2017-18
Cost of Synthetic 6mm thick rubber sheet 12kg/sqm - PHSSR Cost of nut bolts including vauchers - PHSSR
Labour charges
for Joint
Sl no. Description of CI Fixture including jointing
materials as Weight
PHSSR 17-18 Size Wieght Kgs Rate per Kg Amount No of bolts Rate Rs. Amount Rs.
Kgs
1 2 3 4 5 6 7 8 9 10 11
Jointing CI
CI PIPE LINE D/F pipes Size considered from AP standard PH data upto 750mm dias (above 750mm - from SSR directly)
1 1000mm dia D/F Joint 9259.00 1.215x1.215 10.500 93.00 976.50 51.80 51.80 111.00 5749.80
2 900mm dia D/F Joint 8040.00 1.115x1.115 9.450 93.00 878.85 40.60 40.60 111.00 4506.60
3 800mm dia D/F Joint 6836.00 1.015x1.015 8.400 93.00 781.20 27.36 27.36 111.00 3036.96
4 750mm dia D/F Joint 3888.56 0.965x0.965 7.843 93.00 729.40 26.04 111.00 2890.44
5 700mm dia D/F Joint 3619.63 0.915x0.915 6.891 93.00 640.86 24.48 111.00 2717.28
6 600mm dia D/F Joint 2840.08 0.815x0.815 5.171 93.00 480.90 19.20 111.00 2131.20
7 500mm dia D/F Joint 2040.41 0.670x0.670m 3.819 93.00 355.17 13.40 111.00 1487.40
8 450mm dia D/F Joint 1758.53 0.615x0.615m 2.266 93.00 210.74 12.30 111.00 1365.30
9 400mm dia D/F Joint 1508.07 0.565x0.565m 2.764 93.00 257.05 9.84 111.00 1092.24
10 350mm dia D/F Joint 949.05 0.505mx0.505 2.126 93.00 197.72 16nosx0.39 Kg 5.44 111.00 603.84
11 300mm dia D/F Joint 659.50 0.45mx0.45m 1.028 93.00 95.60 12nosX0.39Kg 3.96 111.00 439.56
AC PIPE LINE
Cost of Synthetic 6mm thick rubber sheet 12kg/sqm - PHSSR Cost of nut bolts including vauchers - PHSSR
Labour charges
for Joint
Sl no. Description of CI Fixture including jointing
materials as Weight
PHSSR 17-18 Size Wieght Kgs Rate per Kg Amount No of bolts Rate Rs. Amount Rs.
Kgs
11 250mm dia D/F Joint 627.79 0.40mX.040m 0.85 93.00 79.05 12nosX0.39Kg 3.96 111.00 439.56
12 200mm dia D/F Joint 434.38 0.35mX0.365m 0.62 93.00 57.29 8nosX0.39Kg 2.52 111.00 279.72
13 150mm dia D/F Joint 396.78 0.30mX0.30m 0.43 93.00 39.99 8nosX0.39Kg 2.40 111.00 266.40
14 125mm dia D/F Joint 258.75 0.26mX0.26m 0.31 93.00 29.20 8nosX0.297Kg 1.36 111.00 150.96
15 100mm dia D/F Joint 249.62 0.23mX0.23m 0.25 93.00 23.62 8nosX0.297Kg 1.36 111.00 150.96
16 80mm dia D/F Joint 150.42 0.21mX0.21m 0.21 93.00 19.76 4nosX0.297Kg 0.68 111.00 75.48
17 50mm dia D/F Joint 150.42 0.20mX0.20m 0.15 93.00 13.95 4nosX0.297Kg 0.43 111.00 47.18
18 40mm dia D/F Joint 150.42 0.13mX0.13m 0.13 93.00 12.09 4nosX0.21Kg 0.34 111.00 37.74
At 112.76 per kg upto 300mm di 80 1465.88 13 1183.2 750X750 510 125.76 64137.6
Rs 125.76 above 300mm dia 100 1804.16 16 672.8 800X200 290 125.76 36470.4
112.76 125 2480.72 22 879.28 800X400 379 125.76 47663.04
125.76 150 3044.52 27 1292.24 800X600 557 125.76 70048.32
200 5074.2 45 1389.68 800X800 599 125.76 75330.24
300 11163.24 99 842.16 900X200 363 125.76 45650.88
500 37224.96 296 1078.8 900X400 465 125.76 58478.4
1656.48 900X600 714 125.76 89792.64
1816.56 900X900 783 125.76 98470.08
1030.08 1000X200 444 125.76 55837.44
1301.52 1000X400 561 125.76 70551.36
44000.00 MS tees 8mm thick weight withwastage fabrication cost lowering MS tee
44 300x80 41.21 43.28 24 2942.7 100.4
68 350x100 48.12 50.53 24 3435.73 117.22
400x100 54.04 56.74 24 3858.33 131.64
450x100 59.96 62.95 24 4280.93 146.06
500x150 68.34 71.76 24 4879.62 166.48
600x150 80.18 84.19 24 5724.81 195.32
700x150 92.02 96.62 24 6570.01 224.15
800x200 106.32 111.64 24 7591.3 259
200 5525.24 49
300 13080.16 116 1.2608695652
500 40872 325 325.3043478261
COMMON SSR: 2017-18 Lowering
Total Cost of Total for Each Labour charges for lowering as PHSSR
Jointing Metrials joint 17-18
12 14
For PVC Air valves
Lowering CI D/F pipes
6726.30 15985.30
895.00 SSR 20308
5385.45 13425.45
689.00 SSR 17458
3818.16 10654.16
530.00 SSR 14732
3619.84 7508.40
623.05 PH data 9023.22
3358.14 6977.77
551.7 PH data 8342.66
2612.10 5452.18
426.51 PH data 6533.18
1842.57 3882.98
318.33 PH data 4717.48
1576.04 3334.57
272.5 PH data 4062.06
1349.29 2857.36
226.32 PH data 3468.78
801.56 1750.61
185.62 PH data 2269.34
535.16 1194.66
147.24 PH data 1613.48
0.00
114.06 PH data 228.12
0.00
PH data 0
Total Cost of Total for Each Labour charges for lowering as PHSSR
Jointing Metrials joint 17-18
518.61 1146.40
114.06 PH data 1483.7
337.01 771.39
84.24 PH data 1037.24
306.39 703.17
58.55 PH data 910.66
180.16 438.91
46.55 PH data 610.6
0.00
PH data 0
0.00
PH data 0
174.58 424.20
35.84 PH data 570.92
95.24 245.66
28.33 PH data 357.50
61.13 211.55
28.33 PH data 357.50
49.83 200.25
28.33 PH data 357.50
450x450x250
450x450x300
450x450x350
450x450x400
450x450x450
500x500x250
500x500x300
500x500x350
500x500x400
500x500x450
500x500x500
600x600x300
600x600x350
600x600x400
600x600x450
600x600x500
600x600x600
80x80x40
80x80x50
100x100x40
100x100x50
125x125x50
150x150x50
200x200x50
350x350x100
400x400x100
450x450x100
500x500x150
600x600x150
700x700x150
DI S/S pipe Jointing charges
mm
1000 1998.01
900 1824.65
800 1538.46
750 1159.13
700 1022.01
600 808.81
500 659.61
450 545.04
400 451.44
350 410.07
300 334.5
DI S/S pipe Jointing charges
250 251.74
200 222.04
150 191.92
125 161.88
100 127.86
80 101.01
50
40
Lowering tee
Valve chambers
Rectangular
0.90x0.75x1.05m
0.90x0.90x1.40m
1.05x1.20x1.70m
1.20x1.20x2.10m
1.70x1.20x2.10m
3.0x2.0x2.50m
1909190
610000
341000
83000
79000
0
3022190 500000
-383516 287800
383516 787800
131934 78780
26387 7878
2639 787
13193 3850
3196343 879095
4075438
-4562
0%
Valve chambers
2017-18 Circular
750
-250
15,727
18,209
20,985
26,813
Air valves PN- 1.0 on PVC Mains
2017-18
1 Tamper Proof DI Flanged Single Chamber Air 7480.00 7480.00 7480.00 7480.00 10780.00 10780.00 10780.00 10780.00 10780.00 10780.00 18480.00 18480.00 18480.00
Release Valve with Body and cover made of
Ductile Iron Grade GGG-40/SG-400/15 or
GGG-50/SG-500/7 or Equivalent as per
IS1865, IS:3896-2 with Food Grade Epoxy
Powder Coating(EP-P) (Min:250 Micron)
inside and Outside of Color Blue RAL 5005
and subsequent revisions
2 Transportation charges (5% of basic) 374.00 374.00 374.00 374.00 539.00 539.00 539.00 539.00 539.00 539.00 924.00 924.00 924.00
3 CI A/F Air Tee 1226.13 1226.13 1226.13 1491.24 1999.14 2569.94 2569.94 2569.94 3909.01 3909.01 6019.07 6019.07 8250.86
4 D/F CI pipes -0.60 m long 2 No's 2607.82 2607.82 2607.82 3197.54 4120.02 5188.58 5188.58 5188.58 7393.32 7393.32 9884.80 9884.80 12614.34
5 MTAs 100 140 180 200 280 340 380 440 510 560 680 760 810
6 MS threaded flanges 212.00 270.00 290.00 306.00 420.00 454.00 598.00 842.00 1092.00 1368.00 1614.00 1830.00 2152.00
7 Jointing materials such as bolts nuts 601.68 601.68 601.68 998.48 1035.00 1587.12 1587.12 1587.12 1737.52 1737.52 1737.52 1737.52 2638.00
and rubber vouchers including material
cost for main line - 4nos
8 Jointing materials such as bolts nuts 49.83 49.83 49.83 49.83 61.13 61.13 61.13 61.13 61.13 61.13 95.24 95.24 95.24
and rubber vouchers for Air valve fixing
9 Labour charges for lowering CI pipes 76.06 76.06 76.06 94.16 124.44 158.42 158.42 158.42 235.18 235.18 343.35 343.35 459.73
and tees - (2 jobs+1job)
10 Labour charges for fixing of valve 189.00 189.00 189.00 189.00 201.00 201.00 201.00 201.00 201.00 201.00 235.00 235.00 235.00
11 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Cost of RCC valve chamber of size 14310.00 14310.00 14310.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 29263.00 29263.00 29263.00
13 Add: Overheads & CP 1758.58 1771.93 1780.10 1957.87 2663.06 2978.85 3003.90 3045.29 3602.28 3646.66 5447.77 5488.07 6352.65
14 Grand total 28985.00 29096.00 29165.00 35790.00 41675.00 44310.00 44519.00 44864.00 49512.00 49883.00 74724.00 75060.00 82275.00
local rates
from ssr
Air valves PN-16 on HDPE Mains
#N/A 2017-18
SL PN 16 PN 16
Discription of Item
No. 40mm dia air valve 50mm dia air valve 50mm dia air valve 80mm air valve
Size of Pipeline 63mm 75mm 90mm 110mm 125mm 140mm 160mm 180mm 200mm 225mm 250mm 280mm 315mm
Size of A/F tee 80x40mm 80x40mm 80x40mm 100x40mm 125x50mm 150x50mm 150x50mm 150x50mm 200x50mm 200x50mm 250x80mm 250x80mm 300x80mm
0.90x0.75x 0.90x0.75x1. 0.90x0.75x 1.05m 0.90x0.90x 0.90x0.90x1.4 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.05x1.20x
Size of Valve Chamber 1.05m 05m 1.40m 0m 1.40m 1.40m 1.40m 1.40m 1.40m 1.70m 1.70m 1.70m
1 Tamper Proof DI Flanged Single Chamber Air 7480.00 7480.00 7480.00 7480.00 10780.00 10780.00 10780.00 10780.00 10780.00 10780.00 18480.00 18480.00 18480.00
Release Valve with Body and cover made of
Ductile Iron Grade GGG-40/SG-400/15 or
GGG-50/SG-500/7 or Equivalent as per
IS1865, IS:3896-2 with Food Grade Epoxy
Powder Coating(EP-P) (Min:250 Micron)
inside and Outside of Color Blue RAL 5005
and subsequent revisions
2 Transportation charges(5%) 374.00 374.00 374.00 374.00 539.00 539.00 539.00 539.00 539.00 539.00 924.00 924.00 924.00
3 Cost of Air Tee CI A/F 1226.13 1226.13 1226.13 1491.24 1999.14 2569.94 2569.94 2569.94 3909.01 3909.01 6019.07 6019.07 8250.86
4 Cost of 0.6m D/F CI pipes 2nos 2607.82 2607.82 2607.82 3197.54 4120.02 5188.58 5188.58 5188.58 7393.32 7393.32 9884.80 9884.80 12614.34
5 Cost of HDPE Tail pieces 2 nos 174.00 210.00 290.00 402.00 724.00 878.00 946.00 1442.00 1854.00 2130.00 2494.00 2786.00 3212.00
6 Cost of MS flanges 2nos 212.00 270.00 290.00 306.00 420.00 454.00 598.00 842.00 1092.00 1368.00 1614.00 1830.00 2152.00
7 Jointing materials such as bolts nuts 601.68 601.68 601.68 998.48 1035.00 1587.12 1587.12 1587.12 1737.52 1737.52 2511.16 2511.16 2638.00
and rubber vouchers including material
cost for main line - 4nos
8 Jointing materials such as bolts nuts 49.83 49.83 49.83 49.83 61.13 61.13 61.13 61.13 61.13 61.13 95.24 95.24 95.24
and rubber vouchers for Air valve fixing
9 Labour charges for lowering CI pipes 76.06 76.06 76.06 94.16 124.44 158.42 158.42 158.42 235.18 235.18 343.35 343.35 459.73
and tees - (2 jobs+1job)
10 Labour charges for fixing of valve 189.00 189.00 189.00 189.00 201.00 201.00 201.00 201.00 201.00 201.00 235.00 235.00 235.00
11 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Cost of RCC valve chamber of size 14310.00 14310.00 14310.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 29263.00 29263.00 29263.00
13 Add: Overheads & CP 1768.66 1781.46 1795.07 1985.37 2723.51 3052.10 3080.96 3181.71 3785.26 3860.42 5800.08 5869.24 6679.68
