Pj/121/RINGSULMAPA/APLN/2011
Tgi. Kontrak : 07 Desember 2011
PT PLN (PERSERO)
UNIT INDUK PEMBANGUNAN JARINGAN
SULAWESI, MALUKU DAN PAPUA
Jalan Let. Jend Hertasning Panakkukang Makassar 90222
Phone : (0411)452519, Fax. (0411)444339
PEKERJAANPEMBANGUNAN
PEMBANGKIT LISTRIK TENAGA UAP
SOFIFI 2x3 MW
DOKUMEN KONTRAK
BUKU IV I VI
PLTU SOFIFI 2 X 3 MW
BOOK I
Form of:
- Bank Guarantee for Down/Advance Payment
- Bank Guarantee for Progress Payment
BOOK!I
lof3
BOOK 11/ Section 4.6 Mechanical Works and Addenda Thereto
Section 4.7 Electrical Works and Addenda Thereto
Section 4.8 Instrumentation & Control Works and
Addenda Thereto
Section 4.9 Erection and Commissioning and Addenda
Thereto
BOOK IV
2of3
Schedule 7 Technical Data
BOOK V
30f3
,~
BOOK IV
PART 5 FORMS AND SCHEDULES
Form 1.1 Form of Bid Letter - Technical & Commercial Proposal
:".-:---...
FORM 1.1 : FORM OF BID LETTER
PT PLN (Persero)
DESIGN, SUPPLY, ERECTION AND COMMISSIONING OF Pi.TU SOFIFI
f-"'"
, \.
MAKASAR • 90222
INDONESIA
2. We undertake if our Bid is accepted to commence the Works immerlistciy after the
Contract Effective Date and to execute the whole of the works in accordance with the
effective dates specified in Part 5, Schedule 4, Ccntract Schedule Key Dates.
3. We agree that, if this Bid is accepted we shall prior to the date of signing of the
Contract furnish performance security in the amount equal to ten percent (10%) of
the amount of the Total Contract Price in the form prescribed in the Bid Document.
4. We agree to abide by this Bid for a period of 150 (one hundred fifty) Days calculated
from the final date fixed for receiving the Bid Proposal and it shall remain binding
. upon us and may be accepted at any time before the expiration of that period.
5. The following items are attached to and form part of this Bid and we warrant that all
information stated in the attached items is correct:
t
BOOK IV
PART 5 FORMS AND SCHEDULES
Form 1.1 Form of Bid Letter - Technical & Commercial Proposal
Bid Security
Address _
Witness _
Address , _
/
1 '\
\. /
Occupation
(
\..;)
rR\~~no
Form1.1-2 PLTU Sofifi ( 2 x 3 MW)
BOOK IV
PART 5 FORMS AND SCHEDULES
Form 1.2 Form of Bid Letter- Price Proposal
PT PLN (Persero)
DESIGN, SUPPLY, ERECTION AND COMMISSIONING OF PLTU SOFIFI
PRICE PROPOSAL
MAKASAR - 90222
INDONESIA
Gentlemen:
r,t
I
,~/ 1. H2ving examined the Instructions to bidders, Bid Forms, Schedules, General
Conditions of Contract, Special Conditions of Contract for design, supply, erection
and commissioning of the PLTU Sofifi plant inspection prier to the Issue of Finai
Acceptance Certiflcate and trainlnq, under the turn key basis Works, including
Addenda, we, the undersigned, offer to design, manufacture, deliver, erect on Site,
commission and warrant the whole of the said Works in conformity with the said
Instructions to Bidders, Bid Forms, Schedules, General and Special Conditions of
Contract, Technical Requirements and Bid Document Drawings and the Addendum
r~
-,
fer the Bid Amounts with the basis of fixed lump sum price :
_ _ _ _ _ _ _ _ _ _ _ _ _ (USD )
------------- (
_____________ ( I
(Rp. _ ,
BOOK IV
PART 5 FORMS AND SCHEDULES
Form 1.2 Form of Bid Letter-Price Proposal
The Bid Amounts shall not be subject to escalation of material and labour prices over
,-----
the duration of the Contract.
2. We undertake if our Bid is accepted to commence the Works immediately after the
Effective date of Contract and to execute the whole of the works in accordance with
the dates specified in Part 5, Schedule 4, Contract Schedule Key Dates.
3. We agree that, if this Bid is accepted we shall prior to the date of signing of the
Contract furnish performance security in the amount equal to ten percent (10%) of
the amount of the Total Contract Price in the form prescribed in the Bid Document.
4. We agree to abide by this Bid for a period of 150 (one hundred fifty) Days calculated
from the final date fixed for receiving the Bid: Proposal and it shall remain binding
upon us and may be accepted at any time before the expiration of that period.
5. We understand that you are not bound to accept the lowest or any bid you may
receive.
\,
6. The following items are attached to and form part of this Bid and we warrant that all
information stated in the attached items is correct :
/'
\- )
Dated this day of
Witness
Address
Occupation, _
1"
"'
BOOK \I
Part 4 TECHNICAL REQUIREMENT
Section 4.1 Project Description
Section 4.2 Summary of Works
Section 4.3 General Technical Requirement
Section 4.4 General Technical Specification
Section 4.5 Civil and Structural Works
BOOK III Section 4.6 Mechanical Works
Section 4.7 Electrical Works
Section 4.8 Control and Instrumentation Works
Section 4.9 Erection and Commissioning
BOOK IV
Part 5 FORM AND SCHEDULES
Schedule 1.1 Summary of Contract Price
Schedule 1.2 Detailed Price Schedule
Schedule 1.3 Training
Schedule 1.4 Mandatory Spare Parts _.~
2. In the event of any ambiguity or conflict between the Contract Documents listed
above, the order of precedence shall be as follows:
a. The Contract Agreement
b. The Contract Discussion Agreement (CDA)
c. The Letter of intent
d. The Special Conditions of Contract and Addenda thereto
e. The General Conditions of Contract and Addenda thereto
i~1
BOOK IV
PART 5 Form and Schedules
FORM 2 Form of Contract Agreement
r-··.
CONTRACT AGREEMENT
NO. ----- /-f.
FOR
This Agreement is made on this - day of ---- for the PLTU Sofifi (2 x 3 MW) under
turnkey basis.
Between:
PT. PLN (PERSERO)Proyek Induk Pembangkit dan Jaringan Sulawesi, Maluku dan Papua,
<: ~.
a company duly incorporated under the laws of the Republic of Indonesia having its Head
Office in Jalan Latjend. Herstaning Panakukang Makasar 90222., Indonesia, hereinafter
called the "Owner"
MAKASAR - 90222
I I./ INDONESIA
\,
And
[ to'm 2-2
Whereas the Owner desires that the Works known as Coal Fired Steam Power PI::Int Project
for PLTU Sofifi 2 x 3 MW location at Pasegao , Akebatu Village, Oba Tengah(Akelamo) sub
district, Tidore Island City should be designed, manufactured, tested, delivered, installed,
!~'y
pre-commissloned, commissioned and performance test and guarantee certain facilities to
'- '
be executed by the Contractor, and has accepted a Bid by the Contractor for the design,
manufacture, test, delivery, install, pre-commission, commission, performance test and
guarantee certain facilities execution and completion of such Works and the remedying of
defects therein according to the stipulation of the Contract between the Owner and the
Contractor as listed in Clause 1 below.
Witnesses that the Owner and the Contractor agree as follows:
1. The following documents shall be deemed to form and be read and construed as part
of this Agreement which shall constitute a binding contract between the Owner and
the Contractor.
BOOK I
Part 1 INSTRUCTIONS TO BIDDERS
Part 2 GENERAL CONDITIONS OF CONTRACT
-;
Part 3 SPECIAL CONDITIONS OF CONTRACT
Ttt
BOOK IV
PART 5 Form and Schedules
FORM 2 Formof Contract Agreement
5. The contractor agrees to perform Force Account Work in accordance with clause 3.1
of the Special Conditions of Contract upon the request of the Owner in writing and
agrees to accept as full compensation for such work the Terms of Payment as set out
i!1 clause 3.2 of the Spec!al Conditions of Contract
c 6. The Contractor has furnished and the Owner accepted the Performance Security that
is :[-------]
With respect to the execution of the works by the Contractor which Performance
Security shall operate according to its tenor.
In Witness whereof the parties hereto have caused this Agreement to be executed in
accordance with their respective laws their on the day and year first above written.
tl~"'"
I
'-.>
For and on Behalf of the Contractor For and on Behalf of the Owner
PT PLN (Persero)
fl;T
BOOK IV
PART 5 FORM AND SCHEDULES
Form 3 Bid Bond Form
,,---..,
J
(
FORM 3: BID BOND FORM
NOW THEREFORE, the condition of this obligation is such that if the aforesaid
Principal:
(i) Does not withdraw his Bid during the validity .period specified in Port 1,
instructions to Bidders and
(ii) Fully complies with all of Owner's instructions to Bidders and
(iii) Having been :3 warded the Contract the said Principal will, within the time
required, enter into a formal Contract and give good and sufficient security to
secure the performance of the terms and conditions of the Contract.
Then this Obligation will be void: otherwise the Principal and Surety shall pay unto
the Owner the full amount of this guarantee without condition as liquidated damages
and without requiring the Owner to supply evidence in support of his claim.
IN TESTMONY WHEREOF, the Principal has hereunto set his hand and the Surety
has caused these presents to be executed in its name and its corporate seal to be
affixed by its attorney-in-fact at
of' - - - - - - - - - - - - - - - - - - - - - - -
_ _ _ _ _ _ _ _ _ _(SEAL) '-.~
(PRINCIPAL)
BY-----~:-Al
_ _ _ _ _ _ _ _ _ _(SEAL}
(SURETY)
-:-:-=:-=-=--==-:=-==~ (SEAL)
( )
(ADDRESSED) " .'
~ ~EAW
By ._-. -.__-
(REPRESENTATIVE)
Definitions /'
,f
\.
"Principal" means the Bidder.
"Surety" means the bank, of financial institution guaranteeing amount for bid security.
'( J
tr~O
Fonn 3 - 2
./
BOOK IV
PART 5 FORM AND SCHEDULES
FORM 7 Completeness Check List Form
r,
.~
\
FORM 7. COMPLETENESS CHECK LIST FORM
Pursuant to Part 1 Clause 1.9, the Bidder shall indicate the completeness of his bid
proposal, for each envelope, by ticking the provided box in the following check list
form, conforming that the requisite document(s) is submitted.
Of a particular note, un-ticked box shall mean the Bidder does not submit the
document, and hence, his proposal may not be further evaluated.
r:
~r
'- "
()
. .
1,,-".
~
''-. .:
([7i
-~;.
BOOK IV
PART 5 FORM AND SCHEDULES
FORM 7 Completeness Check List Form
,..'~- ,
....
1
I
ENVELOPE 1 COMPLETENESS CHECK LIST FORM
NO
ITEM
'--- - .
~tr
Form 7 - 2 PLTU Sofifi (2 x 3 MoN)
BOOK IV
PART 5 FORM AND SCHEDULES
FORM 7 Completeness Check List Form
r.
\ /
ENVELOPE 2 COMPLETENESS CHECK LIST FORM
No
ITEM
-
1 Envelope 2 Check List Form 0
2 Bid Letter for Price Proposal 0
3 Complete Price Schedule (Schedule 1.1 to 1.8) 0
shall consist of a statement of the country of origin of the goods and services offered to be
confirmed by a certificate of origin issued at the time of shipment
6 Contract Payment Schedule (Schedule 3.3) 0
7 Payroll Overheads (Schedule 3.4) 0
8 Labor Rates (schedule 3.5) 0
C~·, 9 Equipment Rental Rates (Schedule 3.6) 0
()
For and on behalf of the Bidder
c)
(--
y- .
, 1
\...'
(
\. ..>
iTf
BOOK IV
PART 5 FORM AND SCHEDULES
FORM 8 Supporting Documentation Ust Form
BIDDER'S
NO DESCRIPTION
PROPOSAL
REF PAGE
() 5
Balance Dlaqrarns, Mass Balance Diagrams (Sub-Clause 4.3.3.2.c)
Performnce Data and Curves: Steam Turbine performance curves,
Generator and Excitation performance curves, Stean Generator
0
6'
13
(Sub-Clause 4.3.7.3.1)
A preliminary list of the Quality Control Procedures, Special Process
Procedures, and Quality Control Documentation which applies to the Work
0
0
and which he intends to submit to the Owner (Sub-Clause 4.3.7.3.1)
14 Two copies of his quality control manual (SUb-Clause 4.3.7.4.1) 0
15 A list of those spare parts and quantities he recommends should be
,( supplied for three (3) years continuous operation, having regard for the
remoteness of the Site from suitable sources of such spares (Clause 0
4.3.11.1)
16 A complete list of tools and test equipment (Clause 4.3.11.2)
0
17 The proposed number of trainees, the duration of training and the type of
training to be conducted by the Bidder on the Site (Clause 4.3.13.3) 0
18 Design of jettylwharf and access trestle structure including plan
arrangement of river water basin breakwater (Sub-Clause 4.5.1.6.a) 0
19 The capacities, specifications and description of the method he proposes
to use for dredging of different materials for Owner's review (Sub-Clause 0
4.5.4.3.2)"
c)
20 full details ofthe proposed pile driving equipment and the method of
carrvinQ out the work (Sub-Clause 4.5.4.5.5)
0
If,
Form 8-1 PLTU Sofifi. (2 x 3 MW)
BOOK IV
PART 5 FORM AND SCHEDULES
FORM 8 Supporting Documentation Ust Form
(-)
The Bidder shall carry out soil investigation and shall state it in his bid .
21 \
45
rotating components of the generator (Sub-Clause 4.7.4.4.1)
The methods used to prevent stress corrosion cracking, particularly for
'i
\....
J
the end rim~s (Sub-Clause 4.7.4.4.1) 0
(Section 4.7.9)
53 Examples of the cabling management types of computer printouts and
drawings used in conjunction with the above and for permanent station 0
records (Sub-Sec.1ion 4.7.12.1) . . . . . . --- .
54 Test evidence of ihe fire performance of the cable types offered at the
specified volume of combustible mmerial (Sub-Section 4.7.12.1)
0' i
55 Details of the construction and the relevant standards with which cables
comolv (Sub-Section 4.7.12.2) 0
56 Proposals for the segregation and separation of the cable installation
(Sub-Section 4.7.12.3) 0
57 Details of the earthling, bonding and lightning protection systems
/'_.
proposed (Sub-Section 4.7.12.8) 0
..
J 58 Describe the offered features of diagnostic hardware and software in
'-.
BOOKIV PARTS
FORMSAND SCHEDULES
Schedule 1.1 Summary Price Schedule
Local I:
1
I '·i
, INAl '
h.. . . ~-I--- I I I I I I I -+1----+1- - - - - - - - 1
__,_~2AL FIRED STEAM POWER PLANT -- -
~-
I
43,973,548,445
±
~-
- 43,973,548,445
I ..J
2,972,451 198,285 3,015,000,000 4,500,000,000 5,283,190 7,515,000,000
---e---'
, -., •.. _."
~."1-.r- I Lot 797,738,395 1,482,305,225 1,422,829 2,280,043,620
2
I ,I
Lot 2 1,121,761 74,981 676,454,986 898,487,526 1,196,741 1,574,942,512
comclete Balance of Plant 93,614. - 1,265,462,645 1,631,004,701 2,176,499 2,896,467,346
I--~ Loal Handling System 116,920,904 386,594,3!l~ ~~6,849 503,515,297
~------=- -
•• h Handling System 17,560 I - 158,423,070 101,608,156 280,272 260,031,226
900,000,000
50,000 900,000,000
~ r 1,
~~ /53
Page 1 PLTUSOFIFI(2 X 3 MW)
-
C1>
~
"C
C1>
.J::
0
en
C1>
--
0
s..
D.
an -c
(1)
~
CO
D.
---...,
CO
C1>
C
~
-
-Q)
:::J
"'C
C1>
J:::
0
en
r ;
~---------
BOOK IV PART S FORMS AND SCHEDULE~I
Schedule 1.2 Detailed Price
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
CIVIL WORKS
PL TU SOFIFI (2 X 3) MW
INLAND
FOB EX -WORK
TRAN$P()~tATJON.
ITEM NO DESCRIPTION CIVIL WORKS UNiT I QIT 1 I I
. (A) . ~ (BL
Porelon ILocal '.ForelQn Local
1
'(N7A) flNIA) T1N/AI (N/AF . p,. (((NIA)'" '·><"·P(N/A).··I".J,·'
1 PREPARATORY WORK
.............................
A SITE PREPARATION
1,660,334,462 1,660,334,462
The works shall include but not limited to . mobilization
B
SITE DEVELOPMENT 1,246,982,767 1,246,982,767
•••, " 1 1 ••••..••••••••••• J •.. .............. .
j [.. .. ~.... .. . ~
461,845,469 461,845,469
to outside powerplant, filling up to level and compaction
103,915,231 103,915,231
lel0cation of existing access road (if any) and all related
...re.9:Jir.:9..~'?.r.~~. . . . . ..··.. · · · · · . . 1 ..·..· · · ..·..·1 ·····················\····1· .......\
~ .,." ..
" , , , , . .........................j ·I ·~· ..· ··· ·..· ······ ··1· · ··..··\
3,764,040,573 3,764,040,573
civil works required and as directed by the Owner based
.........................Qn..g.~!IJ!lJ..~j!§! ..9.9.DgHj9.n·..........
3
STEAM GENERATOR (BOILER) STRUCTURE AND
AUXILIARY
... ..1
.........................................................................................................................................................1.,
..
1,131,521,399
.j ·· ..·1······················ \...... ·I···j
1,131,521,399 s
(exclude riling works), support system and all related civil 1 LS
1,131,521,399 1,131,521,399
works required and as directed by the Owner based on
................
ggt\!g.L~i!~ ..9.<:JD9.\ti9.D, . I
4 ADMINISTRATION BUILDING (Single storey) 438,753,196 .l 1 L. . L... .. l 438,753,196 '~
... 1.... ..I ...
t. ~ ( Seh 1.2 .. 1
~ PLTU SOFIFI (2 X 3 MW)
":«
BOOK IV PART 5 FORMSANDSCHEOULESj
Schedule 1.2 Detailed Price Schedule'
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
CIVIl. WORKS
F'LTU SOFIFI (2 X 3) MW
FOB EX·WORK
I f',1~~i~~J:;i~;'.'·.··.·, [ideal"
. . . . . . . . . . . . . . . . . . . . . . . . . . . ,I
-7Icc~i~~;~:~~:~t~~~;;;,:;:~:~~;L CS .........
