You are on page 1of 21

1

OPERATIONAL GUIDELINES
EXEMPTION OF ELECTRICITY DUTY
UNDER IPR -2007
1. Short Title: - Operational guidelines for Exemption of Electricity Duty under
provisions of clause 20.1 & 20.2 of Industrial Policy Resolution –2007.
2. Extent: - It shall extend to the whole of the State of Orissa.
3. Commencement: - It shall come into force from the “Effective Date" of Industrial
Policy Resolution –2007 i. e. 2nd March 2007.
4. Terms and Expressions: -Terms and expressions used in this operational
guideline, but not specifically defined here, shall have the same meaning as in
Industrial Policy Resolution –2007.
5. Eligibility: -
5.1 New industrial unit other than Thrust sector industries shall be exempted from
the payment of electricity duty up to a contract demand of 110 KVA for a period of
five (5) years from the date of availing power supply for commercial production.
5.2 New industrial unit in Thrust sector shall be entitled to 100% exemption of
electricity duty up to a contract demand of 5 M W (Five Megawatt) for a period of five
(5) years from the date of availing power supply for commercial production.
5.3 Non-mineral based new industrial units located in the Revenue districts of
Kalahandi, Nuapada, Bolangir, Subarnpur, Koraput, Malkangiri, Rayagada,
Nawrangpur, Khandamal, Gajapati and Mayurbhanj with minimum investment of five
crore rupees in plant & machinery and providing direct employment to minimum
hundred persons shall be treated as deemed thrust sector unit under clause 15 of
IPR-2007 and be eligible for this incentive as prescribed for the thrust sector (Special
incentives for KBK Region, Kandhamal, Gajapati & Mayurbhanj).
5.4 Deemed thrust sector status granted to industrial unit by High Level Clearance
Authority (HLCA) subject to concurrence of Finance Department and Cabinet
approval under clause 15 of IPR-2007 and be eligible for this incentive as prescribed
for the thrust sector.
5.5 New industrial unit setting up captive power plant shall be exempted from the
payment of 50% of electricity duty for captive power plant for a period of five (5)
years for self- consumption only from the date of its commissioning.

2
5.6 Pioneer Unit in each Thrust sector shall be eligible for extension of period of
incentives for an additional two years over and above the limit specified, provided
the unit has been in continuous commercial production during the normal period of
incentive.
5.7 Units listed at point 3 of SCHEDULE of Annexure - II of IPR-2007 shall not be
eligible for fiscal incentives as industrial units
6. Time frame for filing application: - Eligible Industrial unit shall file its claim
complete in all respect, within six months from the date of starting commercial
production / within six months from the date of notification of this operational
guidelines, which ever is latter.
Incase of Captive Power Plant, the claim shall be filed within six months
from the date of commission of CPP for full production of power / within six months
from the date of notification of this operational guidelines, which ever is latter.
Pioneer Units in each Thrust sector shall file its claim in two stages. It shall be
within six months from the date of starting commercial production / commissioning
of CPP for full production of power, as the case may be / within six months from
the date of notification of this operational guidelines, which ever is latter for normal
period of incentives and for extension of period of incentives for an additional two
years over and above the limit specified, it shall be within next six months of
completion of normal period of incentive.
Application in the prescribed form received after the due date / incomplete in
any respect shall be liable to be summarily rejected. There shall be no consideration
for condonation of delay in filing application.
7. Procedure: -
7.1 Eligible industrial unit claiming exemption from the payment of Electricity Duty on
Distribution Company's power supply & on Captive Power Plant shall submit
application in the prescribed form appended to this operational guideline at Annexure
-'A- I' & 'A- II' respectively, along with copies of all relevant documents as mentioned
in the Checklist at Annexure -'B'. Application shall be submitted to the concerned
General Manager (GM) / Project Manager (PM), District Industries Centres (DIC) in
duplicate for Micro, Small, Medium units up to a contract demand of 110 KVA /
Captive Power Plant of above category and in triplicate for the Large Units up to 110
KVA, Thrust sector, Deemed Thrust sector, Pioneer Unit and Captive Power Plant
for Large Industries. Copies of the documents as indicated in the checklist shall be

3
self - attested by Proprietor / Managing Partner / Managing Director / Authorized
Signatory of the unit.
7.2 On receipt of application with copies of relevant documents, the
acknowledgement as prescribed at Annexure- 'C' shall be dispatched to the
applicant duly signed by the authorized officer / G.M / P.M, DIC on the day of receipt.
G.M / P.M, DIC may authorize any of his officers for the purpose.
7.3 The application shall be examined and scrutinized by the concerned General
Manager / Project Manager, DIC and where necessary spot verification shall be
made. After scrutiny and examination, correction, if any required on the application
form, shall be made under the signature of General Manager / Project Manager, DIC.