14 Part B - Total 29069.00 29176.00 29290.00 36020.00 42179.00 44921.00 45162.00 46003.00 51039.00 51667.00 77664.00 78241.00 85004.00
PN 16
100mm air valve
355mm 400mm 450mm
350x100mm 400x100mm 450x100mm
1.05x1.20x 1.05x1.20x 1.20x1.20x2.10
1.70m 1.70m m
2 Transportation charges (5%) 374.00 374.00 539.00 539.00 539.00 924.00 924.00 1199.00 1199.00 1199.00 2873.75 2873.75
3 Cost of Air Tee CI A/F 1226.13 1491.24 1999.14 2569.94 3909.01 6019.07 8250.86 10893.84 13711.98 16891.27 20893.61 29797.10
Cost of CI tail pices 0.6m long 2 nos
4 2107.36 2629.46 3403.14 4282.34 6135.40 8261.68 10612.50 13404.26 16361.04 19572.12 22950.92 30825.76
5 Cost of CID Joints including bolts & Nuts 2 Nos
628.36 776.56 994.01 1234.73 1758.86 2235.69 2665.27 4159.35 4960.23 5867.83 8522.70 12947.69
6 Jointing materials such as bolts nuts and
rubber vouchers including material cost for
main line - 2nos
300.84 499.24 517.50 793.56 868.76 1255.58 1319.00 1898.10 3016.14 3517.06 4080.82 5680.16
7
Jointing materials such as bolts nuts and rubber
vouchers for Air valve fixing 49.83 49.83 61.13 61.13 95.24 95.24 95.24 174.58 174.58 174.58 306.39 306.39
8 Labour charges for lowering CI tailpieces 76.06 122.84 161.68 205.26 302.58 434.60 577.52 744.95 923.02 1124.44 1353.40 1875.19
and tees - (2 jobs+1job)
9 189.00 189.00 201.00 201.00 235.00 235.00 235.00 274.00 274.00 274.00 469.00 469.00
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 14310 19452 19452 19452 19452 29263 29263 29263 29263 37190 37190 37190
Cost of RCC valve chamber
12 Add: Overheads & CP 1692.56 1853.30 2540.10 2813.81 3352.54 5165.65 5876.15 7723.53 8795.29 9884.53 16191.72 19367.34
Total 28434 34917 40649 42933 47428 72370 78299 93715 102658 119675 172307 198807
Air valves on DI mains
2017-18
40mm air 50mm air 50mm air 50mm air 80mm air 80mm air 100mm air 100mm air 100mm air 150mm air 150mm air 150mm air 200mm air 200mm air
Discription of Item
valve valve valve valve valve valve valve valve valve valve valve valve valve valve
Sno
Dia of pipeline 100mm line 125mm line 150mm line 200mm line 250mm line 300mm line 350mm line 400mm line 450mm line 500mm line 600mm line 700mm line 800mm line 900mm line
Size of tee 100x40 125x50 150x50 200x50 250x80 300x80 350x100 400x100 450x100 500x150 600x150 700x150 800x200 900x200
0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.05x1.20x 1.05x1.20x 1.20x1.20x2.1 1.20x1.20x2. 1.70x1.20x2.1 1.70x1.20x2. 3.0x2.0x
Size of Valve Chamber 1.40m 1.40m 1.40m 1.40m 1.70m 1.70m 1.70m 1.70m 0m 10m 0m 10m 3.0x2.0x 2.5m
2.5m
PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN1.6 PN1.6
1 Tamper Proof DI Flanged Single Chamber 9350.00 13475.00 13475.00 13475.00 23100.00 23100.00 29975.00 29975.00 29975.00 57475.00 57475.00 57475.00 66538.00 66538.00
Air Release Valve with Body and cover
made of Ductile Iron Grade GGG-40/SG-
400/15 or GGG-50/SG-500/7 or Equivalent
as per IS1865, IS:3896-2 with Food Grade
Epoxy Powder Coating(EP-P) (Min:250
Micron) inside and Outside of Color Blue
RAL 5005 and subsequent revisions
2 Transportation charges (5% of basic) 467.50 673.75 673.75 673.75 1155.00 1155.00 1498.75 1498.75 1498.75 2873.75 2873.75 2873.75 3326.90 3326.90
3 Cost of DI Air Tee D/S branch flanged 1691.40 2029.68 3044.52 3270.04 4172.12 5412.48 6765.60 8118.72 10035.64 15845.76 21504.96 27792.96 31763.38 35733.81
4 Labour charges for S/S jointing including 255.72 323.76 383.84 444.08 503.48 669.00 820.14 902.88 1090.08 1319.22 1617.62 2044.02 3076.92 3649.30
cost of rubber gaskets (2 jobs)
5 Jointing materials such as bolts nuts and 49.83 61.13 61.13 95.24 95.24 95.24 174.58 174.58 174.58 306.39 306.39 306.39 337.01 337.01
rubber vouchers for Air valve fixing (1 set)
7 Labour charges for fixing of Air valve 201.00 201.00 201.00 201.00 235.00 235.00 274.00 274.00 274.00 469.00 469.00 469.00 536.00 536.00
8 Labour charges for lowering of tee 1 job 34.80 41.76 48.72 67.28 85.84 111.36 139.20 167.04 206.48 292.32 396.72 512.72 672.80 842.16
Add MA on labpur charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Cost of RCC valve chamber 19452.00 19452.00 19452.00 19452.00 29263.00 29263.00 29263.00 29263.00 37190.00 37190.00 67717.00 67717.00 146155.00 146155.00
10 Add: Overheads & CP 1640.64 2288.15 2435.45 2481.52 3995.55 4190.44 5397.98 5597.26 5889.10 10698.86 11524.20 12454.16 14466.08 15107.64
Grand total 33143.00 38546.00 39775.00 40160.00 62605.00 64232.00 74308.00 75971.00 86334.00 126470.00 163885.00 171645.00 266872.00 272226.00
ves on DI mains
200mm air
valve
1000mm
line
1000x200
3.0x2.0x 2.5m
PN1.6
66538.00
3326.90
39704.23
3996.02
337.01
536.00
1030.08
0.00
146155.00
15721.00
277344.00
Air valves on BWSC & MS mains
2017-18
80mm air 100mm air 100mm 100mm air 150mm air 150mm air 150mm air
Discription of Item
valve valve air valve valve valve valve valve
Sno
350mm 400mm 450mm 600mm
Dia of pipeline 300mm line 500mm line 700mm line
line line line line
3 Cost of MS Air Tee branch flanged 2942.70 3435.73 3858.33 4280.93 4879.62 5724.81 6570.01
4 Jointing materials such as bolts nuts and rubber 95.24 174.58 174.58 174.58 306.39 306.39 306.39
vouchers for Air valve fixing (1 set)
5 Labour charges for fixing of Air valve 235.00 274.00 274.00 274.00 469.00 469.00 469.00
6 Labour charges for lowering of tee 1 job 100.40 117.22 131.64 146.06 166.48 195.32 224.15
7 Add MA on labpur charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Cost of RCC valve chamber 19452.00 29263.00 29263.00 37190.00 37190.00 67717.00 67717.00
9 Add: Overheads & CP 3761.60 4829.96 4889.46 4948.96 9009.08 9128.08 9247.08
Grand total 50842.00 69568.00 70065.00 78488.00 112369.00 143889.00 144882.00
Data Sheet for Fixing sluice valves on PVC Mains
PN - 16
Discription of Item/ Dia of valve 80mm dia 100mm dia 125mm dia 150mm dia 200mm dia 250mm dia
SL
No.
Dia of Pipeline 63mm line 75mm line 90mm line 110mm line 125mm line 140mm line 160mm line 180mm line 200mm line 225mm line 250mm line
0.90x0.75x 0.90x0.75x1.05 0.90x0.75x 1.05m 0.90x0.90x 0.90x0.90x1.40 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.40m 0.90x0.90x 1.40m 1.05x1.20x
Size of Chamber 1.05m m 1.40m m 1.40m 1.40m 1.40m 1.70m
A) MATERIALS
1 Resilient Seated Soft Sealing" Gate Valves 9922.00 9922.00 9922.00 11880.00 15180.00 18480.00 18480.00 18480.00 23980.00 23980.00 30580.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and DI Sluice valves above 400mm dia
2 Transportation charges(5%) 496.10 496.10 496.10 594.00 759.00 924.00 924.00 924.00 1199.00 1199.00 1529.00
3 Cost of 0.6m CI D/F pipes 2607.82 2607.82 2607.82 3197.54 4120.02 5188.58 5188.58 5188.58 7393.32 7393.32 9884.80
4 Cost of MTA's 100.00 140.00 180.00 200.00 280.00 340.00 380.00 440.00 510.00 560.00 680.00
5 Cost of M S threaded flanges two nos 212.00 270.00 290.00 306.00 420.00 454.00 598.00 842.00 1092.00 1368.00 1614.00
6 Jointing materials such as bolts nuts 300.84 300.84 300.84 499.24 517.50 793.56 793.56 793.56 868.76 868.76 1255.58
and rubber vouchers including material
cost for main line - 2nos
7 Jointing materials such as bolts nuts 190.49 190.49 190.49 349.16 360.32 612.78 612.78 612.78 674.02 674.02 1037.22
and rubber vouchers for Sluice valve
fixing
8 Labour charges for lowering CI pipes 34.00 34.00 34.00 43.01 55.86 70.26 70.26 70.26 101.09 101.09 136.87
(2 jobs)
9 Lowering of valve and keeping in postion 82.29 82.29 82.29 109.27 143.30 185.20 185.20 185.20 305.54 305.54 434.21
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber 14310.00 14310.00 14310.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 29263.00
12 Add: Overheads & CP 1898.68 1912.03 1920.20 2338.81 2972.97 3682.64 3707.69 3749.08 4918.25 4962.63 6419.70
Grand total 30154.00 30266.00 30334.00 38969.00 44261.00 50183.00 50392.00 50737.00 60494.00 60864.00 82834.00
xing sluice valves on PVC Mains
2017-18
30580.00 56780.00
1529.00 2839.00
9884.80 12614.34
760.00 810.00
1830.00 2152.00
1255.58 1319.00
1037.22 1070.33
136.87 176.69
434.21 618.18
0.00 0.00
29263.00 29263.00
6460.00 10671.37
83171.00 118314.00
Data Sheet for Fixing Sluice valves on HDPE Mains
PN-16 2017-18
125mm
SL Discription of Item/ Dia of valve 80mm dia 100mm dia 150mm dia 200mm dia 250mm dia 300mm dia
dia
No
. 63mm 125mm
Dia of Pipeline 75mm line 90mm line 110mm line 140mm line 160mm line 180mm line 200mm line 225mm line 250mm line 280mm line 315mm line
line line
0.90x0.75x 0.90x0.75x1. 0.90x0.75x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.05x1.20x
Size of Chamber 1.05m 05m 1.05m 1.40m 1.40m 1.40m 1.40m 1.40m 1.40m 1.40m 1.70m 1.70m 1.70m
without bypass
1 Resilient Seated Soft Sealing" Gate Valves (Sluice 9922 9922 9922 11880 15180 18480 18480 18480 23980 23980 30580 30580 56780
Valves) with Body and Bonnet of Ductile Iron GGG-
40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as
per IS1865, IS:3896-2, without bypass upto 400mm dia
and DI Sluice valves above 400mm dia
2 Transportation charges(5%) 496.10 496.10 496.10 594.00 759.00 924.00 924.00 924.00 1199.00 1199.00 1529.00 1529.00 2839.00
3 Cost of 0.6m CI D/F pipes 2nos 2607.82 2607.82 2607.82 3197.54 4120.02 5188.58 5188.58 5188.58 7393.32 7393.32 9884.80 9884.80 12614.34
4 Cost of HDPE Tial pieces 2 nos 174.00 210.00 290.00 402.00 724.00 878.00 946.00 1442.00 1854.00 2130.00 2494.00 2786.00 3212.00
5 Cost of MS flanges 2nos 212.00 270.00 290.00 306.00 420.00 454.00 598.00 842.00 1092.00 1368.00 1614.00 1830.00 2152.00
6 Jointing materials such as bolts nuts and 300.84 300.84 300.84 499.24 517.50 793.56 793.56 793.56 868.76 868.76 1255.58 1255.58 1319.00
rubber vouchers including material cost for
main line - 2nos
7 Jointing materials such as bolts nuts and 190.49 190.49 190.49 349.16 360.32 612.78 612.78 612.78 674.02 674.02 1037.22 1037.22 1070.33
rubber vouchers for Sluice valve fixing
8 Labour charges for lowering CI pipes (2 jobs) 34.00 34.00 34.00 43.01 55.86 70.26 70.26 70.26 101.09 101.09 136.87 136.87 176.69
9 Lowering of valve and keeping in postion 82.29 82.29 82.29 109.27 143.30 185.20 185.20 185.20 305.54 305.54 434.21 434.21 618.18