" , 1
103,915,231
3,278,640,985
103,915,231
3,278,640,985
~
..
works shall consist of but not limited to
288,653,418 288,653,418
~...... ~"."..I.~.:r~~E...................... . LS 1
431,363,668 431,363,668
......B ~".".. ~~.:rL.1~~ ..F.'91':l[).... . . ......... ..........................J .. ~? 1.
1,593,366,868 1,593,366,868
...~ CW PUMP STRUCTUR.~ . ....
~
~<;:
, .
1
D INTAKE AND DICHARGE LINE LS 1 .........~~5.,?5.!,9.~9. 965,257,030
........................................ . -l -l "...... .. ·..1..· ··
8 COAL UNLOADING JETTY AND ACCESS TRESTLE 8,497,956,632 8,497,956,632
r
...................1 .
~
2,020,573,927 2,020,573,927
..............................
9 COAL HANDLING FACILITIES 2,749,827,923 2,749,827,923
........... · ..·....i'hEi· work shair"i'nclude' bul""'noi"j'imited to foundation
(excluding piling works), structural works and all related
civil works required and as directed by the Owner based
....... ... .2~llgl~1l1~it~g()~cliti()~ ....
COAL STORAGE YARD, COAL DIKE, COAL RUN-OFF
A LS 969,875,485 969,875,485
AND SETTLING POND
.... 1 ..
ITEM NO DESC~IP"ION.~IVjLWbkltS .
(F=A~+G+D+E)
I
t~ t A ;P:"~-rd
FOB EX-WORK
16 'PILING WORKS
..... ····10;467;025;417.. ,·· ..·· .
10,467,025,417
.... . ···· ..woii<·specifiei·~;;[jer·ihi.seciion·iiiciudes·blii·;;oiiimiied"i'Ci ,.................., .
furnishing, delivery,insllalion,joined,testingof piles, including
. . . ~. . ·r:~~tEy~~~~£~~~~~·:~~U.~~d~~A;~ii~~~~~~:
ROOM
......................,~ ·w~fk··spe'cififi·~·;;d~;:·ihis·se·ction··j;;·~'1udes··blit"not"iimiied't"o" , .
fumishing, delivery,insllalion, joined, testingof piles,including
wale~eVvibro or preboring if required, etc,
m 3.100 519.576,153 519,576,153
Circularhollowpre-stressed concretepiles or bore pile in 400
mm minimum diameterwith depth 15 m in accordance DePT
.......' . , .. , . 'Wo;kspecifiei~~derihisseciioninci'~desbliiiioilimiiedio"
furnishing, delivery, insllation. joined, testing of piles, including
waterjeVvibro or preboring jf required, etc,
rn 4.680 259.788,076 259,788,076
Circular hollow pre-stressed concrete piles or bore pile in 400
mm minimum diameter with depth 15 m in accordance DePT
C ·····rADMiNISTRATiONiiUILOiNG ..
-: ;:"~.;1
X3MW)
BOOK IV PART S FORMS AND SCHEDULE1
Schedule 1.2 Detailed Price
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
CIVIL WORKS
PL TU SOFIF: (2 X 3) MW
,-:
I
.' ..'NLA~riiL: 'L .', ERECtIONAND·.CP~MISIONING TOTAL
TRANS'POltTAT10N; ,:;INCl;UpING eRECTION
ITEM NO ;"'3WVi '::: :I
---
'INSU~ANCE " .
I· ;( . (E); (F:A+B+C+D+E)
- .... Local
F FQti1I,S,Q Fo~iQn'l . Local'
..
. (NIA)" ·1 (NIA) I
Woik~iieciiieiundec'itiisseci'i;;'n'inciudesbui'noiiiiTiiiedi;; . , ,.
fumishing, delivery, insllauon, joined, lesting of piles, including
wale~eVvibro or preboring if required, etc.
m
Circular hollow pre-stressed concrete piles or bore pile in 350
mm minimum diameler with deplh 15 m in accordance DCPT
···~r~~~~:~~~ii~~~~:~~lil~t~~~~i~~~~~:~::~n~u~~~:I~;,i·:~~i~~;~gl
wate~eVVibro or preboring if required. etc.
m 320 184,738,188 184,738,1881~
Circular hollow pre-stressed concrete piles or bore pile in 400
mm minimum diameter with depth 15 m in accordance DCPT ~
....................j.............. · · I....·.... ·..·..~ ..·· ..· ..·..I · · · ·1 · - .
E
............... ,~ ~RJ.JZ~~::c~ii:~u:~ft~:?~ciiiin·i;;ci·udesbui·noiiiiTiiied'iii··1 ·1···· ··..····· · ·..·..1··· ·..··..·· ···· ·1· · ······ ······1 · · ·..· )· · · · ..
furnishing. delivery, insllation. joined, testing of piles, including
wate~eVvibro or preboring if required. elc.
m 240 46,184.547 46,184,547
Circular hollow pre-stressed concrete piles or bore pile in 400
mm minimum diameter wilh depth 15 m in accordance DCPT
1 ···....·· ...... ··1·····················..··..·············1·.... ···..··············,1........·········..··1·..·..·......··..··· .......... ·
F COOLING WATER WAYS
· · j · · · · · · ..·I·..· · .. 1···· · .. ·········· ·\·..···..···..··· 1..·..··· ..···· · ..
·· ........· . ··wii'rl(speciiiili·undec..itiisse·ciiiiliinci·udes·buinoiiiiTi'iied'iii
furnishing, delivery. insllalion, joined, testing of piles, includinq
wata~eVVibro or preboring if required, etc.
·..f !CW·j·NTAKE······..·..···········, ··········· .
.......... . j·..··..· ..·····I· ·····················\·········· ···· ·1······· .. ···· j .
Circular hollow pre-stressed concrete piles or bore pile in 400
m Incld Item 7A Incld Item 7A
mm minimum diameter with depth 15 m in accordance DCPT
f· ..· ·.J. · ·· ·1················· ..· · · f ..· ······..·· ··..· ..··1 · ..· ·..·..1· ..·..· ·· ..··..·· ·..
.2. 1 CW SETLING POND ·1 · · · 1 · ..·· · ···1 ·.. ··..···..·· · ..·..·· ·1·· · ·..···· ..····.. ···..·..· ·..1..· · · 1...... .. .
Circular hollow pre-sires sed concrele piles or bore pile in 400
mm minimum diameter with depth 15 m in accordance DePT
m Incld Item 78 Incld Item 7B
1..· ·..···..···· ·1..·· ·· · [ · . . . . . ...·1·· .
3 ......c..":'. PUMP STRUCTURE
Circular hollow pre-stressed concrete piles or bore pile in 400
m Incld ltem7~ Incld Item 7C
mm minimum diameter with depth 15 m in accordance DCPT
~ ··············1·1 ....~.... . ····1 ··1· .
4 ,.}"!I!':'5~~t:'()[)I~C.t:':I\~G.~~It:'~("!!\)
.:; ..·rJET~~t~~~:0~;J~~i0'~~;:f.r~gUir~1.,".t~,.
~~ r Sch 1.2 - 5
;{;t~j
CIVIL WORKS
PLTU SOFIFI (2 X 3) MW
"J': ACCESS TRE'STL'E··"":".:'" """"" ,,,",' " " " " : ' : : : . " : : " " ' " ' : " : ' : : : : : : ' : : ' " ' ' ,. " ,"" "::::::::,"'~"
Circularhollowpre-stres~edconcrete piles or bore pile in 400 m 600 243,726,525 _ 243726525
mm minimum diameter With depth 15 m In accordance DePT I I
............ .. .
Circular hollow pre-stressed concrete pi'es or bore pile in 400 m 360 207,830,461 _ 207830461
rnm minimum diameter With depth 15 m In accordance DePT ' •
2 UiiiOERGROUNO"HOPPER'wiTH'SHEi:'iER'ilNO"i'OUNO.iiTi'ON .. "",,, "''''
Circular. hollow pre-stressed concrete piles or bore pile in 400 m 360 34 638 410 _ 34 638 410
mm minimum diameter wlth depth 15 m In accordance DePT ' , , ,
......... " ......." .. ' ."", ......" " .." "
I COAL SHED
,······Workspeciiieiunderiiiisseciioninciudesbuiiioiiii1iiiedio'"'
furnishing, delivery. insllation, joined. testing of piles, including
wate~eUvibro or preboring if required, etc, 500 51 95 6' _ 7
Circular hollow pre-stressed concrete piles or bore pile in 350 m . 7, .5 51,95 ,615
mm minimum diameter with depth 15 m in accordance DePT
J ASH SILO
Wo;~speciiieiunde;iiiisseciio;;i;;ciudesbuinoiiii1i;iedi;;'
furnishing, delivery. insllation, joined. testing of piles, including
waterjetrvlbrc or preboring if required, etc. I Id I 10
Circular hollow pre-sires sed concrele piies or bore pile in 400 OJ nc tem - Incld Item 10
mm minimum diameter with depth 15 m in accordance DePT
.............................................................................................
K ASH HANDLING FACILITIES
········\iJ{;(k·~·p·ecifi~·i·~n;;ie·;.··this··~·~·~ii·~·n··i~·~i~d~~··t;u·i··n~t··iim[·te·(i·io····
furnishing. delivery, insllatlon, joined. testing of piles. inciuding Incld Item 10 Inc1d Item 10
",,,\\I~terj"'~~lbr()()!preb()ri~!1ifre(\uir"'d.:etc, . . .
L BALANCE OF PLANT
FOB EX-WORK
TEM NO DESCRIPTION CIVIL WORKS UNIT lelTY I ... I __. 1 __ . ,,X 'I>
''Workspecii,ei'iJnderiilissecii0nin'ci;jdesbu'inoiiiffilledi0 ....,...
furnishing, delivery, lnsllation. joined, testing 01 piles, including
waterjebvlbro or preboring if required, etc.
m Incld Item 11 Incld Item 11
Circular hollow pre-stressed concrete piles or nore pile in 400
rnm minimum dlameler with deplh 15 m in accordance DCPT
A/~~
MECHANICAL
PL TU SOFIFI (2 x 3 MW)
ITEM DESCRIPTION
NO.
II I~E§86~i¢AC'
;ILl'
: ;i;:~:;)J,il..y..~.·.r''!'''.':.~;e.'-,'; .._;.••~·.:.;.~...••..,.;••, '.•. ·.'.;.i.'1.. i;-;':~.~'- .. ';:;i·.-.~~;1.:,,;.;:••'-'id.;;;';:'.;;~-;,~~; ; ' :;;;'; ;,; ; ; ;;'; ; ;;' ii. ', i;"._.;~;:'--'••;";,.,-"," ;-.<;;;;,:m;.o;:'i.~.'t.i;';"'.;.l:~;;;.M.; i:••;.~""'''''' ••" ,.;..•...
·····.~;~~;~ib~;~~~~I:. ;·;·:··;f;i~.~:~:~~I".·cm;~·~~~?::~~~~e.~~.
2.1.1 Boller Proper 1.370.1111 1,433.244.247 1,370.181 2,201,223.331
}. :::!W:~l~:~~r~i:s·y'~i~:iii:::a:6:~~g;;ip~~~i..:·::::· . ·: :·: : .......~... ....:::::::::~:~:~~~: .
·870:·107;862···867:540·· . (36·0,482·,7'30
r:~~~~~~~~~.~~~~;;:::+
6
All associated instrumentation andcontrol(') 2
. : -:-. :.• .• . • _.-.~;;~:. ..,.
20,737
.1.~,.~~.!.,~1.!L
29,303,485
ijf?i:~?fl···
. 33:065:175·····.... . ·····33;065:175
?~',:4.9.9.:~~?
48,309,505
!9.,3?~,!~!
.. ·"?4.::i:~~: . . . .. ::::.§~J4.~':9.~§
!'o1,842
. .?g,!~!.. .
77,612,990
~.~.'.~~.?,.1..8.7...
8
Boi'iersupporting steei and hanger:'beams: iiiliii'orms;stair;;; 2
..... ..... ..... ...... 11,1j20
........•
6,511,887 10,735,449 11,520 17,247,336
·11~<:l<:l~rs.,.:-;'~I.~~~y~.al1<:l.~ts:............................................
-. , , .
Painting
. 1~~~:~~~:~~~J .
9 2 17,281
16,103.166 17,281 25,870,993
.......................................................................................................................................................... · 1
.
10 Insulation and lagging including boiler and piping 2 :27~;;1~?:1::· ... ji~::i~ii;?~3.::::::??~;~~~: ::.:.:~i:i;§~?:~.~~
11 ....•.• ~~~~~~~~i".~~a.r~,~i".~:.~".~~~r. .• - •.".~~:• ~r.~u.t:"..~•.=.at:'.i~l •. . . . . ~ .•.• • • . . . .• . • •.• • • •. . . . . . . .
11,520 10,735,449 11.520 10.735,449
~
~l~;~~t~}~i.I~~~t.~~~~&.~p~e.;~f~do::~II:~~s~i~~:~~t:~:~:~I~t· ;:1
'5')60'
':i::~~~:~;;r ......
5,367,7241 5.760 8,623,668
··);4~~t •.• •.· ~,??g,~~~ ~.,~S.6 .~:m;iE
...............................................................
2.1,2 FORce'ii'DRAFT'FANS 25,345 .1.~!.~.~.~.!~.~~ _ 23.617,977 25.34~...... 37.944.124
1 ········ForcedD~aftia·;;s a;;dd;i~es . :?z.;iJ§g[·· !.~,.~.?~,.1.~~. .,·······~~;~i-;:;???:L .??,9.~ :§7:~~4.;i:2.~:
~::::i~~ils6~°0.;,:~~i~~s:~]~;litr~i~:~~~~~t~~;f;~;~:~~t~ri~I~..+ ~
3,000 tncld Ilem 2.1.2 lnctd Item 2.1.2 3,000 Jncld Item 2.1.2
:345 Incld Item 2.1.2 Incld Item 2.1.2 345 Incld Item 2.1.2
.......... . ..
2,1.3 SECONDARY AIR FANS 9,677 5,469.981 9.017.769 9,677 ~~.~~~!Z5o...
"~;4.69;?~i . ... ..:?:iiif?§?·.:::··~:§O'O'.•
1;~;;~~1:t.~i;1t~~~],~rj~~a~ii~ft~~t~~)~~;~;,~I~:. ~
1 . ~,0~9 . 1.~.,.~~!.,?s.9..
2 1;100 In~~~..I.~~~.~ ..1.3
lncld lIe~?.~.::.. . 1 ,~.~9.." . Incld Item 2.1.3
2,1.4 INDUCED DRAFT FANS 17.626 ..~!.~.~~~~.~~ • 16,425.231 17.626 ..2~ .•. ~~~.,~1.~ ..
1 Induced draftfansand drives
~ ·:····:.$.~~i~~O~i.i~~,~~~~~t:;I~ii;jt~t~~a~a.&;~~~)0.~terialsl}-
• :1~J;~~:·I • ·: .·
Ij26
.... ~,~~~,1~~
rncld ltem 2.1.4
Incld Item 2.1 ,4
i§:42..~,~~iJ~:o.o.o.[
Incld Item 2.14
Ineld Item 2.1.4 .......
2,000
·················62·6··
?~,38~,~1S.
tncld Item 2.1.4
lncld Hem 2.1.4
2.1.51p.~@¢~~6f~~~±~~C±i9.~ . .
~
t·l! r Sch 1.2 - 1
f 1-~0
PLTU SOFIFI (2 X 3 MW)
.
· ;~
ITEM
DESCRIPTION QTY INSURANCE INSURANCE
NO.
(A) (B) (E) (F=A+B+c:"D+E)
':~1"~~~~~;~~~~~~~:::~::';"k:,,';~;;t'i ·'''I'''':;--:-:l;;~1:7'1''''-:i::'ii;i':'+':':'-'I''~'':'~;;~;r-:~~;.:i:-:;i~~~-;
2 LUbricating andhydraulic Oil System 2 Ineld lIem 22 1.1 I I
':. I I Incld Item 2.2.1.1 I I I Incld Item 2.2.1.1
'" .:..:r.~r.~ine..<?il ..§I'?r."g"....... .. 2 'n.c.!~ 1':~2. 2.:.~~+. .. II II . ··· · ·· .. '1I..···[nerd· Ilem 2.2.1.1·..·tI · ··tI..· I
..······t....
lnctd lIem 2.2.1.1
..·..··t · · ··t....
tncld Item 2.2.1.1
.. ···· ·1 ..~~~!~.~~.~.~ ~:~.:~.:.~.
.
Ineld nem 2.2.1.1
o/:..:r.~r~.ine. ..~.~be..S)j.lplJ'!'p.~............................................ .. ? 1~c.1~..1::~.2..2 1.111..... ·..1
I
· · ·· 1I ..· ' I Ineld lIem 2.2.1.1 I I
,.. ......,............. Ilneldllem2_2.1.1
.. ,.........
Incld Item 2.2.1.1
. ..
5 .......!ur~i~fJ.§.':':p. "'is'?rylr:~~r.':':f!!e.':'~~........
6 .......~II§'s.~~ci."t!'9i':'~II1J",,,':'I~ti.~~"'':'~~'?~tr.'?ln. ..
.
.c....
.
~ . ·.. +.. i~~~: :·~::·~:·~:·:·+l......
.• .. ·
. . .~........
·r ..···· · ·..···
·l· . . l. i:~1~. ii:·:·i}·~·:~
7 Turbine Instruments ? I Ineld Item 2.2.1.1 1 1 1 I tnctdnern 2.2.1.1 JncJd Item 2.2 1.1
.
..I.~~~~..~~:.~ ..~:::.~.:.~..J ~~:~.d Item 2.2.1.1
2·rji~.~~~rl . ".1 ··]:·:§,~~!.L·
::::-f~~~~i;~~~;~:~~~~:;~;;~;~:!:~:.' ;;~;j:
..................~1,g~!,?~.1... .~~/;!~,~~f3. . ~5.,~1~
? I Incld Item 2.2.1.8 I I I I lncld Item 2.2.1.6 Ineld lIem 2.21.8 Inclc Item 2.2.1.8 Ineld Item 2.2.1.6
.........J::•• : . ;~;:~:~:;~}.
2.2.3
Auxi'LjARYSTEAM S'YSTEM" . . . ..................... ··..····· ·..·· ·..·..1···· .J. · ··· ··1
l.~~~~..l·~~~·~:··~:·~..
Ineld Item 2.3.1
l.·.··. . · . · .
1...
.....................................
Ineld Hem 2.3.1
.. 1 ..
1·..
