ROOF PLAN
34
A-5 MEZZANINE PLAN
ROBINSON'S PLACE
A-6 FRONT ELEVATION,REAR ELEVATION
SALCEDO HALL
31 MANILA
32 COURT OF APPEAL
33
30 35
G-13
A-7 RIGHT-SIDE ELEVATION
20
G-11 G-10
DEPARTMENT
A-8 LEFT-SIDE ELEVATION
13 11 OF
A-9 CROSS SECTION THRU "B"/ BLOW UP DETAIL
G-9
JUSTICE
G-15 9
7 5
S-9
ELEVATOR SHAFT,COLUMN & FOOTING
DETAILS
ROOF TRUSS DETAILS
A-1 SCALE N.T.S S-10
S-11
STANDARD DETAILS
STAIR DETAILS
PERSPECTIVE VIEW S-12
S-13
STANDARD DETAILS
STANDARD DETAILS
ARCHITECTURAL
SANITARY
ROBINSONS PLACE
111.98
P-1 GROUND FLOOR COLD WATER LINE LAYOUT
P-2 SECOND FLOOR COLD WATER LINE LAYOUT
48.40
PROPERTY LINE 1.50 45.40 1.50 P-3 THIRD FLOOR COLD WATER LINE LAYOUT
PIPE THRU WALL DET., PLUMBING FIXTURE
3.00
1.80
PROPOSED LAYOUT OF MERALCO POSTS
LEGEND.
P-4 GROUND FLOOR SANITARY LINE LAYOUT STRUCTURAL
T
21.66
25.25
ROOF PLAN SINK & URINAL DETAIL.
P-6 THIRD FLOOR SANITARY LINE LAYOUT,
GENERAL NOTES, MATERIALS
BUILDING LINE
34 P-7
SPECIFICATIONS, CLEAN OUT DETAIL.
WATER TANK LEVEL COLD WATER &
1.80
EDGE FLASHING SANITARY LINE, SEPTIC TANK DETAILS
P-8 ISOMETRIC.
SALCEDO HALL SANITARY
EXISTING TENNIS COURT
STS
ELECTRICAL
RALCO PO T OF ME
33 E-6
E-7
THIRD FLOOR LIGHTING LAYOUT
MEZZANINE & WATER TANK LVL LIGHTING
LAYOUT
E-8 MEZZANINE POWER LAYOUT
ELECTRICAL
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
1
A-10
LEGEND:
45.40
3.00
CLADDING ON 1-1/2 X 1-1/2 X 1/4
FIRE ESCAPE FIRE ESCAPE ANGULAR BAR, PAINT FINISH
LADDER LADDER (PHASE 2)
- PHASE 2
CANOPY
(PHASE 2) 1
8.38
W
5
W HE DIS.
2
D 5 SLOP D SCOPE OF WORKS FOR
7 6
21.66
(PHASE 1)
4.90
STO. D D W
4 5 2 1. STRUCTURAL WORKS FROM GROUND FLOOR
W TO 3RD FLOOR
5
SHE 2. CONSTRUCTION OF ELEVATOR SHAFT.
D
3 3.
4.
POLYCARBONATE ROOFING SHEET SYSTEM
EXTERIOR AND INTERIOR PAINTING WORKS
D 5.
1 1 6. CHLORINATED RUBBER FLOORING FOR
W BASKETBALL COURT.
2 7. EXTERIOR GRILL WORKS
LOBBY 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
OPEN CLASS AREA TEMPORARY PLAIN CEMENT FINISH
UP DN
CLASSROOM
8.38
9. CEILING WORKS ON OFFICES & COMFORT
ROOMS AT 3RD FLOOR
1 10. INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
A-11
COMFORT ROOMS.
12.
SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
SUPPLY AND INSTALLATION OF TWO(2)WATER
W STORAGE TANKS,AND 2HP WATER PUMP.
CANOPY
(PHASE 2) S I D E W A L K
1
6MM THK FIBER CEMENT BOARD
4 13.
14.
FIRE PROTECTION SYSTEMS
SEPTIC TANK FOR SEWAGE TREATMENT
CLADDING ON 1-1/2 X 1-1/2 X 1/4
15. PE FACULTY RM AT 3RD FLOOR
RAMP ROOF LINE RAMP ANGULAR BAR, PAINT FINISH
(PHASE 2) 16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
1
A-10
LEGEND:
45.40
- PHASE 1
6.97 6.52 6.52 6.52 6.52 6.52 5.85
6MM THK FIBER CEMENT BOARD
CLADDING ON 1-1/2 X 1-1/2 X 1/4
FIRE ESCAPE FIRE ESCAPE ANGULAR BAR, PAINT FINISH
(PHASE 2)
LADDER LADDER
CANOPY
(PHASE 2) 1 - PHASE 2
8.38
HE DIS.
2
W
5 SLOP
D
6 SCOPE OF WORKS FOR
21.66
4.90
D (PHASE 1)
5 W
W 2 1. STRUCTURAL WORKS FROM GROUND FLOOR
5 TO 3RD FLOOR
SHE 2. CONSTRUCTION OF ELEVATOR SHAFT.
3 3.
4.
POLYCARBONATE ROOFING SHEET SYSTEM
EXTERIOR AND INTERIOR PAINTING WORKS
H A L L W A Y 5.
LINE OF D D
ELEV.
LOBBY
CANOPY 3 2 W 6. CHLORINATED RUBBER FLOORING FOR
2 BASKETBALL COURT.
D 7. EXTERIOR GRILL WORKS
2 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
UP DN PLAIN CEMENT FINISH
8.38
CM POWER HOUSE 9. CEILING WORKS ON OFFICES & COMFORT
SIMULATIONS LAB A ROOMS AT 3RD FLOOR
1 10. INSTALLATION OF TOILET FIXTURES,TOILET
A-11 CUBICLE PARTITIONS,FLOOR TILES ON
A 11.
COMFORT ROOMS.
SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
12. SUPPLY AND INSTALLATION OF TWO(2)WATER
CANOPY
(PHASE 2) 18.87 W W 4 13.
STORAGE TANKS,AND 2HP WATER PUMP.
FIRE PROTECTION SYSTEMS
3 3 14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
B 17.
18.
ELECTRICAL WORKS (LIGHTING AND POWER )
PLUMBING WORKS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
CANOPY
(PHASE 2)
D
1 - PHASE 2
4
FABRICATED METAL BLEACHERS
W
4
8.38
D
4
W
4
2
W SCOPE OF WORKS FOR
21.66
15.00
4.90
OPEN ABOVE TEMPORARY
W OFFICE SPACE 2
3 (PHASE 1)
D 1. STRUCTURAL WORKS FROM GROUND FLOOR
2 TO 3RD FLOOR
3 2. CONSTRUCTION OF ELEVATOR SHAFT.
MEZZANINE LINE
W 3. POLYCARBONATE ROOFING SHEET SYSTEM
COVERED COURT 2 4. EXTERIOR AND INTERIOR PAINTING WORKS
CHLORINATED RUBBER FLOOR FINISH W 5.
2 6. CHLORINATED RUBBER FLOORING FOR
ELEV. LOBBY BASKETBALL COURT.
7. EXTERIOR GRILL WORKS
UP DN 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
8.38
PLAIN CEMENT FINISH
D 9. CEILING WORKS ON OFFICES & COMFORT
7 1 ROOMS AT 3RD FLOOR
28.00 A-11 10. INSTALLATION OF TOILET FIXTURES,TOILET
STORAGE CUBICLE PARTITIONS,FLOOR TILES ON
A FABRICATED METAL BLEACHERS
11.
COMFORT ROOMS.
SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
CANOPY
(PHASE 2) 6MM THK FIBER CEMENT BOARD
4 12. SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
CLADDING ON 1-1/2 X 1-1/2 X 1/4
13. FIRE PROTECTION SYSTEMS
ANGULAR BAR, PAINT FINISH 14. SEPTIC TANK FOR SEWAGE TREATMENT
(PHASE 2)
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
B 17.
18.
ELECTRICAL WORKS (LIGHTING AND POWER )
PLUMBING WORKS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
1
A-10 - PHASE 1
OFFICE SPACE 2
8.28
2
CORRIDOR
SCOPE OF WORKS FOR
OFFICE SPACE 1
21.57
15.26
4.90
OPEN BELOW A= 48.86 SQM (PHASE 1)
1. STRUCTURAL WORKS FROM GROUND FLOOR
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.
3 3.
4.
POLYCARBONATE ROOFING SHEET SYSTEM
EXTERIOR AND INTERIOR PAINTING WORKS
ELEV. 5.
LOBBY 6. CHLORINATED RUBBER FLOORING FOR
BASKETBALL COURT.
7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
DN PLAIN CEMENT FINISH
8.39
9. CEILING WORKS ON OFFICES & COMFORT
ROOMS AT 3RD FLOOR
1 10. INSTALLATION OF TOILET FIXTURES,TOILET
A-11 CUBICLE PARTITIONS,FLOOR TILES ON
FOR PHASE 2
A SUSPENDED JOGGING TRACK STORAGE
COMFORT ROOMS.
3.00
MEZZANINE PLAN
MEZZANINE PLAN 1
A-5 SCALE 1:100MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
150 MM THK CHB WALL PLASTER FINISH 150 MM THK CHB WALL
WITH EXTERIOR GROOVE LINE /PAINT FINISH
DRIFTMOULD
3.96
3.96
UP LOGO
(TEMPORARY NOT INCLUDED)
4.00
4.00
17.56
17.56
SPORTS AND
WELLNESS CENTER
3.00
3.00
W W W W
THIRD FLOOR LINE THIRD FLOOR LINE 2 2 4 4
3.00
3.00
OPEN
3.00
3.00
OPEN
W W
F.F.L
2 2
0.60
F.F.L
0.60
N.G.L. N.G.L.
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
48.40
CANOPY (PHASE 2)
MEZZANINE LINE
LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNER
17.56
3.00
W W
3 3
SECOND FLOOR LINE STEEL CASEMENT SWING TYPE
(PHASE 2)
3.00
W
F.F.L 1
0.60
N.G.L.
1 RIGHT-SIDE ELEVATION
A-7 SCALE 1:100MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
CANOPY (PHASE 2)
MEZZANINE LINE
17.56
3.00
PARAPET WALLS
SECOND FLOOR LINE
3.00
F.F.L
0.60
N.G.L.