7.4 Exemption of Electricity Duty on Distribution Company's power supply

7.4.1 One set of application with supporting documents made by the new industrial
unit for Micro, Small, Medium category where contract demand is up to 110 KVA
shall be forwarded to the Electrical Inspector (T&D) of the concerned zone
recommending exemption to be allowed with particulars in the prescribed form
appended at Annexure- 'D' within 30 days from the date of receipt. Copies of said
recommendation letter should be forwarded to Director of Industries, Orissa,
applicant unit, and concerned Electrical Inspector (T&D). The other set of application
etc and copy of the said recommendation letter shall be retained in the office of
General Manager / Project Manager, DIC for record.
7.4.2 In case of Thrust sector, Deemed Thrust sector, Pioneer industries and Large
Industrial Unit with contract demand up to 110 KVA, the General Manager / Project
Manager, DIC shall transmit two sets of application with copies of all relevant
documents along with a certificate to Director of Industries, Orissa (DI) mentioning
date of first fixed capital investment, entitlement for ED exemption, quantum of
contract demand, date of availing power supply for commercial production, present
working status etc in the prescribed form appended at Annexure- 'E' within 30 days
from the date of receipt of application under intimation to the applicant unit. The third
set of application etc and copy of aforesaid certificate shall be retained in the office
of General Manager / Project Manager, DIC for record.
Directorate of Industries, Orissa (DI) on receipt application with supporting
documents from the concerned DIC, shall scrutinize & examine the same and where

4
necessary spot verification shall be made. Then, one set of application with
supporting documents shall be forwarded to the Electrical Inspector (T&D) of the
concerned zone recommending exemption to be allowed with particulars in the
prescribed form appended at Annexure- 'F' within 30 days from the date of receipt of
recommendation from the DIC, if found eligible and suitable. Copies of said
recommendation letter should be endorsed to applicant unit, Electrical Inspector
(T&D) & DIC concerned. The other set of application etc and the said
recommendation letter shall be retained in the office of Director of Industries, Orissa
for record.
7.4.3 On receipt of the recommendation from General Manager / Project Manager,
DIC or Director of Industries, Orissa, as the case may be, the Electrical Inspector
(T&D) of the concerned zone shall exempt the recommended Duty and intimate the
same to the Executive Engineer of concerned Electrical Division, Chief Electrical
Inspector (T&D), Orissa, Bhubaneswar, Director of Industries, Orissa, General
Manager / Project Manager, DIC concerned and applicant unit in the prescribed
format appended at Annexure- 'G' within 30 days from the date of receipt of
recommendation from the DIC / Director of Industries, Orissa.
7.4.4 In any case exemption is allowed after collection of electricity duty; the
Executive Engineer concerned shall take necessary steps to adjust the excess
collection against tariff payable by the industrial unit in near future after getting
refund order from concerned Electrical Inspector (T&D).
7.4.5 Electrical Inspector (T&D) / Executive Engineer concerned, shall keep
accounts of exemption and adjustment and intimate the same at the end of each
financial year to the Chief Electrical Inspector (T&D), Orissa / Director of Industries,
Orissa / District Industries Centre concerned so as to keep record of quantum of
benefit extended during the IPR-2007.
7.4.6 According to the provisions of the IPR-2007, the date of Power Supply to avail
of admissible exemption on Electricity Duty is the date of power supply by the
DISTICO for commercial production. Therefore, it is advisable that Industrial Units
should take construction power and production power separately and to execute
separate agreement for construction power and production power.
7.5 Exemption of Electricity Duty on Captive Power Plant
7.5.1 One set of application with supporting documents made by the new industrial
unit having C.P.P. for Micro, Small, Medium category shall be forwarded to the