I
····..1···
~j' :.~~~t.~~~;~~'~:t~;;~:~~~;i'onandoiheraccessories 2 lnctd Item 2.3.1 tncrd Item 2.3.1 meld Hem2.3.1 lnctd I!em 2.3.1 Incld Ilem 2.3,1 tneld Hem 2.3.1
2.3.2 ICON·OENSATE·SYSTEM··· .... ~.~!~.~9. 3,389 . . ~~!.?.!.~.~~~~..I... ... . J... t:o ont:.
......'!..~,.~.I.~,~~'! ..J
t:.70
..... 5~,.0.~8 • ~O.15.~,!.9.~
f! t Sch 1.2 . 2
A?=i:;j"
BOOK IV PART S FORMS ANDSCHEDULES
Schedule 1.2 Detailed PriceSchedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
PL TU SOFIFI (2 x 3 MW)
TOTAL
ITEM OESCFtIPTION
NO;
Aiiiiemsspeciiiediiiiha'speciiicaiionanCi'oiii'eraccessorias Ineld Item 2.3.2 lncld Item 2.3.2 Inctd Item 2.3.2 Indd lIem 2.3.2
3 Incld Item 2.3.2
Ineld Item '2.3.2
rElg.~ir.Eld...t.()r()PElf~ti()~ ..
l~ ~~~~~~:i;::::-::::::::::_::-_:
_! . . . ':~~~gi~tr-F--'- . Ineld
,
lte~"ii3 +
Ineld Item 2.3.3
............ ,.,
lncrd Item 2.:'.3
.
..
..
.
···r~~id··ii~;·2· 3:3·~·
~: : .: ~it~rr:;~~t.t.~~:ftr.~~jj;~fr.~:~~:~t~t~t~;i.s:~ri:~~:::.:..
~ :~;:::::; ~;:L.
Inclj Item 2.3.3
Ineld Item 2.3.3 rncld Item 2.3.3 Ineld Item 2.3.3 Ineld Item 2.3.3
.............................
..............................................
. . . . .
4
4
25.053
tncld Item 2.3.42
1.675
........................
.. - .~otor operatedvalve 2 Ineld IIem 2.3.4 lnctd Item ;~.3.4 Ineld Item 2.3.4 Ineld Item 2.3.4 lncld Item 2.3.4 Ineld lIem 2.3.4
:.I::.x.p.~n.~i<:>n..J..o.i.n.!............
.. ~... Inetd Item 2.3.4 lneld Item 2.3.4 Ineld Iter.12.3.4 tncru Item 2.3.4 tncld Item 2.3.4
Ineld IIem 2.3.4 ............................
• Flexible Connnection 2 Ineld IIem 2.3.4 Inetd Item ;~.3.4 Ineld lIem 2.3.4 tnctd llem 2.3.4 Ineld Item 2.3.4 Ineld Item 2.3.4
:'Aii'A;;sociai~(jiri;;irum';;;;iaiionaridCo;;t;oi6 2 Ineld Item 23.4 Ineld Item ;~.3 4 Ineld Item 2.3.4 lnctd Item 2.3.4 Ineld lIe~'2.'i4·r.. Ineld uem 2.3.4
:§?a.i:i~~s.:E~i~?~ic.p'~?\~Cji?6:················::::
..·:·::..............
2 Ineld Item 2.3.4 tnctd Item 2.3.4 Ineld Item 2.3.4 tnctd lIem 2.3.4 lncld lIem 2.3.4 Inctd Hem 2.3.4
~·r~f~~!t~f~~:~~~~itpf~::~;e:~}r~1~~~;;~s
. ~S.,333. 2.§~~.~.?!~~~ ~~!1S.0,~~~L ~~.!~.3..3 • ....~.2!3.~~,!!? ..
/-tp-td
BOOKIV PART 5 FORMS AND SCHEDULES
Schedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
,ERECTION AND.COJl.1'1lISIONING
EX· WORK INCLUDING EReCTION·'
'-.~JNSUf{ANCE
"'-(E)i>1
3 I\II~~sc:>~.i.~t.~~.In.~tr':''.''l~.n.t~tic:>n.~n.~ ..<::.c:>.n.~r.c:>.I.r.t .
Including all items specified in the specification and "Scope of
4
work" And other accessories required for system operation.
2:4':1"" DESALiNATi·oN'..PLANT·.......... ··
:..·::::jriii§.~:~:~ti~r.:.~t.~:.~~~~i~::(B.~~)::·.:::: . : : : ·: : : :. : : : : : : ~ lncld Item 2.4.3 Ineld Item 2.4.3 Ineld Item 2.4.3 tncld Item 2.4.31 Ineld Hem2.4.3 lncld Ilem 2.4.3
....... .
..... ~ .
::::::::::1·:····· IncJd ltem 2.4.3 Ineld Item 2.4.3 Ineld Item 2.4.3 Ineld Item 2.4.3 Incld Item 2.4.3 lnctd Item 2.4.3
2 x 50% Seawater Reverse Osmosis (SWRO) and Brackish
6 Water Reverse Osmosis skids (BWRO) including auxiliary Ineld Item 2.4.3 Incfd Ilem 2.4.3 lncld lIem 2.4.3 Incld Item 2.4.3 lncld Item 2.4.3 lncld Item 2.4.3
7
· I~Y.~t~r.!'
Valves.
. 1···.......... -1....·..·
Ineld uem 2.4.3
\~ : :·: : :~ :.: :I :::::~;:i:::: ~::
Inerd Item 2.4.3 Jneld lIem 2.4.3 Item 2.4.3
..lnctd
" " ,
8 l'.ip.in.g ~.n.~ . ~g.~~s..sgr.i.El.s..· . tncld Item 2.4.3
....... .. .. ........ ".
, " "
lnctd lIem 2.4.3 Incld Item 2.4.3
..Incld lIem 2.4.3..
9 1\1.1 . ~.S.~c:>~.I~t.El~ ..In.~t.":''.''l.El.n..tll.t.i.c:>.n. ~n.~ ..<::g.n.~r.'>.1CL ···1 J Ineld lIem 2.4.3
. lncld lIem 2.4.3 tnctd ltem 2.4.3 lncld lIem 2.4.3
10 J~;~~~;;9.;~:~~;:.:.;9t~i;~~~~i;~::~;~p.~Cr.~~~;f~~rk~~~ ........•...
Ineld lIem 2.4.3 Ineld Item 2.4.3 lncld lIem 2.4.3 lnclo Item 2.4.3 I lncld Item 2.4,3 I Incld lIem 2.4.3
2.4.2
1
Raw'ws'ierTanks" Inclc Item 2.4.3 lnctd Item 2.4.3 tnctd Item 2.4.3 Incld Item 2.4.3 Ineld Item 2.4.3 Incld lIem 2.4.3 lncld Hem 2.4,3
2 ·De;;;ineraii~edWaierTa·n·ks·· ... Incld Item 2.4.3 tnctd Item 2.4.3 tncld Item 2.4.3 lneld Item 2.4.3 Ineld lIem 2.4.3 Incld lIem 2.4.3
3 .~Iei~~~~~:A.~~~~:~~r.i~i. . : · . tnctd Item 2.4.3 tncrc Item 2.4.3 lncld lIem 2.4.3 lnctd Item 2.4.3 Ineld lIem 2.4.3 meld Item 2.4.3
4 Foundation Bolts & Nuts Incld Item 2.4.3 rncrd Item 2.4. '3 lnctd Item 2.4.3 lncld Item 2.4.3 Ineld Item 2.4.3 Inerd Item 2.4.3
..........................
i; :~iiasi.~~;~i~~i~i.iiii~~n.j~i:i~~~~~·c.?nir~i(;i. . . ............1 ......1 tnctd Item 2.4.3 lnelu Item 2.4.3 Ineld ltem 2.4.3
..............................
Ineld Item 2.4.3 tnctd Item 2.4.3 Ineld 1Iem 2.4.3
6 Miscellaneous Works lncld Hem24.3 Ineld Hom 24.3 lncld Item 2.4.3 lncld lIem 2.4.3 tncld Item 2.4.3 Ineld Item 2.4.3
t(;r;;;r'
...
· ~
MECHANICAL
Ineld ttern 2.4.3 tnctd Item 2.4.3 lncld nern 2.4.3 lncfd Item 2.4.3 Ineld Item 2.4.3
..... . .
. . . ....~ :•• ~\~'~~~':~~t:~~~t:~~~j~i~.: ••:: : :. :::::::::: : . : : .:. . ~1 I~.:!~.!lem .tncld Item 2.4.3
tneld Item 2.4.3 lncld ltem 2.4.3 lneld Item 2.4.3 lncld Item 2.4.3 Ineld lIem 2.4.3
...................................
..
2.4.3 \neld Item 2..1.3 tnctd Item 2.4.3 Ineld ttem 2.4.3 lneld Item 2.4.3 Incld Item 2.4.3
tncld
................., ··..·..···I~~id··ii~·~·2:4·:3
.......................................
7 All items specified in the specification & scope of work and 1 3,456 1,953,500 1,491,408 3,444,908
3,456
......".tlJ~r.a.9.9.l3.s.~".ri~s.r~gu.ir~~..I".'...s.ys..t~Ill.".p~r!lt.igr ..
......:1 ::i~f.~~~t~~~fii~fJ~e~~t.~~~~~~;.;.;;~,::;:.;.::·
2.4.5
......"1 1
J......... .
lnctd Item 2.4.3
Ineld ltem..2:~:3 .. r..· ..··.. 1............ "T' lncld..i\~~·2·.·4:3·~ ., ~ .
lncld ltern 2.4.3 lneld Item 2.4.3 rncld Item 2.4.3
All items specified in the specification and "Scope of work" Ineld ttem 2.4.3 lneld Item 2.4.3 lncld Item 2.4.3 Ineld Item 2.4.3 Ineld Item 2.4.3
Ineld Item 2.4.3
and other accessories required for system operation.
