GOCE Mission
1
Phase 0
2
Proposal for candidacy
3
ESAC recommendation
4
PB-EO approval
5
MAG pre-Phase A studies
6
MAG analysis publication
7
Phase A
8
Design feasibility study
9
MAG: Report for Mission Selection
10
ESAC recommendation (II)
11
PB-EO approval (II)
12
ITT (Invitation to Tender)
13
Proposal accepted for review
14
PRR Presentation
15
Phase B
16
Request to IPC for approval
17
Authorization granted by IPC
18
OBS: Preliminary organizational workdown structure
19
Industrial design activities
20
Various ITT packages
21
Trade-off studies
22
SRR (Systems Requirements Review)
23
PDR (Preliminary Design Review)
24
Phase C
25
CDR (Critical Design Review)
26
Phase D
27
ADD (Architecture Design Document)
28
QR (Qualification Review)
Proyecto: GOCE Mission Hito inactivo Tarea hito de predecesor controlador de ruta de acc
Fecha: 17/10/2017 Resumen inactivo Tarea de resumen de predecesor controlador de ruta
Página 1
Id 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2
S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2
29
AR (Flight Acceptance Review)
30
ORR (Ground Operations Readiness Review)
31
Phase E
32
LRR (Launch Readiness Review)
33
Commissioning Operation Phase
34
CRR (Commissioning Result Review)
35
ELR (End-of-Life Review)
36
Phase F
37
MCR (Mission Close-out Review
38
GOCE Reentry
Proyecto: GOCE Mission Hito inactivo Tarea hito de predecesor controlador de ruta de acc
Fecha: 17/10/2017 Resumen inactivo Tarea de resumen de predecesor controlador de ruta
Página 2