1 LEFT-SIDE ELEVATION
A-8 SCALE 1:100MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
3.96
Z-PURLINS EPOXY PAINT FINISH
4.00
6MM THK FIBER CEMENT BOARD
CLADDING ON 1-1/2 X 1-1/2 X 1/4
ANGULAR BAR, PAINT FINISH
SUSPENDED SUSPENDED
JOGGING JOGGING
TRACK TRACK
MEZZANINE LINE
17.26
(PHASE 1)
3.00
1. STRUCTURAL WORKS FROM GROUND FLOOR
THIRD FLOOR LINE BASKETBALL COURT
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.
3. POLYCARBONATE ROOFING SHEET SYSTEM
3.00
3.00 4. EXTERIOR AND INTERIOR PAINTING WORKS
5.
6MM THK FIBER CEMENT BOARD 6. CHLORINATED RUBBER FLOORING FOR
CLADDING ON 1-1/2 X 1-1/2 X 1/4 SECOND FLOOR LINE
BASKETBALL COURT.
ANGULAR BAR, PAINT FINISH
ROBINSON'S 7. EXTERIOR GRILL WORKS
PLACE 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
3.00
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
- PHASE 2
3.96
ELEVATOR
SUSPENDED JOGGING TRACK SHAFT
MEZZANINE LINE
17.56
ELEVATOR
SHAFT
3.00
SHAFT
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
1.06
A4 PAPER SIZE
2.10
2.10
2.10
2.10
2.10
LOCK CYLINDER LOCK CYLINDER
(ONE SIDE CYLINDER, (ONE SIDE CYLINDER,
ONE SIDE KNOB) ONE SIDE KNOB)
1.10
1.10
1.10
1.00
1.00
FFL. FFL. FFL. FFL. FFL.
D D D D D D
1 2 3 4 5 6
TYPE: STEEL FLUSH DOOR TYPE: DOUBLE STEEL FLUSH DOOR
TYPE: DOUBLE STEEL LOUVERED DOOR, DOUBLE SWING TYPE: PVC FLUSH DOOR TYPE: STEEL FLUSH DOOR TYPE: WOOD PANEL DOOR
DESCRIPTION: FLUSH DOOR PANEL W/ JAMB TO BE REPAIRED & REPLACED W/ DESCRIPTION: DOUBLE FLUSH DOOR PANEL W/ STEEL JAMB W/
STAINLESS LEVER TYPE DOOR HANDLES , STAINLESS BUTTERFLY BALL LEVER TYPE DOOR HANDLES , STAINLESS BUTTERFLY BALL DESCRIPTION: LOUVERED DOOR PANEL WITH STEEL JAMB, DESCRIPTION: LEVER TYPE HANDLE WITH DOOR DESCRIPTION: LEVER TYPE HANDLE WITH DOOR DESCRIPTION: LOUVERED TYPE DOOR
BEARING HINGES, DOOR CLOSER W/ LOCK CYLINDER ( ONE SIDE BEARING HINGES, DOOR CLOSER W/ LOCK CYLINDER PUSH-PULL HANDLE, STAINLESS BUTTERFLY BALL CLOSER W/ LOCK CYLINDER ( ONE SIDE CLOSER W/ LOCK CYLINDER ( ONE SIDE
CYLINDER, ONE SIDE KNOB), DUCO PAINT FINISHED ( ONE SIDE CYLINDER, ONE SIDE KNOB) BEARING HINGES, DOOR CLOSER WITH DOUBLE CYLINDER, ONE SIDE KNOB) CYLINDER, ONE SIDE KNOB), LOUVERED QUANTITY: 2 SET(S)
LOCK CYLINDER
QUANTITY: 2 SET(S) QUANTITY: 3 SET(S) QUANTITY: 3 SET(S) QUANTITY: 2 SET(S) LOCATION: SLOPS
QUANTITY: 1 SET(S)
LOCATION: GROUND FLOOR CLASSROOM, LOBBY LOCATION: 2ND FLOOR (SIMULATIONS LAB A), LOCATION: COMFORT ROOM LOCATION: DISABLED COMFORT ROOM
3RD FLOOR (TEMPORARY SPACE OFFICE) LOCATION: SECOND FLOOR, CM POWER HOUSE
4.40
1.90
1.45 1.45 1.45 0.62 0.60 0.62
4.00 3.00
1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.10
1.10
0.50
0.50
0.50
W W W W W
1 2 3 4 5
TYPE: STEEL CASEMENT WINDOW TYPE: STEEL CASEMENT WINDOW, SWING TYPE TYPE: STEEL CASEMENT WINDOW, SWING TYPE TYPE: STEEL CASEMENT WINDOW, SWING TYPE TYPE: STEEL CASEMENT WINDOW, SWING TYPE
DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS
IN STEEL FRAME IN STEEL FRAME IN STEEL FRAME IN STEEL FRAME IN STEEL FRAME
QUANTITY: 1 SET(S) QUANTITY: 7 SET(S) QUANTITY: 3 SET(S) QUANTITY: 2 SET(S) QUANTITY: 6 SET(S)
LOCATION: (GROUND FLOOR) TEMPORARY CLASSROOM LOCATION: GROUND FLOOR, 2ND FLOOR, 3RD FLOOR LOCATION: 2ND FLOOR (SIMULATION LAB A) LOCATION: 3RD FLOOR LOCATION: COMFORT ROOMS
(GROUND FLOOR, SECOND FLOOR)
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
FF-02 CHLORINATED
3.00
RUBBERIZED PAINT
1 (FOR PHASE 2)
8.38
(FOR PHASE 2)
FF-01
1.09
FF-02
FF-01
SLOP
21.66
4.90
SCOPE OF WORKS FOR
FF-02 (PHASE 1)
SHE
3 1. STRUCTURAL WORKS FROM GROUND FLOOR
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.