5
Superintending Engineer (P)-cum-E.I. (G) of the concerned zone recommending
exemption mentioning quantum of Electricity used for self consumption, E.D.
exemption to be allowed in the prescribed form appended in Annexure-‘H’ within 30
days from the date of receipt. Copies of said recommendation letter should be
forwarded to Director of Industries, Orissa, and applicant unit. The other set of
application etc. and copy of the said recommendation letter shall be retained in the
office of General Manager / Project Manager, DIC for record.
7.5.2 General Manager / Project Manager, DIC shall transmit two sets of application
with copies of all relevant documents of the C.P.Ps for Large Industrial Units / Thrust
Sector / Deemed Thrust Sector / Pioneer Industries along with a certificate to
Director of Industries, Orissa (DI) mentioning date of first fixed capital investment,
date of first fixed capital investment for CPP, date of commissioning of CPP, capacity
of CPP & entitlement for E D exemption, present working status etc in the prescribed
form appended in Annexure- 'I ' within 30 days from the date of receipt of application
under intimation to the applicant unit. The third set of application etc and copy of
aforesaid certificate shall be retained in the office of General Manager / Project
Manager, DIC for record.
Director of Industries, Orissa on receipt application with supporting documents from
the concerned DIC, shall scrutinize & examine the same and if necessary spot
verification shall be made. Then, one set of application with supporting documents
shall be forwarded to the S. E (P)- cum- EI (G) of the concerned area,
recommending exemption to be allowed with particulars in the prescribed form
appended at Annexure- 'J' within 30 days from the date of receipt of
recommendation from the DIC, if found eligible and suitable. Copies of said
recommendation letter should be endorsed to applicant unit, Chief. Engineer (P) –
cum- CEI (G), Orissa, Bhubaneswar & DIC concerned. The other set of application
etc and the said recommendation letter shall be retained in the office of Director of
Industries, Orissa for record.
7.5.3 On receipt of the recommendation from Director of Industries, Orissa, the S. E
(P)- cum- EI (G) of the area, shall exempt the electricity duty recommended, if any
and intimate the same to the Chief. Engineer (P) – cum- CEI (G), Director of
Industries, Orissa, General Manager / Project Manager, DIC concerned and
applicant unit in the prescribed format appended at Annexure- 'K' within 30 days
from the date of receipt of recommendation from the DIC / Director of Industries,

6
Orissa. The S E (P) – cum- EI (G) shall take steps for adjustment of excess amount
paid, if any, with intimation to all concerned.
7.5.4 S. E (P)- cum- EI (G) concerned, shall keep accounts of exemption and
adjustment and intimate the same at the end of each financial year to their
authorities / Director of Industries, Orissa / District Industries Centre concerned so as
to keep record of quantum of benefit extended during the IPR-2007.
7.5.5 Date of commissioning of the CPP is to be submitted by the applicant unit
along with the application form. Date of commissioning shall be mentioned on the
Commissioning Report with joint signature of the representatives of the applicant
unit, supplier / erector of the CPP, concerned Electrical Inspector and if applicable
representatives of Distribution Company and Orissa Power Transmission
Corporation Ltd.
8. In case of rejection of application at the level of G.M / P.M, DIC / D.I Orissa, /
Electrical Inspector (T&D) / S. E (P)- cum- EI (G) of the concerned zone, the reasons
of rejection shall be communicated to the applicant unit by the concerned authority
as early as possible or within a maximum period of 90 days of receipt of application
at DIC level in the format prescribed at Annexure – 'L'.
9. Industrial units covered under earlier Industrial policy shall continue to enjoy the
incentives if admissible under the said policy as per eligibility.
10. The receipt of claim filed by the industrial units and exemption of Electricity Duty
allowed etc shall be monitored both electronically & manually at DIC / Directorate of
Industries, Orissa / Electrical authorities’ level.
11. Miscellaneous :-
11.1 Electrical authority(s) / Directorate of Industries, Orissa & DIC jointly may
inspect the industrial unit, if felt necessary.
11.2 Industrial Unit shall furnish information, reports, periodical statements etc to the
DIC / Directorate of Industries, Orissa / Electrical authorities concerned as and
when required.
11.3 Industrial Unit availed incentives will not be allowed to shift location of the
industry without prior approval of DIC / Director of Industries, Orissa and concerned
E.I (T&D) or S E (P) – cum- EI (G) as the case may be.

7
Annexure- A- I
APPLICATION FOR EXEMPTION FROM PAYMENT OF ELECTRICITY DUTY ON
DISTRIBUTION COMPANY'S POWER SUPPLY
(IPR2007)
Application received after the due date / incomplete in any respect shall be liable for rejection
(Strike out whichever is not applicable)
M/s. ___________________________
At ___________________________
PO ___________________________
Sub-Division____________________
Dist. __________________________
(Location of the Industrial Unit)
To

The General Manager / Project Manager,


District Industries Centre, _ _ _ _ _ _ _ _

Sub: Exemption from payment of Electricity Duty under the provisions of Industrial Policy
Resolution –2007.
Sir,
In accordance with the provisions laid down in Industrial Policy Resolution –2007, its
operational guidelines notified by Energy Department, Government of Orissa the claim for
exemption of Electricity Duty is submitted herewith for the eligible period with following
particulars.