....~ <::~e.~i~<:llye.<:lt~e.~te.qu.i!''.''ent
~
tJt t Sch1.2-S
Jl~~
P JU SOFIFI (2 X 3 MW)
BOOKIV PARTS FORMS AND SCHEDULES
Schedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
.I
l'RAN~~~~fATidN
MARINE FREIGHT
. _~ I EX· WORK &
ITEM Ul:;w,""",r
NO. ,T:": dAy,.,·· . I . (8): •
4
········:::r Incld Item 2.5 Incld lIem 2.5 lncld uem 2.5 IncrdItem 2.5 lneld Item 2.5
5 .................+ ..........
Incld item z.s
lr cld Item 2.5
Ineld ttern 2.5
meld Ilem 2.5
lncrd Item 2.5
mcro Item 2.5
Ineld Item 2.5
meld Item 2.5
tncld Item 2.5
Ineld Item 2.5
............... .. ,....... .. 1,
. ...... , .
lncld Item 25 Ineld Hem2.5 Ineld Item 2.5 tncto hem 2.5 Incld Item 2.5
..., , ..
lnc.d Item 2.5 Ineld Item 2.5 Ineld lIem 2.5 Ineld Item 2.5 tncld lIem 2.5
!ncld Item 2.5 Ineld Item 2.5 Ineld lIem 2.5 fncld uem 2.5 Ineld Item 2.5
..
" ..
Ineld Item 2.5 Ineld Item 2.5 lnclo Item 2.5 lncrd Item 2.5 fncrd Item 2.5
....... , , , ..
Incld lte1\l2.5 lneld Item 2.5 Incld Item 2.5 Ineld Item 2.5 Ineld lIem 2.5
............................ .. , ..
nem 2.5
·.~~i1E::·~::I . . :; ;: ::::;:
tnctd Item 2.5 lneld Item 2.5 rneld
...~:.g~.I~?():..h..y.~r.13.~.t..... ...
In:::ld ltem 2.6 Incld Item 2.6 lnclo Item 2.6 tnctd lIem 2.6 Ineld Item 2.6
. ":::.. :r 1:1" . ·. ·
lncld Item 2.6 Ineld lIer:;"2'.6'T ......, Ineld Item 2.6
..:~::~;i~~'.d.iii.r;:i.;~s.~.Y.'a.i~ip~~p....
lncld Item 2.6 lneld Hem 2.6
..............................
. Il.:.l?i".~tl.I~~~iD.tl..fr".~h.~~t"..'.p.~rl1p. .
·i~~::::::::~.:r ........I
. :::1:::::: '::r' ::':::1
·1 · \
5 Foam system' . .
.1.~::~~ ~~~.'l~ ..~.~..J l Ineld Hem2.6 meld Item 2.6 Inerd Hem 2.6 lneld Item 2.6
lncln lIem 2,6 Incld Item 2.6 Ineld Ilem 2.6 lncld lIem 26 Ineld Item 2.6
n."
········a:Aj;foamco~c~ni;aieiank
"
. .1.r.~~~~..~~~..I~ ..~..~.. J...., ...... ~. tnctd lIem 2.6 lncld Item 2.6 lneld Item 2.6 lncld Item 2.6
b. Air foam concentrate injection system tncld llem 2.6 lncld lIem 2.6 Ineld lIem 2.6 Ineld Item 2.6 lnctd Item 2.6
~ ······:.~i~::~1~]it~~l~1j~~jifz~~h( .
lncld Item 2.6
lnctd Item 2.6
Ineld lIem 2.6
lncld Item 2.6
Ineld Item 2.6
lneld Item 2.6
Inctd Item 2.6
Ineld Item 2.6
Ineld lIem 2.6
'neld lIem 2.6
I
~W%:~?~~~~;f;~:~~l~:~ito~~~d¢~~t!~16: . .
Ineld Item 2.6\
····..IncldItem.. 2:6· ... . ....... ....
I
.::::L ...
B ·••·•·•• tnctd ltem 2.6 Ineld Item 2.6 Ineld lIem 2.6 Incld lIem 2.6
/!-ct
BOOKIV PART S FORMS AND SCHEDULES
Schedule
1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
TOTAL
FOB EX· WORK
ITEM DESCRIPTION
NO. (B)
~~clrel!i! Loeat
'(}:(IJ80) . (lOR).
i f ' _ " ""
10
Including all items specified in the specification and "Scope of Inctd Item 2.6 lncld Item 2.6
work" and other accessories required for system operation. Incld Item 2.6 Incld item 2.6 Ineld Item 2.6
Incld lle1ll2.1 lneld Item 2.7 Ineld Item 2.7 Ineld Item 2.7 Incld Item 2.7
.........., ·········1···············
······:t.:::·:.~i!l.i~~;;0.~:6~~~s~?ij~~::::::::::::::·::::::::::: 1.....1 Ineld Item ~ 7 lneld lIem 2.7 Ineld Item 2.7
B All items specified in the specification and "scope of work" and Incld llerLl2.7 Ineld lIem 2.7 Ineld ttem 2.7 Ineld Item 2.7 Ineld Item 2.7
......... gt~~c.r.~ql!ir.~~.f'!r..~y~.t~mc:>p~['l.tigD.... .
t.::~~~~~s~o~~:~~i~1~~~W.t.I~tf!.~~;;;~~;;ti~i~~~~~~~~e.ri.~.I~:
Incld ttem 2.8 Ineld uem 2.8 tncld Item 2.8
................................ ..
Ineld Item 2.8 Ineld Item 2.8
............................................. , .
... · · · + 1 [ncld ttem 2.8 Ineld Item 2.8 lneld Item 2.8 Ineld Item 2.8
.............................
trJeld Item 2.8
Incld lIell! 2.8 tncld Item 2.8 Ineld Item 2.8 Ineld lIem 2.8 Ineld Item 2.8
.: . r;~f~~~ttlY.~!;i~~~::::..:·
1 lncld uem 2.10 Inctd Item 2.10 lneld lIem 2.10 lneld Item 2.10
1 Ineld Item 2.10 Ineld Item 2.10 Ineld Item 2.10 tncld Item 2,10 Ineld Item 2.10
[ncld Item 2.10 Ineld lIem 2.10 Ineld Item 2.10 Ineld Item 2.10 Ineld Item 2.10
·mm.
tnctd t1em2.10 tnctd Item 2.10 Ineld Item 210 Ineld Item 2.10 Ineld uem 2.10
:~;itl§~l~~t;~a~ti~~:;:::.:
Incld lIem 2.10 lneld lIem 2.10 lneld Hem 2.10 Incld Hem 2.10 lneld Item 2.10
Ineld Ilem 2.10
::.:::.. 2···::·:::. Ineld Item 2.10 Ineld Item 2.10 tnctd lIem 2.10 lneld Item 2.10
1 Incld Item 2.10 lneld Item 2.10 Incld Item 2.10 Ineld Item 2.10 Ineld Item 2.10
1J··
,·~: • :··::.~~.~~~J~ete.te.r.
lncld Item 2.10 Ineld Item 2.10 tnctd Item 2,10 lneld Item 2.10 Ineld Item 2.10
:::: . 1 lnctd Item 2.10 Ineld Item 2.10 Inctd Item 2.10 \neld ltem2.10 Ineld lIem 2.10
5. Muffle furnace 1 Ineld Item 2.10 Ineld Item 2.10 Ineld Item 2,10 [nerd item 2.10 Ineld Item 2.10
6. Digital balance 1 Incld Item 2.10 Ineld Item 2.10 rnctd ltern 2.10 Ineld Item 2.10 lneld Item 2.10
7. . Top·ioadingeiectrical balance 1 tnctd ltem 2.10 tnctd Item 210 rneld Item 2.10 [neld Item 2,10 tnclo Item 2.10
8.··· ·Electrlcaiwaieri)aii1······················ Inerd Item 2.10 Ineld Item 2.10 tnctd Item 2.10 fncrd Ilem 2.10 lncld nern 2.10
t.rt t A;::-~;r
Sch 1.2 - 7
BOOK IV PART S FORMS AND SCHEDULES
Schedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDUL.E
MECHANICAL
MARINE FREIGHT
FOB EX-WORK &
ITEM DESCRIPTION QTY INSURll,NCE •
NO. (A) (B) (e)
Local . Foreign.
F"?relg~.(IJSD)
(lOR) (USD)
9. Electrical refrigerator Ineld ttern 2.10 tneld Item 2.10 Ilncld Item 2.10 Ineld Item 2.10
10: . shaker····· ···········1·..·
:~::~:.:lij:~:)~::::: .~:~~;:·::~~;:ii.~:.·················,~~,d·".m
Ineld Item 2.10
;·~;:::i::~;~T·· :~::::i:~'};ci
lnctd Ilem2.10 Ineld Item 2.10 Ineld lIem 2.10
14·:i~~i~9:~~i:;n:i~~::~:~~~~~~~r.Y~ixt~r.e.~:· ....1 . ..1 Ineld Item 2.10 Ineld Item 2.10 Ineld Item 2.10
15. Jar tester Ineld Item 7..10 Ineld Item 2.10 tnctd Item 2. 'i 0 tnctd Item 2.10 lncld Item 2.10
·......i~~id·ii~~ ..2.10
•• H ••••••••••••••••••••••••••
······2:Siieciiicgra~iiyh;;d;o;;;eter·
tnctd He012.10 Ineld Item 2.10 lncld Item 2.10 Ineld Item 2.10 Ineld Item 2.10
·i·;iiscosiiyappariii~s···············
Ineld nern 2.10 lneld lIem2.10 Ineld Item 2.10 Ineld lIem 2.10 lncld ttem 2.10
·6:waie·r·conienismeas~ringapiiarat~s····
: ~ : : :~: ;:1~:1: · · · · · · · i~ :; ::::i.i~
Incld ltern 2.10 lncrd Item 2.10 Inetd nem 2.10
Ineld Item2.10
tneld lIem 2.10
lneld Item 2.10
·:·~~:~:·i::·:}~~·l . ·.·.·:·~~i:·:i::·}·~~·{·
Electric regrigerator
:~::: :::: ~::~
9. \neld nern 2.10 Ineld Ilem 2.10
......... .. ..
