You are on page 1of 2
@yageull val urde. deat SAUDI BINLADIN GROUP wv Rncmamessawons aac KING FAISAL SPECIALIST HOSPITAL-JEDDAH,KSA paar nes __MATERIAL S. MITTAL SHEET Feaea Ret car No. Rev (CN1169, AL -AMEEL.CO.LTD ‘MS/CN1169P01/000006 1 “To: DIRECTOR OF ENGINEERING, KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTRE Documere Cowl (4 Cope) Material Description/Location ~ | Sibert Issue Date: “| Response Requested o11033 oy 091013 Waterproofing Tanking System — Service Tunnel External Tanking to Toile Structure and underside of Service Slab oo ‘We erin tat he ater Pereby abies sane fr cations @ ue | Sind fans conform wt the cero spears and al lle ae, Sarat rd © orwng acy tena esa tte onan ecto o find ofp © sme ‘reared by th abit! hace” Aeplonce of is mater seta! det rt eee eee | CA fa ‘epost, ere te subtl sn ay way i veconce wt De spear, 5 OM $2chvrtens mus beens and bough othe tenon othe nace ngncersrepesetre on Dis fom. he Enger sean be ae Span Cae a inalted ifsc voto: are nt ed 01.40.2013. | psranas to 8a Tender Guaton Wo 63 em & ‘SPECIFIED PROPOSED MFR. ‘SURESEAL or Equal Approved (MFR IINSUWRAP AGENT: - AGENT MAKES Maxey PVC membrane 2mm and 1.5mm Elastomeric EPDM membrane thick Geotextile Material ore ee PVC Cartonal Protection Board (In capacity lieu of block to Vertical face of Size | 1.52mm thick Tunnel) | capactry) SIZE 2mm and 1.5mm thick TOT ‘COMMENTS Ee Resubmission of Document Submittal for Approval ‘Attached :- Documentation including Test Data for both 1.5mm and 2mm PVC, Comparison Sheet (PVC against EPDM), Approvals, Technical, Sample, Accessories Information Independent Testing Lab Results (Resistance to Salt, Resistance to Lime milk, Resistance to Sulphuric acid, Resistance to Soll) Zz Refer to Sheet 2 for other Recommendations //Zo men 7 ‘RETORTED TO CONTRACTOR: DOCUMENT STATUS Sood win ain Wary rae Reve a Res Wonka Bare Received ret proces "Revise and resubmit work may ‘Dz For information Only — Review raced ie VY | retreat stowarune ‘eon ges TPORTANT? Perrision to proceed doesnot constitute acceptance of design ‘etal caluations analyses test methods or materials developed or selected by te contractor / suger and does not releve contractor / suppl fom fl ——— compliance with contractual obligations. “Bale Gonfactor Sinature_i4 et pate cto3, 2o/ Form Ret: PN-08 Page 1 of2 Rev. 2 coments Foim Ret, PM-08 Waterproofing Tanking System - ‘Tanking to Structure and Under Code -B—> Sobjert + flowing comments -— MATERIAL SUBMITTAL SHEET __Continuation sheet a i avawes.co 19 / Fnssworg Siowseorovvomeos “s PVC Shests Samp her hall he fated byw aed pocty (RGF) fe GC tok wih Be phpolohes f He Anbest editm of Asta BS/DIN standends. Mocks us: Apply entre g demorstnnte rurfoce frapootio, cack fork bxsatment, caner fuatment, f exeeuhen pre Seta 07/226 /Sovse 14. Appt ag foo project specs Ace lpr fg materi / delivery , shoppe fe be om Alorch Comp biomes and komndli 7 dahons ah ee eee weseg see pat MF AROCR, KAZE RES. ENGR Saudi Diver Cnsettonts pe commen, Page 2 of2 acd

You might also like