1 Category of the Unit :


a New Micro / Small / Medium Enterprises /
Large Industries
b New Industrial Unit under Priority Sector / :
Thrust Sector / Deemed Thrust Sector
under clause- 15 / Pioneer Unit in Thrust
Sector
2 Address of Registered office :
3 Type of organization (Proprietorship / :
Partnership / Co-operative / Private Limited /
Public Limited)
4 Name of Proprietor / Managing Partner / :
Managing Director / Authorized Signatory
5 Date of first fixed capital investment i.e. land / :
building / plant & machinery and balancing
equipment.
6 EM-II / I L No. and date :
7 Items of manufacture / activity : Item Quantity Value
(I)
(ii)
8 Date of starting commercial production
9 Date of power supply for the purpose of :
commercial production
10 Consumer no of the Industry :
11 Connected load / contract demand allowed to :
the industry
12 Total capital investment (Head-wise) :
:
a :

8
b :
c :
d :
e :
13 Direct employment generated :
14 Whether Electricity Duty exemption has availed :
earlier ( Yes/ No) If yes, furnish in details
15 Extent of exemption of electricity duty and the
period for which exemption is claimed

I, Sri__________________________ s/o ____________________at present


________________ (designation) of M/S ______________________ (name of the industrial
unit) certify that the information furnished as above is true and correct to the best of my
knowledge and belief.
I hereby undertake to abide by the terms and conditions prescribed under the
provisions of Industrial Policy –2007 and its operational guidelines.

I hereby undertake to furnish information, reports, periodical statements etc to the


DIC / Directorate of Industries, Orissa / Electrical authorities as and when required.

Copies of relevant documents in support of information / facts furnished above are


enclosed here with.
Enclo.-
1.
2.
3.
4.
5.
Date-
Signature of the Proprietor / Managing Partner/
Managing Director / Authorized Signatory in full and on behalf of
M/s-----------------------------------------------------------------------
Place-
CERTIFICATE FURNISHED BY GENERAL MANAGER / PROJECT MANAGER, DIC

Certified that the information furnished as above has been verified and found
correct. The industrial unit is eligible for exemption of Electricity Duty under the
provisions of IPR-2007.

Signature of authorized officer / G.M / P.M, DIC


with seal & date----------

9
Annexure- A- II
APPLICATION FOR EXEMPTION FROM PAYMENT OF ELECTRICITY DUTY ON
CAPTIVE POWER PLANT (IPR2007)
Application received after the due date / incomplete in any respect shall be liable for rejection
(Strike out whichever is not applicable)
M/s. ___________________________
At ___________________________
PO ___________________________
Sub-Division____________________
Dist. __________________________
(Location of the Industrial Unit)
To
The General Manager / Project Manager,
District Industries Centre, _ _ _ _ _ _ _ _
Sub: Exemption from payment of Electricity Duty under the provisions of Industrial Policy
Resolution –2007.
Sir,
In accordance with the provisions laid down in Industrial Policy Resolution –2007, its
operational guidelines notified by Energy Department, Government of Orissa the claim for
exemption of Electricity Duty is submitted herewith for the eligible period with following
particulars.
1 Category of the Unit :
a New Micro / Small / Medium Enterprises /
Large Industries
b New Industrial Unit under Priority Sector / :
Thrust Sector / Deemed Thrust Sector
under clause- 15 / Pioneer Unit in Thrust
Sector
2 Address of Registered office :
3 Type of organization (Proprietorship / :
Partnership / Co-operative / Private Limited /
Public Limited)
4 Name of Proprietor / Managing Partner / :
Managing Director / Authorized Signatory
5 Date of first fixed capital investment i.e. land / :
building / plant & machinery and balancing
equipment.
6 EM-II / I L No. and date :
7 Items of manufacture / activity : Item Quantity Value
(I)
(ii)
8 Total capital investment (Head-wise) :
a :
b :
c :
d :
e :
9 Date of starting commercial production
10 Direct employment generated
11 Date of power supply for the purpose of :
commercial production
12 Consumer no of the Industry :
13 Connected load / contract demand allowed to :
the industry

10
14 Date of first fixed capital investment for :
setting of Captive Power Plant.
15 Location of the Captive Power Plant :
16 Date of initial inspection (Copy of the initial inspection :
report from the competent authority to be enclosed)
17 Approval Letter No & date from concerned :
Electrical Inspector (G) under Rule 47 A of I.E
Rule 1956. ( Copy to be enclosed)
18 Date of commissioning of Captive Power :
Plant with its capacity
19 Quantum of power generated by CPP & :
used for self- consumption
20 Whether Electricity Duty exemption has availed :
earlier ( Yes/ No) If yes, furnish in details
21 Extent of exemption of electricity duty and the :
period for which exemption is claimed
I, Sri__________________________ s/o ____________________at present
________________ (designation) of M/S ______________________ (name of the industrial
unit) certify that the information furnished as above is true and correct to the best of my
knowledge and belief.
I hereby undertake to abide by the terms and conditions prescribed under the
provisions of Industrial Policy –2007 and its operational guidelines.
I hereby undertake to furnish information, reports, periodical statements etc to the DIC /
Directorate of Industries, Orissa / Electrical authorities as and when required.
Copies of relevant documents in support of information / facts furnished above
are enclosed here with.
Enclo.-
1.
2.
3.

Signature of the Proprietor / Managing Partner /


Managing Director / Authorized Signatory in full and on behalf of
Date M/s__________________________
Place

CERTIFICATE FURNISHED BY GENERAL MANAGER / PROJECT MANAGER,DIC

Certified that the information furnished as above has been verified and found
correct. The industrial unit is eligible for exemption of Electricity Duty under the
provisions of IPR-2007.
Signature of authorized officer / G.M / P.M, DIC
with seal & date----------

11
Annexure –B

CHECK LIST
Copies of documents to be attached with the application shall be self-attested by Proprietor /
Managing Partner/Managing Director / Authorized Signatory
(Strike out whichever is not applicable)
1 Entrepreneurs Memorandum- II / IEM / Industrial License
2 Power of Attorney / Board Resolution / Society Resolution, as applicable, while signing as
Partner / Managing Director / Authorized person.
3 Certificate of registration under Indian Partnership Act1932 / Societies Registration Act- 1860 /
Certificate of incorporation (Memorandum of Association & Article of Association ) under
Company Act-1956
4 Certificate of Thrust Sector / Pioneer Unit in Thrust Sector / Deemed Thrust Sector under
clause- 15 issued by Director of Industries, Orissa
5 Document in support of date of first investment in fixed capital of industrial unit i.e. land /
building / plant & machinery and balancing equipment
6 Certificate on date of commercial production
7 Certified copy of the agreement indicating contract demand executed with Power Distribution
Company for supply of power for commercial production
8 Certificate in support of date of power supply indicating connected load for commercial
production with Consumer No of the Industry from appropriate authority of Power Distribution
Company
9 Details of location of the captive power plant
10 Permission accorded for installation of Captive Power Plant
11 Document in support of date of first fixed capital investment for setting of Captive Power Plant.
12 (A) Copy of approval letter of concerned A.E.I (G) / E.E (P) –cum- DEI (G) / S.E (P)- cum-
E.I.(G) / Chief Engineer (P) –cum-CEI (G) under Rule 47 A of I.E Rule 1956 for C.P.P
(B) Date of commissioning of C P P declared by the concerned Electrical Inspector (G)
13 Quantum of power of CPP used for self- consumption from appropriate Electrical authority
14 Details of Electricity Duty exemption availed earlier

Annexure -C
Acknowledgement
To be issued by authorized officer / G.M / P.M, DIC on the day of receipt
(Strike out whichever is not applicable)
Received the application for exemption from payment of Electricity Duty on Distribution
Company's power supply / Captive Power Plant under INDUSTRIAL POLICY
RESOLUTION –2007 along with documents mentioned below from M/s-----------------
-------------- At/PO----------------------------------------Dist. _____________ on dt. ------------
--- through post / person.
List of documents
1.
2.
3.
4.
Signature of authorized officer / G.M / P.M, DIC
with seal & date----------

12
Annexure-D
OFFICE OF THE GENERAL MANAGER / PROJECT MANAGER, DISTRICT
INDUSTRIES CENTRE ----
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
Sri-------------------------------
General Manager / Project Manager,
DIC -------------------------
To
The Electrical Inspector(T&D),
--------------------------------
--------------------------------
Sub:- Recommendation for exemption from payment of electricity duty on Distribution
Company's power supply up to a contract demand of 110 KVA under the provisions
of -IPR-2007 ( For Micro, Small & Medium Industries)
Sir,
In accordance with the Department of Energy Notification
No________dated__________ & letter No_______ dated ___________, I recommend that
M/s__________________________, At ___________________P.O.___________
Dist.__________________ bearing EM-II / I L No. _________date_________ may be
exempted from payment of Electricity Duty from_____________ i.e. from the date of availing
power supply for commercial production for a period of five (05) years. The particulars of the
unit are given below.
1 Date of first fixed capital investment i.e. land / building / plant &
machinery and balancing equipment.
2 Date of power supply for the purpose of commercial production
3 Date of starting commercial production
4 Connected load / contract demand allowed to the industry ( up to 110 KVA)
5 Consumer no of the Industry
6 Date of application received from the industrial unit for ED Exemption

It is certified that the unit is entitled to Electricity Duty exemption under IPR-2007
Yours faithfully,

General Manager / Project Manager.


Encl. (One set of application with supporting documents)
1. Application form with certificate
2. EM-II / I L
3.
4.
Memo No. _________/ dt.
Copy forwarded to the Director of Industries, Orissa, Cuttack / Chief Electrical
Inspector (T&D), Bhubaneswar for information and necessary action.

General Manager / Project Manager


Memo No. _________/dt.
Copy forwarded to Sri_______________________
M/s__________________________, At ___________________P.O.___________
Dist.__________________ for information.

General Manager / Project Manager

13
Annexure-E
OFFICE OF THE GENERAL MANAGER / PROJECT MANAGER,
DISTRICT INDUSTRIES CENTRE ----
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
Sri-------------------------------
General Manager / Project Manager,
DIC -------------------------
To
Director of Industries, Orissa,
Cuttack
Sub:- Recommendation for exemption from payment of electricity duty on Distribution Company's
power supply up to a contract demand of 110 KVA for the Large Industrial Unit / 5MW in
favour of Thrust sector / Deemed Thrust sector/ Pioneer industries under the provisions of -
IPR-2007
Sir,
In accordance with the provisions made under clause-7.4.2 of operational guidelines for
exemption of electricity duty under IPR –2007, I am to furnish herewith two sets of application with
copies of all relevant documents made by M/s__________________________, At
___________________P.O.___________ Dist.__________________ bearing EM-II / I L No.
_________date_________ The particulars of the unit are given below.

1 Date of receipt of application from the industrial unit for E.D. exemption
2 Status of the Unit (New Industrial Unit under Priority Sector / Thrust Sector / Deemed
Thrust Sector under clause- 15 / Pioneer Unit in Thrust Sector / Large Industrial Unit up to
contract demand 110 KVA)
3 Date of first fixed capital investment i.e. land / building / plant & machinery
and balancing equipment.
4 Date of power supply for the purpose of commercial production
5 Connected load / contract demand allowed to the industry ( up to 110 KVA / 5 M W )
6 Consumer no of the Industry
7 Present working status

The industrial unit is eligible for exemption of Electricity Duty under the provisions of IPR-2007.

Yours faithfully,

General Manager / Project Manager.


Encl. (Two sets of application with supporting documents)
1
2
3
Memo No. _________/ dt.

Copy forwarded to Sri_______________________


M/s__________________________, At ___________________P.O.___________
Dist.__________________ for information.

General Manager / Project Manager.

14
Annexure-F
OFFICE OF THE DIRECTOR OF INDUSTRIES, ORISSA, CUTTACK
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
Sri-------------------------------
Director of Industries, Orissa,
Cuttack
To
The Electrical Inspector (T&D),
--------------------------------
--------------------------------
Sub:- Recommendation for exemption from payment of electricity duty on Distribution Company's
power supply up to a contract demand of 110 KVA of Large Industrial Unit / 5MW in favour
of Thrust sector/ Deemed Thrust sector/ Pioneer industries under the provisions of -IPR-2007
Sir,
In accordance with the Department of Energy Notification No________dated__________ &
letter No_______ dated ___________, I recommend that M/s__________________________, At
___________________P.O.___________ Dist.__________________ bearing EM-II / I L No.
_________date_________ may be exempted from payment of Electricity Duty from_____________
i.e. from the date of availing power supply for commercial production for a period of five (05) years /
for an additional two years over and above the limit specified. The particulars of the unit are given
below.
1 Date of first fixed capital investment i.e. land / building / plant & machinery
and balancing equipment.
2 Date of power supply for the purpose of commercial production
3 Date of starting commercial production
4 Connected load / contract demand allowed to the industry ( up to 110 KVA / 5MW)
5 Consumer no of the Industry
6 Date of application received from the industrial unit for ED Exemption
It is certified that the unit is entitled to 100% exemption of Electricity Duty as a unit
under Thrust sector/ Deemed Thrust sector/ Pioneer industries / Large Industrial Unit with
contract demand up to 110 KVA under the provisions of IPR-2007.
Yours faithfully,

Director of Industries, Orissa.


Encl. (One set of application with supporting documents)
1. Application form with certificate
2.EM-II / I L
3.
4.
Memo No. _________/Ind., dt.
Copy forwarded to the / Chief Electrical Inspector (T&D), Bhubaneswar/ General
Manager, DIC_________ for information and necessary action.

Director of Industries, Orissa, Cuttack


Memo No. _________/Ind., dt.
Copy forwarded to Sri_______________________
M/s__________________________, At ___________________P.O.___________
Dist.__________________ for information.

Director of Industries, Orissa, Cuttack

15
Annexure-G
OFFICE OF THE ELECTRICAL INSPECTOR, ______________
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
The Electrical Inspector (T&D),
--------------------------------
--------------------------------
To
Sri _____________
M/s__________________________,
At ___________________P.O.___________
Dist.__________________

Sub:- Sanction of exemption from payment of electricity duty on Distribution Company's


power supply up to a contract demand of 110 KVA / 5MW under the provisions of -
IPR-2007
Sir,
In accordance with the Department of Energy Notification
No________dated__________ & letter No_______ dated ___________, the 100%
exemption from payment of electricity duty on Distribution Company's power supply up to a
contract demand ________ (110 KVA / 5MW) is allowed in favour of
M/s__________________________, At ___________________P.O.___________
Dist.__________________ bearing EM-II / I L No. _________date_________ and consumer
no______________ for a period five (05) years from the date of availing power supply for
commercial production as a New Industrial Unit for Micro / Small / Medium / Large Industrial
Unit / Thrust Sector / unit under Thrust sector / Deemed Thrust sector for an additional two
years over and above the limit specified for Pioneer Units in each Thrust sector under the
provisions of IPR-2007.
Yours faithfully,

Electrical Inspector (T&D).


___________________

Memo No. _________/ dt.

Copy forwarded to the / Chief Electrical Inspector (T&D), Bhubaneswar / Director of


Industries, Orissa, Cuttack / General Manager, DIC_________ for information.

Electrical Inspector (T&D).


___________________

16
Annexure-H
OFFICE OF THE GENERAL MANAGER / PROJECT MANAGER,
DISTRICT INDUSTRIES CENTRE ----
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
Sri-------------------------------
General Manager / Project Manager,
DIC -------------------------
To
The Electrical Inspector / S.E. (P)-cum-E.I.(G)
___________________

___________________

Sub:- Recommendation for 50% exemption from payment of electricity duty for Captive Power
Plant under the provisions of -IPR-2007(For Micro, Small & Medium Industries)
Sir,
In accordance with the Department of Energy Notification
No.___________dated_________and letter No.__________dt.___________, I recommend that
M/s.________________________,At_____________,
Po____________Dist.___________bearing EM-II / I L
No.______________dt._____________may be exempted from payment of 50% of Electricity
Duty from _____________for a period of 05 years on its new Captive Power Plant for self-
consumption only from the date of its commissioning. The particulars of the unit are given below.

1 Date of first fixed capital investment i.e. land / building / plant & machinery and
balancing equipment.
2 Document in support of date of first fixed capital investment for setting up of CPP.
3 Date of starting commercial production
4 Details of location of the captive power plant.
5 Certificate issued by Chief Electrical Inspector / Electrical Inspector on
energisation / date of commissioning of Captive Power Plant with capacity.
6 Date of application received from the industrial unit for ED Exemption
It is certified that the unit is entitled to get electricity duty exemption under iPR-2007.
Yours faithfully,

General Manager / Project Manager.


Encl.
1
2
3
Memo No.____________/dt.
Copy forwarded to the Director of Industries, Orissa, Cuttack / C.E. (P)-cum-C.E.I.(G),
Bhubaneswar for information and necessary action.
General Manager / Project Manager.
Memo No. _________/ dt.
Copy forwarded to Sri_______________________ M/s__________________________,
At ___________________P.O.___________ Dist.__________________ for information.

General Manager / Project Manager.

17
Annexure-I
OFFICE OF THE GENERAL MANAGER / PROJECT MANAGER,
DISTRICT INDUSTRIES CENTRE ----
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
Sri-------------------------------
General Manager / Project Manager,
DIC -------------------------
To
Director of Industries, Orissa,
Cuttack
Sub:- Recommendation for exemption from payment of 50% of electricity duty for Captive Power
Plant under the provisions of -IPR-2007
Sir,
In accordance with the provisions made under clause-7.5.2 of operational guidelines for
exemption of electricity duty of Captive Power Plant under IPR –2007, I am to furnish herewith
two sets of application with copies of all relevant documents made by
M/s__________________________, At ___________________P.O.___________
Dist.__________________ bearing EM-II / I L No. _________date_________ The particulars of
the unit are given below.

1 Date of submission of application for E.D. exemption


2 Status of the Unit (New Industrial Unit under Priority Sector / Thrust Sector /
Deemed Thrust Sector under clause- 15 / Pioneer Unit in Thrust Sector) up to 5 MW/
Large Industrial Unit up to 110 KVA).
3 Date of first fixed capital investment i.e. land / building / plant & machinery
and balancing equipment.
4 Document in support of date of first fixed capital investment for setting of
Captive Power Plant.
5 Date of starting commercial production
6 Details of location of the captive power plant
7 Certificate issued by Chief Electrical Inspector / Electrical Inspector on
energisation / date of commissioning of Captive Power Plant with capacity
8 Details of Electricity Duty exemption availed earlier
9 Present working status

The industrial unit is eligible for exemption of Electricity Duty on CPP under the provisions of
IPR-2007.
Yours faithfully,

General Manager / Project Manager.