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber 14310.00 14310.00 14310.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 19452.00 29263.00 29263.00 29263.00
12 Add: Overheads & CP 1908.76 1921.56 1935.17 2366.32 3033.42 3755.89 3784.75 3885.50 5101.23 5176.39 6666.68 6735.84 10998.41
Grand total 30238 30345 30459 39199 44765 50794 51035 51876 62021 62648 84895 85473 121043
350mm dia 400mm dia
3949.00 5049.00
13404.26 16361.04
6716.00 8950.00
3644.00 4520.00
1898.10 3016.14
1603.12 2698.58
222.74 271.58
1044.00 1281.80
0.00 0.00
29263.00 29263.00
15175.45 19486.90
155900 191878
Data Sheet for Fixing sluice valves on DI Mains
2017-18
without bypass upto 400mm dia DI Double flanged sluice valves
SL
No Discription of Item/ Dia of Sluice valve 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm
.
on80mm dia on 100mm on 125mm
Size of pipeline 150mm line 200mm line 250mm line 300mm line 350mm line 400mm line 450mm line 500mm line 600mm line
line dia line dia line
0.90x0.75x 1.05m 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.70m 1.05x1.20x 1.70m 1.05x1.20x 1.70m 1.20x1.20x 1.20x1.20x 1.70x1.20x
Size of Valve chamber 1.40m 1.40m 1.40m 1.40m 1.70m 2.10m 2.10m 2.10m
Class of valve PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16
1 Resilient Seated Soft Sealing" Gate Valves (Sluice 9922.00 12957.00 16679.00 20401.00 29975.00 28225.00 70965.00 98725.00 126225.00 210100.00 263725.00 337975.00
Valves) with Body and Bonnet of Ductile Iron GGG-
40/SG-400/15 or GGG-50/SG-500/7 or Equivalent
as per IS1865, IS:3896-2, without bypass upto
400mm dia and DI Sluice valves above 400mm dia
2 Transportation chargers (5% of basic cost) 496.10 647.85 833.95 1020.05 1498.75 1411.25 3548.25 4936.25 6311.25 10505.00 13186.25 16898.75
3 Cost of Dismantling Joint (upto 300mm dia CI and 5546.10 7245.00 9240.00 10265.85 14557.20 17329.20 27,729.45 62,774.25 71,932.35 78,041.25 93,406.95 108,690.75
remaining MS) including 5% transportation
4 Cost of DI flanged sockets - 2 Nos 1804.16 2029.68 2706.24 3157.28 4735.92 6314.56 8,344.24 10,824.96 13,756.72 17,139.52 21,649.92 33,200.64
5 Jointing materials such as bolts nuts and rubber 150.42 249.62 258.75 396.78 434.38 627.79 659.50 949.05 1508.07 1758.53 2040.41 2840.08
washers for dismantling joint including cost of
materials (1 joints)
6 Cost of Jointing materials for valve fixing(Bolts 122.25 190.49 360.32 612.78 674.02 1037.22 1070.33 1603.12 2698.58 3152.08 3685.13 5224.21
nuts, rubbersheet) (2 joints)
7 Jointing of DI S/S 2 Jobs Labour 202.02 255.72 323.76 383.84 444.08 503.48 669.00 820.14 902.88 1090.08 1319.22 1617.62
8 Lowering of valve and keeping in postion 82.29 109.27 143.30 185.20 305.54 434.21 618.18 1044.00 1281.80 1676.20 1943.00 3300.20
9 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Cost of RCC valve chamber 14310.00 19452.00 19452.00 19452.00 19452.00 29263.00 29263.00 29263.00 29263.00 37190.00 37190.00 67717.00
11 Add: Overheads & CP 2495.00 3224.66 4158.75 4958.96 7164.88 7608.43 15467.18 24735.29 30581.56 44039.44 54590.14 69402.09
12 Grand total 35130.00 46361.00 54156.00 60834.00 79242.00 92754.00 158334.00 235675.00 284461.00 404692.00 492736.00 646866.00
on DI Mains
1200mm
700mm line 800mm line 900mm line 1000mm line 1100mm line
line
1.70x1.20x2.10
m 3.00x2.00x2.5 3.00x2.00x2.50 3.00x2.00x2. 3.00x2.00x2.
3.00x2.00x2.50m
0m m 50m 50m
PN-16 PN-16 PN-16 PN-16 PN-16 PN-16
375100.00 650100.00 705100.00 842600.00 960850.00 1094225
on on on
on 125mm on 150mm on 250mm on 300mm on 400mm on 450mm on 500mm
Dia of pipeline 100mm 200mm 350mm on 600mm line
line line line line line line line
line line line
Size of Valve Chamber 0.90x0.90x 0.90x0.90x 0.90x0.90x1 0.90x0.90x 1.05x1.20x1. 1.05x1.20x1. 1.05x1.20x 1.05x1.20x1.70 1.20x1.20x2.10 1.20x1.20x2.10 1.70x1.20x2.10m
1.40m 1.40m .40m 1.40m 70m 70m 1.70m m m m
2 Transportation charges 594.00 759.00 924.00 1199.00 1529.00 2839.00 3949.00 5049.00 8404.00 10549.00 13519.00
3 Cost of Dismantling Joint 7245.00 9240.00 10265.85 14557.20 17329.20 27729.45 62774.25 71932.35 78041.25 93406.95 166235
4 Cost of Tail peces-2 nos 2629.46 3403.14 4282.34 6135.40 8261.68 10612.50 13404.26 16361.04 19572.12 22950.92 30825.76
5 Cost of CID Joints including bolts & 776.56 994.01 1234.73 1758.86 2235.69 2665.27 4159.35 4960.23 5867.83 8522.70 10004.69
Nuts - 2Nos
6 Jointing materials such as bolts nuts 150.42 249.62 258.75 396.78 434.38 627.79 659.50 949.05 1508.07 1758.53 2040.41
and rubber washers for dismantling joint
including cost of materials (1 joints)
7 Cost of Jointing materials for valve 122.25 190.49 360.32 612.78 674.02 1037.22 1070.33 1603.12 2698.58 3152.08 3685.13
fixing(Bolts nuts, rubbersheet) (2 joints)
8 Lowering of valve and keeping in postio 109.27 143.30 185.20 305.54 434.21 618.18 1044.00 1281.80 1676.20 1943.00 329.40
9 Labour charges for lowering CI 43.01 55.86 70.26 101.09 136.87 176.69 222.74 271.58 545.00 636.66 1836.80
pipes (2 jobs)
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber ### 19452.00 19452.00 ### 29263.00 29263.00 29263.00 29263.00 37190.00 37190.00 #REF!
