PROJECT OFFSITE
UNIT PPU
TABLE OF CONTENTS
1.0 CHECKLIST 3
3.0 RESULTS 4
5.0 CONCLUSION 4
7.0 ATTACHMENTS 5
1.0 CHECKLIST
Sl. YES/NO
CHECK POINT REMARKS
No (Y/N)
1 Stress Isometric attached Y
Pipe specification & corrosion allowance taken as
2
per PMS Y
3 Line conditions taken as per Process data Y
4 Input is as per actual/planned configuration Y
Structural supports/ Restraints/ Anchors
5
Are adequate for withstanding piping loads Y
All displacements and frequencies in order; no Y
6 fouling in extreme conditions; no shoe offsetting;
proper shoe length ensured.
7 Flange leakage calculations checked NA
Loads and any special considerations/information N
8 conveyed to Structural/Static Equipment/Rotating
Equipment/Fired Equipment Department if required
9 Analog Study comments, if any, incorporated NA
6 Cases considered in the analysis
Design Y
Operating Y
Steam out N
Hydro test Y
Wind Y
Seismic N
Note : User to add applicable Cases considered for analysis depending on requirements of the system.
MEDIUM
STEAM
STATE
FLUID
PNUEMATI
TEST
SIZE SERIAL PIPE OUT DENSITY
C TEST
(inch) NO. CLASS PRESS. TEMP (kg/m3)
THK TEMP. PRESS.( TEMP. PRESSURE
TYPE (kg/cm2 (°C)
(mm) (°C) kg\cm2g) (°C) (kg\cm2g)
g)
26 V - - G22G IH 50 5.5 190 3 150 - H 8.25 10
RESULTS
The following tables compare the allowable and actual nozzle loadings. The actual loading is the
maximum of sustained and operating load cases.
4.0 CONCLUSION
All stresses and loads are within allowables.
6.0 ATTACHMENTS
a. SYSTEM ISOMETRICS
b. EQUIPMENT DRAWINGS
c. P&IDs