3. POLYCARBONATE ROOFING SHEET SYSTEM
LOBBY 4. EXTERIOR AND INTERIOR PAINTING WORKS
OPEN CLASS AREA TEMPORARY FF-01 5.
6. CHLORINATED RUBBER FLOORING FOR
CLASSROOM BASKETBALL COURT.
UP DN
8.38
7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
FF-04 FF-04 FF-04 1 PLAIN CEMENT FINISH
9. CEILING WORKS ON OFFICES & COMFORT
A-11
ROOMS AT 3RD FLOOR
S I D E W A L K
4 12.
WINDOWS.
SUPPLY AND INSTALLATION OF TWO(2)WATER
RAMP STORAGE TANKS,AND 2HP WATER PUMP.
RAMP ROOF LINE 13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS
1 GROUND FLOORFINISH
A-12 SCALE 1:100MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
8.38
(FOR PHASE 2)
FF-01
PLAIN CEMENT FINISH
FF-04 300 X 300 X 1.3THK
FLOOR VINYL TILES
HE
DIS.
2 (FOR PHASE 2)
FF-01 SLOP
21.66
4.90
SCOPE OF WORKS FOR
FF-01 (PHASE 1)
SHE
8.38
CM POWER HOUSE 7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
FF-01 SIMULATIONS LAB A PLAIN CEMENT FINISH
1
9. CEILING WORKS ON OFFICES & COMFORT
A-11
ROOMS AT 3RD FLOOR
FF-01
A 10. INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
COMFORT ROOMS.
11. SUPPLY & INSTALLATION OF DOORS AND
4 12.
WINDOWS.
SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS
1 SECOND FLOORFINISH
A-13 SCALE 1:100MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
FF-02 CHLORINATED
RUBBERIZED PAINT
1
FABRICATED METAL BLEACHERS
8.38
FF-01
FF-03
FF-04 300 X 300 X 1.3THK
FLOOR VINYL TILES
2
OPEN ABOVE (FOR PHASE 2)
21.66
15.00
4.90
TEMPORARY
FF-02 OFFICE SPACE
SCOPE OF WORKS FOR
(PHASE 1)
3
MEZZANINE LINE
1. STRUCTURAL WORKS FROM GROUND FLOOR
TO 3RD FLOOR
COVERED COURT 2. CONSTRUCTION OF ELEVATOR SHAFT.
3. POLYCARBONATE ROOFING SHEET SYSTEM
A= 791.10 SQM ELEV. LOBBY 4. EXTERIOR AND INTERIOR PAINTING WORKS
A= 28.40 SQM 5.
6. CHLORINATED RUBBER FLOORING FOR
UP DN BASKETBALL COURT.
8.38
7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
1
28.00 PLAIN CEMENT FINISH
A-11 9. CEILING WORKS ON OFFICES & COMFORT
STORAGE
1 THIRD FLOORFINISH
A-14 SCALE 1:100MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
2.00
1.70
6.90
1.27
0.75
6
1.0
3.74
5
0.2
0.72 0.90 0.75 0.90
0.86
1.10
0.72
1-1/2" X 1-1/2" X 1/4" L 1-1/2" X 1-1/2" X 1/4" L
BAR 0.60 O.C BAR 0.60 O.C
WALL CLAD FRAMING WALL CLAD FRAMING
0.50
0.50
1.30
6.41 2.00
6.93
1.28
3.52
0.20
0.44
13.63
1.20 1.20 1.70
13.00
13.00
12.81
0.75
0.75
3. POLYCARBONATE ROOFING SHEET SYSTEM
4. EXTERIOR AND INTERIOR PAINTING WORKS
5.
6. CHLORINATED RUBBER FLOORING FOR
FRONT VIEW BASKETBALL COURT.
7. EXTERIOR GRILL WORKS
HORIZONTAL WALL CLADING (8 SETS) 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
1.80 1.72 1.72 1.80
PLAIN CEMENT FINISH
9. CEILING WORKS ON OFFICES & COMFORT
6" X 6" SQ PIPE ROOMS AT 3RD FLOOR
IN BLACK PAINT
10. INSTALLATION OF TOILET FIXTURES,TOILET
0.22 0.25
FINISH
CUBICLE PARTITIONS,FLOOR TILES ON
2" X 2" SQ PIPE
COMFORT ROOMS.
IN BLACK PAINT 11. SUPPLY & INSTALLATION OF DOORS AND
FINISH
WINDOWS.
2.25
0.30 0.30 0.90 12. SUPPLY AND INSTALLATION OF TWO(2)WATER
0.75
STORAGE TANKS,AND 2HP WATER PUMP.
