Professional Documents
Culture Documents
CERTIFICATION
1.
2.
3.
1. The Detailed Engineering Design (DED) and the Program of Work (POW)
have been prepared and approved in accordance with the national
government standards and relevant provisions of the R.A. No. 10964 (F.Y.
2018 GAA) and other applicable laws and issuances, and copies submitted
to the concerned DILG-PO thru the MLGOO.
2. All bidding documents have been completed and ready to proceed with
publications of Invitation to Bid/ Advertisement (ITB/Ad).
4.b The project is located in an ancestral domain area; application for free-prior
informed consent (FPIC) has been submitted to NCIP.
5. The site of the project has no problem on Land Ownership and/or Road
Right-of-Way (RROW).
6. Funds shall be made available for the maintenance once the project is
completed.
8. The copies of approved DED and POW have been provided to DILG-PO thru
the MLGOO. Consequently, concerned CSOs have been notified of the
submission of Annexes A and B to DILG.
10. The above documents shall be made available to DILG during field
monitoring visits and/or as may be requested.
11. The LGU has a functional Project Monitoring Team in-charged of closely
monitoring the projects under the Local Government Support Fund (LGSF).
Attached is a copy of an Executive Order intended for the purpose.
This Certification is being issued in compliance with the DILG Memorandum Circular
No._____, Series of 2018.
______________________ ________________
Municipal Planning and Date
Development Coordinator
______________________ ________________
Municipal Engineer Date
______________________ ________________
Local Chief Executive Date
Annex B-1
Notarized LGU Certification for Local Access Road / Bridge Projects
ACKNOWLEDGEMENT
REPUBLIC OF THE PHILIPPINES
(Municipality/City of ________________) S.S.
Subscribed and sworn to before me on this date, a Notary Public for and in
__________, Philippines.
NOTARY PUBLIC