:~::::::t:~:in:::.::~~:i::if~:in:::::::::::::~::: ::::~ii
ii·:··Muiilei~·mace·
lncld jtem 2.10 Ineld lIem 2.10
.........................."... . . ............ ···I···J
i4:Suii~rco;;ienieq~ip·me;;t········ tncld ltem2.10 tnctd jtern 2.10 rncrd Item 2.10 Ineld Item 2.10
............................
::::ttt~:~~~;t:i~:~"::.~~~t~i~~~t:o~;.te.r:::
tncld lIe:m2.10 Ineld lIem 2.10 tncld Item 2.10 Ineld Item 2.10 tncrd Item 2.10
Ineld Item 2.10 lncld Item 2.10 I I Ineld Hem 2.10 Ineld Item 2.10 Incld ltem 2.10
4
5. Compressor
.... lncrd Item 2.10
tnctd Item 2.10 :~;:::::~}:H::::::··:r:· :~::: :::~ ~:~ Ineld lIem 2.10
......................
. •~·.:~t.~f~~:.t.~~~:.t~~~afi~.iip.p.a..ra.1U.i::····
Ineld Item 2.10 lneld Item 2.10 Ineld lIem 2.10 lncld Item 2.10 Ineld llem 2.10
\.. . J
1. NOx SOx 0, analyzer Jneld Hem 2.10 Incld Item 2.10 tnctd lIem 2.10 lnctd nem 2.10 lneld Item 2.10
I:~~s(:;n:e.;;~~r.iiie.q~ip.ri1e.6t:.........
·i::·~~it~t11r~~~;i~~~tfs~~;r~j~l~~·)·ii~;;)······
tncrd Item 2.10 tnt-ld Item 2.10 Ineld Item 2.10 Ineld lIem 2.10 lnctd Item 2.10
tncld Ite1ll2.10 lncld lten12.10 lnctd Hem 2.10 tneld Item 2.10 Incld Item 2.10
.
~··::::::~~~t~lt~~f~~~t:~~~:·:························ . Ineld Ilen1 2.10
Incld lteru 2.10
Ineld Item 2.10
tncld Item 2.10
tncld ltem 2.10
lneld Item 2.10
lneld Item 2.10
Ineld Item 2.10
lneld Item 2.10
tncld lIem 2.10
19 :~~~~t~'~~W:~~;lt:.~:~~~~~;;t:t:::····
Ineld tteru 2.10 Ineld Ilem 2.10 lnctd lIern 2.10 Ine]d Item 2.10 Ineld Hem 2.10
tnctd Item 2.10 tncld ltem 2.10 tncld Item 2.10 jnctd nem 2.10 l!1cld Item 2.10
0 : lnctd lIem2.10 Ineld Item 7.10 tncld Item 2.10 Incld Ilem 2.10 Ineld Item 2.10
~
tl t Sch 1.2 - 8
r-rf
PLTU SOFlFtx 3 MW)
BOOK IV PART 5 FORMS AND SCHEDULES
Schedule 1.2 Detailed PriceSchedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
PL TLJ SOFIFI (2 x 3 MW)
.2·1.1 c.:8~§~iN.~±i§~:~:{~±~~::.
1 2 x 100% NaOCIdosing Pumps
.. .....)~::~i~l
Incld nom 2.11
J,()~s.
Ineld Item 2.11
....... 23,768.,~!~....
tncrdItem 2.11
2.~,2~.~,~~?J
lnctd Item 2.11
...........
4.YJ.50
Ineld Item 2.11
...............50,066,741
.. Incld lIem2.11
.
........... . _..
s.~,g~~ .~~,9.,0(),!~? .•..... ... ~~,.~!.S.,,!~.1 ... ~.a..'.~~?,s..o..s.
..... ··i ..···ConiroiRoo·ma·ndS\ea;nT·~·;bine Building VAC 2 Incld Item 2.12 mcto Item 2.12
tncre Item 2.12
.~~~!~. ~~~.~ . ~:.~?J ~~~I~..~~.~~..~:.~.~.
:::::··:~::::::.::~:~:~tt.~~~t~~~~f:~~ff:8.;~:~:;:·:::::::::::::::::::: , .,.........
2 tnctd Item 2 12
lncld Item 2.12 lncld Item 2.12 Ineld lIem 2.12 Jneld Item 2.12
........... . .
4
_8
Ventilation Systemof Work Shop and Air ConditionSystem
.::::: ,• 1 , Ineld Item 2 12 it Incld Item 2.12 Ineld lIem 2.12 Ineld llem.. 2:·12·1......· ·..........lncldHem 2.12
2 Inctd lteru 2 12 lneld Item 2.12 lnctd Item 2.12 Ineldltem2.12 I Ineldllem2.12
...............f9.r..~.Clr..~~.~.Clp.gfliS~ ..~.~~r.!lb.Cl~~~.~ ..I.~t>.9.r.~.t9.!Y... . . .
Y· ..:·:: y~¢.§y~i~~:i;;i·~6~r.~:e.n.?y::i:ii~.s."I~,,~"r.~t.ClrF.lC)C)n.! . 1
Incld nern 2 12
Incld Hem2.12 Ineld Item 2.12 lnerd Item 2.12 lneld Item 2.12
8 VAC systemfor Coal rlandling Electric Room (If Applicable) 2 lncld Item 2.12 Inctd lIem 2.12 Ineld Item 2.12 lnctd Item 2.12 Inetd Item 2.12
. ~···:~~~I;f;~>.~ior~I~:~·~
.
. ~I:~~:a.::~il:::~~~raiioii::~~~~::<,I'.:···
IJ~~.t.9r ~.':'it~~y..~.r~ ..~.Clntr..ClI..~.~i:~·--
todd lien I 2.12 lnctd Item 2.12 Ineld Item 2.12 Ineld Item 2.12 Ineld Item 2.12
tncrdItem 2.12
10 Ull.!~..... . 1.... 2
lnctd Item 2.12 Ineld Item 2.12
lnctu ltem 2.12 lncld Item 2.12
....... .. ..
,_!~r;~~;:::;;\f:~,; 'C";.",i"~;~;"
2.13
NA
NA
NA
NA
NA
NAJ
NA
NA
....,
NA
NA
...........,
NA
NA
NA
NA 'NA
NA NA
NA
NA
NA
NA
NA
~ ~W)
fJ t Sch 1.2 - 9
/:-~
PLTU SOFIFI (2
BOOK IV PART 5 FORMS AND SCHEDULES
Schedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
PL TU SOFIFI (2 x 3 MW)
3
Allitems specified in the specification and "Scope of work" NA NA NA NA w, NA ~'A NA NA NA NA NA
and other accessories required for system operation.
.?:~.4 §~:~~~IFiji~±::::::.:::
1 Turbine Room Overhead Crane
::""::........ . ..1
1 ·. ·::·$.~;~~r 3,923..........
35,392,9.~~ ...
....... ···.. ··..··1 ······················.. i·~~id··ii~·~·i;·4··
Boiler Feed Pumps Incld Item 2.14 tncld Item 2.14 Ineld uem2.14 Ineld lIem 2.14 lnctd lIem 2.14 lncld Item
................................................................
2.14
Incld Item 2.14 'nerd Item 2.14 Ineld Item 2.14 Ineld lIem 2.14 Ineld ltem 2.14 Ineld lIem 2.14
:; ........Incld.......................•..
"
Item2.14
.
..............•.... ..................•................•... Ineld Item 2.14
Incld ttem 2.14
.................................
Ineld Hem 2.14 tnctd Item 2.14 lncld uem 2.14
······.!l~j~it~ii~~~&f;;i"~f~[~.~~····::~~f\t ..
Incld Item 2.14 Ineld Item 2.14 lnctd lIem 2.14 lnctd Item 2.14 Ineld Item 2.14
. lneld Item 2.14
, .
. ·::t~:::\j~tTn::F:::::~:·::I:::: . : :.:. ::r:: .: • ·:.::::::~~:i.:ii.~~}H::: .•:.•:.:.: : : .• : :.: .., .. lnctdltem 2.14 Ineld Item 2.14 lncld lIem 2.14
. j . j~~~~~;I:~:I~ii~~i~t~:ti~.~:.:::::.....:::.;...
...... ...! ...... !~,~~~ ..l~~~..~:.~.~ ......................
lncld Item 2.14 ....·· · ··..·.. ·..··1···· ,
tncld lIe1'J'l2.14
..
Ineld Item 2.14
....., Jneld ltem 2.14
.
I 1 tnctd Item 214 Incld Item 2.14 Ineld Item 2.14 Ineld Hem 2.14 Ineld ltern 2.14
md Control (.) I 1
... : Incld Item 2.14. -
Ineld Item 2.14 Ineld Item 2.14
.............................·1 ..· ••.. ·
Ineld lIem 2.14
.