RIGHT-SIDE VIEW FRONT VIEW LEFT-SIDE VIEW FRONT VIEW FRONT VIEW RIGHT-SIDE VIEW 13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
SIDE VERTICAL WALL FRONT VERTICAL WALL FRONT VERTICAL WALL 16. PE ACTIVITY RM AT GROUND FLOOR.
CLADING DETAIL (3 SETS) CLADING DETAIL 1 (2 SETS) CLADING DETAIL 2 (2 SETS) STEEL LOUVERS DETAIL (6 SETS) 17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS
DATE REVISED:
45.40
6.97 6.52 6.52 6.52 6.52 6.52 5.85
1
FTB-1 C-2 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
C-1 C-1 C-1 C-1 C-1 C-1 C-1
SW-1
F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2
8.38
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
SW-1
21.66
4.90
SW-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
3
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1
0.40
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
SW-1
SW-1
4 - 25d
8.38
0.60
1.85 2 - 16d
1.48
2.11
ELEV.
4 - 25d
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 10d Stirrups; 5 @ 50, 5 @ 75
C-1 C-1 C-1 C-1 C-1 C-1 C-1 5 @ 150, rest @ 250 on centers
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 C-2
4
3 FTB SECTION
S-1 SCALE 1:20M
1 FOUNDATION PLAN
SCALE 1 : 100 MTS
1 S-1 2 3 4
0.60
2 FOOTING TIE BEAM ELEVATION
S-1 SCALE 1:40M
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
SW-2
SW-2
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
8.38
B-2
B-2
B-2
B-2
B-2
B-2
B-1
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
B-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
21.66
4.90
B-1
B-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
B-2
B-2
B-2
B-2
B-2
B-2
S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
B-1
B-1
SB-1
8.38
1.42 1.42
B-2
B-2
B-2
B-2
B-2
B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
1.85
2.11
SW-2
SW-2
ELEV.
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
OPEN
(see detail stair 2)
SB-1
B-1 B-1 B-1 B-1 B-1 B-1 B-1 4
FIRST FLOOR
1 FRAMING PLAN
SCALE 1 : 100 MTS
S-2
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
SW-2
SW-2
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
OPEN
S-1 (stair S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
case)
8.38
B-2
B-2
B-2
B-2
B-2
B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
B-1
B-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
21.66
4.90
B-1
B-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
B-2
B-2
B-2
B-2
B-2
B-2
B-2
S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
B-1
SB-1
B-1
8.38
1.42
B-2
B-2
B-2
B-2
B-2
B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
1.85
2.11
SW-2
SW-2
ELEV.
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-2 S-2 S-2 S-2 S-2 S-2 S-1 S-1 S-1 S-1 S-1 S-1
OPEN
(see detail
stair 2)
SECOND FLOOR
1 FRAMING PLAN
SCALE 1 : 100 MTS
S-3
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
SW-2
SW-2
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
OPEN
S-1 (see detail S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
stair 2)
8.38
B-1
B-2
B-2
B-2
B-2
B-2
B-2
B-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
21.66
4.90
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
B-2
B-2
B-2
B-2
B-2
B-2
B-1
B-1
S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
SB-1
8.38
B-1
B-2
B-2
B-2
B-2
B-2
B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
B-1
1.85
2.11
SW-2
SW-2
ELEV.
SB-1
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
OPEN
(see detail
stair 2)
THIRD FLOOR
1 FRAMING PLAN
SCALE 1 : 100 MTS
S-4
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
SB-1
S-1 S-1 S-1
3.00
B-1SW-2
SW-2
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
CB-1 SB-1 SB-1
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
8.38
B-2
SB-1
S-1 S-1 S-1
SB-1
SB-1
S-1
B-1
SB-1
S-1 S-1 S-1 G H
SB-1
SB-1
S-1
B-2 9.26
CB-1 2
CB-2
21.66
3.41 5.85
4.90
B-1
B-1
SB-1
SB-1
OPEN
SB-1
B-2
S-1 S-1
S-1 Basket Ball Below S-1
CB-2 B-2
CB-1 3 3
SB-1
SB-1
SB-1
SB-1
SB-1
S-1 S-1 S-1 S-1 S-1
S-1 S-1
B-1
SB-1 SB-1
B-1
B-1
CB-2 CB-2
8.38
8.38
1.42 1.42
B-2
B-2
CB-1
1.85 1.85
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
2.11
2.11
SW-2
SW-2
SW-2
ELEV. ELEV.
SB-1
SB-1
SB-1
S-2 S-1 S-1
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
CB-2
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
OPEN OPEN
S-1 (see detail (see detail
stair 2) stair 2)
DATE REVISED:
1.00
B-1 B-1 B-1 B-1 B-1 B-1 B-1
1
CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2
2.0mm x 2" 6" GALVANIZED Z-PURLINS
EPOXY PAINT FINISH
8.38
B-1
B-1
21.66
B-1
4.90
B-1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
TRUSS - 1
3
B-1
8.38
B-1
CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2
1.00
1 ROOF FRAMING PLAN
SCALE 1 : 100 MTS
S-6
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
0.50
8-25d
0.30
0.30
3-25d
G.I. PIPE
300
RC CORBEL
RC CORBEL
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
End Beam
First finish floor level
RC BEAM
RC BEAM
RC BEAM RC BEAM
L /4
Elevator shear wall Elevator shear wall
2.40
L /2
25d Matt Rebars
L /4 at 0.20m O.C.B.W.
RC BEAM RC BEAM
L /4
RC BEAM
RC BEAM
0.60
End Beam
12 @ 0.20m O.C.
Main RSB (grade 60)
2.00
2.00 0.30 2.11 0.30
0.30
rest @ 250mm O.C.
0.05 0.325
0.65
0.40
2.45
1.85
(see detail) From FOOTING to ROOF slab level
(see detail)
1.10
SECTION SECTION
12d horizontal
0.05
RSB @ 200 oc
20d vertical RSB
0.325
0.80
0.60
0.30
2.00
17 - 25D BOTTOM BARS BOTHWAYS 15 - 25D BOTTOM BARS BOTHWAYS
12d ties RSB as shown
10 - 25d RSB @ 200 o.c. vertically 10 - 25d RSB
4.00 4.00
2.00
F-1, C-2 F-2, C-1
1 ELEVATION 2 ELEVATION
S-8 SCALE 1:40M
S-8 SCALE 1:40M
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
R.C. CORBEL
2.17
TOP CHORD TOP CHORD
SCALE 1:50M
S-9 DIA 2" GALVANIZED PIPE
TRUSS WEB MEMBERS
DIA 2" GALVANIZED PIPE
TRUSS WEB MEMBERS
SCALE 1 : 20 MTS
S-9
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
DATE REVISED:
G H
5850
C B
UP DN
G H
ELEV.
5850
A
TOP OF ROOF BEAM TOP OF ROOF BEAM
4
@ 200mm O.C.E.F. (TYP.)
@ 200mm O.C.E.F. (TYP.)
5350
EXTERIOR
(200mm THK.
SHEAR WALL OF
WATER TANK LEVEL ELEVATOR SHAFT
S-11 SCALE 1 : 40 MTS
7000
1488
900
1674
900
4650
4650
900
900
FINISH FLR LEVEL
@ 200mm O.C.E.F. (TYP.)
1488
900
SHEAR WALL)
(200mm THK.
LOWER LANDING
4650
4650
4650
1674
900
900
900
SHEAR WALL)
(200mm THK.
4650
4650
4650
1674
900
900
& BOTTOM @ 150 O.C.
& BOTTOM @ 150 O.C.
GROUND FLR LEVEL GROUND FLR LEVEL
SHEAR WALL)
FINISH FLR LEVEL
(300mm THK.
@ 150 O.C.
3000
1326
900
PIPE HANDRAIL
300
300
1678.5
DATE REVISED:
DATE REVISED:
8.38
4.90
ELEV.
LOBBY U
8.38
TEMPORARY
OPEN CLASS AREA CLASSROOM STO.
LOBBY ELEV.
ENTRANCE / EXIT
S I D E W A L K
RAMP RAMP
DETAIL OF
2 FIRE HOSE CABINET
GROUND FLOOR P-1
SCALE NTS
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
8.38
PLUMBING LEGEND:
FEWC FIRE EXTINGUISHER W/ CABINET
GV GATE VALVE
CV CHECK VALVE
F FAUCET
WM WATER METER
HB HOSE BIBB
21.66
4.90
CWL COLD WATER LINE
HWL HOT WATER LINE
RD ROOF DRAIN
CB CATCH BASIN
DSP DRY STANDPIPE
LAV LAVATORY
WC WATER CLOSET
UR URINAL
FD FLOOR DRAIN
ELEV.
SS SLOP SINK
LOBBY
BS BAR SINK
D U CO CLEAN-OUT
FCO FLOOR CLEAN-OUT (BRASS)
8.38
VS VENT STACK
VSTR VENT STACK THRU ROOF
DS DOWNSPOUT
ELEV.
CM POWER HOUSE
SECOND FLOOR
1 COLD WATER LINE LAYOUT
SCALE 1 : 100 MTS
P-2
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
SANITARY ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SECOND FLOOR
COLD WATER LINE LAYOUT P-2
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 2 OF 8
45.40
8.38
Y
A
21.66
4.90
W
TEMPORARY
L
OFFICE SPACE
L
A
H
COVERED COURT
GENERAL NOTES
8.38
U D 1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING
TO THE PROVISION OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING
CODE & THE RULES AND REGULATION OF THE MUNICIPALITY.
OFFICE SPACE 1
AREA =13.40 SQ.M ELEV.
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS.
THE ENGINEER/ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
FOUND THEREIN.
THIRD FLOOR 7.
MANUFACTURER'S INSTRUCTIONS.
THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE. COORDINATE THE WORKS,
8. ALL WATER PIPE SHALL BE THOROUGHLY FLUSHED AND DISINFECTED WITH LIQUID
CHLORINE OR HYPOCHLORITE SOLUTION.
SCALE 1 : 100 MTS
P-3 9.
10.
ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO ATLEAST 1 - 1/2 OF THE DESIGNED
WORKING PRESSURE OF THE SYSTEM.
11. ALL DIMENSIONS ARE IN METERS AND ALL PIPES SIZE ARE IN MILLIMETERS UNLESS
OTHERWISE SECIFIED.
13. ALL PLUMBING WORKS AND INSTALLATIONS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF DULY LICENSE SANITARY ENGINEER OR MASTER PLUMBER.
