REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

ARCHITECTURAL OFFICE OF THE BUILDING OFFICIAL


A-1 LOCATION MAP,SITE DEVELOPMENT PLAN
THE SITE A-2
PERSPECTIVE
GROUND FLOOR PLAN
A-3 SECOND FLOOR PLAN DISTRICT/CITY/MUNICIPALITY
PROPERTY LINE

PROPOSED LAYOUT OF MERALCO POSTS


ROBINSONS PLACE
A-4 THIRD FLOOR PLAN
PEDRO GIL STREET

ROOF PLAN

34
A-5 MEZZANINE PLAN
ROBINSON'S PLACE
A-6 FRONT ELEVATION,REAR ELEVATION
SALCEDO HALL

EXISTING TENNIS COURT

31 MANILA
32 COURT OF APPEAL
33
30 35
G-13
A-7 RIGHT-SIDE ELEVATION
20
G-11 G-10

DEPARTMENT
A-8 LEFT-SIDE ELEVATION
13 11 OF
A-9 CROSS SECTION THRU "B"/ BLOW UP DETAIL
G-9
JUSTICE
G-15 9

PADRE FAURA STREET


12 10
G-8
A-10 LONGITUDINAL SECTION THRU "A"
G-7 A-11 SCHEDULES OF DOORS AND WINDOWS
23 22 8 21
19 A-12 GROUND FLOOR FINISH
G-16 G-6 SUPREME COURT ANNEX
A-13 SECOND FLOOR FINISH
PEDRO GIL STREET

7 5

3 A-14 THIRD FLOOR FINISH


6 4
PROPOSED 24
17 A-15 WALL FACADE DETAILS
DORMITORY 18 16 G-4
1
G-17 25 2 G-12 LAND USE AND ZONING
26 27 G-3
14 15
17a SUPREME COURT STRUCTURAL
28 29 OBLATION PLAZA
G-1 G-2
G-18

PADRE FAURA STREET S-1 FOUNDATION PLAN,FOOTING TIE BEAM ELEV.


TO BACLARAN TAFT AVENUE TO QUIAPO
S-2 FIRST FLOOR FRAMING PLAN
P. GIL STREET

S-3 SECOND FLOOR FRAMING PLAN


S-4 THIRD FLOOR FRAMING PLAN
S-5 FOURTH FLOOR & MEZZANINE FRAMING PLAN
S-6 ROOF FRAMING PLAN
S-7 STRUCTURAL DETAILS LINE AND GRADE

1 LOCATION MAP S-8

S-9
ELEVATOR SHAFT,COLUMN & FOOTING
DETAILS
ROOF TRUSS DETAILS
A-1 SCALE N.T.S S-10
S-11
STANDARD DETAILS
STAIR DETAILS
PERSPECTIVE VIEW S-12
S-13
STANDARD DETAILS
STANDARD DETAILS

ARCHITECTURAL

SANITARY
ROBINSONS PLACE
111.98
P-1 GROUND FLOOR COLD WATER LINE LAYOUT
P-2 SECOND FLOOR COLD WATER LINE LAYOUT
48.40

PROPERTY LINE 1.50 45.40 1.50 P-3 THIRD FLOOR COLD WATER LINE LAYOUT
PIPE THRU WALL DET., PLUMBING FIXTURE
3.00

1.80
PROPOSED LAYOUT OF MERALCO POSTS
LEGEND.
P-4 GROUND FLOOR SANITARY LINE LAYOUT STRUCTURAL
T

DETAIL OF WATER SUPPLY LINE


PEDRO GIL STREE

P-5 SECOND SANITARY LINE LAYOUT,KITCHEN

21.66

25.25
ROOF PLAN SINK & URINAL DETAIL.
P-6 THIRD FLOOR SANITARY LINE LAYOUT,
GENERAL NOTES, MATERIALS

BUILDING LINE

34 P-7
SPECIFICATIONS, CLEAN OUT DETAIL.
WATER TANK LEVEL COLD WATER &

1.80
EDGE FLASHING SANITARY LINE, SEPTIC TANK DETAILS
P-8 ISOMETRIC.
SALCEDO HALL SANITARY
EXISTING TENNIS COURT
STS

ELECTRICAL
RALCO PO T OF ME

E-1 GROUND FLOOR POWER LAYOUT


OSED LAYOU

E-2 SECOND FLOOR POWER LAYOUT


E-3 THIRD FLOOR POWER LAYOUT
PROP

E-4 GROUND FLOOR LIGHTING LAYOUT


E-5 SECOND FLOOR LIGHTING LAYOUT

33 E-6
E-7
THIRD FLOOR LIGHTING LAYOUT
MEZZANINE & WATER TANK LVL LIGHTING
LAYOUT
E-8 MEZZANINE POWER LAYOUT
ELECTRICAL

E-9 SCHEDULE OF LOADS & COMPUTATIONS

2 SITE DEVELOPMENT PLAN E-10 SCHEDULE OF LOADS AND COMPUTATION


SINGLE LINE DIAGRAM

A-1 SCALE 1:500MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: LOCATION MAP
PERSPECTIVE A-1
(PHASE 1) SITE DEVELOPMENT PLAN
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:

VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR


UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 1 OF 15
A B C D E F G H

1
A-10
LEGEND:
45.40

13.48 PROPERTY LINE 6.52 6.52 6.52 6.52 5.85 - PHASE 1

6MM THK FIBER CEMENT BOARD

3.00
CLADDING ON 1-1/2 X 1-1/2 X 1/4
FIRE ESCAPE FIRE ESCAPE ANGULAR BAR, PAINT FINISH
LADDER LADDER (PHASE 2)

- PHASE 2
CANOPY
(PHASE 2) 1

8.38
W
5

W HE DIS.
2
D 5 SLOP D SCOPE OF WORKS FOR
7 6

21.66
(PHASE 1)

4.90
STO. D D W
4 5 2 1. STRUCTURAL WORKS FROM GROUND FLOOR
W TO 3RD FLOOR
5
SHE 2. CONSTRUCTION OF ELEVATOR SHAFT.

D
3 3.
4.
POLYCARBONATE ROOFING SHEET SYSTEM
EXTERIOR AND INTERIOR PAINTING WORKS
D 5.
1 1 6. CHLORINATED RUBBER FLOORING FOR
W BASKETBALL COURT.
2 7. EXTERIOR GRILL WORKS
LOBBY 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
OPEN CLASS AREA TEMPORARY PLAIN CEMENT FINISH
UP DN
CLASSROOM

8.38
9. CEILING WORKS ON OFFICES & COMFORT
ROOMS AT 3RD FLOOR
1 10. INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
A-11
COMFORT ROOMS.

A ENTRANCE / EXIT 11.

12.
SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
SUPPLY AND INSTALLATION OF TWO(2)WATER
W STORAGE TANKS,AND 2HP WATER PUMP.
CANOPY
(PHASE 2) S I D E W A L K
1
6MM THK FIBER CEMENT BOARD
4 13.
14.
FIRE PROTECTION SYSTEMS
SEPTIC TANK FOR SEWAGE TREATMENT
CLADDING ON 1-1/2 X 1-1/2 X 1/4
15. PE FACULTY RM AT 3RD FLOOR
RAMP ROOF LINE RAMP ANGULAR BAR, PAINT FINISH
(PHASE 2) 16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )

B 18. PLUMBING WORKS

1 GROUND FLOOR PLAN


A-2 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
GROUND FLOOR PLAN A-2
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 2 OF 15
A B C D E F G H

1
A-10
LEGEND:
45.40

- PHASE 1
6.97 6.52 6.52 6.52 6.52 6.52 5.85
6MM THK FIBER CEMENT BOARD
CLADDING ON 1-1/2 X 1-1/2 X 1/4
FIRE ESCAPE FIRE ESCAPE ANGULAR BAR, PAINT FINISH
(PHASE 2)
LADDER LADDER

CANOPY
(PHASE 2) 1 - PHASE 2

8.38
HE DIS.
2
W
5 SLOP
D
6 SCOPE OF WORKS FOR

21.66
4.90
D (PHASE 1)
5 W
W 2 1. STRUCTURAL WORKS FROM GROUND FLOOR
5 TO 3RD FLOOR
SHE 2. CONSTRUCTION OF ELEVATOR SHAFT.
3 3.
4.
POLYCARBONATE ROOFING SHEET SYSTEM
EXTERIOR AND INTERIOR PAINTING WORKS
H A L L W A Y 5.
LINE OF D D
ELEV.
LOBBY
CANOPY 3 2 W 6. CHLORINATED RUBBER FLOORING FOR
2 BASKETBALL COURT.
D 7. EXTERIOR GRILL WORKS
2 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
UP DN PLAIN CEMENT FINISH

8.38
CM POWER HOUSE 9. CEILING WORKS ON OFFICES & COMFORT
SIMULATIONS LAB A ROOMS AT 3RD FLOOR
1 10. INSTALLATION OF TOILET FIXTURES,TOILET
A-11 CUBICLE PARTITIONS,FLOOR TILES ON

A 11.
COMFORT ROOMS.
SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
12. SUPPLY AND INSTALLATION OF TWO(2)WATER

CANOPY
(PHASE 2) 18.87 W W 4 13.
STORAGE TANKS,AND 2HP WATER PUMP.
FIRE PROTECTION SYSTEMS
3 3 14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.

B 17.
18.
ELECTRICAL WORKS (LIGHTING AND POWER )
PLUMBING WORKS

1 SECOND FLOOR PLAN


A-3 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
SECOND FLOOR PLAN A-3
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 3 OF 15
A B C D E F G H
1
A-10
LEGEND:
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85 - PHASE 1


6MM THK FIBER CEMENT BOARD
CLADDING ON 1-1/2 X 1-1/2 X 1/4
FIRE ESCAPE FIRE ESCAPE ANGULAR BAR, PAINT FINISH
LADDER LADDER (PHASE 2)

CANOPY
(PHASE 2)
D
1 - PHASE 2
4
FABRICATED METAL BLEACHERS

W
4

8.38
D
4
W
4

2
W SCOPE OF WORKS FOR

21.66
15.00

4.90
OPEN ABOVE TEMPORARY
W OFFICE SPACE 2
3 (PHASE 1)
D 1. STRUCTURAL WORKS FROM GROUND FLOOR
2 TO 3RD FLOOR
3 2. CONSTRUCTION OF ELEVATOR SHAFT.

