DEPLOYMENT SYSTEM
Reliable Connected Technology Solutions!
• Payload moved into position. • 50m section lifted into position over make/
• Rigging & ‘Launch Joint’ connected to crane’s break tool.
main block. • Land out pipe.
• ‘Lower Rigging Joint’ connected to payload. • Make-up connection
• Payload lowered to make/break tool.
Make/
Break Tool
Payload Manifold
• Main block lowered until pipe collar is resting on make/break tool. Lower Rigging Joint
• 50M section in position over make/break tool. Held in Make/Break Tool
• Make-up connection.
Payload Manifold
• Additional pipe sections with GMC Connectors.
Crane
Hook
Contact Us Today!
• Final lowering joint connected when Let GMC Be Your
payload is approximately 50M off
bottom.
Connected
• Crane used to land out payload on Solution!
seabed.
Subsea
Foundation Payload Manifold