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
THIRD FLOOR
ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
COLD WATER LINE LAYOUT
CHIEF, CPDMO
ARCHITECT OF RECORD
SANITARY ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
ELEV.
LOBBY
TEMPORARY
OPEN CLASS AREA CLASSROOM LOBBY DETAIL AT
3 WATER CLOSET
SCALE NTS
P-4
ENTRANCE / EXIT
GROUND FLOOR
1 SANITARY LINE LAYOUT
SCALE 1 : 100 MTS
DETAIL AT
P-4 3 WATER SUPPLY LINE
SCALE NTS
P-4
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
8.38
PARKING AREA
21.66
4.90
3 DETAIL AT LAVATORY
SCALE NTS
P-1
ELEV.
LOBBY
D U
8.38
ELEV.
CM POWER HOUSE
SECOND FLOOR
1 SANITARY LINE LAYOUT
SCALE 1 : 100 MTS 4 DETAIL AT URINAL
P-5 P-5
SCALE NTS
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
28.00
TEMPORARY
15.00
OFFICE SPACE
COVERED COURT
ELEV.
LOBBY
D U
ELEV.
STO
THIRD FLOOR
1 SANITARY LINE LAYOUT
SCALE 1 : 100 MTS
P-6
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
4.90
LOAD BEARING
ELEV. ELEV.
SPECIFICATIONS
1. COLD WATER LINES MAIN RISER & DOWNFEED SHALL BE GALVANIZED IRON (G.I) PIPE
SCHEDULE 40, STANDARD CONFORMING TO ASTM A - 120-80 "APO",
'SUPREME".
WATER TANK LEVEL WATER TANK LEVEL FOR INSIDE TOILETS, BATHS AND KITCHEN, SHALL BE HIGH DENSITY,
POLYPROPYLENE PIPE "VESBO" PN 20."
1 COLD WATER LINE LAYOUT 2 SANITARY LINE LAYOUT 2. DRAINAGE LINES PVC PIPE SERIES 1000 II, WITH SOLVENT JOINT FITTINGS, BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.
5. DRAIN & CLEANOUTS CAST IRON BODY WITH BRONZE/BRASS TOP BRONZE CONFORMING
ASTM B62 1034 KPa CLASS THREADED CONNECTION.
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
WATER TANK LEVEL
ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD.
DEAN COLLEGE OF MEDICINE
MARIE JOSEPHINE M. DE LUNA, PhD
VICE CHANCELLOR FOR ACADEMIC AFFAIRS
COLD WATER LINE LAYOUT
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE. COORDINATE THE WORKS,
THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT
UNLESS OTHERWISE SPECIFIED.
8. ALL WATER PIPE SHALL BE THOROUGHLY FLUSHED AND DISINFECTED WITH LIQUID
CHLORINE OR HYPOCHLORITE SOLUTION.
9. ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO ATLEAST 1 - 1/2 OF THE DESIGNED
WORKING PRESSURE OF THE SYSTEM.
10. ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATICALLY TESTED TO
ATLEAST 3.0 M. AHEAD TO ENSURE THAT THE SYSTEM ARE WATER TIGHT.
11. ALL DIMENSIONS ARE IN METERS AND ALL PIPES SIZE ARE IN MILLIMETERS UNLESS
OTHERWISE SECIFIED.
13. ALL PLUMBING WORKS AND INSTALLATIONS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF DULY LICENSE SANITARY ENGINEER OR MASTER PLUMBER.
SPECIFICATIONS
1. COLD WATER LINES MAIN RISER & DOWNFEED SHALL BE GALVANIZED IRON (G.I) PIPE
SCHEDULE 40, STANDARD CONFORMING TO ASTM A - 120-80 "APO",
'SUPREME".
2. DRAINAGE LINES PVC PIPE SERIES 1000 II, WITH SOLVENT JOINT FITTINGS, BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.
3. SEWER & WASTE LINES 50 O TO 100 O, PVC PIPES SERIES 1000 II, 150 O & ABOVE PVC PIPES
CLASS 35 WITH SOLVENT JOINT FITTINGS, BY "NELTEX", "ATLANTA"
BRAND OR APPROVED EQUAL.
4. VENT LINES PVC PIPE SERIES 600, WITH SOLVENT JOINT FITTINGS BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.
5. DRAIN & CLEANOUTS CAST IRON BODY WITH BRONZE/BRASS TOP BRONZE CONFORMING
ASTM B62 1034 KPa CLASS THREADED CONNECTION.
LEGEND :
CO CLEAN OUT
WC WATER CLOSET
LAV LAVATORY
FD FLOOR DRAIN
VSTR VENT STACK THRU ROOF
GV GATE VALVE
CV CHECK VALVE
M WATER METER
WATER LINE
WASTE WATER LINE
HB HOSE BIBB
SHO SHOWER
KS KITCHEN SINK
LS LAUNDRY SINK
PLUMBING LEGEND
1 SANITARY ISOMETRIC 2 COLD WATER ISOMETRIC
SCALE 1 : 100 MTS SCALE 1 : 100 MTS
P-8 P-8
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
SANITARY ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
ISOMETRIC DWG P-8
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 8 OF 8
GENERAL NOTES:
A B C D E F G H
SERVICE
LOBBY UP
2
A-12 A-10
A-9
A-11
A-8 3
FAWD
ELEV.
