Id 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
0
GOCE Mission
1
Phase 0
2
Proposal for candidacy
3
ESAC recommendation
4
PB-EO approval
5
MAG pre-Phase A studies
6
MAG analysis publication
7
Phase A
8
Design feasibility study
9
MAG: Report for Mission Selection
10
ESAC recommendation (II)
11
PB-EO approval (II)
12
ITT (Invitation to Tender)
13
Proposal accepted for review
14
PRR Presentation
15
Phase B
16
Request to IPC for approval
17
Authorization granted by IPC
18
OBS: Preliminary organizational workdown structure
19
Industrial design activities
20
Various ITT packages
21
Trade-off studies
22
SRR (Systems Requirements Review)
23
PDR (Preliminary Design Review)
24
Phase C
25
CDR (Critical Design Review)
26
Phase D
27
ADD (Architecture Design Document)
28
QR (Qualification Review)

Tarea Tareas externas

División Hito externo

Hito Fecha límite

Resumen Tarea hito de predecesor controlador de ruta de acc

Resumen del proyecto Tarea de resumen de predecesor controlador de ruta

Tarea inactiva Tarea normal de predecesor controlador de ruta de a

Proyecto: GOCE Mission Hito inactivo Tarea hito de predecesor controlador de ruta de acc
Fecha: 17/10/2017 Resumen inactivo Tarea de resumen de predecesor controlador de ruta

Tarea manual Tarea normal de predecesor controlador de ruta de a

solo duración Tarea hito de predecesor controlador de ruta de acc

Informe de resumen manual Tarea de resumen de predecesor controlador de ruta

Resumen manual Tarea normal de predecesor controlador de ruta de a

solo el comienzo Progreso

solo fin Progreso manual

Página 1
Id 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
29
AR (Flight Acceptance Review)
30
ORR (Ground Operations Readiness Review)
31
Phase E
32
LRR (Launch Readiness Review)
33
Commissioning Operation Phase
34
CRR (Commissioning Result Review)
35
ELR (End-of-Life Review)
36
Phase F
37
MCR (Mission Close-out Review
38
GOCE Reentry

Tarea Tareas externas

División Hito externo

Hito Fecha límite

Resumen Tarea hito de predecesor controlador de ruta de acc

Resumen del proyecto Tarea de resumen de predecesor controlador de ruta

Tarea inactiva Tarea normal de predecesor controlador de ruta de a

Proyecto: GOCE Mission Hito inactivo Tarea hito de predecesor controlador de ruta de acc
Fecha: 17/10/2017 Resumen inactivo Tarea de resumen de predecesor controlador de ruta

Tarea manual Tarea normal de predecesor controlador de ruta de a

solo duración Tarea hito de predecesor controlador de ruta de acc

Informe de resumen manual Tarea de resumen de predecesor controlador de ruta

Resumen manual Tarea normal de predecesor controlador de ruta de a

solo el comienzo Progreso

solo fin Progreso manual

Página 2