PVC (Polyvinyl Chloride) is a polymer of the hydrocarbon “vinyl” with addition of Chlorine U-PVC pipe is
an unplasticized PVC pipe without plasticizers, hence it is rigid.
Major advantages:
- Light weight & easy installation - Low thermal conductivity
- High compression & impact strength - None flame propagating - Self-extinguishing
- High chemical & corrosion resistance

Properties Value Unit


Density 1.4 - 1.45 g/cm³
Vicat softening temperature 80 - 91 oC
Co-efficientof linear thermal expansion ≤ 0.8 x 10 -⁴ K-1
Tensile Strength 500 - 550 Kg/cm²
Compression force 320, 750 ,1250 ( BS EN 61386-1 ) N
Impact strength Heavy & Medium Light (Comply with BS EN 61386-1 )
Dielectric strength 2000 Volt
Insulation Resistance >100 MΩ

'LPHQVLRQ &ODVVLÀFDWLRQ
Size 0LQLPXP,QVLGH'LDPHWHU PP
2' PP /LJKW 0HGLXP Heavy
16 13.7 13.0 12.2
20 17.4 16.9 15.8
25 22.1 21.4 20.6
32 28.6 27.8 26.6
38 34.8 33.6 33.0
40 35.8 35.4 34.4
50 45.1 44.3 43.2
&RQGXLW·VGLPHQVLRQVWR%660996HFWLRQ2.2%64607%6(11-2-50086%6(121/1-61386DQG,(&
6WDQGDUG2-6142DQG.:6*6233 & 32

Size
Size Wall Thickness (mm)
:DOO7KLFNQHVV PP
OD (mm)
2' PP Special
6SHFLDO General
General Standard
6WDQGDUG
Light / Yellow
* Yellow Medium/Blue
* Blue Heavy
5HG/Red
20
20 1.3
1.3 1.55
1.55 1.9
1.9
25
25 1.5
1.5 1.8
1.8 2.0
2.0
32
32 -- 2.1
2.1 2.5
2.5
38
38 1.6
1.6 2.2
2.2 2.5
2.5
50
50 -- 2.2
2.2 2.5
2.5

Note: Sizes 20x1.8mm, 25x1.9mm and 50x3.2mm as heavy guage are available upon request.
1RWH7KHIROORZLQJVL]HV20x1.8PP25x1.9PPDQG50x3.2PPDUHDYDLODEOHXSRQUHTXHVW
Yellow (Special): Lies within the requirements of British/ European Standards but of light gauge. (Compression force 320 N)
<HOORZ 6SHFLDO /LHVZLWKLQWKHUHTXLUHPHQWVRI.XZDLWLDQG%ULWLVK6WDQGDUGVEXWRIOLJKWJDXJH &RPSUHVVLRQIRUFH3201
Blue (General) : Lies within the requirements of Kuwaiti and British / European Standards but of medium gauge.(Compression
%OXH *HQHUDO /LHVZLWKLQWKHUHTXLUHPHQWVRI.XZDLWLDQG%ULWLVK6WDQGDUGVEXWRIPHGLXPJDXJH &RPSUHVVLRQIRUFH7501
force 750 N)
5HG 6WDQGDUG /LHVZLWKLQWKHUHTXLUHPHQWVRI%ULWLVK6WDQGDUGDQG0LQLVWU\RI(OHFWULFLW\DQG:DWHU.XZDLWEXWRIKHDY\
JDXJH &RPSUHVVLRQIRUFH12501
Red (Standard) : Lies within the requirements of British/ EuropeanStandard and Ministry of Electricity and Water - Kuwait but of
heavy gauge. (Compression force 1250 N)
7KH38PP&RQGXLWKDVEHHQSURGXFHGDQGSURPRWHGE\$O$GDVDQLWR0(:VSHFLÀFDWLRQV
The 38 mm Conduit has been produced and promoted by Al Adasani to MEW specifications.
U-PVC Conduit Accessories &LUFXODU -XQFWLRQ %R[HV DYDLODEOH LQ VL]HV RI
FRPSO\ZLWKWKHUHTXLUHPHQWVRI%6 DQGPP
SDUWV %6(1 Types Codes
20mm 25mm
$GDSWDEOH%R[
/RRSLQ &/% 
PP[PP $%
7HUPLQDO &%: &%:
)RURQHDQJOHWKURXJK
7KURXJK &%7 &%7
WKUHHDQGIRXUZD\
$QJOH &%$ &%$
HQWULHVRIPP
7HH &%: &%:
GLDPHWHUV
,QWHUVHFWLRQ &%: &%:
$GDSWDEOH%R[ 8ZD\ &%8: &%8:
PP[PP $% <ZD\ &%<: &%<:
)RURQHDQJOHWKURXJK +ZD\ &%+: &%+:
WKUHHDQGIRXUZD\
HQWULHVRI 1 2
DQGPPGLDPHWHU
2QH*DQJ6ZLWFK%R[
6%,* [[PP
3URYLGHGZLWKPP
NQRFNRXWV
3 4

7ZR*DQJ6ZLWFK%R[
6%* [[PP
3URYLGHGZLWKPP
NQRFNRXWV

5 6
6XUIDFH6ZLWFK%R[
[[PP 66%1
SURYLGHGZLWKPP
NQRFNRXWRQRSSRVLWH
VLGHV

7 8
6XUIDFH6ZLWFK%R['RXEOH
66%' [[PP

Bends (BE) 9
6L]HV
PP
PP
PP
PP
PP
Couplers (CO) Square Extension Ring
6L]HV (ERIG)
PP 6L]H
PP [[PP
PP [[PP
PP
PP
Expansion Couplers (ECO) Rectangular Extension
6L]HV Ring (ER2G)
PP 6L]H
PP [[PP
PP
PP
PP
Female Adaptor (FA) Circular Lids (LCB)
6L]HV
PP
PP
PP
PP
PP
Double Female Adaptor (FA) Square Lids (LS2H)
6L]HV :LWKWZRIL[LQJSRLQWVIRU
PP *DQJ6ZLWFK%R[

Square Lids (LS4H)


Reducer (RE)
)RUDQGPP
6L]H
$GDSWRU%R[HV
[PP

Rectangular Lids (LRB)


Saddle, Bases & Screws (SCBS) )RU*DQJ6ZLWFK%R[
6L]HV
PP
PP
PP
PP
PP - None ame propagating - Self-extinguishing
Circular Extension Ring (ERC)
6L]HV General Properties
PP
PP

Note :
$OOVL]HVLQPP
:KLWHFRORXUFRQGXLWDUHDYDLODEOHXSRQVSHFLDOUHTXHVW)RURWKHUVL]HVRIILWWLQJVQRWOLVWHGLQWKLVFDWDORJXHRU
RWKHUW\SHVRISLSHDFFHVVRULHVSOHDVHFRQWDFWRXUVDOHVGHSDUWPHQW

Installation instructions for U-PVC electrical conduits


Installation instructions
Handling and storage
- Care should be exercised to avoid rough handling of U-PVC Electrical conduits and fittings.
They should not be dragged over sharp objects or projections, dropped or have objects
dropped upon them.
- Transportation by truck will require that the conduits will be continuously supported along its
length and all sharp edges on the truck bed that could come in contact with the pipe must be
padded.
- Conduits should be stored on leveled ground which is free of any sharp objects. If different
thickness are stacked together, the thickest conduits should be on bottom. They should be
stacked not more than 2.0 m height. If the conduits are stored in racks, it should be
continuously supported along its length.
- The conduits should be protected from the direct sun light and to be put in an area with good
ventilation.
- Fittings must be stored in their original cartons to keep them free of dust and reduce the
possibility of damage and must be stored inside shaded store.
- Solvent cement and cleaner must be stored in a cool area (below 25 0C). Because of their
flammability they must not be exposed to ignition, heat sparks or open flames.
- Solvent cements have definite shelf life, each can should be clearly marked with date of
manufacturing.

Jointing procedure
U-PVC electrical conduits can be joined together or with fittings by means of solvent cementing
method, providing a chemically fused joint.

Solvent Cementing Procedure

- The solvent cement we recommend to be used for jointing Electrical conduits with fittings is
parabond P- 8.
- The conduit must be cut off at right angles.
- The outside surface of the conduit and the inside surface of the fitting must be Cleaned from
any obvious dirt by dry and clean cloth.It should be dry before the solvent cement is applied.
- A full layer of solvent cement is immediately applied to the conduit end equal to the depth of
the fitting’s socket.
- A medium layer of cement is then applied to the conduit or fitting socket. The cement should
not puddle wherever a socket is cemented, the area beyond the socket should not be coated
with cement and it should not be allowed to run down in to the inside of the conduits or fittings.
- The two parts must be assembled quickly and while the cement is still fluid, they must be held
in one position without movement for a short while (30 seconds) until initial bonding has taken
place.
- To avoid overheating in summer temperatures, the jointing area must be protected from the
sun light. At high temperatures, the cementing procedure should be completed within 2
minutes. In summer, it is recommended to start cementing in the early morning hours.
- The excess bead and cement from juncture of conduit and fitting must be wiped off with a
clean cloth .
Expansion and contraction
U-PVC conduits like any other piping materials undergo length changes as a result of
temperature variations above and below the installation temperature. The change in pipe length
depends on the co-efficient of linear expansion, the length of pipe and the temperature
variations.
In case of suspended conduits installations, which are subject to variations of temperature,
special care is given to consider expansion or contraction.

Length change can be calculated from the following formula:


ΔL = L. ΔT. б
ΔL = Length change in mm
L = length in m of the pipe or pipe section where the length change is to be determined.
ΔT = Different between installation temperature and maximum or minimum working tempera-
ture in 0C
б = Coefficient of linear expansion of the pipe material in mm/m 0C. it is 0.08 mm/m 0C .

Example of determining ΔL
Length of pipe, L = 10 m
Temperature difference ΔT = 20 0C
ΔL = 10 x 20 x 0.08 = 16 mm

Expansion & contraction can be absorbed by using Expansion coupler.

Pipe clamps
U-PVC suspended conduits need to be supported at specific intervals, depending on the
temperature and the size of the conduit. These intervals are specified in Table 3.
When the conduit saddles or clamps are mounted, the inside diameter of the clamps must be
in size that allow length changes of the pipe at the specified points .

Horizontal
d
20 ℃ 30 ℃ 40 ℃ 50 ℃

20 85 70 50 support
25 90 75 55 45
32 100 85 65 50
40 110 100 80 60
50 125 115 95 70

Note: .
- conduits sizes up to 25 mm can be bended using proper spring according to the conduit size,
for bigger sizes manufactured bends can be used
Plastic Pipes & Fittings Factory
Yousif Khalid Al-Adasani Ent.
P.O. Box 13017 ,1653 SAFAT, KUWAIT /
Sabhan Industrial Area Cable: YOUKADSAN
Telephone: 24714870 - 24730226 - 24730225 - 24743801 - 24743800
Fax: 24764 - 24718258115
Website: www.aladasani.com - Email: info@aladasani.com

02/ 2018

You might also like