MEZZANINE LINE
W 3. POLYCARBONATE ROOFING SHEET SYSTEM
COVERED COURT 2 4. EXTERIOR AND INTERIOR PAINTING WORKS
CHLORINATED RUBBER FLOOR FINISH W 5.
2 6. CHLORINATED RUBBER FLOORING FOR
ELEV. LOBBY BASKETBALL COURT.
7. EXTERIOR GRILL WORKS
UP DN 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,

8.38
PLAIN CEMENT FINISH
D 9. CEILING WORKS ON OFFICES & COMFORT
7 1 ROOMS AT 3RD FLOOR
28.00 A-11 10. INSTALLATION OF TOILET FIXTURES,TOILET
STORAGE CUBICLE PARTITIONS,FLOOR TILES ON
A FABRICATED METAL BLEACHERS
11.
COMFORT ROOMS.
SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.

CANOPY
(PHASE 2) 6MM THK FIBER CEMENT BOARD
4 12. SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
CLADDING ON 1-1/2 X 1-1/2 X 1/4
13. FIRE PROTECTION SYSTEMS
ANGULAR BAR, PAINT FINISH 14. SEPTIC TANK FOR SEWAGE TREATMENT
(PHASE 2)
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
B 17.
18.
ELECTRICAL WORKS (LIGHTING AND POWER )
PLUMBING WORKS

1 THIRD FLOOR PLAN


A-4 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
THIRD FLOOR PLAN A-4
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 4 OF 15
A B C D E F G H
45.45
LEGEND:
7.02 6.52 6.52 6.52 6.52 6.52 5.85

1
A-10 - PHASE 1

6MM THK FIBER CEMENT BOARD


CLADDING ON 1-1/2 X 1-1/2 X 1/4
FIRE ESCAPE FIRE ESCAPE ANGULAR BAR, PAINT FINISH
LADDER LADDER (PHASE 2)
- PHASE 2
CANOPY
(PHASE 2) 1
3.00

29.00 FOR PHASE 2

OFFICE SPACE 2

8.28
2

CORRIDOR
SCOPE OF WORKS FOR
OFFICE SPACE 1

21.57
15.26

4.90
OPEN BELOW A= 48.86 SQM (PHASE 1)
1. STRUCTURAL WORKS FROM GROUND FLOOR
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.
3 3.
4.
POLYCARBONATE ROOFING SHEET SYSTEM
EXTERIOR AND INTERIOR PAINTING WORKS
ELEV. 5.
LOBBY 6. CHLORINATED RUBBER FLOORING FOR
BASKETBALL COURT.
7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
DN PLAIN CEMENT FINISH

8.39
9. CEILING WORKS ON OFFICES & COMFORT
ROOMS AT 3RD FLOOR
1 10. INSTALLATION OF TOILET FIXTURES,TOILET
A-11 CUBICLE PARTITIONS,FLOOR TILES ON
FOR PHASE 2
A SUSPENDED JOGGING TRACK STORAGE
COMFORT ROOMS.
3.00

11. SUPPLY & INSTALLATION OF DOORS AND


WINDOWS.
12. SUPPLY AND INSTALLATION OF TWO(2)WATER
CANOPY
(PHASE 2) 6MM THK FIBER CEMENT BOARD
4 13.
STORAGE TANKS,AND 2HP WATER PUMP.
FIRE PROTECTION SYSTEMS
ROOF LINE CLADDING ON 1-1/2 X 1-1/2 X 1/4 14. SEPTIC TANK FOR SEWAGE TREATMENT
ANGULAR BAR, PAINT FINISH
(PHASE 2)
15. PE FACULTY RM AT 3RD FLOOR
ROOF EAVES LINE
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

MEZZANINE PLAN
MEZZANINE PLAN 1
A-5 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
MEZZANINE FLOORPLAN A-5
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 5 OF 15
1 2 3 4 4 3 2 1

6MM THK FIBER CEMENT BOARD


CLADDING ON 1-1/2 X 1-1/2 X 1/4
ANGULAR BAR, PAINT FINISH
TOP OF ROOF LINE TOP OF ROOF LINE

150 MM THK CHB WALL PLASTER FINISH 150 MM THK CHB WALL
WITH EXTERIOR GROOVE LINE /PAINT FINISH
DRIFTMOULD

3.96
3.96

UP LOGO
(TEMPORARY NOT INCLUDED)

TOP OF BEAM LINE TOP OF BEAM LINE


FIXED WINDOW LOUVER
(PHASE-2)

6MM THK FIBER CEMENT BOARD


CLADDING ON 1-1/2 X 1-1/2 X 1/4

4.00
4.00

ANGULAR BAR, PAINT FINISH 6MM THK FIBER CEMENT BOARD


CLADDING ON 1-1/2 X 1-1/2 X 1/4
STEEL CANOPY (TEMPORARY NOT ANGULAR BAR, PAINT FINISH
INCLUDED)

MEZZANINE LINE MEZZANINE LINE (PHASE 2)

17.56
17.56

SPORTS AND
WELLNESS CENTER

3.00
3.00

W W W W
THIRD FLOOR LINE THIRD FLOOR LINE 2 2 4 4

3.00
3.00

OPEN

SECOND FLOOR LINE


W W
SECOND FLOOR LINE
2 2

3.00
3.00

OPEN

W W
F.F.L
2 2

0.60
F.F.L
0.60

N.G.L. N.G.L.

1 FRONT ELEVATION 2 REAR ELEVATION


A-6 SCALE 1:100MTS A-6 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
FRONT ELEVATION
REAR ELEVATION
A-6
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 6 OF 15
A B C D E F G H

48.40

TOP OF ROOF LINE

2.5 MM THK PVC ROOFING


3.96

TOP OF BEAM LINE

FIXED WINDOW LOUVER AND LOGO BANNER


(PHASE-2)
4.00

CANOPY (PHASE 2)

(TEMPORARY NOT INCLUDED)

MEZZANINE LINE
LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNERS LOGO BANNER
17.56

3.00

2 " X 4 " SQ. TUBULAR PIPES


FIXED LOUVERS
THIRD FLOOR LINE (PHASE 2)
3.00

W W
3 3
SECOND FLOOR LINE STEEL CASEMENT SWING TYPE
(PHASE 2)
3.00

W
F.F.L 1
0.60

N.G.L.

1 RIGHT-SIDE ELEVATION
A-7 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
RIGHT-SIDE ELEVATION A-7
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 7 OF 15
H G F E D C B A

TOP OF ROOF LINE

2.5 MM THK PVC ROOFING


3.96

TOP OF BEAM LINE


4.00

6MM THK FIBER CEMENT BOARD


OPEN OPEN OPEN OPEN OPEN OPEN CLADDING ON 1-1/2 X 1-1/2 X 1/4
ANGULAR BAR, PAINT FINISH

CANOPY (PHASE 2)

MEZZANINE LINE
17.56

3.00

OPEN OPEN OPEN OPEN OPEN OPEN

THIRD FLOOR LINE


3.00

OPEN OPEN OPEN OPEN OPEN OPEN OPEN

PARAPET WALLS
SECOND FLOOR LINE
3.00

OPEN OPEN OPEN OPEN OPEN OPEN OPEN

F.F.L
0.60

N.G.L.

1 LEFT-SIDE ELEVATION
A-8 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:

LEFT-SIDE ELEVATION A-8


(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 8 OF 15
4 2
3 2 1 LEGEND:
- PHASE 1
DIA 3 " GALVANIZED PIPE SCH. 60
EPOXY PAINT FINISH

TOP OF ROOF LINE


2.5 MM THK PVC ROOFING
- PHASE 2
2.0 MM X 2" 6" GALVANIZED

3.96
Z-PURLINS EPOXY PAINT FINISH

2.0 MM X 2" 6" GALVANIZED


C-PURLINS EPOXY PAINT FINISH TOP OF BEAM LINE

4.00
6MM THK FIBER CEMENT BOARD
CLADDING ON 1-1/2 X 1-1/2 X 1/4
ANGULAR BAR, PAINT FINISH
SUSPENDED SUSPENDED
JOGGING JOGGING
TRACK TRACK
MEZZANINE LINE

SCOPE OF WORKS FOR

17.26
(PHASE 1)

3.00
1. STRUCTURAL WORKS FROM GROUND FLOOR
THIRD FLOOR LINE BASKETBALL COURT
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.
3. POLYCARBONATE ROOFING SHEET SYSTEM

3.00
3.00 4. EXTERIOR AND INTERIOR PAINTING WORKS
5.
6MM THK FIBER CEMENT BOARD 6. CHLORINATED RUBBER FLOORING FOR
CLADDING ON 1-1/2 X 1-1/2 X 1/4 SECOND FLOOR LINE
BASKETBALL COURT.
ANGULAR BAR, PAINT FINISH
ROBINSON'S 7. EXTERIOR GRILL WORKS
PLACE 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
3.00

PLAIN CEMENT FINISH


9. CEILING WORKS ON OFFICES & COMFORT
ROOMS AT 3RD FLOOR
0.60

F.F.L LOBBY PARKING


N.G.L.
10. INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
2 BLOW UP DETAIL 11.
COMFORT ROOMS.
SUPPLY & INSTALLATION OF DOORS AND
2.70

FILL FILL FILL


WINDOWS.
A-9 SCALE 1:20MTS 12. SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

1 CROSS SECTION THRU "A"


A-9 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D VICE CHANCELLOR FOR ACADEMIC AFFAIRS
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:

CROSS SECTION THRU "B" A-9


(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 9 OF 15
A B C D E F G H
LEGEND:
- PHASE 1
TOP OF ROOF LINE

- PHASE 2
3.96

TOP OF BEAM LINE


4.00

ELEVATOR
SUSPENDED JOGGING TRACK SHAFT

MEZZANINE LINE
17.56

ELEVATOR
SHAFT
3.00

SCOPE OF WORKS FOR


(PHASE 1)
THIRD FLOOR LINE BASKET BALL COURT

1. STRUCTURAL WORKS FROM GROUND FLOOR


ELEVATOR
SHAFT TO 3RD FLOOR
3.00

2. CONSTRUCTION OF ELEVATOR SHAFT.


3. POLYCARBONATE ROOFING SHEET SYSTEM
4. EXTERIOR AND INTERIOR PAINTING WORKS
SECOND FLOOR LINE CM POWER HOUSE SIMULATIONS LAB A LOBBY
5.
6. CHLORINATED RUBBER FLOORING FOR
ELEVATOR
BASKETBALL COURT.
3.00

SHAFT

7. EXTERIOR GRILL WORKS


8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
PLAIN CEMENT FINISH
0.60

F.F.L TEMPORARY CLASS RM. LOBBY


9. CEILING WORKS ON OFFICES & COMFORT
N.G.L.
ROOMS AT 3RD FLOOR
10. INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
2.70

FILL FILL FILL FILL FILL FILL FILL


COMFORT ROOMS.
11. SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
12. SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

1 LONGITUDINAL SECTION THRU "A"


A-10 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
LONGITUDINAL SECTION
THRU "A"
A-10
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 10 OF 15
0.150.45
0.80 1.50 1.50
0.80 1.00
0.20
0.75 0.75 0.75 0.75
FROSTED FILM STICKER W/ FROSTED FILM STICKER W/
6MM THK. TEMPERED CLEAR GLASS 6MM THK. TEMPERED CLEAR GLASS

ACRYLIC DOOR SIGN / 0.20


CLASS SCHEDULE,
1.06

1.06
A4 PAPER SIZE

LEVER TYPE HANDLE, LEVER TYPE HANDLE,

2.10
2.10

2.10

2.10
2.10
LOCK CYLINDER LOCK CYLINDER
(ONE SIDE CYLINDER, (ONE SIDE CYLINDER,
ONE SIDE KNOB) ONE SIDE KNOB)

1.10

1.10
1.10
1.00

1.00
FFL. FFL. FFL. FFL. FFL.

D D D D D D
1 2 3 4 5 6
TYPE: STEEL FLUSH DOOR TYPE: DOUBLE STEEL FLUSH DOOR
TYPE: DOUBLE STEEL LOUVERED DOOR, DOUBLE SWING TYPE: PVC FLUSH DOOR TYPE: STEEL FLUSH DOOR TYPE: WOOD PANEL DOOR
DESCRIPTION: FLUSH DOOR PANEL W/ JAMB TO BE REPAIRED & REPLACED W/ DESCRIPTION: DOUBLE FLUSH DOOR PANEL W/ STEEL JAMB W/
STAINLESS LEVER TYPE DOOR HANDLES , STAINLESS BUTTERFLY BALL LEVER TYPE DOOR HANDLES , STAINLESS BUTTERFLY BALL DESCRIPTION: LOUVERED DOOR PANEL WITH STEEL JAMB, DESCRIPTION: LEVER TYPE HANDLE WITH DOOR DESCRIPTION: LEVER TYPE HANDLE WITH DOOR DESCRIPTION: LOUVERED TYPE DOOR
BEARING HINGES, DOOR CLOSER W/ LOCK CYLINDER ( ONE SIDE BEARING HINGES, DOOR CLOSER W/ LOCK CYLINDER PUSH-PULL HANDLE, STAINLESS BUTTERFLY BALL CLOSER W/ LOCK CYLINDER ( ONE SIDE CLOSER W/ LOCK CYLINDER ( ONE SIDE
CYLINDER, ONE SIDE KNOB), DUCO PAINT FINISHED ( ONE SIDE CYLINDER, ONE SIDE KNOB) BEARING HINGES, DOOR CLOSER WITH DOUBLE CYLINDER, ONE SIDE KNOB) CYLINDER, ONE SIDE KNOB), LOUVERED QUANTITY: 2 SET(S)
LOCK CYLINDER
QUANTITY: 2 SET(S) QUANTITY: 3 SET(S) QUANTITY: 3 SET(S) QUANTITY: 2 SET(S) LOCATION: SLOPS
QUANTITY: 1 SET(S)
LOCATION: GROUND FLOOR CLASSROOM, LOBBY LOCATION: 2ND FLOOR (SIMULATIONS LAB A), LOCATION: COMFORT ROOM LOCATION: DISABLED COMFORT ROOM
3RD FLOOR (TEMPORARY SPACE OFFICE) LOCATION: SECOND FLOOR, CM POWER HOUSE

4.40
1.90
1.45 1.45 1.45 0.62 0.60 0.62

4.00 3.00
1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.10
1.10

0.50
0.50

0.50
W W W W W
1 2 3 4 5
TYPE: STEEL CASEMENT WINDOW TYPE: STEEL CASEMENT WINDOW, SWING TYPE TYPE: STEEL CASEMENT WINDOW, SWING TYPE TYPE: STEEL CASEMENT WINDOW, SWING TYPE TYPE: STEEL CASEMENT WINDOW, SWING TYPE

DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS DESCRIPTION: 6mm THK. TEMPERED CLEAR GLASS
IN STEEL FRAME IN STEEL FRAME IN STEEL FRAME IN STEEL FRAME IN STEEL FRAME

QUANTITY: 1 SET(S) QUANTITY: 7 SET(S) QUANTITY: 3 SET(S) QUANTITY: 2 SET(S) QUANTITY: 6 SET(S)

LOCATION: (GROUND FLOOR) TEMPORARY CLASSROOM LOCATION: GROUND FLOOR, 2ND FLOOR, 3RD FLOOR LOCATION: 2ND FLOOR (SIMULATION LAB A) LOCATION: 3RD FLOOR LOCATION: COMFORT ROOMS
(GROUND FLOOR, SECOND FLOOR)

1 SCHEDULES OF DOORS AND WINDOWS


A-11 SCALE 1:50MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
SCHEDULES OF DOORS AND
WINDOWS
A-11
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 11 OF 15
A B C D E F G H
LEGEND:
FF-01 PLAIN CEMENT FINISH
45.40

13.48 PROPERTY LINE 6.52 6.52 6.52 6.52 5.85

FF-02 CHLORINATED

3.00
RUBBERIZED PAINT
1 (FOR PHASE 2)

FF-03 0.60M X 0.60M


HOMOGENOUS TILES

8.38
(FOR PHASE 2)
FF-01

FF-04 300 X 300 X 1.3THK


FLOOR VINYL TILES
HE DIS.
2 (FOR PHASE 2)

1.09
FF-02
FF-01
SLOP

21.66
4.90
SCOPE OF WORKS FOR
FF-02 (PHASE 1)
SHE
3 1. STRUCTURAL WORKS FROM GROUND FLOOR
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.
3. POLYCARBONATE ROOFING SHEET SYSTEM
LOBBY 4. EXTERIOR AND INTERIOR PAINTING WORKS
OPEN CLASS AREA TEMPORARY FF-01 5.
6. CHLORINATED RUBBER FLOORING FOR
CLASSROOM BASKETBALL COURT.
UP DN

8.38
7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
FF-04 FF-04 FF-04 1 PLAIN CEMENT FINISH
9. CEILING WORKS ON OFFICES & COMFORT
A-11
ROOMS AT 3RD FLOOR

A ENTRANCE / EXIT 10. INSTALLATION OF TOILET FIXTURES,TOILET


CUBICLE PARTITIONS,FLOOR TILES ON
COMFORT ROOMS.
11. SUPPLY & INSTALLATION OF DOORS AND

S I D E W A L K
4 12.
WINDOWS.
SUPPLY AND INSTALLATION OF TWO(2)WATER
RAMP STORAGE TANKS,AND 2HP WATER PUMP.
RAMP ROOF LINE 13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

1 GROUND FLOORFINISH
A-12 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
GROUND FLOOR PLAN A-12
(PHASE 1) FINISH
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:

VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR


UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 12 OF 15
A B C D E F G H
LEGEND:
FF-01 PLAIN CEMENT FINISH
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85


FF-02 CHLORINATED
RUBBERIZED PAINT
1 (FOR PHASE 2)

FF-03 0.60M X 0.60M


HOMOGENOUS TILES

8.38
(FOR PHASE 2)
FF-01
PLAIN CEMENT FINISH
FF-04 300 X 300 X 1.3THK
FLOOR VINYL TILES
HE
DIS.
2 (FOR PHASE 2)
FF-01 SLOP

21.66
4.90
SCOPE OF WORKS FOR
FF-01 (PHASE 1)
SHE

3 1. STRUCTURAL WORKS FROM GROUND FLOOR


TO 3RD FLOOR
H A L L W A Y ELEV.
2. CONSTRUCTION OF ELEVATOR SHAFT.
LINE OF 3. POLYCARBONATE ROOFING SHEET SYSTEM
CANOPY FF-01 LOBBY
4. EXTERIOR AND INTERIOR PAINTING WORKS
5.
A= 40.80 SQM
6. CHLORINATED RUBBER FLOORING FOR
UP DN BASKETBALL COURT.

