You are on page 1of 5

SULTANATE OF OMAN

TENDER NUMBER:

MODIFICATION WORKS IN EXISTING KHASAB


GRID STATION TO ENERGIZE 132KV & 33KV
SYSTEM FROM NEW POWER STATION IN
MUSANDAM GOVERNORATE

Volume - 1
Modification Works in Existing Khasab Grid Station To Energize Tender Document
132kv & 33kv System From New Power Station In Musandam
Volume 1
Governorate
Schedule of Prices

CIF - Unit rates (RO) LTE- Unit rates (RO)


Item Description Unit Qty TOTAL (RO)
In figures In words In figures In words
Scope of Work
1 Modification, Testing, Pre- commissioning
and Commissioning of existing 33kV, 1250A,
25kA / 3Sec GIS Switchgear Panel (DG I/C Nos 2
Panel-9 and 10) as per the Scope of Work
(Refer Appendix: 1).
2 Supply and installation of 33 kV 1C X 630
Sq.mm XLPE AWA PVC copper cable 2
Runs/Phase for interconnection between 33kV
Lot 1
GIS BUS -A (33kV DG Incomer feeders CB-
9HO) and 33kV GIS BUS-B (33kV DG
Incomer feeders (CB-10HO)
3 Modification, Testing, Pre- commissioning
and commissioning of the existing 132kV
Nos 2
Control & Relay Panels as per the red marked
drawing (Refer Appendix: 2)
4 Modification, Testing, Pre- commissioning
and commissioning of the existing 33kV
Nos 14
Control & Relay Panels as per the red marked
drawing (Refer Appendix: 3)
5 Modification in SCS (Substation Control
System) & LDC (Load Dispatch Centre) as
Lot 1
per the requirement and additional licenses for
modification.

2
Modification Works in Existing Khasab Grid Station To Energize Tender Document
132kv & 33kv System From New Power Station In Musandam
Volume 1
Governorate
Schedule of Prices

CIF - Unit rates (RO) LTE- Unit rates (RO)


Item Description Unit Qty TOTAL (RO)
In figures In words In figures In words
6 LV Power and control cables between 33kV
GIS and the Control and relay panels Lot 1

7 Power System Study for the following; Lot 1


a) Parallel to the utility grid via step up
transformers (black start the Musandam
132kV Grid)
b) Island operation at KGS (33kV Island
Black Start)
The study shall include the following,
1. Load Flow Studies
2. Short Circuit Studies
3. Energization study of,
 2x125MVA, 132/33kV transformers
 132kV OHL’s (Khasab-Tibat &
Khasab-Dibba)

 2x50MVA, 132/11kV transformers


(Dibba)
 2x63MVA, 132/33kV transformers
(Tibat)
DigSILENT Power factory Version 17.0 shall

3
Modification Works in Existing Khasab Grid Station To Energize Tender Document
132kv & 33kv System From New Power Station In Musandam
Volume 1
Governorate
Schedule of Prices

CIF - Unit rates (RO) LTE- Unit rates (RO)


Item Description Unit Qty TOTAL (RO)
In figures In words In figures In words
be used for the above studies.

8 Load Shedding Study shall be carried out


considering the following scenario’s
i. MIPP running only
ii. KPS & MIPP running paralleling
iii. KPS running only
Under Frequency / Under Voltage Relay Lot 1
settings shall be determined and the
configuration of Under Frequency / Under
Voltage Relays shall be carried out.
Contractor shall consider realistic
combination of failure of equipment’s to
determine the Under Frequency Relay / Under
Voltage Relay settings.
9 Any other item necessary to complete the
project and not included above (Tenderer to Lot 1
specify and include in breakdown prices list)

TOTAL

4
Modification Works in Existing Khasab Grid Station To Energize Tender Document
132kv & 33kv System From New Power Station In Musandam
Volume 1
Governorate
Schedule of Prices

Total (RO) In
Item Description Total (RO) In Words
Figures

A. Supply and installation, Modification,


Testing & Pre-commissioning work

B. Add Contingency 5% of Total Price

C. Total Sum

Total Summary of Prices

Authorized Signatory:

Name of Signatory:

Company Name and Address:

Date: Seal: