.31 4.14 33.01
Concrete placement B3@.044 VLF 15.62 1.39 0.26 17.27
24" square concrete columns Material costs include plywood forms and bracing (3 uses), reinforcing
steel and concrete. Labor costs include setting and bracing the forms and stripping the forms. Labor
costs also include the cost of building the reinforcing steel cage on site, lifting the cage in position and
placing concrete. Equipment costs include scaffolding and a boomlift with a 30' reach. Equipment costs
also include a trailer-mounted 15-CY per hour concrete pump.
24" with 4 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.083 VLF 9.92 3.16 0.05 13.13
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.102 VLF 9.92 3.88 1.76 15.56
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.110 VLF 9.92 4.19 1.93 16.04
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.077 VLF 7.44 2.93 0.05 10.42
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.092 VLF 7.44 3.50 1.59 12.53
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.099 VLF 7.44 3.77 1.74 12.95
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.074 VLF 6.20 2.82 0.05 9.07
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.088 VLF 6.20 3.35 1.53 11.08
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 485
24" with 4 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.096 VLF 6.20 3.65 1.69 11.54
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.110 VLF 10.96 4.19 0.07 15.22
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.132 VLF 10.96 5.02 2.28 18.26
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.142 VLF 10.96 5.40 2.50 18.86
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.104 VLF 8.48 3.96 0.06 12.50
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 6 bars, ties at 12" O.C. (12' to 18' high)
Reinforcing steel RI@.122 VLF 8.48 4.64 2.11 15.23
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.131 VLF 8.48 4.99 2.31 15.78
Concrete formwork B1@.436 VLF 16.33 14.29 4.14 34.76
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.101 VLF 7.24 3.84 0.06 11.14
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.118 VLF 7.24 4.49 2.06 13.79
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.128 VLF 7.24 4.87 2.25 14.36
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.136 VLF 13.12 5.18 0.08 18.38
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.160 VLF 13.12 6.09 2.77 21.98
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 486
24" with 4 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.172 VLF 13.12 6.55 3.03 22.70
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.130 VLF 10.64 4.95 0.08 15.67
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.151 VLF 10.64 5.75 2.61 19.00
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.161 VLF 10.64 6.13 2.84 19.61
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.127 VLF 9.40 4.83 0.08 14.31
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.147 VLF 9.40 5.59 2.54 17.53
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.157 VLF 9.40 5.97 2.79 18.16
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.175 VLF 13.92 6.66 0.11 20.69
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.205 VLF 13.92 7.80 3.54 25.26
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.219 VLF 13.92 8.33 3.87 26.12
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.170 VLF 11.44 6.47 0.11 18.02
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.195 VLF 11.44 7.42 3.38 22.24
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 487
24" with 4 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.208 VLF 11.44 7.91 3.67 23.02
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 4 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.167 VLF 10.20 6.35 0.10 16.65
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 4 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.191 VLF 10.20 7.27 3.31 20.78
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 4 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.205 VLF 10.20 7.80 3.62 21.62
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 5 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.148 VLF 12.40 5.63 0.09 18.12
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 5 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.175 VLF 12.40 6.66 3.02 22.08
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 5 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.188 VLF 12.40 7.15 3.30 22.85
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 5 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.143 VLF 9.92 5.44 0.09 15.45
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 5 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.165 VLF 9.92 6.28 2.86 19.06
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 5 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.176 VLF 9.92 6.70 3.10 19.72
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 5 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.140 VLF 8.68 5.33 0.09 14.10
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 5 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.161 VLF 8.68 6.13 2.81 17.62
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 488
24" with 8 No. 5 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.173 VLF 8.68 6.58 3.05 18.31
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 6 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.202 VLF 14.48 7.69 0.13 22.30
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 6 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.235 VLF 14.48 8.94 4.06 27.48
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 6 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.251 VLF 14.48 9.55 4.44 28.47
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 6 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.197 VLF 12.00 7.50 0.12 19.62
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 6 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.225 VLF 12.00 8.56 3.90 24.46
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 6 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.240 VLF 12.00 9.13 4.24 25.37
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 6 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.194 VLF 10.76 7.38 0.12 18.26
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 6 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.221 VLF 10.76 8.41 3.83 23.00
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 6 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.237 VLF 10.76 9.02 4.19 23.97
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 7 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.254 VLF 18.80 9.67 0.16 28.63
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 7 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.291 VLF 18.80 11.07 5.05 34.92
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 489
24" with 8 No. 7 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.311 VLF 18.80 11.83 5.48 36.11
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 7 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.248 VLF 16.32 9.44 0.15 25.91
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 7 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.282 VLF 16.32 10.73 4.90 31.95
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 7 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.300 VLF 16.32 11.42 5.31 33.05
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 7 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.245 VLF 15.08 9.32 0.15 24.55
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 7 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.278 VLF 15.08 10.58 4.83 30.49
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 7 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.296 VLF 15.08 11.26 5.23 31.57
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 8 bars, ties at 8" O.C. (to 12' high)
Reinforcing steel RI@.333 VLF 20.40 12.67 0.21 33.28
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 8 bars, ties at 8" O.C. (over 12' to 18' high)
Reinforcing steel RI@.380 VLF 20.40 14.46 6.61 41.47
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 8 bars, ties at 8" O.C. (over 18' to 20' high)
Reinforcing steel RI@.405 VLF 20.40 15.41 7.17 42.98
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 8 bars, ties at 12" O.C. (to 12' high)
Reinforcing steel RI@.328 VLF 17.92 12.48 0.20 30.60
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 8 bars, ties at 12" O.C. (over 12' to 18' high)
Reinforcing steel RI@.371 VLF 17.92 14.12 6.45 38.49
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 490
24" with 8 No. 8 bars, ties at 12" O.C. (over 18' to 20' high)
Reinforcing steel RI@.394 VLF 17.92 14.99 6.97 39.88
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
24" with 8 No. 8 bars, ties at 16" O.C. (to 12' high)
Reinforcing steel RI@.325 VLF 16.68 12.37 0.20 29.25
Concrete formwork B1@.392 VLF 16.33 12.85 0.12 29.30
Concrete placement B3@.061 VLF 22.49 1.93 0.01 24.43
24" with 8 No. 8 bars, ties at 16" O.C. (over 12' to 18' high)
Reinforcing steel RI@.367 VLF 16.68 13.96 6.38 37.02
Concrete formwork B1@.436 VLF 16.33 14.29 3.85 34.47
Concrete placement B3@.062 VLF 22.49 1.96 0.25 24.70
24" with 8 No. 8 bars, ties at 16" O.C. (over 18' to 20' high)
Reinforcing steel RI@.391 VLF 16.68 14.88 6.92 38.48
Concrete formwork B1@.462 VLF 16.33 15.14 4.14 35.61
Concrete placement B3@.063 VLF 22.49 1.99 0.26 24.74
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 491
Concrete stairs
Concrete stairs cast on grade Prices include erecting and stripping side and riser forms, placing
grade 60 reinforcing steel and 3000 P.S.I. concrete poured directly from a chute. One No. 3 bar is
included behind each stair nosing. Foundations and side walls are not included. Stairs are assumed to
have a 6" throat (minimum concrete thickness), 6" riser and 12" tread.
3' wide stairway, reinforced with No. 3 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.579 LF 6.40 19.37 -- 25.77
Reinforcing steel RI@.039 LF 2.72 1.48 -- 4.20
Concrete B6@.080 LF 11.54 2.55 -- 14.09
Cost of stairway per riser
Forms BV@.647 Ea 5.72 21.65 -- 27.37
Reinforcing steel RI@.043 Ea 2.43 1.64 -- 4.07
Concrete B6@.090 Ea 10.33 2.87 -- 13.20
Total cost of 2 riser stairway
Forms BV@1.29 Ea 11.45 43.16 -- 54.61
Reinforcing steel RI@.086 Ea 4.86 3.27 -- 8.13
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
Total cost of 3 riser stairway
Forms BV@1.94 Ea 17.17 64.91 -- 82.08
Reinforcing steel RI@.129 Ea 7.29 4.91 -- 12.20
Concrete B6@.270 Ea 30.98 8.60 -- 39.58
Total cost of 4 riser stairway
Forms BV@2.59 Ea 22.89 86.66 -- 109.55
Reinforcing steel RI@.172 Ea 9.72 6.55 -- 16.27
Concrete B6@.360 Ea 41.30 11.47 -- 52.77
Total cost of 5 riser stairway
Forms BV@3.24 Ea 28.61 108.40 -- 137.01
Reinforcing steel RI@.215 Ea 12.15 8.18 -- 20.33
Concrete B6@.450 Ea 51.63 14.33 -- 65.96
Total cost of 6 riser stairway
Forms BV@3.88 Ea 34.34 129.80 -- 164.14
Reinforcing steel RI@.258 Ea 14.58 9.82 -- 24.40
Concrete B6@.540 Ea 61.95 17.20 -- 79.15
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 495
4' wide stairway, reinforced with No. 3 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.696 LF 8.53 23.29 -- 31.82
Reinforcing steel RI@.050 LF 3.62 1.90 -- 5.52
Concrete B6@.100 LF 15.38 3.19 -- 18.57
Cost of stairway per riser
Forms BV@.778 Ea 7.63 26.03 -- 33.66
Reinforcing steel RI@.056 Ea 3.24 2.13 -- 5.37
Concrete B6@.112 Ea 13.77 3.57 -- 17.34
Total cost of 2 riser stairway
Forms BV@1.56 Ea 15.26 52.20 -- 67.46
Reinforcing steel RI@.112 Ea 6.48 4.26 -- 10.74
Concrete B6@.224 Ea 27.53 7.13 -- 34.66
Total cost of 3 riser stairway
Forms BV@2.33 Ea 17.17 77.96 -- 95.13
Reinforcing steel RI@.168 Ea 9.72 6.39 -- 16.11
Concrete B6@.336 Ea 41.30 10.70 -- 52.00
Total cost of 4 riser stairway
Forms BV@3.11 Ea 30.52 104.10 -- 134.62
Reinforcing steel RI@.224 Ea 12.96 8.52 -- 21.48
Concrete B6@.448 Ea 55.07 14.27 -- 69.34
Total cost of 5 riser stairway
Forms BV@3.89 Ea 38.15 130.20 -- 168.35
Reinforcing steel RI@.280 Ea 16.20 10.65 -- 26.85
Concrete B6@.560 Ea 68.83 17.84 -- 86.67
Total cost of 6 riser stairway
Forms BV@4.67 Ea 45.78 156.30 -- 202.08
Reinforcing steel RI@.336 Ea 19.44 12.78 -- 32.22
Concrete B6@.672 Ea 82.60 21.40 -- 104.00
Total cost of 7 riser stairway
Forms BV@5.45 Ea 53.41 182.40 -- 235.81
Reinforcing steel RI@.392 Ea 22.68 14.92 -- 37.60
Concrete B6@.784 Ea 96.37 24.97 -- 121.34
Total cost of 8 riser stairway
Forms BV@6.22 Ea 61.04 208.10 -- 269.14
Reinforcing steel RI@.448 Ea 25.92 17.05 -- 42.97
Concrete B6@.896 Ea 110.13 28.54 -- 138.67
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 496
5' wide stairway, reinforced with No. 3 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Reinforcing steel BV@.814 LF 10.66 27.24 -- 37.90
Forms RI@.062 LF 4.53 2.36 -- 6.89
Concrete B6@.140 LF 19.23 4.46 -- 23.69
Cost of stairway per riser
Forms BV@.909 Ea 9.54 30.42 -- 39.96
Reinforcing steel RI@.069 Ea 4.05 2.63 -- 6.68
Concrete B6@.157 Ea 17.21 5.00 -- 22.21
Total cost of 2 riser stairway
Forms BV@1.82 Ea 19.08 60.90 -- 79.98
Reinforcing steel RI@.138 Ea 8.10 5.25 -- 13.35
Concrete B6@.314 Ea 34.42 10.00 -- 44.42
Total cost of 3 riser stairway
Forms BV@2.73 Ea 17.17 91.35 -- 108.52
Reinforcing steel RI@.207 Ea 12.15 7.88 -- 20.03
Concrete B6@.471 Ea 51.63 15.00 -- 66.63
Total cost of 4 riser stairway
Forms BV@3.64 Ea 38.15 121.80 -- 159.95
Reinforcing steel RI@.276 Ea 16.20 10.50 -- 26.70
Concrete B6@.628 Ea 68.83 20.00 -- 88.83
Total cost of 5 riser stairway
Forms BV@4.55 Ea 47.69 152.20 -- 199.89
Reinforcing steel RI@.345 Ea 20.25 13.13 -- 33.38
Concrete B6@.785 Ea 86.04 25.00 -- 111.04
Total cost of 6 riser stairway
Forms BV@5.45 Ea 57.23 182.40 -- 239.63
Reinforcing steel RI@.414 Ea 24.30 15.75 -- 40.05
Concrete B6@.942 Ea 103.25 30.00 -- 133.25
Total cost of 7 riser stairway
Forms BV@6.36 Ea 66.77 212.80 -- 279.57
Reinforcing steel RI@.483 Ea 28.35 18.38 -- 46.73
Concrete B6@1.10 Ea 120.46 35.04 -- 155.50
Total cost of 8 riser stairway
Forms BV@7.27 Ea 76.30 243.30 -- 319.60
Reinforcing steel RI@.552 Ea 32.40 21.00 -- 53.40
Concrete B6@1.26 Ea 137.67 40.13 -- 177.80
6' wide stairway, reinforced with No. 3 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.931 LF 12.79 31.15 -- 43.94
Reinforcing steel RI@.073 LF 3.62 2.78 -- 6.40
Concrete B6@.160 LF 23.08 5.10 -- 28.18
Cost of stairway per riser
Forms BV@1.04 Ea 11.45 34.80 -- 46.25
Reinforcing steel RI@.082 Ea 3.24 3.12 -- 6.36
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 497
3' wide stairway, reinforced with No. 3 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.579 LF 6.40 19.37 -- 25.77
Reinforcing steel RI@.030 LF 2.41 1.14 -- 3.55
Concrete B6@.080 LF 11.54 2.55 -- 14.09
Cost of stairway per riser
Forms BV@.647 Ea 5.72 21.65 -- 27.37
Reinforcing steel RI@.034 Ea 2.16 1.29 -- 3.45
Concrete B6@.090 Ea 10.33 2.87 -- 13.20
Total cost of 2 riser stairway
Forms BV@1.29 Ea 11.45 43.16 -- 54.61
Reinforcing steel RI@.068 Ea 4.32 2.59 -- 6.91
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
Total cost of 3 riser stairway
Forms BV@1.94 Ea 17.17 64.91 -- 82.08
Reinforcing steel RI@.102 Ea 6.48 3.88 -- 10.36
Concrete B6@.270 Ea 30.98 8.60 -- 39.58
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 498
4' wide stairway, reinforced with No. 3 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.696 LF 8.53 23.29 -- 31.82
Reinforcing steel RI@.039 LF 3.22 1.48 -- 4.70
Concrete B6@.100 LF 15.38 3.19 -- 18.57
Cost of stairway per riser
Forms BV@.778 Ea 7.63 26.03 -- 33.66
Reinforcing steel RI@.044 Ea 2.88 1.67 -- 4.55
Concrete B6@.112 Ea 13.77 3.57 -- 17.34
Total cost of 2 riser stairway
Forms BV@1.56 Ea 15.26 52.20 -- 67.46
Reinforcing steel RI@.088 Ea 5.76 3.35 -- 9.11
Concrete B6@.224 Ea 27.53 7.13 -- 34.66
Total cost of 3 riser stairway
Forms BV@2.33 Ea 17.17 77.96 -- 95.13
Reinforcing steel RI@.132 Ea 8.64 5.02 -- 13.66
Concrete B6@.336 Ea 41.30 10.70 -- 52.00
Total cost of 4 riser stairway
Forms BV@3.11 Ea 30.52 104.10 -- 134.62
Reinforcing steel RI@.176 Ea 11.52 6.70 -- 18.22
Concrete B6@.448 Ea 55.07 14.27 -- 69.34
Total cost of 5 riser stairway
Forms BV@3.89 Ea 38.15 130.20 -- 168.35
Reinforcing steel RI@.220 Ea 14.40 8.37 -- 22.77
Concrete B6@.560 Ea 68.83 17.84 -- 86.67
Total cost of 6 riser stairway
Forms BV@4.67 Ea 45.78 156.30 -- 202.08
Reinforcing steel RI@.264 Ea 17.28 10.05 -- 27.33
Concrete B6@.672 Ea 82.60 21.40 -- 104.00
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 499
5' wide stairway, reinforced with No. 3 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.814 LF 10.66 27.24 -- 37.90
Reinforcing steel RI@.048 LF 4.02 1.83 -- 5.85
Concrete B6@.140 LF 19.23 4.46 -- 23.69
Cost of stairway per riser
Forms BV@.909 Ea 9.54 30.42 -- 39.96
Reinforcing steel RI@.054 Ea 3.60 2.06 -- 5.66
Concrete B6@.157 Ea 17.21 5.00 -- 22.21
Total cost of 2 riser stairway
Forms BV@1.82 Ea 19.08 60.90 -- 79.98
Reinforcing steel RI@.108 Ea 7.20 4.11 -- 11.31
Concrete B6@.314 Ea 34.42 10.00 -- 44.42
Total cost of 3 riser stairway
Forms BV@2.73 Ea 17.17 91.35 -- 108.52
Reinforcing steel RI@.162 Ea 10.80 6.16 -- 16.96
Concrete B6@.471 Ea 51.63 15.00 -- 66.63
Total cost of 4 riser stairway
Forms BV@3.64 Ea 38.15 121.80 -- 159.95
Reinforcing steel RI@.216 Ea 14.40 8.22 -- 22.62
Concrete B6@.628 Ea 68.83 20.00 -- 88.83
Total cost of 5 riser stairway
Forms BV@4.55 Ea 47.69 152.20 -- 199.89
Reinforcing steel RI@.270 Ea 18.00 10.27 -- 28.27
Concrete B6@.785 Ea 86.04 25.00 -- 111.04
Total cost of 6 riser stairway
Forms BV@5.45 Ea 57.23 182.40 -- 239.63
Reinforcing steel RI@.324 Ea 21.60 12.33 -- 33.93
Concrete B6@.942 Ea 103.25 30.00 -- 133.25
Total cost of 7 riser stairway
Forms BV@6.36 Ea 66.77 212.80 -- 279.57
Reinforcing steel RI@.378 Ea 25.20 14.38 -- 39.58
Concrete B6@1.10 Ea 120.46 35.04 -- 155.50
Total cost of 8 riser stairway
Forms BV@7.27 Ea 76.30 243.30 -- 319.60
Reinforcing steel RI@.432 Ea 28.80 16.44 -- 45.24
Concrete B6@1.26 Ea 137.67 40.13 -- 177.80
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 500
6' wide stairway, reinforced with No. 3 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.931 LF 12.79 31.15 -- 43.94
Reinforcing steel RI@.057 LF 4.83 2.17 -- 7.00
Concrete B6@.160 LF 23.08 5.10 -- 28.18
Cost of stairway per riser
Forms BV@1.04 Ea 11.45 34.80 -- 46.25
Reinforcing steel RI@.064 Ea 4.32 2.44 -- 6.76
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
Total cost of 2 riser stairway
Forms BV@2.08 Ea 22.89 69.60 -- 92.49
Reinforcing steel RI@.128 Ea 8.64 4.87 -- 13.51
Concrete B6@.360 Ea 41.30 11.47 -- 52.77
Total cost of 3 riser stairway
Forms BV@3.12 Ea 17.17 104.40 -- 121.57
Reinforcing steel RI@.192 Ea 12.96 7.31 -- 20.27
Concrete B6@.540 Ea 61.95 17.20 -- 79.15
Total cost of 4 riser stairway
Forms BV@4.16 Ea 45.78 139.20 -- 184.98
Reinforcing steel RI@.256 Ea 17.28 9.74 -- 27.02
Concrete B6@.720 Ea 82.60 22.93 -- 105.53
Total cost of 5 riser stairway
Forms BV@5.21 Ea 57.23 174.30 -- 231.53
Reinforcing steel RI@.320 Ea 21.60 12.18 -- 33.78
Concrete B6@.900 Ea 103.25 28.67 -- 131.92
Total cost of 6 riser stairway
Forms BV@6.25 Ea 68.67 209.10 -- 277.77
Reinforcing steel RI@.384 Ea 25.92 14.61 -- 40.53
Concrete B6@1.08 Ea 123.90 34.40 -- 158.30
Total cost of 7 riser stairway
Forms BV@7.29 Ea 80.12 243.90 -- 324.02
Reinforcing steel RI@.448 Ea 30.24 17.05 -- 47.29
Concrete B6@1.26 Ea 144.55 40.13 -- 184.68
Total cost of 8 riser stairway
Forms BV@8.33 Ea 91.56 278.70 -- 370.26
Reinforcing steel RI@.512 Ea 34.56 19.48 -- 54.04
Concrete B6@1.44 Ea 165.20 45.86 -- 211.06
3' wide stairway, reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.579 LF 6.40 19.37 -- 25.77
Reinforcing steel RI@.063 LF 3.92 2.40 -- 6.32
Concrete B6@.080 LF 11.54 2.55 -- 14.09
Cost of stairway per riser
Forms BV@.647 Ea 5.72 21.65 -- 27.37
Reinforcing steel RI@.070 Ea 3.51 2.66 -- 6.17
Concrete B6@.090 Ea 10.33 2.87 -- 13.20
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 501
4' wide stairway, reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.696 LF 8.53 23.29 -- 31.82
Reinforcing steel RI@.080 LF 5.23 3.04 -- 8.27
Concrete B6@.100 LF 15.38 3.19 -- 18.57
Cost of stairway per riser
Forms BV@.778 Ea 7.63 26.03 -- 33.66
Reinforcing steel RI@.090 Ea 4.68 3.43 -- 8.11
Concrete B6@.112 Ea 13.77 3.57 -- 17.34
Total cost of 2 riser stairway
Forms BV@1.56 Ea 15.26 52.20 -- 67.46
Reinforcing steel RI@.180 Ea 9.36 6.85 -- 16.21
Concrete B6@.224 Ea 27.53 7.13 -- 34.66
Total cost of 3 riser stairway
Forms BV@2.33 Ea 17.17 77.96 -- 95.13
Reinforcing steel RI@.270 Ea 14.04 10.27 -- 24.31
Concrete B6@.336 Ea 41.30 10.70 -- 52.00
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 502
5' wide stairway, reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.814 LF 10.66 27.24 -- 37.90
Reinforcing steel RI@.100 LF 6.54 3.81 -- 10.35
Concrete B6@.140 LF 19.23 4.46 -- 23.69
Cost of stairway per riser
Forms BV@.909 Ea 9.54 30.42 -- 39.96
Reinforcing steel RI@.111 Ea 5.85 4.22 -- 10.07
Concrete B6@.157 Ea 17.21 5.00 -- 22.21
Total cost of 2 riser stairway
Forms BV@1.82 Ea 19.08 60.90 -- 79.98
Reinforcing steel RI@.222 Ea 11.70 8.45 -- 20.15
Concrete B6@.314 Ea 34.42 10.00 -- 44.42
Total cost of 3 riser stairway
Forms BV@2.73 Ea 17.17 91.35 -- 108.52
Reinforcing steel RI@.333 Ea 17.55 12.67 -- 30.22
Concrete B6@.471 Ea 51.63 15.00 -- 66.63
Total cost of 4 riser stairway
Forms BV@3.64 Ea 38.15 121.80 -- 159.95
Reinforcing steel RI@.444 Ea 23.40 16.89 -- 40.29
Concrete B6@.628 Ea 68.83 20.00 -- 88.83
Total cost of 5 riser stairway
Forms BV@4.55 Ea 47.69 152.20 -- 199.89
Reinforcing steel RI@.555 Ea 29.25 21.12 -- 50.37
Concrete B6@.785 Ea 86.04 25.00 -- 111.04
Total cost of 6 riser stairway
Forms BV@5.45 Ea 57.23 182.40 -- 239.63
Reinforcing steel RI@.666 Ea 35.10 25.34 -- 60.44
Concrete B6@.942 Ea 103.25 30.00 -- 133.25
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 503
6' wide stairway, reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance
Forms BV@.931 LF 12.79 31.15 -- 43.94
Reinforcing steel RI@.117 LF 7.84 4.45 -- 12.29
Concrete B6@.160 LF 23.08 5.10 -- 28.18
Cost of stairway per riser
Forms BV@1.04 Ea 11.45 34.80 -- 46.25
Reinforcing steel RI@.131 Ea 7.02 4.99 -- 12.01
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
Total cost of 2 riser stairway
Forms BV@2.08 Ea 22.89 69.60 -- 92.49
Reinforcing steel RI@.262 Ea 14.04 9.97 -- 24.01
Concrete B6@.360 Ea 41.30 11.47 -- 52.77
Total cost of 3 riser stairway
Forms BV@3.12 Ea 17.17 104.40 -- 121.57
Reinforcing steel RI@.393 Ea 21.06 14.95 -- 36.01
Concrete B6@.540 Ea 61.95 17.20 -- 79.15
Total cost of 4 riser stairway
Forms BV@4.16 Ea 45.78 139.20 -- 184.98
Reinforcing steel RI@.524 Ea 28.08 19.94 -- 48.02
Concrete B6@.720 Ea 82.60 22.93 -- 105.53
Total cost of 5 riser stairway
Forms BV@5.21 Ea 57.23 174.30 -- 231.53
Reinforcing steel RI@.655 Ea 35.10 24.92 -- 60.02
Concrete B6@.900 Ea 103.25 28.67 -- 131.92
Total cost of 6 riser stairway
Forms BV@6.25 Ea 68.67 209.10 -- 277.77
Reinforcing steel RI@.786 Ea 42.12 29.91 -- 72.03
Concrete B6@1.08 Ea 123.90 34.40 -- 158.30
Total cost of 7 riser stairway
Forms BV@7.29 Ea 80.12 243.90 -- 324.02
Reinforcing steel RI@.917 Ea 49.14 34.89 -- 84.03
Concrete B6@1.26 Ea 144.55 40.13 -- 184.68
Total cost of 8 riser stairway
Forms BV@8.33 Ea 91.56 278.70 -- 370.26
Reinforcing steel RI@1.05 Ea 56.16 39.95 -- 96.11
Concrete B6@1.44 Ea 165.20 45.86 -- 211.06
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 504
3' wide stairway, reinforced with No. 4 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.579 LF 6.40 19.37 -- 25.77
Reinforcing steel RI@.047 LF 3.42 1.79 -- 5.21
Concrete B6@.080 LF 11.54 2.55 -- 14.09
Cost of stairway per riser
Forms BV@.647 Ea 5.72 21.65 -- 27.37
Reinforcing steel RI@.052 Ea 3.06 1.98 -- 5.04
Concrete B6@.090 Ea 10.33 2.87 -- 13.20
Total cost of 2 riser stairway
Forms BV@1.29 Ea 11.45 43.16 -- 54.61
Reinforcing steel RI@.104 Ea 6.12 3.96 -- 10.08
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
Total cost of 3 riser stairway
Forms BV@1.94 Ea 17.17 64.91 -- 82.08
Reinforcing steel RI@.156 Ea 9.18 5.94 -- 15.12
Concrete B6@.270 Ea 30.98 8.60 -- 39.58
Total cost of 4 riser stairway
Forms BV@2.59 Ea 22.89 86.66 -- 109.55
Reinforcing steel RI@.208 Ea 12.24 7.91 -- 20.15
Concrete B6@.360 Ea 41.30 11.47 -- 52.77
Total cost of 5 riser stairway
Forms BV@3.24 Ea 28.61 108.40 -- 137.01
Reinforcing steel RI@.260 Ea 15.30 9.89 -- 25.19
Concrete B6@.450 Ea 51.63 14.33 -- 65.96
Total cost of 6 riser stairway
Forms BV@3.88 Ea 34.34 129.80 -- 164.14
Reinforcing steel RI@.312 Ea 18.36 11.87 -- 30.23
Concrete B6@.540 Ea 61.95 17.20 -- 79.15
Total cost of 7 riser stairway
Forms BV@4.53 Ea 40.06 151.60 -- 191.66
Reinforcing steel RI@.364 Ea 21.42 13.85 -- 35.27
Concrete B6@.630 Ea 72.28 20.07 -- 92.35
Total cost of 8 riser stairway
Forms BV@5.18 Ea 45.78 173.30 -- 219.08
Reinforcing steel RI@.416 Ea 24.48 15.83 -- 40.31
Concrete B6@.720 Ea 82.60 22.93 -- 105.53
4' wide stairway, reinforced with No. 4 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.696 LF 8.53 23.29 -- 31.82
Reinforcing steel RI@.061 LF 4.56 2.32 -- 6.88
Concrete B6@.100 LF 15.38 3.19 -- 18.57
Cost of stairway per riser
Forms BV@.778 Ea 7.63 26.03 -- 33.66
Reinforcing steel RI@.068 Ea 4.08 2.59 -- 6.67
Concrete B6@.112 Ea 13.77 3.57 -- 17.34
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 505
5' wide stairway, reinforced with No. 4 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.814 LF 10.66 27.24 -- 37.90
Reinforcing steel RI@.074 LF 5.70 2.82 -- 8.52
Concrete B6@.140 LF 19.23 4.46 -- 23.69
Cost of stairway per riser
Forms BV@.909 Ea 9.54 30.42 -- 39.96
Reinforcing steel RI@.083 Ea 5.10 3.16 -- 8.26
Concrete B6@.157 Ea 17.21 5.00 -- 22.21
Total cost of 2 riser stairway
Forms BV@1.82 Ea 19.08 60.90 -- 79.98
Reinforcing steel RI@.166 Ea 10.20 6.32 -- 16.52
Concrete B6@.314 Ea 34.42 10.00 -- 44.42
Total cost of 3 riser stairway
Forms BV@2.73 Ea 17.17 91.35 -- 108.52
Reinforcing steel RI@.249 Ea 15.30 9.47 -- 24.77
Concrete B6@.471 Ea 51.63 15.00 -- 66.63
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 506
6' wide stairway, reinforced with No. 4 bars set every 18" each way
Cost of stairway per LF of diagonal distance
Forms BV@.931 LF 12.79 31.15 -- 43.94
Reinforcing steel RI@.117 LF 6.85 4.45 -- 11.30
Concrete B6@.160 LF 23.08 5.10 -- 28.18
Cost of stairway per riser
Forms BV@1.04 Ea 11.45 34.80 -- 46.25
Reinforcing steel RI@.131 Ea 6.13 4.99 -- 11.12
Concrete B6@.180 Ea 20.65 5.73 -- 26.38
Total cost of 2 riser stairway
Forms BV@2.08 Ea 22.89 69.60 -- 92.49
Reinforcing steel RI@.262 Ea 12.26 9.97 -- 22.23
Concrete B6@.360 Ea 41.30 11.47 -- 52.77
Total cost of 3 riser stairway
Forms BV@3.12 Ea 17.17 104.40 -- 121.57
Reinforcing steel RI@.393 Ea 18.39 14.95 -- 33.34
Concrete B6@.540 Ea 61.95 17.20 -- 79.15
Total cost of 4 riser stairway
Forms BV@4.16 Ea 45.78 139.20 -- 184.98
Reinforcing steel RI@.524 Ea 24.52 19.94 -- 44.46
Concrete B6@.720 Ea 82.60 22.93 -- 105.53
Total cost of 5 riser stairway
Forms BV@5.21 Ea 57.23 174.30 -- 231.53
Reinforcing steel RI@.655 Ea 30.65 24.92 -- 55.57
Concrete B6@.900 Ea 103.25 28.67 -- 131.92
Total cost of 6 riser stairway
Forms BV@6.25 Ea 68.67 209.10 -- 277.77
Reinforcing steel RI@.786 Ea 36.77 29.91 -- 66.68
Concrete B6@1.08 Ea 123.90 34.40 -- 158.30
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 507
Concrete stairs cast on grade Prices include material and labor and material costs for erecting and
stripping side and riser forms and 3,000 lb. pump-mix concrete with short polypropylene fiber additive.
Foundations and side walls are not included. Stairs are assumed to have a 6" throat, 6" risers and 12"
treads.
Concrete stairs cast on grade Prices include material and labor and material costs for erecting and
stripping side and riser forms and 3,000 lb. pump-mix concrete with long polypropylene fiber additive.
Foundations and side walls are not included. Stairs are assumed to have a 6" throat, 6" risers and 12"
treads.
Concrete stairs cast above grade Prices include erecting and stripping side, soffit and riser forms,
placing grade 60 reinforcing steel and 3,000 P.S.I. concrete with a trailer-mounted 15-CY per hour
pump. A No. 3 bar is also included behind each stair nosing. Foundations and concrete side walls are
not included. Stairs are assumed to have a 6" throat (minimum concrete thickness), 7" risers and 12"
treads. Equipment cost includes scaffolding and the concrete pump and is based on the production of a
crew of 3.
3' wide stairway above grade reinforced with No. 4 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.13 LF 25.79 37.81 0.21 63.81
Reinforcing steel RI@.084 LF 5.53 3.20 0.08 8.81
Concrete B6@.084 LF 16.49 2.68 0.04 19.21
Cost of stairway per riser
Forms BV@1.26 Ea 23.08 42.16 0.24 65.48
Reinforcing steel RI@.095 Ea 4.95 3.62 0.09 8.66
Concrete B6@.094 Ea 14.76 2.99 0.04 17.79
Total cost of 16 riser stairway
Reinforcing steel RI@1.52 Ea 79.21 57.84 1.43 138.48
Concrete B6@1.50 Ea 236.13 47.78 0.71 284.62
Total cost of 18 riser stairway
Forms BV@22.6 Ea 415.39 756.20 4.24 1,175.83
Reinforcing steel RI@1.71 Ea 89.11 65.07 1.60 155.78
Concrete B6@1.70 Ea 265.65 54.15 0.79 320.59
Total cost of 20 riser stairway
Reinforcing steel RI@1.90 Ea 99.01 72.30 1.78 173.09
Concrete B6@1.88 Ea 295.16 59.88 0.88 355.92
Total cost of 22 riser stairway
Forms BV@27.7 Ea 507.70 926.80 5.19 1,439.69
Reinforcing steel RI@2.09 Ea 108.91 79.52 1.96 190.39
Concrete B6@2.07 Ea 324.68 65.93 0.97 391.58
Total cost of 24 riser stairway
Forms BV@30.2 Ea 553.85 1,010.00 5.66 1,569.51
Reinforcing steel RI@2.28 Ea 118.81 86.75 2.14 207.70
Concrete B6@2.26 Ea 354.19 71.98 1.06 427.23
4' wide stairway above grade reinforced with No. 4 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.42 LF 34.38 47.51 0.27 82.16
Reinforcing steel RI@.110 LF 7.38 4.19 0.10 11.67
Concrete B6@.112 LF 21.99 3.57 0.05 25.61
Cost of stairway per riser
Forms BV@1.59 Ea 30.77 53.20 0.30 84.27
Reinforcing steel RI@.123 Ea 6.60 4.68 0.12 11.40
Concrete B6@.126 Ea 19.68 4.01 0.06 23.75
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 514
5' wide stairway above grade reinforced with No. 4 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.73 LF 42.98 57.89 0.32 101.19
Reinforcing steel RI@.136 LF 9.22 5.18 0.13 14.53
Concrete B6@.136 LF 27.49 4.33 0.06 31.88
Cost of stairway per riser
Forms BV@1.93 Ea 38.46 64.58 0.36 103.40
Reinforcing steel RI@.152 Ea 8.25 5.78 0.14 14.17
Concrete B6@.152 Ea 24.60 4.84 0.07 29.51
Total cost of 16 riser stairway
Forms BV@30.9 Ea 615.39 1,034.00 5.79 1,655.18
Reinforcing steel RI@2.43 Ea 132.01 92.46 2.28 226.75
Concrete B6@2.43 Ea 393.55 77.40 1.14 472.09
Total cost of 18 riser stairway
Forms BV@34.7 Ea 692.31 1,161.00 6.51 1,859.82
Reinforcing steel RI@2.74 Ea 148.51 104.30 2.57 255.38
Concrete B6@2.74 Ea 442.74 87.27 1.28 531.29
Total cost of 20 riser stairway
Forms BV@38.6 Ea 769.24 1,292.00 7.24 2,068.48
Reinforcing steel RI@3.04 Ea 165.02 115.70 2.85 283.57
Concrete B6@3.04 Ea 491.94 96.82 1.43 590.19
Total cost of 22 riser stairway
Forms BV@42.5 Ea 846.16 1,422.00 7.96 2,276.12
Reinforcing steel RI@3.34 Ea 181.52 127.10 3.14 311.76
Concrete B6@3.34 Ea 541.13 106.40 1.57 649.10
Total cost of 24 riser stairway
Forms BV@46.3 Ea 923.08 1,549.00 8.69 2,480.77
Reinforcing steel RI@3.65 Ea 198.02 138.90 3.42 340.34
Concrete B6@3.65 Ea 590.32 116.30 1.71 708.33
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 515
6' wide stairway above grade reinforced with No. 4 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@2.02 LF 51.58 67.59 0.38 119.55
Reinforcing steel RI@.162 LF 11.06 6.16 0.15 17.37
Concrete B6@.165 LF 32.98 5.26 0.08 38.32
Cost of stairway per riser
Forms BV@2.26 Ea 46.15 75.62 0.42 122.19
Reinforcing steel RI@.181 Ea 9.90 6.89 0.17 16.96
Concrete B6@.184 Ea 29.52 5.86 0.09 35.47
Total cost of 16 riser stairway
Forms BV@36.2 Ea 738.47 1,211.00 6.79 1,956.26
Concrete B6@2.94 Ea 472.26 93.64 1.38 567.28
Total cost of 18 riser stairway
Forms BV@40.7 Ea 830.78 1,362.00 7.63 2,200.41
Reinforcing steel RI@3.26 Ea 178.22 124.00 3.05 305.27
Concrete B6@3.31 Ea 531.29 105.40 1.55 638.24
Total cost of 20 riser stairway
Forms BV@45.2 Ea 923.08 1,512.00 8.48 2,443.56
Reinforcing steel RI@3.62 Ea 198.02 137.70 3.39 339.11
Concrete B6@3.68 Ea 590.32 117.20 1.73 709.25
Total cost of 22 riser stairway
Forms BV@49.8 Ea 1,015.39 1,666.00 9.33 2,690.72
Reinforcing steel RI@3.98 Ea 217.82 151.40 3.73 372.95
Concrete B6@4.05 Ea 649.35 129.00 1.90 780.25
Total cost of 24 riser stairway
Forms BV@54.3 Ea 1,107.70 1,817.00 10.18 2,934.88
Reinforcing steel RI@4.30 Ea 237.62 163.60 4.07 405.29
Concrete B6@4.42 Ea 708.39 140.80 2.07 851.26
Concrete stairs cast above grade Prices include erecting and stripping side, soffit and riser forms,
placing grade 60 reinforcing steel and 3,000 P.S.I. concrete with a trailer-mounted 15-CY per hour
pump. A No. 3 bar is also included behind each stair nosing. Foundations and concrete side walls are
not included. Stairs are assumed to have a 6" throat (minimum concrete thickness), 7" risers and 12"
treads. Equipment cost includes scaffolding and the concrete pump and is based on the production of a
crew of 3.
3' wide stairway above grade reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.13 LF 25.79 37.81 0.21 63.81
Reinforcing steel RI@.062 LF 4.53 2.36 0.06 6.95
Concrete B6@.084 LF 16.49 2.68 0.04 19.21
Cost of stairway per riser
Forms BV@1.26 Ea 23.08 42.16 0.24 65.48
Reinforcing steel RI@.069 Ea 4.05 2.63 0.06 6.74
Concrete B6@.094 Ea 14.76 2.99 0.04 17.79
Total cost of 16 riser stairway
Reinforcing steel RI@1.10 Ea 64.80 41.86 1.04 107.70
Concrete B6@1.50 Ea 236.13 47.78 0.71 284.62
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 516
4' wide stairway above grade reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.42 LF 34.38 47.51 0.27 82.16
Reinforcing steel RI@.081 LF 6.03 3.08 0.08 9.19
Concrete B6@.112 LF 21.99 3.57 0.05 25.61
Cost of stairway per riser
Forms BV@1.59 Ea 30.77 53.20 0.30 84.27
Reinforcing steel RI@.090 Ea 5.40 3.43 0.08 8.91
Concrete B6@.126 Ea 19.68 4.01 0.06 23.75
Total cost of 16 riser stairway
Forms BV@25.4 Ea 492.31 849.90 4.77 1,346.98
Reinforcing steel RI@1.44 Ea 86.40 54.79 1.35 142.54
Concrete B6@2.02 Ea 314.84 64.34 0.95 380.13
Total cost of 18 riser stairway
Forms BV@28.6 Ea 553.85 957.00 5.36 1,516.21
Reinforcing steel RI@1.62 Ea 97.20 61.64 1.52 160.36
Concrete B6@2.27 Ea 354.19 72.30 1.06 427.55
Total cost of 20 riser stairway
Forms BV@31.8 Ea 615.39 1,064.00 5.96 1,685.35
Reinforcing steel RI@1.80 Ea 108.00 68.49 1.69 178.18
Concrete B6@2.52 Ea 393.55 80.26 1.18 474.99
Total cost of 22 riser stairway
Forms BV@35.0 Ea 676.93 1,171.00 6.55 1,854.48
Reinforcing steel RI@1.98 Ea 118.80 75.34 1.86 196.00
Concrete B6@2.77 Ea 432.90 88.22 1.30 522.42
Total cost of 24 riser stairway
Forms BV@38.1 Ea 738.47 1,275.00 7.15 2,020.62
Reinforcing steel RI@2.16 Ea 129.60 82.19 2.03 213.82
Concrete B6@3.02 Ea 472.26 96.19 1.42 569.87
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 517
5' wide stairway above grade reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Reinforcing steel BV@1.73 LF 42.98 57.89 0.32 101.19
Forms RI@.099 LF 7.54 3.77 0.09 11.40
Concrete B6@.136 LF 27.49 4.33 0.06 31.88
Cost of stairway per riser
Forms BV@1.93 Ea 38.46 64.58 0.36 103.40
Reinforcing steel RI@.110 Ea 6.75 4.19 0.10 11.04
Concrete B6@.152 Ea 24.60 4.84 0.07 29.51
Total cost of 16 riser stairway
Forms BV@30.9 Ea 615.39 1,034.00 5.79 1,655.18
Reinforcing steel RI@1.76 Ea 108.00 66.97 1.65 176.62
Concrete B6@2.43 Ea 393.55 77.40 1.14 472.09
Total cost of 18 riser stairway
Forms BV@34.7 Ea 692.31 1,161.00 6.51 1,859.82
Reinforcing steel RI@1.98 Ea 121.50 75.34 1.86 198.70
Concrete B6@2.74 Ea 442.74 87.27 1.28 531.29
Total cost of 20 riser stairway
Forms BV@38.6 Ea 769.24 1,292.00 7.24 2,068.48
Reinforcing steel RI@2.20 Ea 135.00 83.71 2.06 220.77
Concrete B6@3.04 Ea 491.94 96.82 1.43 590.19
Total cost of 22 riser stairway
Forms BV@42.5 Ea 846.16 1,422.00 7.96 2,276.12
Reinforcing steel RI@2.42 Ea 148.50 92.08 2.27 242.85
Concrete B6@3.34 Ea 541.13 106.40 1.57 649.10
Total cost of 24 riser stairway
Forms BV@46.3 Ea 923.08 1,549.00 8.69 2,480.77
Reinforcing steel RI@2.64 Ea 162.00 100.50 2.48 264.98
Concrete B6@3.65 Ea 590.32 116.30 1.71 708.33
6' wide stairway above grade reinforced with No. 4 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@2.02 LF 51.58 67.59 0.38 119.55
Reinforcing steel RI@.117 LF 9.05 4.45 0.11 13.61
Concrete B6@.165 LF 32.98 5.26 0.08 38.32
Cost of stairway per riser
Forms BV@2.26 Ea 46.15 75.62 0.42 122.19
Reinforcing steel RI@.131 Ea 8.10 4.99 0.12 13.21
Concrete B6@.184 Ea 29.52 5.86 0.09 35.47
Total cost of 16 riser stairway
Forms BV@36.2 Ea 738.47 1,211.00 6.79 1,956.26
Reinforcing steel RI@2.10 Ea 129.60 79.91 1.97 211.48
Concrete B6@2.94 Ea 472.26 93.64 1.38 567.28
Total cost of 18 riser stairway
Forms BV@40.7 Ea 830.78 1,362.00 7.63 2,200.41
Reinforcing steel RI@2.36 Ea 145.80 89.80 2.21 237.81
Concrete B6@3.31 Ea 531.29 105.40 1.55 638.24
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 518
Concrete stairs cast above grade Prices include erecting and stripping side, soffit and riser forms,
placing grade 60 reinforcing steel and 3,000 P.S.I. concrete with a trailer-mounted 15-CY per hour
pump. A No. 3 bar is also included behind each stair nosing. Foundations and concrete side walls are
not included. Stairs are assumed to have a 6" throat (minimum concrete thickness), 7" risers and 12"
treads. Equipment cost includes scaffolding and the concrete pump and is based on the production of a
crew of 3.
3' wide stairway above grade reinforced with No. 5 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.13 LF 25.79 37.81 0.21 63.81
Reinforcing steel RI@.105 LF 7.62 4.00 0.10 11.72
Concrete B6@.084 LF 16.49 2.68 0.04 19.21
Cost of stairway per riser
Forms BV@1.25 Ea 23.08 41.83 0.24 65.15
Reinforcing steel RI@.117 Ea 6.82 4.45 0.11 11.38
Concrete B6@.094 Ea 14.76 2.99 0.04 17.79
Total cost of 16 riser stairway
Reinforcing steel RI@1.87 Ea 109.13 71.15 1.76 182.04
Concrete B6@1.50 Ea 236.13 47.78 0.71 284.62
Total cost of 18 riser stairway
Forms BV@22.6 Ea 415.39 756.20 4.24 1,175.83
Reinforcing steel RI@2.11 Ea 122.77 80.29 1.97 205.03
Concrete B6@1.70 Ea 265.65 54.15 0.79 320.59
Total cost of 20 riser stairway
Reinforcing steel RI@2.34 Ea 136.41 89.04 2.19 227.64
Concrete B6@1.88 Ea 295.16 59.88 0.88 355.92
Total cost of 22 riser stairway
Forms BV@27.7 Ea 507.70 926.80 5.19 1,439.69
Reinforcing steel RI@2.57 Ea 150.05 97.79 2.41 250.25
Concrete B6@2.07 Ea 324.68 65.93 0.97 391.58
Total cost of 24 riser stairway
Forms BV@30.2 Ea 553.85 1,010.00 5.66 1,569.51
Reinforcing steel RI@2.81 Ea 163.69 106.90 2.63 273.22
Concrete B6@2.26 Ea 354.19 71.98 1.06 427.23
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 519
4' wide stairway above grade reinforced with No. 5 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.42 LF 34.38 47.51 0.27 82.16
Reinforcing steel RI@.136 LF 10.16 5.18 0.13 15.47
Concrete B6@.112 LF 21.99 3.57 0.05 25.61
Cost of stairway per riser
Forms BV@1.59 Ea 30.77 53.20 0.30 84.27
Reinforcing steel RI@.153 Ea 9.09 5.82 0.14 15.05
Concrete B6@.126 Ea 19.68 4.01 0.06 23.75
Total cost of 16 riser stairway
Forms BV@25.4 Ea 492.31 849.90 4.77 1,346.98
Reinforcing steel RI@2.45 Ea 145.51 93.22 2.30 241.03
Concrete B6@2.02 Ea 314.84 64.34 0.95 380.13
Total cost of 18 riser stairway
Forms BV@28.6 Ea 553.85 957.00 5.36 1,516.21
Reinforcing steel RI@2.75 Ea 163.69 104.60 2.58 270.87
Concrete B6@2.27 Ea 354.19 72.30 1.06 427.55
Total cost of 20 riser stairway
Forms BV@31.8 Ea 615.39 1,064.00 5.96 1,685.35
Reinforcing steel RI@3.06 Ea 181.88 116.40 2.87 301.15
Concrete B6@2.52 Ea 393.55 80.26 1.18 474.99
Total cost of 22 riser stairway
Forms BV@35.0 Ea 676.93 1,171.00 6.55 1,854.48
Reinforcing steel RI@3.37 Ea 200.07 128.20 3.16 331.43
Concrete B6@2.77 Ea 432.90 88.22 1.30 522.42
Total cost of 24 riser stairway
Forms BV@38.1 Ea 738.47 1,275.00 7.15 2,020.62
Reinforcing steel RI@3.67 Ea 218.26 139.60 3.44 361.30
Concrete B6@3.02 Ea 472.26 96.19 1.42 569.87
5' wide stairway above grade reinforced with No. 5 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.73 LF 42.98 57.89 0.32 101.19
Reinforcing steel RI@.169 LF 12.70 6.43 0.16 19.29
Concrete B6@.136 LF 27.49 4.33 0.06 31.88
Cost of stairway per riser
Forms BV@1.93 Ea 38.46 64.58 0.36 103.40
Reinforcing steel RI@.188 Ea 11.37 7.15 0.18 18.70
Concrete B6@.152 Ea 24.60 4.84 0.07 29.51
Total cost of 16 riser stairway
Forms BV@30.9 Ea 615.39 1,034.00 5.79 1,655.18
Reinforcing steel RI@3.01 Ea 181.88 114.50 2.82 299.20
Concrete B6@2.43 Ea 393.55 77.40 1.14 472.09
Total cost of 18 riser stairway
Forms BV@34.7 Ea 692.31 1,161.00 6.51 1,859.82
Reinforcing steel RI@3.38 Ea 204.62 128.60 3.17 336.39
Concrete B6@2.74 Ea 442.74 87.27 1.28 531.29
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 520
6' wide stairway above grade reinforced with No. 5 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@2.02 LF 51.58 67.59 0.38 119.55
Reinforcing steel RI@.200 LF 15.24 7.61 0.19 23.04
Concrete B6@.165 LF 32.98 5.26 0.08 38.32
Cost of stairway per riser
Forms BV@2.26 Ea 46.15 75.62 0.42 122.19
Reinforcing steel RI@.224 Ea 13.64 8.52 0.21 22.37
Concrete B6@.184 Ea 29.52 5.86 0.09 35.47
Total cost of 16 riser stairway
Forms BV@36.2 Ea 738.47 1,211.00 6.79 1,956.26
Reinforcing steel RI@3.58 Ea 218.26 136.20 3.36 357.82
Concrete B6@2.94 Ea 472.26 93.64 1.38 567.28
Total cost of 18 riser stairway
Forms BV@40.7 Ea 830.78 1,362.00 7.63 2,200.41
Reinforcing steel RI@4.03 Ea 245.54 153.30 3.78 402.62
Concrete B6@3.31 Ea 531.29 105.40 1.55 638.24
Total cost of 20 riser stairway
Forms BV@45.2 Ea 923.08 1,512.00 8.48 2,443.56
Reinforcing steel RI@4.48 Ea 272.82 170.50 4.20 447.52
Concrete B6@3.68 Ea 590.32 117.20 1.73 709.25
Total cost of 22 riser stairway
Forms BV@49.8 Ea 1,015.39 1,666.00 9.33 2,690.72
Reinforcing steel RI@4.93 Ea 300.11 187.60 4.62 492.33
Concrete B6@4.05 Ea 649.35 129.00 1.90 780.25
Total cost of 24 riser stairway
Forms BV@54.3 Ea 1,107.70 1,817.00 10.18 2,934.88
Reinforcing steel RI@5.38 Ea 327.39 204.70 5.04 537.13
Concrete B6@4.42 Ea 708.39 140.80 2.07 851.26
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 521
Concrete stairs cast above grade Prices include erecting and stripping side, soffit and riser forms,
placing grade 60 reinforcing steel and 3,000 P.S.I. concrete with a trailer-mounted 15-CY per hour
pump. A No. 3 bar is also included behind each stair nosing. Foundations and concrete side walls are
not included. Stairs are assumed to have a 6" throat (minimum concrete thickness), 7" risers and 12"
treads. Equipment cost includes scaffolding and the concrete pump and is based on the production of a
crew of 3.
3' wide stairway above grade reinforced with No. 5 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.13 LF 25.79 37.81 0.21 63.81
Reinforcing steel RI@.076 LF 6.24 2.89 0.07 9.20
Concrete B6@.084 LF 16.49 2.68 0.04 19.21
Cost of stairway per riser
Forms BV@1.26 Ea 23.08 42.16 0.24 65.48
Reinforcing steel RI@.085 Ea 5.58 3.23 0.08 8.89
Concrete B6@.094 Ea 14.76 2.99 0.04 17.79
Total cost of 16 riser stairway
Reinforcing steel RI@1.36 Ea 89.28 51.75 1.28 142.31
Concrete B6@1.50 Ea 236.13 47.78 0.71 284.62
Total cost of 18 riser stairway
Forms BV@22.6 Ea 415.39 756.20 4.24 1,175.83
Reinforcing steel RI@1.53 Ea 100.44 58.22 1.43 160.09
Concrete B6@1.69 Ea 265.65 53.83 0.79 320.27
Total cost of 20 riser stairway
Reinforcing steel RI@1.70 Ea 111.60 64.69 1.59 177.88
Concrete B6@1.88 Ea 295.16 59.88 0.88 355.92
Total cost of 22 riser stairway
Forms BV@27.7 Ea 507.70 926.80 5.19 1,439.69
Reinforcing steel RI@1.87 Ea 122.76 71.15 1.75 195.66
Concrete B6@2.07 Ea 324.68 65.93 0.97 391.58
Total cost of 24 riser stairway
Forms BV@30.2 Ea 553.85 1,010.00 5.66 1,569.51
Reinforcing steel RI@2.04 Ea 133.92 77.62 1.91 213.45
Concrete B6@2.26 Ea 354.19 71.98 1.06 427.23
4' wide stairway above grade reinforced with No. 5 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.42 LF 34.38 47.51 0.27 82.16
Reinforcing steel RI@.099 LF 8.31 3.77 0.09 12.17
Concrete B6@.112 LF 21.99 3.57 0.05 25.61
Cost of stairway per riser
Forms BV@1.59 Ea 30.77 53.20 0.30 84.27
Reinforcing steel RI@.110 Ea 7.44 4.19 0.10 11.73
Concrete B6@.126 Ea 19.68 4.01 0.06 23.75
Total cost of 16 riser stairway
Forms BV@25.4 Ea 492.31 849.90 4.77 1,346.98
Reinforcing steel RI@1.76 Ea 119.04 66.97 1.65 187.66
Concrete B6@2.02 Ea 314.84 64.34 0.95 380.13
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 522
5' wide stairway above grade reinforced with No. 5 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.73 LF 42.98 57.89 0.32 101.19
Reinforcing steel RI@.121 LF 10.39 4.60 0.11 15.10
Concrete B6@.136 LF 27.49 4.33 0.06 31.88
Cost of stairway per riser
Forms BV@1.93 Ea 38.46 64.58 0.36 103.40
Reinforcing steel RI@.135 Ea 9.30 5.14 0.13 14.57
Concrete B6@.152 Ea 24.60 4.84 0.07 29.51
Total cost of 16 riser stairway
Forms BV@30.9 Ea 615.39 1,034.00 5.79 1,655.18
Reinforcing steel RI@2.16 Ea 148.80 82.19 2.03 233.02
Concrete B6@2.43 Ea 393.55 77.40 1.14 472.09
Total cost of 18 riser stairway
Forms BV@34.7 Ea 692.31 1,161.00 6.51 1,859.82
Reinforcing steel RI@2.43 Ea 167.40 92.46 2.28 262.14
Concrete B6@2.74 Ea 442.74 87.27 1.28 531.29
Total cost of 20 riser stairway
Forms BV@38.6 Ea 769.24 1,292.00 7.24 2,068.48
Reinforcing steel RI@2.70 Ea 186.00 102.70 2.53 291.23
Concrete B6@3.04 Ea 491.94 96.82 1.43 590.19
Total cost of 22 riser stairway
Forms BV@42.5 Ea 846.16 1,422.00 7.96 2,276.12
Reinforcing steel RI@2.97 Ea 204.60 113.00 2.78 320.38
Concrete B6@3.34 Ea 541.13 106.40 1.57 649.10
Total cost of 24 riser stairway
Forms BV@46.3 Ea 923.08 1,549.00 8.69 2,480.77
Reinforcing steel RI@3.24 Ea 223.20 123.30 3.04 349.54
Concrete B6@3.65 Ea 590.32 116.30 1.71 708.33
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 523
6' wide stairway above grade reinforced with No. 5 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@2.02 LF 51.58 67.59 0.38 119.55
Reinforcing steel RI@.143 LF 12.47 5.44 0.13 18.04
Concrete B6@.165 LF 32.98 5.26 0.08 38.32
Cost of stairway per riser
Forms BV@2.26 Ea 46.15 75.62 0.42 122.19
Reinforcing steel RI@.160 Ea 11.16 6.09 0.15 17.40
Concrete B6@.184 Ea 29.52 5.86 0.09 35.47
Total cost of 16 riser stairway
Forms BV@36.2 Ea 738.47 1,211.00 6.79 1,956.26
Reinforcing steel RI@2.56 Ea 178.56 97.41 2.40 278.37
Concrete B6@2.94 Ea 472.26 93.64 1.38 567.28
Total cost of 18 riser stairway
Forms BV@40.7 Ea 830.78 1,362.00 7.63 2,200.41
Reinforcing steel RI@2.88 Ea 200.88 109.60 2.70 313.18
Concrete B6@3.31 Ea 531.29 105.40 1.55 638.24
Total cost of 20 riser stairway
Forms BV@45.2 Ea 923.08 1,512.00 8.48 2,443.56
Reinforcing steel RI@3.20 Ea 223.20 121.80 3.00 348.00
Concrete B6@3.68 Ea 590.32 117.20 1.73 709.25
Total cost of 22 riser stairway
Forms BV@49.8 Ea 1,015.39 1,666.00 9.33 2,690.72
Reinforcing steel RI@3.52 Ea 245.52 133.90 3.30 382.72
Concrete B6@4.05 Ea 649.35 129.00 1.90 780.25
Total cost of 24 riser stairway
Forms BV@54.3 Ea 1,107.70 1,817.00 10.18 2,934.88
Reinforcing steel RI@3.84 Ea 267.84 146.10 3.60 417.54
Concrete B6@4.42 Ea 708.39 140.80 2.07 851.26
Concrete stairs cast above grade Prices include erecting and stripping side, soffit and riser forms,
placing grade 60 reinforcing steel and 3,000 P.S.I. concrete with a trailer-mounted 15-CY per hour
pump. A No. 3 bar is also included behind each stair nosing. Foundations and concrete side walls are
not included. Stairs are assumed to have a 6" throat (minimum concrete thickness), 7" risers and 12"
treads. Equipment cost includes scaffolding and the concrete pump and is based on the production of a
crew of 3.
3' wide stairway above grade reinforced with No. 6 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.13 LF 25.79 37.81 0.21 63.81
Reinforcing steel RI@.135 LF 10.82 5.14 0.13 16.09
Concrete B6@.084 LF 16.49 2.68 0.04 19.21
Cost of stairway per riser
Forms BV@1.26 Ea 23.08 42.16 0.24 65.48
Reinforcing steel RI@.151 Ea 9.68 5.75 0.14 15.57
Concrete B6@.094 Ea 14.76 2.99 0.04 17.79
Total cost of 16 riser stairway
Reinforcing steel RI@2.42 Ea 154.89 92.08 2.27 249.24
Concrete B6@1.50 Ea 236.13 47.78 0.71 284.62
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 524
4' wide stairway above grade reinforced with No. 6 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.42 LF 34.38 47.51 0.27 82.16
Reinforcing steel RI@.176 LF 14.42 6.70 0.17 21.29
Concrete B6@.112 LF 21.99 3.57 0.05 25.61
Cost of stairway per riser
Forms BV@1.59 Ea 30.77 53.20 0.30 84.27
Reinforcing steel RI@.197 Ea 12.91 7.50 0.18 20.59
Concrete B6@.126 Ea 19.68 4.01 0.06 23.75
Total cost of 16 riser stairway
Forms BV@25.4 Ea 492.31 849.90 4.77 1,346.98
Reinforcing steel RI@3.15 Ea 206.53 119.90 2.96 329.39
Concrete B6@2.02 Ea 314.84 64.34 0.95 380.13
Total cost of 18 riser stairway
Forms BV@28.6 Ea 553.85 957.00 5.36 1,516.21
Reinforcing steel RI@3.55 Ea 232.34 135.10 3.32 370.76
Concrete B6@2.27 Ea 354.19 72.30 1.06 427.55
Total cost of 20 riser stairway
Forms BV@31.8 Ea 615.39 1,064.00 5.96 1,685.35
Reinforcing steel RI@3.94 Ea 258.16 149.90 3.69 411.75
Concrete B6@2.52 Ea 393.55 80.26 1.18 474.99
Total cost of 22 riser stairway
Forms BV@35.0 Ea 676.93 1,171.00 6.55 1,854.48
Reinforcing steel RI@4.33 Ea 283.97 164.80 4.06 452.83
Concrete B6@2.77 Ea 432.90 88.22 1.30 522.42
Total cost of 24 riser stairway
Forms BV@38.1 Ea 738.47 1,275.00 7.15 2,020.62
Reinforcing steel RI@4.73 Ea 309.79 180.00 4.43 494.22
Concrete B6@3.02 Ea 472.26 96.19 1.42 569.87
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 525
5' wide stairway above grade reinforced with No. 6 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.73 LF 42.98 57.89 0.32 101.19
Reinforcing steel RI@.217 LF 18.03 8.26 0.20 26.49
Concrete B6@.136 LF 27.49 4.33 0.06 31.88
Cost of stairway per riser
Forms BV@1.93 Ea 38.46 64.58 0.36 103.40
Reinforcing steel RI@.243 Ea 16.13 9.25 0.23 25.61
Concrete B6@.152 Ea 24.60 4.84 0.07 29.51
Total cost of 16 riser stairway
Forms BV@30.9 Ea 615.39 1,034.00 5.79 1,655.18
Reinforcing steel RI@3.89 Ea 258.16 148.00 3.65 409.81
Concrete B6@2.43 Ea 393.55 77.40 1.14 472.09
Total cost of 18 riser stairway
Forms BV@34.7 Ea 692.31 1,161.00 6.51 1,859.82
Reinforcing steel RI@4.37 Ea 290.43 166.30 4.10 460.83
Concrete B6@2.74 Ea 442.74 87.27 1.28 531.29
Total cost of 20 riser stairway
Forms BV@38.6 Ea 769.24 1,292.00 7.24 2,068.48
Reinforcing steel RI@4.86 Ea 322.70 184.90 4.56 512.16
Concrete B6@3.04 Ea 491.94 96.82 1.43 590.19
Total cost of 22 riser stairway
Forms BV@42.5 Ea 846.16 1,422.00 7.96 2,276.12
Reinforcing steel RI@5.35 Ea 354.97 203.60 5.01 563.58
Concrete B6@3.34 Ea 541.13 106.40 1.57 649.10
Total cost of 24 riser stairway
Forms BV@46.3 Ea 923.08 1,549.00 8.69 2,480.77
Reinforcing steel RI@5.83 Ea 387.24 221.80 5.47 614.51
Concrete B6@3.65 Ea 590.32 116.30 1.71 708.33
6' wide stairway above grade reinforced with No. 6 bars set every 8" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@2.02 LF 51.58 67.59 0.38 119.55
Reinforcing steel RI@.258 LF 21.64 9.82 0.24 31.70
Concrete B6@.165 LF 32.98 5.26 0.08 38.32
Cost of stairway per riser
Forms BV@2.26 Ea 46.15 75.62 0.42 122.19
Reinforcing steel RI@.288 Ea 19.36 10.96 0.27 30.59
Concrete B6@.184 Ea 29.52 5.86 0.09 35.47
Total cost of 16 riser stairway
Forms BV@36.2 Ea 738.47 1,211.00 6.79 1,956.26
Reinforcing steel RI@4.61 Ea 309.79 175.40 4.32 489.51
Concrete B6@2.94 Ea 472.26 93.64 1.38 567.28
Total cost of 18 riser stairway
Forms BV@40.7 Ea 830.78 1,362.00 7.63 2,200.41
Reinforcing steel RI@5.18 Ea 348.51 197.10 4.86 550.47
Concrete B6@3.31 Ea 531.29 105.40 1.55 638.24
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 526
Concrete stairs cast above grade Prices include erecting and stripping side, soffit and riser forms,
placing grade 60 reinforcing steel and 3,000 P.S.I. concrete with a trailer-mounted 15-CY per hour
pump. A No. 3 bar is also included behind each stair nosing. Foundations and concrete side walls are
not included. Stairs are assumed to have a 6" throat (minimum concrete thickness), 7" risers and 12"
treads. Equipment cost includes scaffolding and the concrete pump and is based on the production of a
crew of 3.
3' wide stairway above grade reinforced with No. 6 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.13 LF 25.79 37.81 0.21 63.81
Reinforcing steel RI@.098 LF 8.85 3.73 0.09 12.67
Concrete B6@.084 LF 16.49 2.68 0.04 19.21
Cost of stairway per riser
Forms BV@1.26 Ea 23.08 42.16 0.24 65.48
Reinforcing steel RI@.109 Ea 7.92 4.15 0.10 12.17
Concrete B6@.094 Ea 14.76 2.99 0.04 17.79
Total cost of 16 riser stairway
Reinforcing steel RI@1.74 Ea 126.72 66.21 1.64 194.57
Concrete B6@1.50 Ea 236.13 47.78 0.71 284.62
Total cost of 18 riser stairway
Forms BV@22.6 Ea 415.39 756.20 4.24 1,175.83
Reinforcing steel RI@1.96 Ea 142.56 74.58 1.84 218.98
Concrete B6@1.69 Ea 265.65 53.83 0.79 320.27
Total cost of 20 riser stairway
Reinforcing steel RI@2.18 Ea 158.40 82.95 2.04 243.39
Concrete B6@1.88 Ea 295.16 59.88 0.88 355.92
Total cost of 22 riser stairway
Forms BV@27.7 Ea 507.70 926.80 5.19 1,439.69
Reinforcing steel RI@2.40 Ea 174.24 91.32 2.25 267.81
Concrete B6@2.07 Ea 324.68 65.93 0.97 391.58
Total cost of 24 riser stairway
Forms BV@30.2 Ea 553.85 1,010.00 5.66 1,569.51
Reinforcing steel RI@2.62 Ea 190.08 99.69 2.45 292.22
Concrete B6@2.26 Ea 354.19 71.98 1.06 427.23
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 527
4' wide stairway above grade reinforced with No. 6 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.42 LF 34.38 47.51 0.27 82.16
Reinforcing steel RI@.126 LF 11.80 4.79 0.12 16.71
Concrete B6@.112 LF 21.99 3.57 0.05 25.61
Cost of stairway per riser
Forms BV@1.59 Ea 30.77 53.20 0.30 84.27
Reinforcing steel RI@.141 Ea 10.56 5.37 0.13 16.06
Concrete B6@.126 Ea 19.68 4.01 0.06 23.75
Total cost of 16 riser stairway
Forms BV@25.4 Ea 492.31 849.90 4.77 1,346.98
Reinforcing steel RI@2.26 Ea 168.96 85.99 2.12 257.07
Concrete B6@2.02 Ea 314.84 64.34 0.95 380.13
Total cost of 18 riser stairway
Forms BV@28.6 Ea 553.85 957.00 5.36 1,516.21
Reinforcing steel RI@2.54 Ea 190.08 96.65 2.38 289.11
Concrete B6@2.27 Ea 354.19 72.30 1.06 427.55
Total cost of 20 riser stairway
Forms BV@31.8 Ea 615.39 1,064.00 5.96 1,685.35
Reinforcing steel RI@2.82 Ea 211.20 107.30 2.64 321.14
Concrete B6@2.52 Ea 393.55 80.26 1.18 474.99
Total cost of 22 riser stairway
Forms BV@35.0 Ea 676.93 1,171.00 6.55 1,854.48
Reinforcing steel RI@3.10 Ea 232.32 118.00 2.91 353.23
Concrete B6@2.77 Ea 432.90 88.22 1.30 522.42
Total cost of 24 riser stairway
Forms BV@38.1 Ea 738.47 1,275.00 7.15 2,020.62
Reinforcing steel RI@3.38 Ea 253.44 128.60 3.17 385.21
Concrete B6@3.02 Ea 472.26 96.19 1.42 569.87
5' wide stairway above grade reinforced with No. 6 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@1.73 LF 42.98 57.89 0.32 101.19
Reinforcing steel RI@.154 LF 14.75 5.86 0.14 20.75
Concrete B6@.136 LF 27.49 4.33 0.06 31.88
Cost of stairway per riser
Forms BV@1.93 Ea 38.46 64.58 0.36 103.40
Reinforcing steel RI@.172 Ea 13.20 6.55 0.16 19.91
Concrete B6@.152 Ea 24.60 4.84 0.07 29.51
Total cost of 16 riser stairway
Forms BV@30.9 Ea 615.39 1,034.00 5.79 1,655.18
Reinforcing steel RI@2.75 Ea 211.20 104.60 2.58 318.38
Concrete B6@2.43 Ea 393.55 77.40 1.14 472.09
Total cost of 18 riser stairway
Forms BV@34.7 Ea 692.31 1,161.00 6.51 1,859.82
Reinforcing steel RI@3.10 Ea 237.60 118.00 2.90 358.50
Concrete B6@2.74 Ea 442.74 87.27 1.28 531.29
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 528
6' wide stairway above grade reinforced with No. 6 bars set every 12" each way
Cost of stairway per LF of diagonal distance top to bottom
Forms BV@2.02 LF 51.58 67.59 0.38 119.55
Reinforcing steel RI@.183 LF 17.70 6.96 0.17 24.83
Concrete B6@.165 LF 32.98 5.26 0.08 38.32
Cost of stairway per riser
Forms BV@2.26 Ea 46.15 75.62 0.42 122.19
Reinforcing steel RI@.204 Ea 15.84 7.76 0.19 23.79
Concrete B6@.184 Ea 29.52 5.86 0.09 35.47
Total cost of 16 riser stairway
Forms BV@36.2 Ea 738.47 1,211.00 6.79 1,956.26
Reinforcing steel RI@3.26 Ea 253.44 124.00 3.06 380.50
Concrete B6@2.94 Ea 472.26 93.64 1.38 567.28
Total cost of 18 riser stairway
Forms BV@40.7 Ea 830.78 1,362.00 7.63 2,200.41
Reinforcing steel RI@3.67 Ea 285.12 139.60 3.44 428.16
Concrete B6@3.31 Ea 531.29 105.40 1.55 638.24
Total cost of 20 riser stairway
Forms BV@45.2 Ea 923.08 1,512.00 8.48 2,443.56
Reinforcing steel RI@4.08 Ea 316.80 155.20 3.83 475.83
Concrete B6@3.68 Ea 590.32 117.20 1.73 709.25
Total cost of 22 riser stairway
Forms BV@49.8 Ea 1,015.39 1,666.00 9.33 2,690.72
Reinforcing steel RI@4.49 Ea 348.48 170.80 4.21 523.49
Concrete B6@4.05 Ea 649.35 129.00 1.90 780.25
Total cost of 24 riser stairway
Forms BV@54.3 Ea 1,107.70 1,817.00 10.18 2,934.88
Concrete B6@4.42 Ea 708.39 140.80 2.07 851.26
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 529
8" x 12" tie beam with 4 No. 5 bars, using scaffolding, crew of 8 Includes material and labor for
placing concrete, tying reinforcing steel, and installing and stripping forms, including steel beam
saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Equipment includes a 15-CY per hour concrete pump and scaffolding. Labor as well as pumping
costs are assumed to increase with height above grade. Scaffolding costs are based on the production
of a crew of 8.
8" x 12" tie beam with 4 No. 5 bars, using scaffolding, crew of 16 Includes material and labor for
placing concrete, tying reinforcing steel, and installing and stripping forms, including steel beam
saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Equipment includes a 15-CY per hour concrete pump with operator and scaffolding. Labor as well
as pumping costs are assumed to increase with height above grade. Scaffolding costs are based on the
production of a crew of 16.
8" x 12" tie beam with 4 No. 5 bars, using scaffolding and a boomlift, crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Labor as well as pumping costs are assumed to increase with height
above grade. Equipment includes a trailer-mounted 15-CY per hour pump with operator, scaffolding and
boomlift. Equipment costs are based on the production of a crew of 8. The boomlift is self-propelled and
has a telescoping and articulated boom with a 30' reach.
8" x 12" tie beam with 4 No. 5 bars, using scaffolding and a boomlift, crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Equipment includes a trailer-mounted 15-CY per hour pump with
operator, scaffolding and a boomlift. Equipment costs are based on the production of a crew of 16. Labor
as well as pumping costs are assumed to increase with height above grade. The boomlift is
self-propelled and has a telescoping and articulated boom with a 30' reach.
8" x 16" tie beam with 4 No. 5 bars, using scaffolding, crew of 8 Includes material and labor for
placing concrete, tying reinforcing steel, and installing and stripping forms, including steel beam
saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Equipment includes a 15-CY per hour concrete pump with operator and scaffolding. Labor as well
as pumping costs are assumed to increase with height above grade. Scaffolding costs are based on the
production of a crew of 8.
8" x 16" tie beam with 4 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a trailer-mounted 15-CY per hour pump with operator, and scaffolding. Equipment
costs are based on the production of a crew of 16.
8" x 16" tie beam with 4 No. 5 bars using scaffolding, boomlift and a crew of 8 Includes material
and labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a trailer-mounted 15-CY per hour pump with operator, scaffolding and boomlift.
Equipment costs are based on the production of an 8-person crew. The boomlift is a self-propelled
telescoping and articulated boom with a 30' reach.
8" x 16" tie beam with 4 No. 5 bars using scaffolding and a boomlift, crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Labor as well as pumping costs are assumed to increase with height
above grade. Equipment includes a trailer-mounted 15-CY per hour pump with operator, scaffolding and
boomlift. Equipment costs are based on the production of a crew of 16. The boomlift is a self-propelled
telescoping and articulated boom with a 30' reach.
8" x 24" tie beam with 6 No. 5 bars using scaffolding and a crew of 8 Includes material and labor
for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel beam
saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Labor as well as pumping costs are assumed to increase with height above grade. Equipment
includes a 15-CY per hour pump with operator and scaffolding. Equipment costs are based on the
production of a crew of 8.
8" x 24" tie beam with 6 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a 15-CY per hour pump with operator and scaffolding. Equipment costs are based
on the production of a crew of 16.
8" x 24" tie beam with 6 No. 5 bars using scaffolding, a boomlift and a crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Labor and pumping costs are assumed to increase with height above
grade. Equipment includes a 15-CY per hour pump with operator, scaffolding and boomlift. The boomlift
is a self-propelled telescoping and articulated boom with a 30' reach. Equipment costs are based on the
production of a crew of 8.
8" x 24" tie beam with 6 No. 5 bars using scaffolding, a boomlift and a crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Equipment includes a 15-CY per hour concrete pump with operator,
scaffolding and boomlift. Labor as well as pumping costs are assumed to increase with height above
grade. The boomlift is a self-propelled telescoping and articulated boom with a 30' reach. Equipment
costs are based on the production of a crew of 16.
8" x 36" tie beam with 8 No. 5 bars using scaffolding and crew of 8 Includes material and labor for
placing concrete, tying reinforcing steel, and installing and stripping forms, including steel beam
saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Labor as well as pumping costs are assumed to increase with height above grade. Equipment
includes a 15-CY per hour pump with operator and scaffolding. Equipment costs are base on the
production of a crew of 8.
8" x 36" tie beam with 8 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a 15-CY per hour pump with operator and scaffolding. Equipment costs are based
on the production of a crew of 16.
8" x 36" tie beam with 8 No. 5 bars using scaffolding, boomlift, and a crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Labor as well as pumping costs are assumed to increase with height
above grade. Equipment includes a 15-CY per hour pump with operator, scaffolding and boomlift. The
boomlift is a self-propelled telescoping and articulated boom with a 30' reach. Equipment costs are
based on the production of a crew of 8.
8" x 36" tie beam with 8 No. 5 bars using scaffolding, boomlift and crew of 16 Includes material
and labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a 15-CY per hour pump with operator, scaffolding and boomlift. The boomlift is a
self-propelled telescoping and articulated boom with a 30' reach. Equipment costs are based on the
production of a crew of 16.
12" x 12" tie beam with 4 No. 5 bars using scaffolding and a crew of 8 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor and pumping costs are assumed to increase with height above grade. Equipment
includes a 15-CY per hour concrete pump with operator and scaffolding. Scaffolding costs are based on
the production of a crew of 8.
12" x 12" tie beam with 4 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a trailer-mounted 15-CY per hour pump with operator, and scaffolding. Equipment
costs are based on the production of a crew of 16.
12" x 12" tie beam with 4 No. 5 bars using scaffolding, a boomlift and a crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Labor as well as pumping costs assumed to increase with height above
grade. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Equipment includes a 15-CY per hour concrete pump with operator, and scaffolding and a
boomlift. Equipment costs are based on the production of a crew of 8. The boomlift is a self-propelled
telescoping and articulated boom with a 30' reach.
12" x 12" tie beam with 4 No. 5 bars using scaffolding, a boomlift and a crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Labor as well as pumping costs are assumed to increase with height
above grade. Equipment includes a trailer-mounted 15-CY per hour pump with operator, scaffolding and
a boomlift. Equipment costs are based on the production of a crew of 16. The boomlift is a self-propelled
telescoping and articulated boom with a 30' reach.
12" x 16" tie beam with 4 No. 5 bars using scaffolding and a crew of 8 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a 15-CY per hour concrete pump and scaffolding. Scaffolding costs are based on
the production of a crew of 8.
12" x 16" tie beam with 4 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a trailer-mounted 15-CY per hour pump with operator, and scaffolding. Equipment
costs are based on the production of a crew of 16.
12" x 16" tie beam with 4 No. 5 bars using scaffolding, a boomlift and a crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Labor as well as pumping costs are assumed to increase with height
above grade. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Equipment includes a 15-CY per hour concrete pump with operator, and scaffolding and a
boomlift. Equipment costs are based on the production of a crew of 8. The boomlift is a self-propelled
telescoping and articulated boom with a 30' reach.
12" x 16" tie beam with 4 No. 5 bars using scaffolding, a boomlift and a crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Labor as well as pumping costs are assumed to increase with height
above grade. Equipment includes a trailer-mounted 15-CY per hour pump with operator, scaffolding and
a boomlift. Equipment costs are based on the production of a crew of 16. The boomlift is a self-propelled
telescoping and articulated boom with a 30' reach.
12" x 24" tie beam with 6 No. 5 bars using scaffolding and a crew of 8 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Labor as well as pumping costs are assumed to increase with height above grade.
Equipment includes a 15-CY per hour concrete pump and scaffolding. Scaffolding costs are based on
the production of a crew of 8.
12" x 24" tie beam with 6 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Equipment includes a 15-CY per hour concrete pump and scaffolding. Scaffolding costs
are based on the production of a crew of 16. Labor as well as pumping costs are assumed to increase
with height above grade.
12" x 24" tie beam with 6 No. 5 bars using scaffolding, a boomlift and a crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Equipment includes a 15-CY per hour concrete pump with operator,
boomlift and scaffolding. Scaffolding and boomlift costs are based on the production of a crew of 8.
Labor as well as pumping costs are assumed to increase with height above grade.
12" x 24" tie beam with 6 No. 5 bars using scaffolding, a boomlift and a crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Equipment includes a 15-CY per hour concrete pump with operator,
boomlift and scaffolding. Scaffolding and boomlift costs are based on the production of a crew of 16.
Labor as well as pumping costs are assumed to increase with height above grade.
12" x 36" tie beam with 8 No. 5 bars using scaffolding and crew of 8 Includes material and labor
for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel beam
saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and screw
jacks. Equipment includes a 15-CY per hour concrete pump and scaffolding. Scaffolding costs are
based on the production of a crew of 8. Labor as well as pumping costs are assumed to increase with
height above grade.
12" x 36" tie beam with 8 No. 5 bars using scaffolding and a crew of 16 Includes material and
labor for placing concrete, tying reinforcing steel, and installing and stripping forms, including steel
beam saddles. Beams installed over forms include material costs for soffit forms, diagonal bracing and
screw jacks. Equipment includes a 15-CY per hour concrete pump and scaffolding. Scaffolding costs
are based on the production of a 16-man crew. Labor as well as pumping costs are assumed to
increase with height above grade.
12" x 36" tie beam with 8 No. 5 bars using scaffolding, a boomlift and a crew of 8 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Equipment includes a 15-CY per hour concrete pump with operator,
boomlift and scaffolding. Scaffolding and boomlift costs are based on the production of a crew of 8.
Labor as well as pumping costs are assumed to increase with height above grade.
12" x 36" tie beam with 8 No. 5 bars using scaffolding, boomlift and a crew of 16 Includes
material and labor for placing concrete, tying reinforcing steel, and installing and stripping forms,
including steel beam saddles. Beams installed over forms include material costs for soffit forms,
diagonal bracing and screw jacks. Equipment includes a 15-CY per hour concrete pump with operator,
boomlift and scaffolding. Scaffolding and boomlift costs are based on the production of a crew of 16.
Labor as well as pumping costs are assumed to increase with height above grade.
8" wide rake beams installed at a 6-in-12 slope using scaffolding, crew of 8 Includes installing
and stripping forms, scaffolding, placing and tying reinforcing bars and steel beam saddles and placing
concrete with a trailer-mounted 15-CY per hour pump. Labor costs and concrete pumping costs
increase as wall heights increase. Scaffolding costs are based on the production of a crew of 8.
8" wide rake beams installed at a 6-in-12 slope using scaffolding, crew of 16 Includes installing
and stripping forms, scaffolding, placing and tying reinforcing bars and steel beam saddles and placing
concrete with a trailer-mounted 15-CY per hour pump. Labor costs and concrete pumping costs
increase as wall heights increase. Scaffolding costs are based on the production of a crew of 16.
8" wide rake beams installed at a 6-in-12 slope using scaffolding and a boomlift, crew of 8
Includes installing and stripping forms, scaffolding, a boomlift, placing and tying reinforcing bars and
steel beam saddles and placing concrete with a trailer-mounted 15-CY per hour pump. Labor costs and
concrete pumping costs increase as wall heights increase. Equipment costs are based on the
production of a crew of 8.
8" wide rake beams installed at a 6-in-12 slope using scaffolding and a boomlift, crew of 16
Includes installing and stripping forms, scaffolding, a boomlift, placing and tying reinforcing bars and
steel beam saddles and placing concrete with a trailer-mounted 15-CY per hour pump. Labor costs and
concrete pumping costs increase as wall heights increase. Equipment costs are based on the
production of a crew of 16.
12" wide rake beams installed at a 6-in-12 slope using scaffolding, crew of 8 Includes installing
and stripping forms, scaffolding, placing and tying reinforcing bars and steel beam saddles and placing
concrete with a trailer-mounted 15-CY per hour pump. Labor costs and concrete pumping costs
increase as wall heights increase. Scaffold costs are based on the production of a crew of 8.
12" wide rake beams installed at a 6-in-12 slope using scaffolding, crew of 16 Includes installing
and stripping forms, scaffolding, placing and tying reinforcing bars and steel beam saddles and placing
concrete with a trailer-mounted 15-CY per hour pump. Labor costs and concrete pumping costs
increase as wall heights increase. Scaffold costs are based on the production of a crew of 16.
12" wide rake beams installed at a 6-in-12 slope using scaffolding and a boomlift, crew of 8
Includes installing and stripping forms, scaffolding, a boomlift, placing and tying reinforcing bars and
steel beam saddles and placing concrete with a trailer-mounted 15-CY per hour pump. Labor costs and
concrete pumping costs increase as wall heights increase. Equipment costs are based on the
production of a crew of 8.
12" wide rake beams installed at a 6-in-12 slope using scaffolding and a boomlift, crew of 16
Includes installing and stripping forms, scaffolding, a boomlift, placing and tying reinforcing bars and
steel beam saddles and placing concrete with a trailer-mounted 15-CY per hour pump. Labor costs and
concrete pumping costs increase as wall heights increase. Equipment costs are based on the
production of a crew of 16.
Elevated concrete flat slab construction, 4" Form material includes 2 x 6 joists on 2' centers, 4 x 6
stringers on 7' centers, 4 x 4 wood shores on 6' centers and 3/4" ply form laid with the long sheet
dimension perpendicular to the joists. No reinforcing steel included. All dimension lumber is Douglas fir
or equal strength. Concrete is regular mix if dumped by crane and bucket and a 3,000 P.S.I. pump mix
if pumped. Form labor includes form stripping. Labor includes the cost of placing and trowel-finishing the
slab. Equipment includes a 60-ton crawler crane if concrete is bucket-dumped or a 28-meter boom truck
with operator if concrete is pumped. A boomlift with a 30' reach is used to lift form material to the deck.
4" thick slab, placed with crane and bucket, wood shores
8' floor-to-floor height
Formwork BV@.083 SF 1.94 2.78 0.27 4.99
Concrete T7@.028 SF 1.50 0.84 0.37 2.71
9' floor-to-floor height
Formwork BV@.085 SF 2.00 2.84 0.28 5.12
Concrete T7@.028 SF 1.50 0.84 0.37 2.71
10' floor-to-floor height
Formwork BV@.087 SF 2.08 2.91 0.29 5.28
Concrete T7@.028 SF 1.50 0.84 0.37 2.71
11' floor-to-floor height
Formwork BV@.090 SF 2.14 3.01 0.30 5.45
Concrete T7@.028 SF 1.50 0.84 0.37 2.71
12' floor-to-floor height
Formwork BV@.091 SF 2.20 3.05 0.30 5.55
Concrete T7@.028 SF 1.50 0.84 0.37 2.71
4" thick slab above grade, placed with crane and bucket, adjustable steel shores
8' through 12' floor heights
Formwork BV@.075 SF 1.46 2.51 0.25 4.22
Concrete T7@.028 SF 1.50 0.84 0.37 2.71
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 572
Elevated concrete flat slab construction, 6" Form material includes 2 x 6 joists on 2' centers, 4 x 6
stringers on 7' centers, 4 x 4 wood shores on 6' centers and 3/4" ply form laid with the long sheet
dimension perpendicular to the joists. No reinforcing steel, interior beams, girders or spandrel beams
included. All dimension lumber is Douglas fir or equal strength. Concrete is 3,000 P.S.I. regular mix if
dumped by crane and bucket and a 3,000 P.S.I. pump mix if pumped. Form labor includes form
stripping. Labor includes the cost of placing and trowel-finishing the slab. Equipment includes a 60-ton
crawler crane if concrete is bucket-dumped or a 28-meter boom truck with operator if concrete is
pumped. A boomlift with a 30' reach is used to lift form material to the deck.
6" thick slab above grade placed with crane and bucket, wood shores
8' floor-to-floor height
Formwork BV@.083 SF 1.84 2.78 0.27 4.89
Concrete T7@.033 SF 2.25 0.99 0.44 3.68
9' floor-to-floor height
Formwork BV@.085 SF 1.90 2.84 0.28 5.02
Concrete T7@.033 SF 2.25 0.99 0.44 3.68
10' floor-to-floor height
Formwork BV@.087 SF 1.97 2.91 0.29 5.17
Concrete T7@.033 SF 2.25 0.99 0.44 3.68
11' floor-to-floor height
Formwork BV@.090 SF 2.03 3.01 0.30 5.34
Concrete T7@.033 SF 2.25 0.99 0.44 3.68
12' floor-to-floor height
Formwork BV@.091 SF 2.10 3.05 0.30 5.45
Concrete T7@.033 SF 2.25 0.99 0.44 3.68
6" thick slab above grade placed with crane and bucket, adjustable steel shores
8' through 12' floor heights
Formwork BV@.075 SF 1.37 2.51 0.25 4.13
Concrete T7@.033 SF 2.25 0.99 0.44 3.68
Elevated concrete flat slab construction, 8" Form material includes 2 x 6 joists on 2' centers, 4 x 6
stringers on 6.5' centers, 4 x 4 wood shores on 5' centers and 3/4" ply form laid with the long sheet
dimension perpendicular to the joists. No reinforcing steel, interior beams, girders or spandrel beams
included. All dimension lumber is Douglas fir or equal strength. Concrete is 3,000 P.S.I. regular mix if
dumped by crane and bucket and a 3,000 P.S.I. pump mix if pumped. Form labor includes form
stripping. Labor includes the cost of placing and trowel-finishing the slab. Equipment includes a 60-ton
crawler crane if concrete is bucket-dumped or a 28-meter boom truck with operator if concrete is
pumped. A boomlift with a 30' reach is used to lift form material to the deck.
8" thick slab above grade, placed with crane and bucket, wood shores
8' floor-to-floor height
Formwork BV@.088 SF 2.02 2.94 0.29 5.25
Concrete T7@.039 SF 3.03 1.17 0.52 4.72
9' floor-to-floor height
Formwork BV@.091 SF 2.10 3.05 0.30 5.45
Concrete T7@.039 SF 3.03 1.17 0.52 4.72
10' floor-to-floor height
Formwork BV@.093 SF 2.18 3.11 0.31 5.60
Concrete T7@.039 SF 3.03 1.17 0.52 4.72
11' floor-to-floor height
Formwork BV@.096 SF 2.27 3.21 0.32 5.80
Concrete T7@.039 SF 3.03 1.17 0.52 4.72
12' floor-to-floor height
Formwork BV@.099 SF 2.34 3.31 0.33 5.98
Concrete T7@.039 SF 3.03 1.17 0.52 4.72
8" thick slab above grade, placed with crane and bucket, adjustable steel shores
8' through 12' floor heights
Formwork BV@.078 SF 1.41 2.61 0.26 4.28
Concrete T7@.039 SF 3.03 1.17 0.52 4.72
Elevated concrete flat slab construction, 10" Form material includes 2 x 6 joists on 2' centers, 4 x 6
stringers on 5.5' centers, 4 x 4 wood shores on 4.5' centers and 3/4" ply form laid with the long sheet
dimension perpendicular to the joists. No reinforcing steel, interior beams, girders or spandrel beams
included. All dimension lumber is Douglas fir or equal strength. Concrete is 3,000 P.S.I. regular mix if
dumped by crane and bucket and a 3,000 P.S.I. pump mix if pumped. Form labor includes form
stripping. Labor includes the cost of placing and trowel-finishing the slab. Equipment includes a 60-ton
crawler crane if concrete is bucket-dumped or a 28-meter boom truck with operator if concrete is
pumped. A boomlift with a 30' reach is used to lift form material to the deck.
10" thick slab above grade, placed with crane and bucket, wood shores
8' floor-to-floor height
Formwork BV@.094 SF 2.24 3.15 0.31 5.70
Concrete T7@.044 SF 3.78 1.32 0.58 5.68
9' floor-to-floor height
Formwork BV@.098 SF 2.34 3.28 0.32 5.94
Concrete T7@.044 SF 3.78 1.32 0.58 5.68
10' floor-to-floor height
Formwork BV@.102 SF 2.45 3.41 0.34 6.20
Concrete T7@.044 SF 3.78 1.32 0.58 5.68
11' floor-to-floor height
Formwork BV@.105 SF 2.56 3.51 0.35 6.42
Concrete T7@.044 SF 3.78 1.32 0.58 5.68
12' floor-to-floor height
Formwork BV@.109 SF 2.65 3.65 0.36 6.66
Concrete T7@.044 SF 3.78 1.32 0.58 5.68
10" thick slab above grade, placed with crane and bucket, adjustable steel shores
8' through 12' floor heights
Formwork BV@.082 SF 1.47 2.74 0.27 4.48
Concrete T7@.044 SF 3.78 1.32 0.58 5.68
Elevated concrete flat slab construction, 12" Form material includes 2 x 6 joists on 2' centers, 4 x 6
stringers on 5.5' centers, 4 x 4 wood shores on 4.5' centers and 3/4" ply form laid with the long sheet
dimension perpendicular to the joists. No reinforcing steel, interior beams, girders or spandrel beams
included. All dimension lumber is Douglas fir or equal strength. Concrete is 3,000 P.S.I. regular mix if
dumped by crane and bucket and a 3,000 P.S.I. pump mix if pumped. Form labor includes form
stripping. Labor includes the cost of placing and trowel-finishing the slab. Equipment includes a 60-ton
crawler crane if concrete is bucket-dumped or a 28-meter boom truck with operator if concrete is
pumped. A boomlift with a 30' reach is used to lift form material to the deck.
12" thick slab above grade, placed with crane and bucket, wood shores
8' floor-to-floor height
Formwork BV@.094 SF 2.24 3.15 0.31 5.70
Concrete T7@.050 SF 4.52 1.50 0.66 6.68
9' floor-to-floor height
Formwork BV@.098 SF 2.34 3.28 0.32 5.94
Concrete T7@.050 SF 4.52 1.50 0.66 6.68
10' floor-to-floor height
Formwork BV@.102 SF 2.45 3.41 0.34 6.20
Concrete T7@.050 SF 4.52 1.50 0.66 6.68
11' floor-to-floor height
Formwork BV@.105 SF 2.56 3.51 0.35 6.42
Concrete T7@.050 SF 4.52 1.50 0.66 6.68
12' floor-to-floor height
Formwork BV@.109 SF 2.65 3.65 0.36 6.66
Concrete T7@.050 SF 4.52 1.50 0.66 6.68
12" thick slab, placed with crane and bucket, adjustable steel shores
8' through 12' floor heights
Formwork BV@.082 SF 1.47 2.74 0.27 4.48
Concrete T7@.050 SF 4.52 1.50 0.66 6.68
Concrete beams
Interior beams and girders Includes forms and form stripping and placing the concrete. All dimension
lumber is Douglas fir, or equal strength. The forms are 3/4" ply form. Reinforcing steel is not included.
Concrete is 3,000 P.S.I. regular mix if dumped by crane and bucket and 3,000 P.S.I. pump mix if
pumped. Equipment includes a 60-ton crawler crane if concrete is bucket-dumped or a 28-meter boom
truck with operator if concrete is pumped.
12" wide x 12" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@.423 LF 11.02 14.15 -- 25.17
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
9' floor-to-bottom-of-beam height
Formwork BV@.423 LF 11.65 14.15 -- 25.80
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
10' floor-to-bottom-of-beam height
Formwork BV@.423 LF 12.38 14.15 -- 26.53
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
11' floor-to-bottom-of-beam height
Formwork BV@.423 LF 13.00 14.15 -- 27.15
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
12' floor-to-bottom-of-beam height
Formwork BV@.423 LF 13.52 14.15 -- 27.67
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
12" wide x 12" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@.423 LF 6.35 14.15 -- 20.50
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 578
12" wide x 16" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@.519 LF 11.86 17.37 -- 29.23
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
9' floor-to-bottom-of-beam height
Formwork BV@.519 LF 12.58 17.37 -- 29.95
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
10' floor-to-bottom-of-beam height
Formwork BV@.519 LF 13.21 17.37 -- 30.58
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
11' floor-to-bottom-of-beam height
Formwork BV@.519 LF 13.73 17.37 -- 31.10
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
12' floor-to-bottom-of-beam height
Formwork BV@.519 LF 14.56 17.37 -- 31.93
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
12" wide x 16" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@.519 LF 7.22 17.37 -- 24.59
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
12" wide x 24" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@.705 LF 13.52 23.59 -- 37.11
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
9' floor-to-bottom-of-beam height
Formwork BV@.705 LF 14.14 23.59 -- 37.73
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
10' floor-to-bottom-of-beam height
Formwork BV@.705 LF 14.87 23.59 -- 38.46
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
11' floor-to-bottom-of-beam height
Formwork BV@.705 LF 15.50 23.59 -- 39.09
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
12' floor-to-bottom-of-beam height
Formwork BV@.705 LF 16.02 23.59 -- 39.61
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
12" wide x 24" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@.705 LF 8.84 23.59 -- 32.43
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
16" wide x 24" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@.753 LF 13.83 25.20 -- 39.03
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
9' floor-to-bottom-of-beam height
Formwork BV@.753 LF 14.66 25.20 -- 39.86
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
10' floor-to-bottom-of-beam height
Formwork BV@.753 LF 15.29 25.20 -- 40.49
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
11' floor-to-bottom-of-beam height
Formwork BV@.753 LF 15.91 25.20 -- 41.11
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
12' floor-to-bottom-of-beam height
Formwork BV@.753 LF 16.64 25.20 -- 41.84
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 581
16" wide x 24" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@.753 LF 9.26 25.20 -- 34.46
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
Exterior spandrel beams Includes placing and stripping forms and placing concrete. All dimension
lumber is Douglas fir or equal strength. The forms are 3/4" plyform. Reinforcing steel is not included.
Concrete is 3,000 P.S.I. regular mix if dumped by crane and bucket and 3,000 P.S.I. pump mix if
pumped. Equipment includes a 60-ton crawler crane if concrete is bucket-dumped or a 28-meter boom
truck with operator if concrete is pumped.
12" wide x 12" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@.706 LF 12.90 23.62 -- 36.52
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 582
12" wide x 12" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@.706 LF 8.22 23.62 -- 31.84
Concrete T7@.032 LF 4.52 0.96 0.42 5.90
12" wide x 16" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@.849 LF 13.73 28.41 -- 42.14
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
9' floor-to-bottom-of-beam height
Formwork BV@.849 LF 14.46 28.41 -- 42.87
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
10' floor-to-bottom-of-beam height
Formwork BV@.849 LF 15.18 28.41 -- 43.59
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 583
12" wide x 16" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@.849 LF 9.14 28.41 -- 37.55
Concrete T7@.044 LF 6.06 1.32 0.58 7.96
12" wide x 24" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@1.13 LF 15.50 37.81 -- 53.31
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
9' floor-to-bottom-of-beam height
Formwork BV@1.13 LF 16.22 37.81 -- 54.03
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
10' floor-to-bottom-of-beam height
Formwork BV@1.13 LF 16.85 37.81 -- 54.66
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
11' floor-to-bottom-of-beam height
Formwork BV@1.13 LF 17.58 37.81 -- 55.39
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
12' floor-to-bottom-of-beam height
Formwork BV@1.13 LF 18.10 37.81 -- 55.91
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
12" wide x 24" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@1.13 LF 10.92 37.81 -- 48.73
Concrete T7@.065 LF 9.05 1.95 0.86 11.86
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 584
16" wide x 24" deep beam, placed with crane and bucket, wood shores
8' floor-to-bottom-of-beam height
Formwork BV@1.20 LF 15.91 40.15 -- 56.06
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
9' floor-to-bottom-of-beam height
Formwork BV@1.20 LF 16.74 40.15 -- 56.89
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
10' floor-to-bottom-of-beam height
Formwork BV@1.20 LF 17.37 40.15 -- 57.52
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
11' floor-to-bottom-of-beam height
Formwork BV@1.20 LF 17.99 40.15 -- 58.14
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
12' floor-to-bottom-of-beam height
Formwork BV@1.20 LF 18.51 40.15 -- 58.66
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
16" wide x 24" deep beam, placed with crane and bucket, adjustable steel shores
8' through 12' floor-to-bottom-of-beam height
Formwork BV@1.20 LF 11.34 40.15 -- 51.49
Concrete T7@.088 LF 12.17 2.64 1.17 15.98
Pan slabs Prices include the cost of erecting joist and pan forms, setting adjustable steel shores,
placing concrete, trowel finish and stripping forms. All dimension lumber is Douglas fir or equal strength.
Concrete is 3,000 P.S.I. regular mix if dumped by crane and bucket and 3,000 P.S.I. pump mix if
pumped. Use these figures for estimating the portion of a slab that is over the pan forms and joists
between the pans. Bridging joists, special headers, dropped beams and reinforcing steel are not
included. Equipment includes a 60-ton crawler crane if concrete is bucket-dumped or a 28-meter boom
truck with operator if concrete is pumped. Pans forms are assumed to be rented.
20" wide x 14" deep pans, 5" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.018 SF 3.28 0.57 1.02 4.87
20" wide x 14" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.018 SF 2.82 0.57 1.02 4.41
20" wide x 14" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.44 0.60 1.07 5.11
20" wide x 14" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.018 SF 2.98 0.57 1.02 4.57
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 586
20" wide x 14" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.58 0.60 1.07 5.25
20" wide x 16" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.018 SF 3.08 0.57 1.02 4.67
20" wide x 16" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.70 0.60 1.07 5.37
20" wide x 16" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.018 SF 3.26 0.57 1.02 4.85
20" wide x 16" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.87 0.60 1.07 5.54
20" wide x 16" deep pans, 8" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.39 0.60 1.07 5.06
20" wide x 16" deep pans, 8" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 4.04 0.60 1.07 5.71
20" wide x 20" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.66 0.60 1.07 5.33
20" wide x 20" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 4.27 0.60 1.07 5.94
20" wide x 20" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 3.87 0.60 1.07 5.54
20" wide x 20" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 4.49 0.60 1.07 6.16
20" wide x 20" deep pans, 8" joists, 3" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 4.08 0.60 1.07 5.75
20" wide x 20" deep pans, 8" joists, 4-1/2" slab, pumped
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete B3@.019 SF 4.68 0.60 1.07 6.35
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 587
20" wide x 14" deep pans, 5" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.038 SF 3.01 1.14 0.50 4.65
20" wide x 14" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.035 SF 2.59 1.05 0.46 4.10
20" wide x 14" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.039 SF 3.15 1.17 0.52 4.84
20" wide x 14" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.036 SF 2.72 1.08 0.48 4.28
20" wide x 14" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.040 SF 3.30 1.20 0.53 5.03
20" wide x 16" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.037 SF 2.84 1.11 0.49 4.44
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 588
20" wide x 16" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.041 SF 3.41 1.23 0.54 5.18
20" wide x 16" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.038 SF 3.01 1.14 0.50 4.65
20" wide x 16" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.042 SF 3.57 1.26 0.56 5.39
20" wide x 16" deep pans, 8" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.039 SF 3.12 1.17 0.52 4.81
20" wide x 16" deep pans, 8" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.043 SF 3.70 1.29 0.57 5.56
20" wide x 20" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.040 SF 3.36 1.20 0.53 5.09
20" wide x 20" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.044 SF 3.92 1.32 0.58 5.82
20" wide x 20" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.042 SF 3.55 1.26 0.56 5.37
20" wide x 20" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.046 SF 4.12 1.38 0.61 6.11
20" wide x 20" deep pans, 8" joists, 3" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.043 SF 3.73 1.29 0.57 5.59
20" wide x 20" deep pans, 8" joists, 4-1/2" slab, crane and bucket
Formwork BV@.104 SF 0.33 3.48 3.17 6.98
Concrete T7@.047 SF 4.30 1.41 0.62 6.33
30" wide x 14" deep pans, 5" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 2.86 0.57 1.02 4.45
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 589
30" wide x 14" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 2.38 0.57 1.02 3.97
30" wide x 14" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.01 0.57 1.02 4.60
30" wide x 14" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 2.52 0.57 1.02 4.11
30" wide x 14" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.10 0.57 1.02 4.69
30" wide x 16" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 2.59 0.57 1.02 4.18
30" wide x 16" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.18 0.57 1.02 4.77
30" wide x 16" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.33 0.57 1.02 4.92
30" wide x 16" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.33 0.57 1.02 4.92
30" wide x 16" deep pans, 8" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 2.75 0.57 1.02 4.34
30" wide x 16" deep pans, 8" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.45 0.60 1.07 5.12
30" wide x 20" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 2.98 0.57 1.02 4.57
30" wide x 20" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.59 0.60 1.07 5.26
30" wide x 20" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.15 0.57 1.02 4.74
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 590
30" wide x 20" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.78 0.60 1.07 5.45
30" wide x 20" deep pans, 8" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.018 SF 3.32 0.57 1.02 4.91
30" wide x 20" deep pans, 8" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.93 0.60 1.07 5.60
30" wide x 24" deep pans, 6" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.39 0.60 1.07 5.06
30" wide x 24" deep pans, 6" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 4.04 0.60 1.07 5.71
30" wide x 24" deep pans, 7" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.63 0.60 1.07 5.30
30" wide x 24" deep pans, 7" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 4.24 0.60 1.07 5.91
30" wide x 24" deep pans, 8" joists, 3" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 3.85 0.60 1.07 5.52
30" wide x 24" deep pans, 8" joists, 4-1/2" slab, pumped
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete B3@.019 SF 4.43 0.60 1.07 6.10
30" wide x 14" deep pans, 5" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.035 SF 2.64 1.05 0.46 4.15
30" wide x 14" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.032 SF 2.18 0.96 0.42 3.56
30" wide x 14" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.036 SF 2.69 1.08 0.48 4.25
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 591
30" wide x 14" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.033 SF 2.29 0.99 0.44 3.72
30" wide x 14" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.037 SF 2.86 1.11 0.49 4.46
30" wide x 16" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.034 SF 2.36 1.02 0.45 3.83
30" wide x 16" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.038 SF 2.92 1.14 0.50 4.56
30" wide x 16" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.035 SF 2.49 1.05 0.46 4.00
30" wide x 16" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.038 SF 3.05 1.14 0.50 4.69
30" wide x 16" deep pans, 8" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.035 SF 2.53 1.05 0.46 4.04
30" wide x 16" deep pans, 8" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.039 SF 3.18 1.17 0.52 4.87
30" wide x 20" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.036 SF 2.72 1.08 0.48 4.28
30" wide x 20" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.040 SF 3.30 1.20 0.53 5.03
30" wide x 20" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.037 SF 2.90 1.11 0.49 4.50
30" wide x 20" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.041 SF 3.45 1.23 0.54 5.22
30" wide x 20" deep pans, 8" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.038 SF 3.04 1.14 0.50 4.68
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 592
30" wide x 20" deep pans, 8" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.042 SF 3.60 1.26 0.56 5.42
30" wide x 24" deep pans, 6" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.039 SF 3.12 1.17 0.52 4.81
30" wide x 24" deep pans, 6" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.043 SF 3.70 1.29 0.57 5.56
30" wide x 24" deep pans, 7" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.040 SF 3.33 1.20 0.53 5.06
30" wide x 24" deep pans, 7" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.044 SF 3.89 1.32 0.58 5.79
30" wide x 24" deep pans, 8" joists, 3" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.042 SF 3.50 1.26 0.56 5.32
30" wide x 24" deep pans, 8" joists, 4-1/2" slab, crane and bucket
Formwork BV@.069 SF 0.22 2.31 3.17 5.70
Concrete T7@.046 SF 4.08 1.38 0.61 6.07
Two-way joist or waffle slabs Includes joists, stringers and ply form supporting the domes, pan
forms, adjustable steel shores, placing concrete, trowel finishing and stripping forms. All dimension
lumber is Douglas fir or equal strength. Concrete is 3,000 P.S.I. regular mix if dumped by crane and
bucket and 3,000 P.S.I. pump mix if concrete is pumped. Prices apply for areas over the pan forms and
joists between the pans. Dropped beams and reinforcing steel are not included. Equipment includes a
60-ton crawler crane if concrete is bucket-dumped or a 28-meter boom truck with operator if concrete is
pumped. Pans are assumed to be rented.
3' domes
4' domes
5' domes
Concrete accessories
Chamfer strip
3/4" x 3/4" x 1", 10' lengths BC@.015 LF 0.27 0.54 -- 0.81
Chamfer corner forms
3/4" corner forms BC@.189 Ea 14.14 6.84 -- 20.98
Concrete
3,000 lb. concrete
1-1/2" aggregate for footings --@.000 CY 108.00 -- -- 108.00
1" aggregate for slabs and sidewalks --@.000 CY 110.00 -- -- 110.00
Pump mix --@.000 CY 119.00 -- -- 119.00
Slab base Aggregate base for slabs. No waste included. Labor costs are for spreading aggregate from
piles only using hand tools. Add for fine grading.
Crushed stone base 1.4 tons equal 1 cubic yard
Using crushed stone, per CY --@.000 CY 34.70 -- -- 34.70
1" base ( .309 CY per CSF) BL@.001 SF 0.11 0.03 -- 0.14
2" base ( .617 CY per CSF) BL@.003 SF 0.21 0.09 -- 0.30
3" base ( .926 CY per CSF) BL@.004 SF 0.32 0.12 -- 0.44
4" base (1.23 CY per CSF) BL@.006 SF 0.43 0.18 -- 0.61
5" base (1.54 CY per CSF) BL@.007 SF 0.53 0.21 -- 0.74
6" base (1.85 CY per CSF) BL@.008 SF 0.64 0.24 -- 0.88
Slab membrane Material costs are for 10' wide membrane with 6" laps. Labor costs are to lay
membrane over a level slab base.
4 mil polyethylene BL@.002 SF 0.07 0.06 -- 0.13
6 mil polyethylene BL@.002 SF 0.08 0.06 -- 0.14
Beam and girder forms Using nails, snap ties and oil, 1.3 SF of 3/4" plyform and 2.1 BF of lumber
per SFCA. For scheduling purposes, estimate that a crew of 5 can lay out, fabricate and erect 250 to
300 SF of beam and girder forms in an 8-hour day.
1 use BV@.149 SFCA 3.32 4.99 -- 8.31
3 uses BV@.141 SFCA 1.78 4.72 -- 6.50
5 uses BV@.120 SFCA 1.48 4.02 -- 5.50
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 598
Shores for beams and girders Using 4" x 4" wooden posts. These figures assume an average shore
height of 12'0" with a 2'0" long horizontal 4" x 4" head and 2" x 6" diagonal brace (30 BF of lumber per
shore), and includes nails, adjustable post clamps and accessories. For scheduling purposes estimate
that a crew of 5 can lay out, fabricate and install 30 to 35 adjustable wood shores in an 8-hour day when
shores have an average height of 12'0". Quantity and spacing of shores is dictated by the size of the
beams and girders. Generally, allow one shore for each 6 LF of beam or girder. Costs for heavy duty
shoring are listed under General Requirements, Heavy Duty Shoring.
1 use BV@1.50 Ea 26.50 50.19 -- 76.69
3 uses BV@1.00 Ea 14.70 33.46 -- 48.16
5 uses BV@.748 Ea 12.40 25.03 -- 37.43
Split face concrete block Textured block, medium weight, split one side, structural. Includes 8%
waste and local delivery.
8" wide, 4" x 16", 2.25 per SF B9@.111 SF 6.39 3.55 -- 9.94
8" wide, 8" x 16", 1.125 per SF B9@.111 SF 3.34 3.55 -- 6.89
12" wide, 8" x 8", 2.25 per SF B9@.117 SF 9.20 3.74 -- 12.94
12" wide, 8" x 16", 1.125 per SF B9@.117 SF 4.75 3.74 -- 8.49
Add for lightweight block -- % 12.0 -- -- --
Add for color --@.000 SF 0.34 -- -- 0.34
Add for mortar (at 7 cubic feet
per 100 square feet of wall) --@.000 SF 0.54 -- -- 0.54
Concrete pavers Natural concrete 3/4" thick, including local delivery. Pavers installed in concrete bed
but no concrete included.
6" x 6", 4 per SF B9@.150 SF 17.10 4.79 -- 21.89
6" x 12", 2 per SF B9@.150 SF 8.73 4.79 -- 13.52
12" x 12", 1 per SF B9@.150 SF 4.08 4.79 -- 8.87
12" x 18", .667 per SF B9@.150 SF 2.87 4.79 -- 7.66
18" x 18", .444 per SF B9@.150 SF 1.96 4.79 -- 6.75
Add for light colors --@.000 SF 0.55 -- -- 0.55
Add for dark colors --@.000 SF 1.64 -- -- 1.64
Add for pavers
with beach pebble surface --@.000 SF 1.09 -- -- 1.09
Concrete screen block Natural color. Foundations and supports not included. Material costs include
8% waste. (Quantity per SF is shown in parentheses.)
Textured screen (no corebar defacements)
4" x 12" x 12" (1 per SF) B9@.211 SF 2.78 6.74 -- 9.52
4" x 6" x 6" (3.68 per SF) B9@.407 SF 3.28 13.01 -- 16.29
4" x 8" x 8" (2.15 per SF) B9@.285 SF 4.78 9.11 -- 13.89
Concrete slump block Natural concrete color, 4" widths are veneer, no foundation or reinforcing
included. Cost in material column includes 8% waste. (Quantity per SF is shown in parentheses.)
4" x 4" x 8" (4.5 per SF) B9@.267 SF 5.56 8.53 -- 14.09
4" x 4" x 12" (3 per SF) B9@.267 SF 3.93 8.53 -- 12.46
4" x 4" x 16" (2.25 per SF) B9@.267 SF 2.95 8.53 -- 11.48
6" x 4" x 16" (2.25 per SF) B9@.243 SF 4.64 7.77 -- 12.41
6" x 6" x 16" (1.5 per SF) B9@.217 SF 2.53 6.94 -- 9.47
8" x 4" x 16" (2.25 per SF) B9@.264 SF 4.77 8.44 -- 13.21
8" x 6" x 16" (1.5 per SF) B9@.243 SF 3.56 7.77 -- 11.33
12" x 4" x 16" (2.25 per SF) B9@.267 SF 8.11 8.53 -- 16.64
12" x 6" x 16" (1.5 per SF) B9@.260 SF 5.86 8.31 -- 14.17
Masonry accessories
Silica sand --@.000 Sack 10.00 -- -- 10.00
Dry mortar mix
Type S, 80 Lb sack --@.000 Sack 5.94 -- -- 5.94
Type N, 70 Lb sack --@.000 Sack 4.30 -- -- 4.30
Concrete reinforcing steel Steel reinforcing bars (rebar), ASTM A615 Grade 60. Material costs are for
deformed steel reinforcing bars, including 10% lap allowance, cutting and bending. These costs also
include detailed shop drawings and delivery to jobsite with identity tags per shop drawings. Add for
epoxy or galvanized coating of bars, chairs, splicing, spiral caissons and round column reinforcing, if
required, from the sections following the data below. Costs per pound (Lb) and per linear foot (LF)
including tie wire and tying.
Reinforcing steel placed and tied in footings and grade beams
1/4" diameter, #2 rebar RI@.015 Lb 1.10 0.57 -- 1.67
1/4" diameter, #2 rebar
(.17 Lb per LF) RI@.003 LF 0.19 0.11 -- 0.30
3/8" diameter, #3 rebar RI@.011 Lb 0.70 0.42 -- 1.12
3/8" diameter, #3 rebar
(.38 Lb per LF) RI@.004 LF 0.27 0.15 -- 0.42
1/2" diameter, #4 rebar RI@.010 Lb 0.68 0.38 -- 1.06
1/2" diameter, #4 rebar
(.67 Lb per LF) RI@.007 LF 0.45 0.27 -- 0.72
5/8" diameter, #5 rebar RI@.009 Lb 0.60 0.34 -- 0.94
5/8" diameter, #5 rebar
(1.04 Lb per LF) RI@.009 LF 0.62 0.34 -- 0.96
3/4" diameter, #6 rebar RI@.008 Lb 0.58 0.30 -- 0.88
3/4" diameter, #6 rebar
(1.50 Lb per LF) RI@.012 LF 0.88 0.46 -- 1.34
7/8" diameter, #7 rebar RI@.008 Lb 0.70 0.30 -- 1.00
7/8" diameter, #7 rebar
(2.04 Lb per LF) RI@.016 LF 1.42 0.61 -- 2.03
1" diameter, #8 rebar RI@.008 Lb 0.60 0.30 -- 0.90
1" diameter, #8 rebar
(2.67 Lb per LF) RI@.021 LF 1.62 0.80 -- 2.42
Welded wire mesh Steel, electric weld, including 15% waste and overlap.
2" x 2" W.9 x W.9 (#12 x #12),
slabs RI@.004 SF 1.05 0.15 -- 1.20
2" x 2" W.9 x W.9 (#12 x #12),
beams and columns RI@.020 SF 1.02 0.76 -- 1.78
4" x 4" W1.4 x W1.4 (#10 x #10),
slabs RI@.003 SF 0.49 0.11 -- 0.60
4" x 4" W2.0 x W2.0 (#8 x #8),
slabs RI@.004 SF 0.57 0.15 -- 0.72
4" x 4" W2.9 x W2.9 (#6 x #6),
slabs RI@.005 SF 0.64 0.19 -- 0.83
4" x 4" W4.0 x W4.0 (#4 x #4),
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 599 (part 2)
Welded wire mesh Galvanized steel, electric weld, including 15% waste and overlap.
2" x 2" W.9 x W.9 (#12 x #12),
slabs RI@.004 SF 2.05 0.15 -- 2.20
4" x 4" W1.4 x W1.4 (#10 x #10),
slabs RI@.003 SF 0.96 0.11 -- 1.07
4" x 4" W2.0 x W2.0 (#8 x #8),
slabs RI@.004 SF 1.15 0.15 -- 1.30
4" x 4" W2.9 x W2.9 (#6 x #6),
slabs RI@.005 SF 1.29 0.19 -- 1.48
4" x 4" W4.0 x W4.0 (#4 x #4),
slabs RI@.006 SF 1.66 0.23 -- 1.89
2015 National Concrete & Masonry Estimator, All Rights Reserved Page 600
Concrete block Natural gray, medium weight. Costs are for the block only.
4" wide units
4" x 8", 4.5 per SF, (half block) --@.000 SF 5.04 -- -- 5.04
4" x 12", corner --@.000 Ea 1.20 -- -- 1.20
4" x 16", 2.25 per SF --@.000 SF 2.78 -- -- 2.78
8" x 8", 2.25 per SF --@.000 SF 3.06 -- -- 3.06
8" x 12", corner --@.000 Ea 1.20 -- -- 1.20
8" x 16", 1.125 per SF --@.000 SF 1.80 -- -- 1.80
Cleaning and pointing masonry These costs assume the masonry surface is in fair to good
condition with no unusual damage. Add the cost of protecting adjacent surfaces such as trim or the
base of the wall and the cost of scaffolding, if required. Labor required to presoak or saturate the area
cleaned is included in the labor cost. Work more than 12' above floor level will increase costs.
Brushing (hand cleaning) masonry, includes the cost of detergent or chemical solution
Light cleanup (100 SF per manhour) B9@.010 SF 0.03 0.32 -- 0.35
Medium scrub (75 SF per manhour) B9@.013 SF 0.04 0.42 -- 0.46
Heavy (50 SF per manhour) B9@.020 SF 0.06 0.64 -- 0.70
Water blasting masonry, using rented 400 to 700 PSI power washer with 3 to 8 gallon per minute flow
rate, includes blaster rental at $65 per day
Smooth face (250 SF per manhour) B9@.004 SF -- 0.13 0.03 0.16
Rough face (200 SF per manhour) B9@.005 SF -- 0.16 0.04 0.20
Sandblasting masonry, using 150 PSI compressor (with accessories and sand) at $129.00 per day
Smooth face (50 SF per manhour) B9@.020 SF 0.32 0.64 0.21 1.17
Rough face (40 SF per manhour) B9@.025 SF 0.36 0.80 0.51 1.67
Steam cleaning masonry, using rented steam cleaning rig (with accessories) at $112.00 per day
Smooth face (75 SF per manhour) B9@.013 SF -- 0.42 0.14 0.56
Rough face (55 SF per manhour) B9@.018 SF -- 0.58 0.19 0.77
Add for masking adjacent surfaces -- % -- 5.0 -- --
Add for difficult stain removal -- % 50.0 50.0 -- --
Add for working from scaffold -- % -- 20.0 -- --
Repointing brick, cut out joint, mask (blend-in), and regrout (tuck pointing)
30 SF per manhour B9@.033 SF 0.08 1.06 -- 1.14
Masonry cleaning Costs to clean masonry surfaces using commercial cleaning agents, including
washing and scaffolding equipment.
Typical cleaning of surfaces
Granite, sandstone, terra cotta, brick BL@.015 SF 0.30 0.44 -- 0.74
Table 1
Grout for bond beams. 3,000 PSI concrete by block size and linear foot of beam.
No block or reinforcing included. Based on block cavity at 50% of block volume.
Block size Volume of grout used per LF
8" high x 4" wide .10 CU ft
8" high x 6" wide .15 CU ft
8" high x 8" wide .22 CU ft
8" high x 10" wide .30 CU ft
8" high x 12" wide .40 CU ft
16" high x 8" wide .44 CU ft
16" high x 10" wide .60 CU ft
16" high x 12" wide .80 CU ft
Table 2
Modular brick and mortar required for single wythe walls in running bond
(no allowances for breakage or waste)
Nominal size of Number of bricks Cubic feet of mortor
brick in inches per 100 SF Per 100 SF Per 1000 bricks
T H L 3/8" Joints 1/2" Joints 3/8" Joints 1/2" Joints
4 x 2-2/3 x 8 675 5.5 7.0 8.1 10.3
4 x 3-1/5 x 8 563 4.8 6.1 8.6 10.9
4x4x8 450 4.2 5.3 9.2 11.7
4 x 5-1/3 x 8 338 3.5 4.4 10.2 12.9
4 x 2 x 12 600 6.5 8.2 10.8 13.7
4 x 2-2/3 x 12 450 5.1 6.5 11.3 14.4
4 x 3-1/5 x 12 375 4.4 5.6 11.7 14.9
4 x 4 x 12 300 3.7 4.8 12.3 15.7
4 x 5-1/3 x 12 225 3.0 3.9 13.4 17.1
6 x 2-2/3 x 12 450 7.9 10.2 17.5 22.6
6 x 3-1/5 x 12 375 6.8 8.8 18.1 23.4
6 x 4 x 12 300 5.6 7.4 19.1 24.7
Table 2 gives net quantities of brick and mortar required to construct walls one wythe in thickness with
various modular brick sizes and the two most common joint thicknesses (3/8 in. and 1/2 in.). Mortar
quantities are for full bed and head joints. From Brick Industry Association - Technical Note 10
Table 3
Non-modular brick and mortar required for single wythe walls in running bond
(no allowances for breakage or waste)
Size of brick in inches With 3/8" joints With 1/2" joints
Number Cubic feet Cubic feet Number of Cubic feet Cubic feet
of bricks of mortar of mortar bricks per of mortar of mortar
per 100 per 100 per 1,000 100 SF per 100 per 1,000
T H L SF SF bricks SF bricks
2-3/4 x 2-3/4 x 9-3/4 455 3.2 7.1 432 4.5 10.4
2-5/8 x 2-3/4 x 8-3/4 504 3.4 6.8 470 4.1 8.7
3-3/4 x 2-1/4 x 8 655 5.8 8.8 616 7.2 11.7
3-3/4 x 2-3/4 x 8 551 5.0 9.1 522 6.4 12.2
Table 3 provides similar information for walls constructed only with non-modular brick. From Brick
Industry Association - Technical Note 10
Table 4
Use this table to estimate the mortar and sand required for CMU block.
Block size Joint thicknessBages of mortar/blockCY/block
(15% waste)
4 x 8 x 16 3/8" .0090 .0015
6 x 8 x 16 3/8" .0135 .0023
8 x 8 x 16 3/8" .0180 .0030
12 x 8 x 16 3/8" .0270 .0045
Table 5
Use this table to estimate the pre-blended mortar mix required for CMU block.
Weight of Bags of Bags of Bags of Bags of
pre- pre- pre- pre- pre-
blended* blended* blended* blended* blended*
Width Height Length mortar mix mortar mix mortar mix mortar mix mortar mix
per block per block per block per block per block
(lbs) (40 lb. bag) (60 lb. bag) (80 lb. bag) (94 lb. bag)
4 x 8 x 16 2 core 4.50 .113 .075 .056 .05
6 x 8 x 16 2 core 6.00 .150 .100 .075 .06
8 x 4 x 16 2 core 5.50 .138 .092 .069 .06
8 x 4 x 16 Solid 10.00 .250 .167 .125 .11
8 x 8 x 16 2 core 7.50 .188 .125 .094 .08
12 x 8 x 16 2 core 10.50 .263 .175 .131 .11
*Pre blended indicates that the mortar mix includes the sand - just add water
All quantities include an allowance for a 10% wastage
This is the end of the 2015 National Concrete & Masonry Estimator