8.38
CM POWER HOUSE 7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
FF-01 SIMULATIONS LAB A PLAIN CEMENT FINISH
1
9. CEILING WORKS ON OFFICES & COMFORT
A-11
ROOMS AT 3RD FLOOR
FF-01
A 10. INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
COMFORT ROOMS.
11. SUPPLY & INSTALLATION OF DOORS AND
4 12.
WINDOWS.
SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

1 SECOND FLOORFINISH
A-13 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
SECOND FLOORFINISH A-13
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 13 OF 15
A B C D E F G H LEGEND:
FF-01 PLAIN CEMENT FINISH
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

FF-02 CHLORINATED
RUBBERIZED PAINT
1
FABRICATED METAL BLEACHERS

FF-03 0.60M X 0.60M


HOMOGENOUS TILES

8.38
FF-01

FF-03
FF-04 300 X 300 X 1.3THK
FLOOR VINYL TILES
2
OPEN ABOVE (FOR PHASE 2)

21.66
15.00

4.90
TEMPORARY
FF-02 OFFICE SPACE
SCOPE OF WORKS FOR
(PHASE 1)
3

MEZZANINE LINE
1. STRUCTURAL WORKS FROM GROUND FLOOR
TO 3RD FLOOR
COVERED COURT 2. CONSTRUCTION OF ELEVATOR SHAFT.
3. POLYCARBONATE ROOFING SHEET SYSTEM
A= 791.10 SQM ELEV. LOBBY 4. EXTERIOR AND INTERIOR PAINTING WORKS
A= 28.40 SQM 5.
6. CHLORINATED RUBBER FLOORING FOR
UP DN BASKETBALL COURT.

8.38
7. EXTERIOR GRILL WORKS
8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
1
28.00 PLAIN CEMENT FINISH
A-11 9. CEILING WORKS ON OFFICES & COMFORT
STORAGE

A FABRICATED METAL BLEACHERS A= 8.80


SQM
10.
ROOMS AT 3RD FLOOR
INSTALLATION OF TOILET FIXTURES,TOILET
CUBICLE PARTITIONS,FLOOR TILES ON
COMFORT ROOMS.
4 11. SUPPLY & INSTALLATION OF DOORS AND
WINDOWS.
12. SUPPLY AND INSTALLATION OF TWO(2)WATER
STORAGE TANKS,AND 2HP WATER PUMP.
13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
16. PE ACTIVITY RM AT GROUND FLOOR.
17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

1 THIRD FLOORFINISH
A-14 SCALE 1:100MTS

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
THIRD FLOORFINISH A-14
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 14 OF 15
6mm THK FIBER CEMENT BOARD
ON 1-1/2" X 1-1/2" X 1/4" L BAR FRAMING
IN PAINT FINISH

2.00
1.70
6.90

1.27
0.75

6
1.0
3.74

5
0.2
0.72 0.90 0.75 0.90

0.86
1.10

0.72
1-1/2" X 1-1/2" X 1/4" L 1-1/2" X 1-1/2" X 1/4" L
BAR 0.60 O.C BAR 0.60 O.C
WALL CLAD FRAMING WALL CLAD FRAMING

0.50

0.50
1.30

FRONT VIEW RIGHT SIDE VIEW

UPPER FRONT ARC A DETAIL (1 SET)

6mm THK FIBER CEMENT BOARD


ON 1-1/2" X 1-1/2" X 1/4" L BAR FRAMING
IN PAINT FINISH

6.41 2.00

6.93

1.28
3.52

0.20

0.44
13.63
1.20 1.20 1.70
13.00

13.00

12.81

FRONT VIEW RIGHT SIDE VIEW

LOWER FRONT ARC A DETAIL (1 SET)

6mm THK FIBER CEMENT BOARD


SCOPE OF WORKS FOR
ON 1-1/2" X 1-1/2" X 1/4" L BAR FRAMING
IN PAINT FINISH
(PHASE 1)
7.03
1. STRUCTURAL WORKS FROM GROUND FLOOR
0.30
TO 3RD FLOOR
2. CONSTRUCTION OF ELEVATOR SHAFT.

0.75

0.75
3. POLYCARBONATE ROOFING SHEET SYSTEM
4. EXTERIOR AND INTERIOR PAINTING WORKS
5.
6. CHLORINATED RUBBER FLOORING FOR
FRONT VIEW BASKETBALL COURT.
7. EXTERIOR GRILL WORKS
HORIZONTAL WALL CLADING (8 SETS) 8. CONSTRUCTION OF STAIRS WITH HAND RAILS,
1.80 1.72 1.72 1.80
PLAIN CEMENT FINISH
9. CEILING WORKS ON OFFICES & COMFORT
6" X 6" SQ PIPE ROOMS AT 3RD FLOOR
IN BLACK PAINT
10. INSTALLATION OF TOILET FIXTURES,TOILET

0.22 0.25
FINISH
CUBICLE PARTITIONS,FLOOR TILES ON
2" X 2" SQ PIPE
COMFORT ROOMS.
IN BLACK PAINT 11. SUPPLY & INSTALLATION OF DOORS AND
FINISH
WINDOWS.

2.25
0.30 0.30 0.90 12. SUPPLY AND INSTALLATION OF TWO(2)WATER
0.75
STORAGE TANKS,AND 2HP WATER PUMP.
RIGHT-SIDE VIEW FRONT VIEW LEFT-SIDE VIEW FRONT VIEW FRONT VIEW RIGHT-SIDE VIEW 13. FIRE PROTECTION SYSTEMS
14. SEPTIC TANK FOR SEWAGE TREATMENT
15. PE FACULTY RM AT 3RD FLOOR
SIDE VERTICAL WALL FRONT VERTICAL WALL FRONT VERTICAL WALL 16. PE ACTIVITY RM AT GROUND FLOOR.
CLADING DETAIL (3 SETS) CLADING DETAIL 1 (2 SETS) CLADING DETAIL 2 (2 SETS) STEEL LOUVERS DETAIL (6 SETS) 17. ELECTRICAL WORKS (LIGHTING AND POWER )
18. PLUMBING WORKS

1 WALL FACADE DETAILS


A-15 SCALE 1:50MTS
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
WALL FACADE DETAILS A-15
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 15 OF 15
A B C D E F G H

45.40
6.97 6.52 6.52 6.52 6.52 6.52 5.85
1
FTB-1 C-2 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
C-1 C-1 C-1 C-1 C-1 C-1 C-1

SW-1
F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2

8.38
FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1
SW-1

F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1


FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
2
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1

21.66
4.90
SW-1
FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
3
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1
0.40
FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1

FTB-1
SW-1

SW-1
4 - 25d

8.38

0.60
1.85 2 - 16d
1.48

2.11
ELEV.
4 - 25d
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 10d Stirrups; 5 @ 50, 5 @ 75
C-1 C-1 C-1 C-1 C-1 C-1 C-1 5 @ 150, rest @ 250 on centers
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 C-2
4
3 FTB SECTION
S-1 SCALE 1:20M

1 FOUNDATION PLAN
SCALE 1 : 100 MTS
1 S-1 2 3 4

Column Column Column Column


(see Schedule of Columns) (see Schedule of Columns) (see Schedule of Columns)
4 - 25d 4 - 25d
2 - 16d 2 - 16d
4 - 25d 4 - 25d

10d Stirrups; 5 @ 50, 5 @ 75 10d Stirrups; 5 @ 50, 5 @ 75


5 @ 150, rest @ 250 on centers 5 @ 150, rest @ 250 on centers
0.60

0.60
2 FOOTING TIE BEAM ELEVATION
S-1 SCALE 1:40M

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D FOUNDATION PLAN
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:

FOOTING TIE BEAM ELEVATION


S-1
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 1 OF 13
A B C D E F G H
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

B-1 B-1 B-1 B-1 B-1 B-1 B-1


1

SW-2
SW-2

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1

8.38
B-2

B-2

B-2

B-2

B-2

B-2

B-1
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
B-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

B-2 B-2 B-2 B-2 B-2 B-2 B-2


2

21.66
4.90
B-1

B-1
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
B-2

B-2

B-2

B-2

B-2

B-2
S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

B-2 B-2 B-2 B-2 B-2 B-2 B-2


3

SB-1
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
B-1

B-1
SB-1

8.38
1.42 1.42
B-2

B-2

B-2

B-2

B-2

B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
1.85

2.11
SW-2

SW-2
ELEV.
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

OPEN
(see detail stair 2)
SB-1
B-1 B-1 B-1 B-1 B-1 B-1 B-1 4

FIRST FLOOR
1 FRAMING PLAN
SCALE 1 : 100 MTS
S-2

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
FIRST FLOOR FRAMING PLAN
S-2
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 2 OF 13
A B C D E F G H
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

B-1 B-1 B-1 B-1 B-1 B-1 B-1


1

SW-2
SW-2

SB-1
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
OPEN
S-1 (stair S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
case)

8.38
B-2

B-2

B-2

B-2

B-2

B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1

B-1
B-1

SB-1
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

B-2 B-2 B-2 B-2 B-2 B-2 B-2


2

21.66
4.90
B-1

B-1
SB-1
SB-1

SB-1

SB-1

SB-1

SB-1
B-2

B-2

B-2

B-2

B-2

B-2

B-2
S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

B-2 B-2 B-2 B-2 B-2 B-2 B-2


3

SB-1
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
B-1

SB-1

B-1

8.38
1.42
B-2

B-2

B-2

B-2

B-2

B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1
1.85

2.11
SW-2

SW-2
ELEV.
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-2 S-2 S-2 S-2 S-2 S-2 S-1 S-1 S-1 S-1 S-1 S-1

OPEN
(see detail
stair 2)

B-1 B-1 B-1 B-1 B-1 B-1 B-1 4

SECOND FLOOR
1 FRAMING PLAN
SCALE 1 : 100 MTS
S-3
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
SECOND FLOOR FRAMING PLAN
S-3
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 3 OF 13
A B C D E F G H
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

B-1 B-1 B-1 B-1 B-1 B-1 B-1


1

SW-2
SW-2

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
OPEN
S-1 (see detail S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
stair 2)

8.38
B-1
B-2

B-2

B-2

B-2

B-2

B-2
B-1

SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1


SB-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

B-2 B-2 B-2 B-2 B-2 B-2 B-2


2

21.66
4.90
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
B-2

B-2

B-2

B-2

B-2

B-2
B-1

B-1
S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

B-2 B-2 B-2 B-2 B-2 B-2 B-2


3

SB-1
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1

SB-1

8.38
B-1

B-2

B-2

B-2

B-2

B-2

B-2
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1

B-1
1.85

2.11
SW-2

SW-2
ELEV.
SB-1

SB-1

SB-1

SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

OPEN
(see detail
stair 2)

B-1 B-1 B-1 B-1 B-1 B-1 B-1 4

THIRD FLOOR
1 FRAMING PLAN
SCALE 1 : 100 MTS
S-4
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
THIRD FLOOR FRAMING PLAN
S-4
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 4 OF 13
A B C D E F G H
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85


9.26
3.86
B-1 B-1 B-1 B-1 B-1 B-1 B-1
1
CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

SB-1
S-1 S-1 S-1
3.00

B-1SW-2
SW-2

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1
CB-1 SB-1 SB-1
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1

8.38
B-2

SB-1
S-1 S-1 S-1
SB-1

SB-1
S-1
B-1

SB-1
S-1 S-1 S-1 G H
SB-1

SB-1
S-1

B-2 9.26
CB-1 2
CB-2

21.66
3.41 5.85

4.90
B-1

B-1
SB-1

SB-1
OPEN

SB-1
B-2
S-1 S-1
S-1 Basket Ball Below S-1

CB-2 B-2
CB-1 3 3

SB-1

SB-1
SB-1

SB-1

SB-1
S-1 S-1 S-1 S-1 S-1
S-1 S-1
B-1

SB-1 SB-1

B-1

B-1
CB-2 CB-2

8.38

8.38
1.42 1.42

B-2

B-2
CB-1
1.85 1.85
SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1 SB-1

2.11

2.11
SW-2

SW-2

SW-2
ELEV. ELEV.
SB-1

SB-1

SB-1
S-2 S-1 S-1
CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2

CB-2
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
OPEN OPEN
S-1 (see detail (see detail
stair 2) stair 2)

B-1 B-1 B-1 B-1 B-1 B-1 B-1 4 B-1 B-1 4

FOURTH FLOOR MEZZANINE FLOOR


1 FRAMING PLAN 1 FRAMING PLAN
SCALE 1 : 100 MTS SCALE 1 : 100 MTS
S-5 S-5
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
FOURTH FLOOR FRAMING PLAN
MEZZANINE FRAMING PLAN
S-5
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 5 OF 13
A B C D E F G H
45.40

1.00 6.97 6.52 6.52 6.52 6.52 6.52 5.85 1.00

1.00
B-1 B-1 B-1 B-1 B-1 B-1 B-1
1
CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2
2.0mm x 2" 6" GALVANIZED Z-PURLINS
EPOXY PAINT FINISH

12.0mm DIAMETER SAG ROD


with NUT & WASHERS

8.38
B-1
B-1

21.66
B-1

4.90
B-1
TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1

TRUSS - 1
3

B-1

8.38
B-1

CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2 CB-2

B-1 B-1 B-1 B-1 B-1 B-1 B-1


4

1.00
1 ROOF FRAMING PLAN
SCALE 1 : 100 MTS
S-6
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
ROOF FRAMING PLAN
S-6
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 6 OF 13
10d Stirrups, 4@ 50,
5@ 100, Rest @ 250
NOTE: Typical to all beams

0.50
8-25d

0.30
0.30
3-25d

10mm thk. SOLE & BEARING


M.S. PLATES 6 DETAIL OF RC CORBEL (CB-2)
SCALE 1:60M
S-7
2.5mm THK POLYCARBONATE
LONG SPAN ROOFING

2.0mm x 2" x 6" GALVANIZED


Z-PURLINS SPACED @ 0.70 O.C.
3"d TOP CHORD
4" THK CHB END WALL G.I. PIPE

G.I. PIPE

300
RC CORBEL

RC CORBEL

7 DET. OF ROOF END WALL


SCALE 1:60M
S-7

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
STRUCTURAL DETAILS
S-7
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 7 OF 13
L or Distance
L /4 L /2 L /4
7.30 m
End Beam 2.00 0.30 2.70 0.30 2.00

End Beam
First finish floor level

RC BEAM

RC BEAM
RC BEAM RC BEAM

L /4
Elevator shear wall Elevator shear wall

2.40
L /2
25d Matt Rebars
L /4 at 0.20m O.C.B.W.

RC BEAM RC BEAM
L /4

RC BEAM

RC BEAM

0.60
End Beam

12 @ 0.20m O.C.
Main RSB (grade 60)

12 @ 0.15m O.C. 5 DETAIL OF ELEVATOR SHEAR WALL FOOTING


Extra Top RSB (grade 60)
S-8 SCALE 1:50M

TYPICAL DET. PLAN OF S - 1 LINE OF ELEVATOR SHEAR WALL FOOTING


4 SUSPENDED SLABS & GUTTERS
SCALE 1:50M ( SEE DRAWING NO. 5, SHEET NO. S-8 )
S-8
2.71 m

2.00
2.00 0.30 2.11 0.30

10 - 25d RSB 10 - 25d RSB


0.65
3-sets 10d ties spaced; 16 - 25d vertical RSB 1.10
5 @ 50, 5 @ 100, 16 - 25d vertical RSB

0.30
rest @ 250mm O.C.

0.05 0.325
0.65

0.40

3-sets 10d ties spaced;


5 @ 50, 10 @ 100,
rest @ 200mm O.C.
Footing Tie Beam
C-1 C-2 Footing Tie Beam

2.45
1.85
(see detail) From FOOTING to ROOF slab level
(see detail)

1.10
SECTION SECTION

12d horizontal

0.05
RSB @ 200 oc
20d vertical RSB

0.325
0.80

0.60

10 - 25D TOP BARS


17 - 25D TOP BARS 8 - 25D TOP BARS BOTHWAYS

0.30
2.00
17 - 25D BOTTOM BARS BOTHWAYS 15 - 25D BOTTOM BARS BOTHWAYS
12d ties RSB as shown
10 - 25d RSB @ 200 o.c. vertically 10 - 25d RSB
4.00 4.00

2.00
F-1, C-2 F-2, C-1
1 ELEVATION 2 ELEVATION
S-8 SCALE 1:40M
S-8 SCALE 1:40M

3 DET. PLAN OF ELEVATOR SHEAR WALL


DETAIL ELEVATION OF COLUMNS & FOUNDATION S-8 SCALE 1:20M

ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
ELEVATOR SHAFT,COLUMN &
FOOTING DETAILS
S-8
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 8 OF 13
4 3 2 1
21.66
1.00 8.38 4.90 8.38 1.00

ROOF APEX WEB MEMBERS (TYPICAL)


DIA 2" GALVANIZED PIPE
EPOXY PAINT FINISH
0.95

BOTTOM OF TRUSS TOP & BOTTOM CHORD


DIA 3" GALVANIZED PIPE SCH. 60
EPOXY PAINT FINISH
TRUSS STIFFENER
( see detail )

2.0mm x 2" 6" GALVANIZED Z-PURLINS


TRUSS STIFFENER TRUSS STIFFENER EPOXY PAINT FINISH
( see detail ) ( see detail )
4.00

2.5mm THICK CORR. POLYCARBONATE ROOF COVERING

TOP OF ROOF ROOF BEAM TOP OF ROOF BEAM

R.C. CORBEL

2.17
TOP CHORD TOP CHORD

1 TYPICAL TRUSS ELEVATION


DIA 3" GALVANIZED PIPE SCH. 60 DIA 3" GALVANIZED PIPE SCH. 60

SCALE 1:50M
S-9 DIA 2" GALVANIZED PIPE
TRUSS WEB MEMBERS
DIA 2" GALVANIZED PIPE
TRUSS WEB MEMBERS

BOTTOM CHORD BOTTOM CHORD


DIA 3" GALVANIZED PIPE SCH. 60 DIA 3" GALVANIZED PIPE SCH. 60
R12.6

2 TYP. TRUSS STIFFENER DETAIL


5

SCALE 1 : 20 MTS
S-9
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
ROOF TRUSS DETAIL
S-9
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 9 OF 13
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
STANDARD DETAILS
S-10
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 10 OF 13
S-11
11 OF 13
STAIR DETAILS

G H
5850
C B
UP DN
G H
ELEV.
5850
A
TOP OF ROOF BEAM TOP OF ROOF BEAM
4
@ 200mm O.C.E.F. (TYP.)
@ 200mm O.C.E.F. (TYP.)
5350

1 DET. PLAN OF STAIR 2


SHEAR WALL)

EXTERIOR
(200mm THK.

SHEAR WALL OF
WATER TANK LEVEL ELEVATOR SHAFT
S-11 SCALE 1 : 40 MTS
7000
1488

900
1674

MEZZANINE FLR LEVEL MEZZANINE FLR LEVEL


@ 200mm O.C.E.F. (TYP.)
1488

900

@ 200mm O.C.E.F. (TYP.)


LOWER LANDING LOWER LANDING
SHEAR WALL)
(200mm THK.
1674
4650

4650

4650
900

900
FINISH FLR LEVEL
@ 200mm O.C.E.F. (TYP.)
1488

@ 200mm O.C.E.F. (TYP.)


THIRD FLR LEVEL THIRD FLR LEVEL
1488

900
SHEAR WALL)
(200mm THK.

LOWER LANDING
4650

4650
4650
1674

900
900

FINISH FLR LEVEL


@ 200mm O.C.E.F. (TYP.)
1488

@ 200mm O.C.E.F. (TYP.)


@ 1000mm O.C. (TYP.)
SECOND FLR LEVEL SECOND FLR LEVEL
1488

900
SHEAR WALL)
(200mm THK.
4650

4650
4650
1674

900

& BOTTOM @ 150 O.C.


& BOTTOM @ 150 O.C.
150 LOWER LANDING
@ 150 O.C. @ 200mm O.C.E.F. (TYP.)
1312.5

@ 200mm O.C.E.F. (TYP.)