12 Add: Overheads & CP 5854.72 6762.22 7558.16 9326.09 12373.05 18019.33 26620.92 31675.46 44055.83 53246.88 238.78
Total 48857.00 56430.00 63072.00 77825.00 103251.00 150368.00 222147.00 264327.00 367639.00 444337.00 #REF!
Air valves on DI mains
Size of tee 100x40 125x50 150x50 200x80 250x80 300x80 350x100 400x100 450x100 500x150 600x150
0.90x0.90x1. 0.90x0.90x1. 0.90x0.90x1. 0.90x0.90x1. 1.05x1.20x1. 1.05x1.20x1. 1.05x1.20x1. 1.05x1.20x1 1.20x1.20x2. 1.20x1.20x2. 1.70x1.20x2.
Size of Valve Chamber
40m 40m 40m 40m 70m 70m 70m .70m 10m 10m 10m
A) MATERIALS PN1.0 PN1.0 PN1.0 PN1.0 PN1.6 PN1.6 PN1.6 PN1.6 PN1.6 PN1.6 PN1.6
1 Cost of Kinetic Double Air valve 2638.00 2638.00 2638.00 2638.00 - - -
heavy dury suitable for working
pressure upto 16 kg/cm2 without
isolating valve, confirming to IS 14845
2 Cost of Kinetic Air valve as per IS 13265.00 13265.00 13265.00 13265.00 18288.00 36027.00 36027.00
14845 heavy duty with isolating valve
bevel gear operated as per IS 14846
2 Transportation charges (10% of basic) 263.80 263.80 263.80 263.80 1326.50 1326.50 1326.50 1326.50 1828.80 3602.70 3602.70
3 Cost of CI Air Tee 862.27 1042.13 1475.91 2385.79 3433.21 4962.02 5051.95 9961.07 12960.50 16240.30 25116.92
4 Cost of CID joints - 2nos 497.04 632.04 825.14 1114.80 1512.10 1819.52 3017.90 3583.72 4329.40 6080.58 9376.24
6 Jointing materials such as bolts nuts 506.96 532.10 702.38 749.84 1095.46 1166.66 1530.44 2404.68 2970.98 3351.04 5324.32
and rubber vouchers for main line
jointing (2 joints)
7 Jointing materials such as bolts nuts 88.22 138.70 138.70 138.70 142.19 142.19 253.48 253.48 253.48 351.19 351.19
and rubber vouchers for Air valve
fixing (1 set)
Part A - Total 4856.00 5247.00 6044.00 7291.00 20774.00 22682.00 24445.00 30794.00 40631.00 65653.00 79798.00
B) LABOUR COMPONENT
6 Labour charges for fixing of Air valve 88.70 88.70 88.70 88.70 103.70 103.70 121.80 121.80 121.80 206.30 206.30
7 Labour charges for flanged joints (2 126.80 126.80 126.80 126.80 126.80 126.80 135.00 135.00 135.00 203.00 203.00
jobs)
8 Cost of RCC valve chamber #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 Add: LA & LI on labour comp at 13% 28.02 28.02 28.02 28.02 29.97 29.97 33.38 33.38 33.38 53.21 53.21
Part B - Total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Grand total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Data Sheet for fixing Sluice valves on BWSCP/ MS Mains (PN-1.6)
PN 16 2017-18
300mm sluice
Sno Discription of Item/ Dia of Sluice valve 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm
valve
on 100mm dia on 125mm dia
Dia of the pipeline on80mm dia line 150mm line 200mm line 250mm line 300mm line
line line
Size of the valve chamber 0.90x0.75x1.05m 0.90x0.90x1.40m 0.90x0.90x1.40m 0.90x0.90x1.40m 0.90x0.90x1.40m 1.05x1.20x1.70m 1.05x1.20x1.70m
1 Resilient Seated Soft Sealing" Gate Valves 9922.00 12957.00 16679.00 20401.00 29975.00 28225.00 70965.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and DI Sluice valves above 400mm dia
2 Transportation charges (5% of basic cost) 496.10 647.85 833.95 1,020.05 1,498.75 1,411.25 3,548.25
3 Cost of Dismantling Joint 5546.10 7245.00 9240.00 10265.85 14557.20 17329.20 27729.45
4 Cost of Flanged Tail Pieces with 10mm Thick 1,040.00 1,275.00 1,568.00 1,861.00 2,556.00 3,159.00 3,763.00
MS sheet fabricated including welding to main
line - 2Nos, 0.3 m length
5 Jointing materials such as bolts nuts and 150.42 249.62 258.75 396.78 434.38 627.79 659.50
rubber washers for dismantling joint including
cost of materials (1 joints)
6 Cost of Jointing materials for valve 122.25 190.49 360.32 612.78 674.02 1037.22 1070.33
fixing(Bolts nuts, rubbersheet) (2 joints)
7 Lowering of valve and keeping in postion 82.29 109.27 143.30 185.20 305.54 434.21 618.18
8 Cost of RCC valve chamber 14310.00 19452.00 19452.00 19452.00 19452.00 29263.00 29263.00
9 Add: Overheads & CP 2363.45 3087.10 3959.69 4730.21 6807.62 7110.25 14752.36
fixing Sluice valves on BWSCP/ MS Mains (PN-1.6) Data Sheet for fixing Sluice valves on BWSCP/ MS Mains (PN-1.6)
PN 16 2017-18
350mm sluice 400mm sluice 450mm sluice 500mm sluice 600mm sluice 700mm sluice 800mm sluice 900mm 1000mm
Sno Discription of Item/ Dia of Sluice valve
valve valve valve valve valve valve valve sluice valve sluice valve
Dia of the pipeline 350mm line 400mm line 450mm line 500mm line 600mm line 700mm line 800mm line 900mm line 1000mm line
3.00x2.00x2.50
Size of the valve chamber 1.05x1.20x1.70m 1.05x1.20x1.70m 1.20x1.20x2.10m 1.20x1.20x2.10m 1.70x1.20x2.10m 1.70x1.20x2.10m 3.00x2.00x2.50m 3.00x2.00x2.50m
m
1 Resilient Seated Soft Sealing" Gate Valves 98725.00 126225.00 210100.00 263725.00 337975.00 375100.00 650100.00 705100.00 842600.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and DI Sluice valves above 400mm dia