Encl. (Two sets of application with supporting documents)
1
2
3
Memo No. _________/ dt.
Copy forwarded to Sri_______________________ M/s__________________________,
At ___________________P.O.___________ Dist.__________________ for information.

General Manager / Project Manager.

18
Annexure-J
OFFICE OF THE DIRECTOR OF INDUSTRIES, ORISSA, CUTTACK
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
Sri-------------------------------
Director of Industries, Orissa,
Cuttack
To
The Electrical Inspector / S. E (P)-cum- EI (G)
--------------------------------
--------------------------------
Sub:- Recommendation for 50% exemption from payment of electricity duty for Captive
Power Plant of Large Industrial Unit under the provisions of -IPR-2007
Sir,
In accordance with the Department of Energy Notification
No________dated__________ & letter No_______ dated ___________, I recommend that
M/s__________________________, At ___________________P.O.___________
Dist.__________________ bearing EM-II / I L No. _________date_________ may be
exempted from payment of 50% of Electricity Duty from_____________ for a period of 05
years on its new captive power plant for self-consumption only from the date of its
commissioning. The particulars of the unit are given below.

1 Date of first fixed capital investment i.e. land / building / plant & machinery and balancing
equipment.
2 Document in support of date of first fixed capital investment for setting up of CPP.
3 Date of starting commercial production
4 Details of location of the captive power plant
5 Certificate issued by Chief Electrical Inspector / Electrical Inspector on
energisation / date of commissioning of Captive Power Plant with capacity
6 Date of application received from the industrial unit for ED Exemption
It is certified that the unit is entitled to get electricity duty exemption under-IPR-2007
Yours faithfully,
Encl.
1.
2.
3.
Director of Industries, Orissa.
Memo No. _________/Ind., dt.
Copy forwarded to Chief Electrical Inspector (T&D) / C.E. (P)-cum-CEI (G), Orissa /
General Manager, DIC_________ for information and necessary action.

Director of Industries, Orissa.


Memo No. _________/Ind., dt.
Copy forwarded to Sri_______________________ M/s__________________________,
At ___________________P.O.___________ Dist.__________________ for information.

Director of Industries, Orissa.

19
Annexure-K
OFFICE OF THE ELECTRICAL INSPECTOR, ______________ / S. E (P)-cum- EI
(G)
No----------------- Dt.---------------
(Strike out whichever is not applicable)
From
The Electrical Inspector / S. E (P)-cum- E I (G)

--------------------------------
--------------------------------
To
Sri _____________
M/s__________________________,
At ___________________P.O.___________
Dist.__________________

Sub:- Sanction of 50% exemption from payment of electricity duty for Captive Power Plant
under the provisions of -IPR-2007
Sir,
In accordance with the Department of Energy Notification
No________dated__________ & letter No_______ dated ___________& letter
No.____________dt.____________,the 50% exemption from payment of electricity duty is
allowed in favour of M/s__________________________, At
___________________P.O.___________ Dist.__________________ bearing EM-II / I L No.
_________date_________ from_____________ for a period of 05 years on its new captive
power plant for self-consumption only from the date of its commissioning/ for an additional
two years over and above the limit specified as a Pioneer industries under the provisions of
IPR-2007.
Yours faithfully,

Electrical Inspector / S. E (P)-cum- EI (G).


___________________
Memo No. _________/ dt.
Copy forwarded to the Chief Electrical Inspector (T&D), Bhubaneswar / Director of
Industries, Orissa, Cuttack / General Manager, DIC_________ for information.

Electrical Inspector/ S. E (P)-cum- EI (G)


___________________

20
Annexure-L

OFFICE OF THE GENERAL MANAGER / PROJECT MANAGER, DISTRICT INDUSTRIES


CENTRE ----- / DIRECTOR OF INDUSTRIES, ORISSA, CUTTACK / ELECTRICAL
INSPECTOR, ______________ / S. E (P)-CUM- EI (G)_______

NO DT.
(Strike out whichever is not applicable)
From
Sri-------------------------------
General Manager / Project Manager,
DIC -------------------------/
Director of Industries, Orissa./
Electrical Inspector(T&D) ______________ /
S. E (P)-cum- EI (G)_______

To

Sri _____________
M/s__________________________,
At ___________________P.O.___________
Dist.__________________

This is to inform that –


The application for exemption from payment of electricity duty on Distribution
Company's power supply / Captive Power Plant made by M /s ______________
bearing EM / IL No ___________ Dt__________ on dt.___________ for the period
_________ under IPR-2007 is rejected due to following reasons.
(Specify the reasons)
1.
2.
3.
4.
Signature of G.M / P.M, DIC / D.I Orissa /
Electrical Inspector(T&D)/
S. E (Proj.)-Cum- EI (Gen)
with seal & date----------.

21

You might also like