900
& BOTTOM @ 150 O.C.
& BOTTOM @ 150 O.C.
GROUND FLR LEVEL GROUND FLR LEVEL

SHEAR WALL)
FINISH FLR LEVEL

(300mm THK.
@ 150 O.C.

3000
1326

900
PIPE HANDRAIL
300

300
1678.5

@ 200mm O.C.E.F. (TYP.)


900

@ 200mm O.C.E.F. (TYP.)


TOP OF FOOTING
DET. SECTION DET. SECTION DET. SECTION
2 OF STAIR 2 AT A 3 OF STAIR 2 AT B 4 OF STAIR 2 AT C
S-11 SCALE 1 : 40 MTS
S-11 SCALE 1 : 40 MTS
S-11 SCALE 1 : 40 MTS
DETAIL OF STAIR 2
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
STANDARD DETAILS
S-12
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 12 OF 13
ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD


ARCH. ALLEN R. BUENAVENTURA DIOSDADO B. DIMALANTA P R O P O S E D
CHIEF, CPDMO
ARCHITECT OF RECORD
STRUCTURAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
STANDARD DETAILS
S-13
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. TIN
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. DATE: CADD FILE: 13 OF 13
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

8.38
4.90
ELEV.
LOBBY U

8.38
TEMPORARY
OPEN CLASS AREA CLASSROOM STO.
LOBBY ELEV.

ENTRANCE / EXIT

S I D E W A L K
RAMP RAMP

DETAIL OF
2 FIRE HOSE CABINET
GROUND FLOOR P-1
SCALE NTS

1 COLD WATER LINE LAYOUT


SCALE 1 : 100 MTS
P-1

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD.


DEAN COLLEGE OF MEDICINE
MARIE JOSEPHINE M. DE LUNA, PhD
VICE CHANCELLOR FOR ACADEMIC AFFAIRS
GROUND FLOOR COLD WATER
LINE LAYOUT PLAN
SPORTS & WELLNES CENTER MANUEL B. AGULTO,MD
P-1
REVISION NO.:
CHIEF, CPDMO SANITARY ENGINEER
ARCHITECT OF RECORD
CHANCELLOR FIRE HOSE CABINET DETAIL
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 1 OF 8
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

8.38
PLUMBING LEGEND:
FEWC FIRE EXTINGUISHER W/ CABINET
GV GATE VALVE
CV CHECK VALVE
F FAUCET
WM WATER METER
HB HOSE BIBB

21.66
4.90
CWL COLD WATER LINE
HWL HOT WATER LINE
RD ROOF DRAIN
CB CATCH BASIN
DSP DRY STANDPIPE
LAV LAVATORY
WC WATER CLOSET
UR URINAL
FD FLOOR DRAIN
ELEV.
SS SLOP SINK
LOBBY
BS BAR SINK

D U CO CLEAN-OUT
FCO FLOOR CLEAN-OUT (BRASS)

8.38
VS VENT STACK
VSTR VENT STACK THRU ROOF
DS DOWNSPOUT
ELEV.
CM POWER HOUSE

SECOND FLOOR
1 COLD WATER LINE LAYOUT
SCALE 1 : 100 MTS
P-2

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
SANITARY ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SECOND FLOOR
COLD WATER LINE LAYOUT P-2
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 2 OF 8
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

8.38
Y
A

21.66
4.90
W
TEMPORARY

L
OFFICE SPACE

L
A
H
COVERED COURT

GENERAL NOTES

8.38
U D 1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING
TO THE PROVISION OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING
CODE & THE RULES AND REGULATION OF THE MUNICIPALITY.
OFFICE SPACE 1
AREA =13.40 SQ.M ELEV.
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS.
THE ENGINEER/ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
FOUND THEREIN.

3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS REQUIRED


FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF
ARCHITECT OR ENGINEER.

4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH,


AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURAL AS VERIFIED BY THE
CONTRACTOR.

5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE


SPECIFIED.

6. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE

THIRD FLOOR 7.
MANUFACTURER'S INSTRUCTIONS.

THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE. COORDINATE THE WORKS,

1 COLD WATER LINE LAYOUT


THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT
UNLESS OTHERWISE SPECIFIED.

8. ALL WATER PIPE SHALL BE THOROUGHLY FLUSHED AND DISINFECTED WITH LIQUID
CHLORINE OR HYPOCHLORITE SOLUTION.
SCALE 1 : 100 MTS
P-3 9.

10.
ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO ATLEAST 1 - 1/2 OF THE DESIGNED
WORKING PRESSURE OF THE SYSTEM.

ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATICALLY TESTED TO


ATLEAST 3.0 M. AHEAD TO ENSURE THAT THE SYSTEM ARE WATER TIGHT.

11. ALL DIMENSIONS ARE IN METERS AND ALL PIPES SIZE ARE IN MILLIMETERS UNLESS
OTHERWISE SECIFIED.

12. ALL PIPES DIMENSIONS REFER TO INSIDE DIAMETER.

13. ALL PLUMBING WORKS AND INSTALLATIONS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF DULY LICENSE SANITARY ENGINEER OR MASTER PLUMBER.

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:
THIRD FLOOR
ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
COLD WATER LINE LAYOUT
CHIEF, CPDMO
ARCHITECT OF RECORD
SANITARY ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:

PIPE THRU WALL DETAIL


P-3
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
PLUMBING FIXTURE LEGEND
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 3 OF 8
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

ELEV.
LOBBY

TEMPORARY
OPEN CLASS AREA CLASSROOM LOBBY DETAIL AT
3 WATER CLOSET
SCALE NTS
P-4
ENTRANCE / EXIT

GROUND FLOOR
1 SANITARY LINE LAYOUT
SCALE 1 : 100 MTS
DETAIL AT
P-4 3 WATER SUPPLY LINE
SCALE NTS
P-4

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD.


DEAN COLLEGE OF MEDICINE
MARIE JOSEPHINE M. DE LUNA, PhD
VICE CHANCELLOR FOR ACADEMIC AFFAIRS
GROUND FLOOR SANITARY LINE
LAYOUT
SPORTS & WELLNES CENTER MANUEL B. AGULTO,MD
P-4
REVISION NO.:
CHIEF, CPDMO SANITARY ENGINEER
ARCHITECT OF RECORD
CHANCELLOR DETAIL OF WATER SUPPLY LINE
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 4 OF 8
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

2 DETAIL AT KITCHEN SINK


SCALE NTS
P-6
SERVICE
LOBBY
D

8.38
PARKING AREA

21.66
4.90
3 DETAIL AT LAVATORY
SCALE NTS
P-1
ELEV.
LOBBY

D U

8.38
ELEV.
CM POWER HOUSE

SECOND FLOOR
1 SANITARY LINE LAYOUT
SCALE 1 : 100 MTS 4 DETAIL AT URINAL
P-5 P-5
SCALE NTS

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD.


DEAN COLLEGE OF MEDICINE
MARIE JOSEPHINE M. DE LUNA, PhD
VICE CHANCELLOR FOR ACADEMIC AFFAIRS
SECOND FLOOR SANITARY LINE
LAYOUT
SPORTS & WELLNES CENTER MANUEL B. AGULTO,MD
P-5
REVISION NO.:
CHIEF, CPDMO SANITARY ENGINEER
ARCHITECT OF RECORD
CHANCELLOR KITCHEN SINK,LAVATORY
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
AND URINAL DETAIL
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 5 OF 8
45.40

6.97 6.52 6.52 6.52 6.52 6.52 5.85

28.00

TEMPORARY
15.00

OFFICE SPACE

COVERED COURT
ELEV.
LOBBY

D U

ELEV.
STO

THIRD FLOOR
1 SANITARY LINE LAYOUT
SCALE 1 : 100 MTS
P-6

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD.


DEAN COLLEGE OF MEDICINE
MARIE JOSEPHINE M. DE LUNA, PhD
VICE CHANCELLOR FOR ACADEMIC AFFAIRS
THIRD FLOOR SANITARY LINE
LAYOUT
SPORTS & WELLNES CENTER MANUEL B. AGULTO,MD
P-6
REVISION NO.:
CHIEF, CPDMO SANITARY ENGINEER
ARCHITECT OF RECORD
CHANCELLOR GENERAL NOTES
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
MATERIALS SPECS
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR CLEANOUT DETAIL
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 6 OF 8
6.52 5.85 6.52 5.85

4.90
LOAD BEARING

125mm R.C. SLAB W/ 10mm dia. RSB


D D SPACED @ 0.30m on ON CENTERS, B.W.

ELEV. ELEV.

SPECIFICATIONS
1. COLD WATER LINES MAIN RISER & DOWNFEED SHALL BE GALVANIZED IRON (G.I) PIPE
SCHEDULE 40, STANDARD CONFORMING TO ASTM A - 120-80 "APO",
'SUPREME".

WATER TANK LEVEL WATER TANK LEVEL FOR INSIDE TOILETS, BATHS AND KITCHEN, SHALL BE HIGH DENSITY,
POLYPROPYLENE PIPE "VESBO" PN 20."

1 COLD WATER LINE LAYOUT 2 SANITARY LINE LAYOUT 2. DRAINAGE LINES PVC PIPE SERIES 1000 II, WITH SOLVENT JOINT FITTINGS, BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.

SCALE 1 : 100 MTS SCALE 1 : 100 MTS


P-9 P-9 3. SEWER & WASTE LINES 50 O TO 100 O, PVC PIPES SERIES 1000 II, 150 O & ABOVE PVC PIPES
CLASS 35 WITH SOLVENT JOINT FITTINGS, BY "NELTEX", "ATLANTA"
BRAND OR APPROVED EQUAL.
4. VENT LINES PVC PIPE SERIES 600, WITH SOLVENT JOINT FITTINGS BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.