2 Transportation charges (5% of basic cost) 4,936.25 6,311.25 10,505.00 13,186.25 16,898.75 18,755.00 32,505.00 35,255.00 42,130.00
3 Cost of Dismantling Joint 62774.25 71932.35 78041.25 93406.95 108690.75 120919.05 148,433.25 154,856.10 185,493.00
4 Cost of Flanged Tail Pieces with 10mm Thick 4,367.00 5,245.00 5,874.00 6,842.00 8,150.00 9,458.00 10,766.00 12,074.00 13,382.00
MS sheet fabricated including welding to main
line - 2Nos, 0.3 m length
5 Jointing materials such as bolts nuts and 949.05 1508.07 1758.53 2040.41 2840.08 3619.63 6836.00 8040.00 9259.00
rubber washers for dismantling joint including
cost of materials (1 joints)
6 Cost of Jointing materials for valve 1603.12 2698.58 3152.08 3685.13 5224.21 6716.29 7636.32 10770.90 13452.60
fixing(Bolts nuts, rubbersheet) (2 joints)
7 Lowering of valve and keeping in postion 1044.00 1281.80 1676.20 1943.00 3300.20 3850.23 4,400.27 4,950.30 5,500.33
Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Cost of RCC valve chamber 29263.00 29263.00 37190.00 37190.00 67717.00 67717.00 146155.00 146155.00 146155.00
9 Add: Overheads & CP 23744.38 29299.76 42357.23 52394.43 65771.20 73305.64 117181.15 126761.95 151373.88
Grand total 34033.00 45213.00 52495.00 58925.00 76261.00 88597.00 152369.00
Grand total 227406.00 273765.00 390654.00 474413.00 616567.00 679441.00 1124013.00 1203963.00 1409346.00
Data Sheet for Fixing Scour valves (PN 1.6) on DI, BWSC, MS mains 2017-18
DI Sluice valves without bypass upto 400mm dia DI Sluice valves above 4
80mm dia 100mm dia 125mm dia 150mm dia 200mm dia 300mm dia 500mm dia
SL No Discription of Item / Dia of valve 63-125mm dia >125-180mm >180-225mm >225-350mm >350-400mm >400-600mm 600-1000mm
line dia line dia line dia line dia line dia line dia line
0.90x0.75x 1.05m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 1.05x1.20x1.70m 1.20x1.20x2.10m
Size of Chamber
1 Resilient Seated Soft Sealing" Gate Valves 9922.00 12957.00 16679.00 20401.00 29975.00 70965.00 263725.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and DI Sluice valves above 400mm dia
2 Transportation chargers (5% of basic cost) 496.10 647.85 833.95 1020.05 1498.75 3548.25 13186.25
3 Cost of DI Duck foot bend 1691.40 1916.92 2480.72 3044.52 4284.88 7442.16 19870.08
4 Cost of 0.6m DI D/F pipes 3nos 4397.64 5412.48 7442.16 9133.56 15222.60 33489.72 111674.88
5 Cost of DI Semicircular bend 1578.64 2029.68 2706.24 3608.32 5525.24 13080.16 40872.00
6 Jointing materials such as bolts nuts and 601.68 998.48 1035.00 1587.12 1737.52 2638.00 8161.64
rubber vouchers - 4 Jobs
7 Jointing materials such as bolts nuts 190.49 349.16 360.32 612.78 674.02 1070.33 3685.13
and rubber washers for valve fixing -
2Jobs
8 Labour charges for lowering CI pipes & 141.65 179.20 232.75 292.75 421.20 736.20 1591.65
Bends (5 jobs)
9 Sluice valve lowering and fixing charges 82.29 109.27 143.30 185.20 305.54 618.18 1943.00
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber excluding TOT 14310.00 19452.00 19452.00 19452.00 19452.00 29263.00 37190.00
12 Add: Overheads & CP 2600.72 3349.30 4345.02 5430.38 8120.63 18188.01 63270.22
Grand total
36013.00 47401.00 55710.00 64768.00 87217.00 181039.00 565170.00
uice valves above 400mm dia
3.00x2.00x2.50m
650100.00
32505.00
31792.13
297799.68
65395.20
13058.62
5896.21
2546.64
3108.80
0.00
146155.00
150064.84
1398422.00
Data Sheet for fixing Scour Valves (PN -1.6) on PVC,HDPE, AC & PSC Mains 2017-18
DI Sluice valves without bypass upto 400mm dia DI Sluice valves above 4
Dia of pipeline 80mm dia 100mm dia 125mm dia 150mm dia 200mm dia 300mm dia 500mm dia
SL
No. 63-125mm dia >125-180mm >180-225mm >225-350mm >350-400mm >400-600mm 600-1000mm
Discription of Item/ Dia of valve
line dia line dia line dia line dia line dia line dia line
0.90x0.75x 1.05m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 1.05x1.20x 1.20x1.20x
Size of Chamber
1.70m 2.10m
1 Resilient Seated Soft Sealing" Gate Valves (Sluice 9922.00 11880.00 15180.00 18480.00 23980.00 56780.00 210980.00
Valves) with Body and Bonnet of Ductile Iron GGG-
40/SG-400/15 or GGG-50/SG-500/7 or Equivalent
as per IS1865, IS:3896-2, without bypass upto
400mm dia and DI Sluice valves above 400mm dia
2 Transportation chargers (5% of basic cost) 496.10 594.00 759.00 924.00 1199.00 2839.00 10549.00
3 Cost of CI Duck foot bend 1691.40 1916.92 2480.72 3044.52 4284.88 7442.16 19870.08
4 Cost of 0.6m CI D/F pipes 3nos 4397.64 5412.48 7442.16 9133.56 15222.60 33489.72 111674.88
5 Cost of CI Semicircular bend 1578.64 2029.68 2706.24 3608.32 5525.24 13080.16 40872.00
6 Jointing materials such as bolts nuts and rubber 601.68 998.48 1035.00 1587.12 1737.52 2638.00 8161.64
vouchers - 4 Jobs
7 Jointing materials such as bolts nuts and 190.49 349.16 360.32 612.78 674.02 1070.33 3685.13
rubber washers for valve fixing - 2Jobs
8 Labour charges for lowering CI pipes & 141.65 179.20 232.75 292.75 421.20 736.20 1591.65
Bends (5 jobs)
9 Sluice valve lowering and fixing charges 82.29 109.27 143.30 185.20 305.54 618.18 1943.00
10 Cost of RCC valve chamber 14310.00 19452.00 19452.00 19452.00 19452.00 29263.00 37190.00
11 Add: Overheads & CP 2600.72 3195.33 4130.72 5155.76 7263.60 16160.15 55729.92
Grand total
36013.00 46117.00 53922.00 62476.00 80066.00 164117.00 502247.00
DI Sluice valves above 400mm dia
2 Transportation chargers (5% of basic cost) 1017.50 1361.25 1705.00 2461.25 3561.25 4248.75 6517.50 12911.25 23086.25 34292.50 60500.00
3 Cost of Dismantling Joint (upto 300mm dia 7245.00 10265.85 14557.20 17329.20 27729.45 62774.25 71932.35 93406.95 108690.75 120919.05 148433.25
CI and remaining MS) including 5%
transportation
4 Cost of DI flanged sockets - 2 Nos 2029.68 3157.28 4735.92 6314.56 8,344.24 10,824.96 13,756.72 21,649.92 33,200.64 41,752.32 55,585.92
5 Jointing materials such as bolts nuts and 249.62 396.78 434.38 627.79 659.50 949.05 1508.07 2040.41 2840.08 3619.63 6836.00
rubber washers for dismantling joint
including cost of materials (1 joints)
6 Cost of Jointing materials for valve 190.49 612.78 674.02 1037.22 1070.33 1603.12 2698.58 3685.13 5224.21 6716.29 7636.32
fixing(Bolts nuts, rubbersheet) (2 joints)
7 Jointing of DI S/S 2 Jobs Labour 255.72 383.84 444.08 503.48 669.00 820.14 902.88 1319.22 1617.62 2044.02 3076.92
8 Lowering of valve and keeping in postion 109.27 185.20 305.54 434.21 618.18 1044.00 1281.80 1474.00 2503.60 2920.87 3338.13
9 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Cost of RCC valve chamber 19452.00 19452.00 19452.00 29263.00 29263.00 29263.00 29263.00 37190.00 67717.00 67717.00 146155.00
11 Add: Overheads & CP 4281.55 5934.50 7754.58 10610.54 15504.35 22769.63 31171.26 53740.02 86984.62 122278.31 203599.60
12 Grand total 55181.00 68974.00 84163.00 117806.00 158644.00 219272.00 289382.00 485642.00 793590.00 1088110.00 1845161.00
h bypass above 300mm dia
1200mm
900mm line 1000mm line 1100mm line
line
1 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH
2 Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance Hand
of all materials and labour charges ,seigniorage charges etc complete Mixing
162.00 Kgs Cost of Cement 4100.00 1 MT 664.20
0.90 cum Intial rate of 40mm metal @ Rs. 1101.23 /cum 991.11
0.45 cum Cost of Sand Rs. 669.91 /cum 301.46
1.20 Kl Water Rs. 100.00 Kl 120.00
0.10 Kl Masons 1st class@ Rs. 350.00 /each 35.00
2.36 No Mazdoor Rs. 280.00 /each 660.80 bldg. 12
Add MA 0.20 139.16
Add contractors Profit@14% 407.64
3 Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and
conveyance of all materials and labour charges ,seign. charges etc.complete.RCC Walls
0.90 cum cost of 20mm guage metal Rs. 1446.23 /cum 1301.61
0.45 cum cost of sand Rs. 789.91 /cum 355.46
400.00 kg cost of cement Rs. 4100.00 /MT 1640.00
0.167 Kl Masons 1st class@ Rs. 224.00 /each 37.41 bldg.21B
0.167 Kl Masons 2nd class@ Rs. 206.00 /each 34.40
4.70 no man mazdoor Rs. 280.00 /each 1316.00
1.00 Hr Concrete Mixer 10 / 7 cft (0.2 / 0 Rs. 200.80 HR 200.80
1.20 Kl Water (including for curing) Rs. 50.00 Kl 60.00
Add MA 0.20 277.56
Add contractors Profit@14% 731.25
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and
conveyance of all materials and labour charges ,seign. charges etc.complete.for slabs &
4 Beams
0.90 cum cost of 20mm guage metal Rs. 1446.23 /cum 1301.61
0.45 cum cost of sand Rs. 789.91 /cum 355.46
400.00 kg cost of cement Rs. 4100.00 /MT 1640.00
0.067 Kl Masons 1st class@ Rs. 224.00 /each 15.01
0.133 Kl Masons 2nd class@ Rs. 206.00 /each 27.40 bldg.21c
2.50 no man mazdoor Rs. 280.00 /each 700.00
0.267 Hr Concrete Mixer 10 / 7 cft (0.2 / 0 Rs. 200.80 HR 53.61
1.20 Kl Water (including for curing) Rs. 50.00 Kl 60.00
Add MA 0.20 148.48
Add contractors Profit@14% 602.22
5 RCC(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all
materials and labour charges etc.complete for RCC items but excluding cost &
fabrication of steel
Centering
Basic Rate Centering Rate per Charges+cont Total Rate
Sl.No. Item MA
in cum area in sqm sqm ractors per cum
Profit@14%
PH SSR 33-b4
1 Straight wall 100mm thick 5954.50 20.00 519.80 11851.44 592.57 ###
2 Straight wall 200mm thick 5954.50 10.00 519.80 5925.72 296.29 ###
3 Bottom slab 4903.80 189.00 215.46 9.45 5128.70
4 Roof slab 4903.80 189.00 215.46 9.45 5128.70
5 Cost and supply of HYSD steel including transportation, cutting, bending, tieing placing
in position etc., complete
1.05 MT Cost of steel ### 1 MT 39375.00
6.00 Binding wire 50.00 kg 300.00
(b) Labour for cutting, bending,
shifting to site, tying and placing in
position
2.00 Blacksmith / Bar bender 224.00 day 448.00 bldg.26/11.7
6.40 Mazdoor (Unskilled) 170.00 day 1088.00
Add MA 0.20 307.20
Add contractors profit 14% 5812.55