METHOD OF STATEMENT FOR ACMV INSTALLATION WORKS

TABLE OF CONTENTS:-

1. INTRODUCTION

2. ZONING PLAN

3. ORGANIZATION CHART

4. METHOD OF STATEMENT

4.1 Method of statement for Refrigeration Pipes and Electrical Wire Installation Work

4.2 Method of statement of Refrigerant Pipes Pressure Test

4.3 Method of statement for FCU Installation

4.4 Method of statement for CU Installation Work

4.5 Method of statement for Testing and Commissioning Work

March 26, 2018 1


1. INTRODUCTION:-
This paper describes method of statement of ACMV installation, risk assessment, inspection
and testing plan and maintenance plan. Mechanical Ventilation System will be installed at
basement and first storey.

This procedure covers the requirement of field inspection except necessary inspection
specified in Singapore Regulation where the inspection by Government Department shall be
required. Singapore Practice will be applied.

2. ZONNING PLAN:-
The zoning area describes where FCUs and CUs are located. We will follow the main
contractor’s zoning plan.

3. ORGANIZATION CHART:-
Generally, Project Director manages all project team, control and implementation of the
whole project.

The Project Manager shall directly control project engineer and provides sub-contractor,
workers and materials for project.

The Organization Chart is attached by Appendix 1.

4. METHOD OF STATEMENT:-
4.1 Method of Statement for Refrigeration Pipes and Electrical Wire Installation Work

-Set up ladder / scaffold (<3m) at the area for work.

-Measure from the reference line and position / mark location to be drilled.

-Select the correct size / model of drill pit and drill in the particular point.

-Check the depth of drilled holes of the required anchor bolt / anchor rod.

-Install the anchor rod / bolt and tighten the nuts.

-Install the steel band with insulation.

-Install / place the refrigerant copper pipes together with electrical wire.

-To joint copper pipes use burner to brazing.

-Glue and tape the insulation gaps.

-Carry on the pressure test to ensure no leaks in copper pipe.

March 26, 2018 2


Equipment /Tools used:

a. Scaffold /ladder
b. Electrical drill
c. General hand tools
d. Pipe cutter and bender
e. Burner for brazing work
Material used:

a. Steel band with insulation


b. Refrigerant pipes
c. Thermal Insulation
d. Electrical Wire
e. Anchor Bolts / wall plugs
Remarks:

All materials to be used approved by CONSULTANT.

4.2 Method of Statement of Refrigerant Pipes Pressure Test

-Inform main contractor about the pressure test.

-Set up ladder / scaffold (<3m) at the area for work.

-Loop the copper pipes and make inlet and outlet connection for the Nitrogen gas.

-Fix pressure gauge in the outlet.

-Ensure the pressure gauge is calibrated.

-Charge the nitrogen up to 200/450 psi or as per manufacturer’s recommendation.

-Remove the cylinder connection and close the inlet terminal of the refrigerant pipes.

-Display warning sign to warn others.

Equipment / Tools used

1. Ladder / scaffold
2. General hand tools
3. Pressure gauge

Materials / Tools used

1. Nitrogen cylinders

March 26, 2018 3


4.3 Method of Statement for FCU Installation

-Do protection on the finished floor to avoid damages to other trades.

-Check the position, level and strongest of the wall.

-Do marking for the correct model of FCU by using pencil. (Ensure the wall is painted at least
one coat).

-Fix the base plate in the marked location.

-Let the painter apply second coat around the base plate area.

-Check again the base plate level before installing the FCU.

-Fix the FCU in the base plate.

-Do protection on the FCU.

Equipment / tools used

1. Electrical drill
2. General hand tools
3. Ladder
Materials & equipment used

1. Wall plug & screws


2. Fan Coil Unit

4.4 Method of Statement for CU Installation Work

-Ensure the area is safe to work.

-Set up ladder (secured) and lifeline to access the A/C ledge.

-Run trunking and refrigerant pipes in the A/C ledge area.

-Select the correct model of the CU to be placed in the A/C ledge.

-Bring out the CU at correct location / direction.

-Do the pipe and wire termination to CU.

-Anchored the CUs by using anchor bolt.

-Do protection on the CU until T & C.

March 26, 2018 4


Equipment / tools used

a. Electrical drill
b. General hand tools
c. Ladder
Materials and equipment used

a. Wall plugs and screws


b. Anchor bolts and nuts
c. CU

4.5 Method of Statement for Testing and Commissioning ACMV Work

-Do protection on the finished floor to avoid damages to other trades.

-Ensure the area is clean for T&C.

-Ensure the correct models of Equipment are installed.

-To remove all the protection from the equipment.

-Ensure the correct models of isolator are connected with Fan & CU.

-Turn on electrical supply to the unit.

-Display “T&C in progress” notice in the main door to inform others.

-Turn on FCU one by one to ensure the pipes and wiring is connected correctly.

- For testing purpose, all FCU units are running for 6 hr at setting temperature 22oC. -At the
same time, CUs running ampere is taken.

-Record the reading in the inspection forms.

-End of the day switch off all the A/C and turn off the power supply to the unit.

Equipment /tools used

a. Electrical drill
b. General hand tools
c. Ladder
Materials & equipment’s used

a. Thermometer
b. Pressure Gauge
c. R410 Refrigerant gas

March 26, 2018 5