5. DRAIN & CLEANOUTS CAST IRON BODY WITH BRONZE/BRASS TOP BRONZE CONFORMING
ASTM B62 1034 KPa CLASS THREADED CONNECTION.

6. WATER METER "ARAD, EVER, ASAHI" OR MWSS APPROVED.


1034 KPa CLASS THREADED CONNECTION.

ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:
WATER TANK LEVEL
ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD.
DEAN COLLEGE OF MEDICINE
MARIE JOSEPHINE M. DE LUNA, PhD
VICE CHANCELLOR FOR ACADEMIC AFFAIRS
COLD WATER LINE LAYOUT

SPORTS & WELLNES CENTER MANUEL B. AGULTO,MD


P-7
REVISION NO.:
CHIEF, CPDMO SANITARY ENGINEER WATER TANK LEVEL
ARCHITECT OF RECORD
CHANCELLOR SANITARY LINE LAYOUT
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104 SEPTIC TANK DETAIL
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 7 OF 8
GENERAL NOTES
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING
TO THE PROVISION OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING
CODE & THE RULES AND REGULATION OF THE MUNICIPALITY.

2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS.


THE ENGINEER/ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
FOUND THEREIN.

3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS REQUIRED


FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF
ARCHITECT OR ENGINEER.

4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH,


AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURAL AS VERIFIED BY THE
CONTRACTOR.

5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE


SPECIFIED.

6. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE


MANUFACTURER'S INSTRUCTIONS.

7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE. COORDINATE THE WORKS,
THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT
UNLESS OTHERWISE SPECIFIED.

8. ALL WATER PIPE SHALL BE THOROUGHLY FLUSHED AND DISINFECTED WITH LIQUID
CHLORINE OR HYPOCHLORITE SOLUTION.

9. ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO ATLEAST 1 - 1/2 OF THE DESIGNED
WORKING PRESSURE OF THE SYSTEM.

10. ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATICALLY TESTED TO
ATLEAST 3.0 M. AHEAD TO ENSURE THAT THE SYSTEM ARE WATER TIGHT.

11. ALL DIMENSIONS ARE IN METERS AND ALL PIPES SIZE ARE IN MILLIMETERS UNLESS
OTHERWISE SECIFIED.

12. ALL PIPES DIMENSIONS REFER TO INSIDE DIAMETER.

13. ALL PLUMBING WORKS AND INSTALLATIONS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF DULY LICENSE SANITARY ENGINEER OR MASTER PLUMBER.

SPECIFICATIONS
1. COLD WATER LINES MAIN RISER & DOWNFEED SHALL BE GALVANIZED IRON (G.I) PIPE
SCHEDULE 40, STANDARD CONFORMING TO ASTM A - 120-80 "APO",
'SUPREME".

FOR INSIDE TOILETS, BATHS AND KITCHEN, SHALL BE HIGH DENSITY,


POLYPROPYLENE PIPE "VESBO" PN 20."

2. DRAINAGE LINES PVC PIPE SERIES 1000 II, WITH SOLVENT JOINT FITTINGS, BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.

3. SEWER & WASTE LINES 50 O TO 100 O, PVC PIPES SERIES 1000 II, 150 O & ABOVE PVC PIPES
CLASS 35 WITH SOLVENT JOINT FITTINGS, BY "NELTEX", "ATLANTA"
BRAND OR APPROVED EQUAL.
4. VENT LINES PVC PIPE SERIES 600, WITH SOLVENT JOINT FITTINGS BY "NELTEX",
"ATLANTA" BRAND OR APPROVED EQUAL.

5. DRAIN & CLEANOUTS CAST IRON BODY WITH BRONZE/BRASS TOP BRONZE CONFORMING
ASTM B62 1034 KPa CLASS THREADED CONNECTION.

6. WATER METER "ARAD, EVER, ASAHI" OR MWSS APPROVED.


1034 KPa CLASS THREADED CONNECTION.

LEGEND :
CO CLEAN OUT
WC WATER CLOSET
LAV LAVATORY
FD FLOOR DRAIN
VSTR VENT STACK THRU ROOF
GV GATE VALVE
CV CHECK VALVE
M WATER METER
WATER LINE
WASTE WATER LINE
HB HOSE BIBB

SHO SHOWER
KS KITCHEN SINK
LS LAUNDRY SINK

PLUMBING LEGEND
1 SANITARY ISOMETRIC 2 COLD WATER ISOMETRIC
SCALE 1 : 100 MTS SCALE 1 : 100 MTS
P-8 P-8
ARCHITECT: SANITARY ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA RENATO P. GASPAR P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
SANITARY ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.:
ISOMETRIC DWG P-8
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2311 TIN 932 - 420 - 104
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1366222 PLACE : TUGUEGARAO DATE: 1.2.2014 CADD FILE: 8 OF 8
GENERAL NOTES:
A B C D E F G H

SERVICE
LOBBY UP

2
A-12 A-10

A-9

A-11
A-8 3
FAWD

ELEV.
LOBBY U

TEMPORARY CLASS AREA TEMPORARY


CLASSROOM STO.
LOBBY A-7 ELEV.

B-2 D-2 E-2 F-2


C-2 PB-A
B-3 PB-C PB-D D-3 PB-E E-3 PB-F F-3
PB-B C-3
ENTRANCE / EXIT
4
SIDE
WALK
RAMP RAMP

GROUND FLOOR
1 POWER LAYOUT PLAN
SCALE 1 : 100 MTS
E-1

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: GROUND FLOOR POWER LAYOUT
E-1
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
1 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)

1X40 FLUORESCENT LIGHT (40 W) BOX TYPE

INCANDESCENT LIGHT ON RECEPTACLE, HD


A B C D E F G H
PL PIN LIGHT

WALL LAMP

2A-9 1 DUPLEX CONVENIENCE OUTLET


FAWD
SERVICE
WP
WEATHERPROOF OUTLET
LOBBY
D
CEILING MOUNTED CONV. OUTLET
CM

AIRCON OUTLET
AC

FLOOR MOUNTED OUTLET (INDUSTRIAL TYPE)


FCO

2A-10
2 ABC
ABOVE COUNTER OUTLET

2A-9
EXHAUST FAN OUTLET
EF

MINI-EXHAUST FAN OUTLET


MEF

3 CEILING FAN OUTLET


FAWD 2A-8 CF
HALL ELEV.
WAY LOBBY EMERGENCY LIGHT OUTLET
EML
D U
PANEL BOARD / CIRCUIT BREAKER
CM
SIMULATIONS LAB A
EMERGENCY POWER
TRANSFORMERS
ELEV. Sa ONE GANG SWITCH
GENSET
HOUSE
MDP DP-A PB-2A E-3 E-3
Sab TWO GANG SWITCH

2A-7 4
Sabc THREE GANG SWITCH

(x No) NUMBER OF SETS


SECOND FLOOR
1 POWER LAYOUT PLAN S3W HOMERUN TO CIRCUIT BREAKER

SCALE 1 : 100 MTS


E-2 no. HOMERUN TO CIRCUIT BREAKER

FIRE ALARM WARNING DEVICE OUTLET


FAWD WITH EMERGENCY LIGHTING SYSTEM

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SECOND FLOOR POWER LAYOUT
E-2
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
2 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)
A B C D E F G H 1X40 FLUORESCENT LIGHT (40 W) BOX TYPE

INCANDESCENT LIGHT ON RECEPTACLE, HD

PL PIN LIGHT

1 WALL LAMP

3A-14
DUPLEX CONVENIENCE OUTLET
3A-10

WP
WEATHERPROOF OUTLET
3A-13
CEILING MOUNTED CONV. OUTLET
CM

AIRCON OUTLET
AC
3A-15

2 FLOOR MOUNTED OUTLET (INDUSTRIAL TYPE)


FCO

E-3 ABOVE COUNTER OUTLET


TEMPORARY ABC
FAWD OFFICE
SPACE
EXHAUST FAN OUTLET
EF

FAWD 3
3A-16
MINI-EXHAUST FAN OUTLET
MEF
COVERED
COURT ELEV.
LOBBY CF
CEILING FAN OUTLET

D U EMERGENCY LIGHT OUTLET


PB-3A EML

ELEV. PANEL BOARD / CIRCUIT BREAKER


3A-11 STO
3A-12

Sa ONE GANG SWITCH


4
Sab TWO GANG SWITCH

Sabc THREE GANG SWITCH


THIRD FLOOR (x No) NUMBER OF SETS
1 POWER LAYOUT PLAN
SCALE 1 : 100 MTS S3W HOMERUN TO CIRCUIT BREAKER
E-3
no. HOMERUN TO CIRCUIT BREAKER

FIRE ALARM WARNING DEVICE OUTLET


FAWD WITH EMERGENCY LIGHTING SYSTEM

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: THIRD FLOOR POWER LAYOUT
E-3
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
3 OF 10
A B C D E F G H

TO TAFT AVE. PEDRO GIL STREET

Sab
S3w 1
3Sabcd
2Sabc 3Sabcd
SITE
SERVICEUP UP PGH ROBINSONS MALL
LOBBY
COMPOUND

A-6
4Sabc
2Sabcd 2
Sa A-4
Sa TO TAFT AVE. PADRE FAURA STREET
A-5 Sabc

Sabc

Sabc Sabc A-3 1 LOCATION PLAN


3 E-4 NOT TO SCALE
Sab Sab Sab Sab

ELEV.
LOBBY UP
Sa
Sabc
S3w S3w
OFFICE Sa
SPACE LOBBY A-2
STO.