LOBBY U
GROUND FLOOR
1 POWER LAYOUT PLAN
SCALE 1 : 100 MTS
E-1
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: GROUND FLOOR POWER LAYOUT
E-1
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
1 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)
WALL LAMP
AIRCON OUTLET
AC
2A-10
2 ABC
ABOVE COUNTER OUTLET
2A-9
EXHAUST FAN OUTLET
EF
2A-7 4
Sabc THREE GANG SWITCH
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SECOND FLOOR POWER LAYOUT
E-2
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
2 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)
A B C D E F G H 1X40 FLUORESCENT LIGHT (40 W) BOX TYPE
PL PIN LIGHT
1 WALL LAMP
3A-14
DUPLEX CONVENIENCE OUTLET
3A-10
WP
WEATHERPROOF OUTLET
3A-13
CEILING MOUNTED CONV. OUTLET
CM
AIRCON OUTLET
AC
3A-15
FAWD 3
3A-16
MINI-EXHAUST FAN OUTLET
MEF
COVERED
COURT ELEV.
LOBBY CF
CEILING FAN OUTLET
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: THIRD FLOOR POWER LAYOUT
E-3
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
3 OF 10
A B C D E F G H
Sab
S3w 1
3Sabcd
2Sabc 3Sabcd
SITE
SERVICEUP UP PGH ROBINSONS MALL
LOBBY
COMPOUND
A-6
4Sabc
2Sabcd 2
Sa A-4
Sa TO TAFT AVE. PADRE FAURA STREET
A-5 Sabc
Sabc
ELEV.
LOBBY UP
Sa
Sabc
S3w S3w
OFFICE Sa
SPACE LOBBY A-2
STO.
C-1 E-1
B-1 D-1 F-1 5Sabc
A-1
3Sabcd 3Sabcd 3Sabcd 3Sabcd 3Sabcd
Sa Sa Sa Sa Sa Sa Sab
4
SIDE
WALK
RAMP RAMP
GROUND FLOOR
1 LIGHTING LAYOUT PLAN
SCALE 1 : 100 MTS
E-4
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: GROUND FLOOR LIGHTING LAYOUT
E-4
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
4 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)
WALL LAMP
WP
WEATHERPROOF OUTLET
D
CEILING MOUNTED CONV. OUTLET
CM
AIRCON OUTLET
AC
Sa Sa
Sabc EXHAUST FAN OUTLET
EF
Sabc
MINI-EXHAUST FAN OUTLET
2A-6 2A-5 2A-4 MEF
6Sabc Sabc
Sabc
Sab Sab
3 CEILING FAN OUTLET
CF
2Sabc
PANEL BOARD / CIRCUIT BREAKER
S3w S3w
Sa Sa
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SECOND FLOOR LIGHTING LAYOUT
E-5
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
5 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)
WALL LAMP
Sa
1 DUPLEX CONVENIENCE OUTLET
Sa Sa Sa Sa 4Sabcd
WP
WEATHERPROOF OUTLET
3A-1
3A-9 CEILING MOUNTED CONV. OUTLET
CM
FL FL FL FL FL FL FL FL FL FL FL Sab
AIRCON OUTLET
3A-8 AC
3A-7
Sa
FLOOR MOUNTED OUTLET (INDUSTRIAL TYPE)
FCO
3A-4
Sa
Sab
3A-3 Sa ONE GANG SWITCH
STO
Sab TWO GANG SWITCH
Sa Sa Sa Sa Sa Sa 4Sabcd
2Sabc 4 Sabc THREE GANG SWITCH
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: THIRD FLOOR LIGHTING LAYOUT
E-6
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
6 OF 10
A B C D E F G H
1
2Sabc 2Sabc Sabcd 2Sabc 2Sabc Sabcd
4D6
4D5
3Sabcd
Sa
Sabc
4A-1
OFFICE
SPACE
2
HALLWAY
2Sabcd 3Sabcd
3 3
4D-7
4Sabcd
4D3
Sab 2Sabc 2Sabcd 2Sabc 2Sabc Sabcd 4C-1
4 4
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: MEZZANINE FLOOR LIGHTING
LAYOUT
WATER TANK LEVEL LIGHTING
E-7
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.: LAYOUT
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
7 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)
WALL LAMP
HALLWAY
4B-3 MEF
4F8 4E12
PB-4D
OFFICE
SPACE
1
ELEV. Sa ONE GANG SWITCH
4E1 4C-3
4E11 4E10 4E9
4E8 4E7 4E6 4E5 4E4 4E3 4E2
PB-4E
4C-2
PB-4C Sab TWO GANG SWITCH
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: MEZZANINE POWER LAYOUT
E-8
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
8 OF 10
SCHEDULE OF LOADS AND COMPUTATION,(FIRST FLOOR), PB-A SCHEDULE OF LOADS AND COMPUTATION,(FOURTH FLOOR), PB-4D
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SCHEDULE OF LOADS AND
COMPUTATIONS E-9
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
9 OF 10
SCHEDULE OF LOADS AND COMPUTATION,(SECOND FLOOR), PB-2A
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:
DATE REVISED:
ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SCHEDULE OF LOADS &
COMPUTATIONS
SINGLE LINE DIAGRAM
E-10
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
10 OF 10