C-1 E-1
B-1 D-1 F-1 5Sabc
A-1
3Sabcd 3Sabcd 3Sabcd 3Sabcd 3Sabcd
Sa Sa Sa Sa Sa Sa Sab
4
SIDE
WALK
RAMP RAMP

GROUND FLOOR
1 LIGHTING LAYOUT PLAN
SCALE 1 : 100 MTS
E-4

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: GROUND FLOOR LIGHTING LAYOUT
E-4
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
4 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)

1X40 FLUORESCENT LIGHT (40 W) BOX TYPE

INCANDESCENT LIGHT ON RECEPTACLE, HD


A B C D E F G H
PL PIN LIGHT

WALL LAMP

1 DUPLEX CONVENIENCE OUTLET


S3w
Sa

WP
WEATHERPROOF OUTLET
D
CEILING MOUNTED CONV. OUTLET
CM

AIRCON OUTLET
AC

FLOOR MOUNTED OUTLET (INDUSTRIAL TYPE)


FCO

2Sabc Sabcd 3Sabc 3Sabc


Sab Sabcd
Sab 3Sabc 2 ABC
ABOVE COUNTER OUTLET

Sa Sa
Sabc EXHAUST FAN OUTLET
EF

Sabc
MINI-EXHAUST FAN OUTLET
2A-6 2A-5 2A-4 MEF

6Sabc Sabc
Sabc
Sab Sab
3 CEILING FAN OUTLET
CF

2A-3 EMERGENCY LIGHT OUTLET


3Sab EML
DN UP

2Sabc
PANEL BOARD / CIRCUIT BREAKER
S3w S3w
Sa Sa

CM Sa ONE GANG SWITCH


2A-2
POWER Sab TWO GANG SWITCH
HOUSE 2A-1 2Sab
4
Sabc THREE GANG SWITCH

(x No) NUMBER OF SETS


SECOND FLOOR
1 LIGHTING LAYOUT PLAN S3W HOMERUN TO CIRCUIT BREAKER

SCALE 1 : 100 MTS


E-5 no. HOMERUN TO CIRCUIT BREAKER

FIRE ALARM WARNING DEVICE OUTLET


FAWD WITH EMERGENCY LIGHTING SYSTEM

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SECOND FLOOR LIGHTING LAYOUT
E-5
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
5 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)

1X40 FLUORESCENT LIGHT (40 W) BOX TYPE

INCANDESCENT LIGHT ON RECEPTACLE, HD


A B C D E F G H
PL PIN LIGHT

WALL LAMP

Sa
1 DUPLEX CONVENIENCE OUTLET
Sa Sa Sa Sa 4Sabcd

WP
WEATHERPROOF OUTLET
3A-1
3A-9 CEILING MOUNTED CONV. OUTLET
CM
FL FL FL FL FL FL FL FL FL FL FL Sab

AIRCON OUTLET
3A-8 AC
3A-7
Sa
FLOOR MOUNTED OUTLET (INDUSTRIAL TYPE)
FCO

Sa ABOVE COUNTER OUTLET


2 ABC
Sa

EXHAUST FAN OUTLET


EF

MINI-EXHAUST FAN OUTLET


MEF
Sa 2Sabcd
3A-2 Sabc 3 CEILING FAN OUTLET
Sabc
CF
COVERED
EMERGENCY LIGHT OUTLET
COURT EML

PANEL BOARD / CIRCUIT BREAKER


2Sabc
3A-6 S3w U D S3w
FL FL FL FL FL FL FL FL FL FL FL 3A-5

3A-4
Sa
Sab
3A-3 Sa ONE GANG SWITCH

STO
Sab TWO GANG SWITCH
Sa Sa Sa Sa Sa Sa 4Sabcd
2Sabc 4 Sabc THREE GANG SWITCH

(x No) NUMBER OF SETS

THIRD FLOOR S3W HOMERUN TO CIRCUIT BREAKER

1 LIGHTING LAYOUT PLAN no. HOMERUN TO CIRCUIT BREAKER


SCALE 1 : 100 MTS
E-6 FIRE ALARM WARNING DEVICE OUTLET
FAWD WITH EMERGENCY LIGHTING SYSTEM

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: THIRD FLOOR LIGHTING LAYOUT
E-6
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
6 OF 10
A B C D E F G H

1
2Sabc 2Sabc Sabcd 2Sabc 2Sabc Sabcd

4D6

4D5

3Sabcd
Sa
Sabc

4A-1

2Sabcd Sabc 4B-1 Sa 2 G H

OFFICE
SPACE
2

HALLWAY
2Sabcd 3Sabcd
3 3

4D-7
4Sabcd

4D1 2Sabc Sabc


S3w S3w S3w U D
S3w
4D4 ELEV. ELEV.
4D2 OFFICE
SPACE
1

4D3
Sab 2Sabc 2Sabcd 2Sabc 2Sabc Sabcd 4C-1
4 4

MEZZANINE FLOOR WATER TANK LEVEL


1 LIGHTING LAYOUT PLAN 2 LIGHTING LAYOUT PLAN
SCALE 1 : 100 MTS SCALE 1 : 100 MTS
E-7 E-7
ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: MEZZANINE FLOOR LIGHTING
LAYOUT
WATER TANK LEVEL LIGHTING
E-7
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.: LAYOUT
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
7 OF 10
ELECTRICAL LEGEND:
SYMBOL DESCRIPTION
2X20 FLUORESCENT LIGHT (2-20W w/ LUMINAIRE)
1X20
FLUORESCENT LIGHT (1-20W w/ LUMINAIRE)

1X40 FLUORESCENT LIGHT (40 W) BOX TYPE

INCANDESCENT LIGHT ON RECEPTACLE, HD


A B C D E F G H
PL PIN LIGHT

WALL LAMP

1 DUPLEX CONVENIENCE OUTLET


PB-4A
PB-4F
4F9 4F10 4F11 4F12 4F13 4F14 4F15 4F16 4F17 4F18 4F19 WEATHERPROOF OUTLET
WP
4F1 4A-2
CEILING MOUNTED CONV. OUTLET
CM
4F2

4E18 AIRCON OUTLET


AC
4F3
FLOOR MOUNTED OUTLET (INDUSTRIAL TYPE)
4A-3 FCO
4E17

ABOVE COUNTER OUTLET


2 ABC
4F4
FAWD
4E16
4B-2 PB-4B
EXHAUST FAN OUTLET
EF
TEMPORARY
4F5 OFFICE
4E15 SPACE MINI-EXHAUST FAN OUTLET

HALLWAY
4B-3 MEF

3 CEILING FAN OUTLET


4E14 FAWD CF
4F6

EMERGENCY LIGHT OUTLET


EML
3A-17
4F7 4E13
PANEL BOARD / CIRCUIT BREAKER
U D

4F8 4E12
PB-4D
OFFICE
SPACE
1
ELEV. Sa ONE GANG SWITCH

4E1 4C-3
4E11 4E10 4E9
4E8 4E7 4E6 4E5 4E4 4E3 4E2
PB-4E
4C-2
PB-4C Sab TWO GANG SWITCH

4 Sabc THREE GANG SWITCH

(x No) NUMBER OF SETS

MEZZANINE FLOOR S3W HOMERUN TO CIRCUIT BREAKER

1 POWER LAYOUT PLAN no. HOMERUN TO CIRCUIT BREAKER


SCALE 1 : 100 MTS
E-8 FIRE ALARM WARNING DEVICE OUTLET
FAWD WITH EMERGENCY LIGHTING SYSTEM

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: MEZZANINE POWER LAYOUT
E-8
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
8 OF 10
SCHEDULE OF LOADS AND COMPUTATION,(FIRST FLOOR), PB-A SCHEDULE OF LOADS AND COMPUTATION,(FOURTH FLOOR), PB-4D

SCHEDULE OF LOADS AND COMPUTATION,(FOURTH FLOOR), PB-4E

SCHEDULE OF LOADS AND COMPUTATION,GROUND FLOOR(TYPICAL PER ROOM)

SCHEDULE OF LOADS AND COMPUTATION,GROUND FLOOR (TYPICAL ROOM)

SCHEDULE OF LOADS AND COMPUTATION, 4TH FLOOR (ROOM)


SCHEDULE OF LOADS AND COMPUTATION,(FOURT FLOOR), PB-4F

SCHEDULE OF LOADS AND COMPUTATION, 4TH FLOOR (ROOM)

SCHEDULE OF LOADS AND COMPUTATION, 4TH FLOOR (ROOM)

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SCHEDULE OF LOADS AND
COMPUTATIONS E-9
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
9 OF 10
SCHEDULE OF LOADS AND COMPUTATION,(SECOND FLOOR), PB-2A

SCHEDULE OF LOADS AND COMPUTATION,ACU(FOURTH FLOOR), PB-4G

SCHEDULE OF LOADS AND COMPUTATION, (THIRD FLOOR), PB-3A


TRANSFOMER COMPUTATION:

SCHEDULE OF LOADS AND COMPUTATION, DP-A

SCHEDULE OF LOADS AND COMPUTATION, MAIN DISTRIBUTION PANEL

ARCHITECT: ELECTRICAL ENGINEER PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED: DATE ISSUED: SHEET CONTENT: SHEET NO.:

DATE REVISED:

ARCH. ALLEN R. BUENAVENTURA NESTOR T. RIVERA P R O P O S E D AGNES D. MEJIA, MD. MARIE JOSEPHINE M. DE LUNA, PhD
CHIEF, CPDMO
ARCHITECT OF RECORD
PROFESSIONAL ELECTRICAL ENGINEER SPORTS & WELLNES CENTER
DEAN COLLEGE OF MEDICINE VICE CHANCELLOR FOR ACADEMIC AFFAIRS
MANUEL B. AGULTO,MD
CHANCELLOR
REVISION NO.: SCHEDULE OF LOADS &
COMPUTATIONS
SINGLE LINE DIAGRAM
E-10
(PHASE 1) CHARLOTTE M. CHIONG, MD.,PhD. JOSE FLORENCIO F. LAPE A JR.,MD REF. NO.:
P.R.C. REG.NO. TIN P.R.C. REG.NO. 2093 TIN 140 - 204 - 148
VICE CHANCELLOR FOR PLANNING VICE CHANCELLOR FOR
UNIVERSITY OF THE PHILIPPINES MANILA AND DEVELOPMENT ADMINISTRATION
PTR NO. DATE: PTR NO. 1370227 PLACE : TUGUEGARAO DATE: 1.8.2014 CADD FILE:
10 OF 10