8
Allitems specified in the specification and "Scope of work" Incld Item 2.14 lnctd Item 2.14 Incrd Item 2.14 lncld Ilem 2.14 Inctd lIem 2.14 lncld Item 2.14
and other accessories required for system operation.
10 Chain Block with Gear trolley Inrld Iten12.15 Incld ltem 2.15 lnctd Item 2.15 mctoItem 2.15
".~''''i't~r:7········ .
11" AiiAssociaiedinsi;~meniaiioriand Control ('j InchJ uem 2 15
tncrd lIem2 15
Sch 1.2 - 10
tecto Item
lneld Hem 2.15
2.~5 tncld lIem 2.15
In.-:ld Item 2.15
~
lneld lIem 2.15
Inerd Item 2.15
/-et-rJ
BOOKIV PART S FORMS AND SCHEDULES
Schedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
PLTU SOFIFI (2 x 3 MW)
ITEM
NO.
14
Allitems specified in the specification and "Scope of work" Ineld Item 7.. IS lneld lIem 2.15 lneld Item 2.15
and other accessories required for system operation.
3....:::g~~~~~i~r.:ii.?:~~i~~~:c.~~h:.:::::::::·· Incld Item 2.16 lncld Item 2.16 Ineld lIem 2.16 lncld Item 2.16 Ineld Item 2.16
4 Fork Lift lncld
.... Item 2.16
. . Ineld Item 2.16 Ineld Item 2.16 Ineld Item 2.16 Ineld Item 2.16
?..::::·fir.~::i;Y~i.e.i::tiii.Ck
8 Track Loader
. ~~:~~~~(~~~::~::~:~I
lncld Item 2,16
. lnctd Item 2.16
lncld Item 2.16
meld Item 2.16
rnctd ltem 2.16
Inctd Item 2.16
Ineld ':em 2.16
lnctd Item 2.16
lncld Item 2.16
9 Allitems specified in the specification and "Scope of work" lncld Item 2.16 incieaem z.rs Ineld lIem 2.16 tnctd Item 2.16 lncld lIem 2.16
and other accessories required for system operation.
..
:·:::::·$~~si~~~~;~~::· 2
2 ....... 1
lncld Item 2.17
Inc\d Ilem 2.17
Ineld Item 2.17
Ineld Item 2.17
lneld lIem 2.17
fnctd Item 2.1"1
Ineld Item 2.17
·.. i'~~id'·ii~·~·2:17··~···· ..·······
lncfd Item 2.17
. . . ..
·..· · ·.. ·" -
r::::~;.~~~~~~*~nJ.~~~;~;
Ineld Ilem 2.17 fncld Item 2.17 lncld Item 2.~7 Ineld Item 2.17 incto lIem 2.17 \neld Item 2.17 Incld Item 2.17
... " . ............ J. ..
. .. .
Inelll Item 2.17 lncld Item 2.17 Ineld Item 2.17 Ineld Item 2.17 tnctd uem 2.17 lneld Item 2.17 Incld Item 2.17
9 Other items and accessories required for system operator Incld lIem 2_17 tnctd Item 2.17 tnclrt Item 2.17 Ineld Item 2.17 Ineld Item 2.17 tnctd Ilem 2.17 Inetd Item 2.17
2.18 IFUEL OIL·SYSTEM(lncl. Tank) 13.248 7,488,6~9. ..... ~~~!~g~!9.?~.L !.3,.2..~.~. 1.2. 1.:~~!.,.S.~.2 .
j:- i1~1~'~~~:~~"··"
lncld Item 2.18 Incld Item 2.18 lnclu Item /..18 lnclo Item 2.18 Indd Item 2.18
lncld nem 2.18 lnctd Item 2.18 Ineld Item 2.1 8 Incld Item 2.18 Ineld Item 2.18
4 ······H·si)6iiTransferSystem
lnctd lIem2.18
lneld Item 2.18 ijt:f::::T::!:j'
.............................
I
';~~;"'I;:~;;;l
lneld Item 2.18 lneld Item 2.18
lncrd Item 2.18
Incld Item 2.18
Inclc ltem 2.18
::~,~~~~~~j~t::t~;r~~
tncld lterTl4.18 lncld Item 2.18 tnctd Item 2.18 rnclc Item 2.18 lnctd lIem 2.18
................................. . J ..
Ineld Item 2.18 Ineld lIem 2.1 8 I ····.;.~~id··ii~~·2.18 Jneld Ilem 2.18 tnctc lIem 2.18
............................. .
1.···
7 AilAssociiitedinsirumentation and Control n lnctd nem 2.18 Ineld Hem 2.18 I In~jd·ii~·;;;·2.18 rneld Item 2_18 Jneld uem 2.18
8 ,Mi~~~i(~;;~:;;~~l;\io.i~~:.································· . lncld ltern 2.18
..............................
I ...
I
· .. +.. · ·Inerd
·..· Item 2
1
ucto Item 2.18 lncto Item 2.18
··················a
...... · ·.·. . ·. . . ··
········~~~'O?_;r
t~ I
Sch 1.2 - 11
·~;
. MA~INE FREIGHT '1- "; ."I~cliND .:': i ERECTION AND COMMISIONING I TOTAL
E;:- WORK &, TRANS~ibRTATi()N INCLUDING ERECTION
iIT~MI····· _ I ,..--...... _- I _ '1 INSURANCE
(El
I NOi '. -,
._.. 'n_.
(F=A+B+C+D+E)
~~':.- ,,':",,:::-:1.-., "~. ~.... __t__ I I I . . I I I
.J:;59";·1~§ii;M~1.;~E.~~~~,·N.!3.I(.~'f~·~"··. ': ·S, ., ., . :.i,::i :.:.~ ..•.:. i;::~.i,,1.§~~:fli:~~~; : .: '::::~~;;.8~f~j~:: . . · ·.. : :-ii~;.1~s.i~~~·
··SubiTiergedScrlippei·c·oiiii;;yor·oi'Dragchai'iicon·iieyorwiiii ··1····· 2 Ineld Item 2.~9 tncld Item 2.19 Incld Item 2.19 lncld Item 2.19 lncfd lIem 2.19 Indd Hem 2.19
ash cooler
. . ;. ::J~i:ttfi:~~~1~s~;=e~t.~\~~: ......,::,:::::::::, .
1 Ineld lIem 2.19 Incld Item 2.19 lncld Item 2.19 tncld ltem 2.19 Ineld Item 2.19 lnctd Item 2_19
md ~ontrnl ,I<, ····..·.. 1 1 ........................ . .
Ineld Item 2.19 Ineld Item 2.19 Incld Item 2.19 Ineld lIem 2.191 Ineld ttem 2_19
........... 1 ·
. . ..
1 1 Ineld Item 2.19 lneld Item 2.19 Ineld lIem 2.19 Ineld Item 2.19 Ineld Item 2.19
"i.19A··FLY"AS·HHANDLiNG SYSTEM .
:t il!;~'~~I~--::::_:;:-::::---?;- T,,:::::
5 Piping and ValveWith Pipe Support. Insulation andLagging 1
lncld Item 2.19A
Ineld Item 2.19A
_l--~~ii)~~~7~~r:g~~'ii';::::::
··1· .
lncld Uem 2.19A lncld l1em 2.19A Inctd Item 2.19A lncld Item 2.19A
Indd Item 2_19A lneld Item 2.19A lncld !Iem 2_19A Ineld Item 2.19A Incld Item 2.19A Inctd lIem 2.19A
........ ·..·4....
. ..
Ineld Ilem2.19A lncld Item ?.19A
Ineld lIem 2.19A lneld Item 2.19A
...................................... ..tncld Item 2.19A rneld Item 2.19A
,.
Ineld .tem 2.19A Ineld Item 2.19A Ineld Hem 2.19A
I· + Ineld item 2.19A
. . Indd Item 2.19A Incld lIem 2.19A
m'2:~O:·1~;fu~~~¢~f~e.4:~~1~~~tl.;~~i1.t:t~':I:: .
........... " " .
1 VacuumExhauster
NA
·2::~r.iil1~,:y§~e~;~i;;r·:············· . ···m:::::... . NA
3 SecondarySeparator
NA
.~::::::q~~iIii~~r.:::.:.::::::·:
5 Control & Instrument
::···:::: '.m.'
NA
NA
···6::~fp.i~Q:.;,:~i~~:}iiiin.Q::r.ub.b.~r.e:ip~~~~9u.i~k~o.~pli~9::: • ... NA
lneld Sch.
Ineld Sch. 1.1 Ineld s.n, 1.1 Ineld sen. 1.1 lncrd Seh. 1.1 tnctd Seh. 1.1 lncld Sen. 1.1 Ineld Seh. 1.1 meld sen. 1.1
2.21 ISTUDIES I CALCULATION Lot Item 7 neru 7
1.1
Item 7 Item 7 'tern 7 Item 7 Item 7 Item 7
, • ·, . . • . . ~ • • .. • m 1. Item 7
The studles/calculatlon required to be performed as stipulated 1
i~JI99k..I.U:l!'.rt'U>.~c.t,i,()nA,.? .
I I I I 2.972,451
I I 2,112,454
I I 198,285
I I - I
3,015,000,000
I I
4,500,000,000
I I I
Sub Total 5,283,190 7.515,000,000
f~
t~ r Sch 1.2· 12
"j
/ ' PLTU SOFIFI (2 X3 MW)
/"'--~
BOOKIV PART 5 FORMS AND SCHEDULES
Schedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAIL PRICE SCHEDULE
ELECTRICAL & IC
PL TU SOFIFI (2 x 3 MW)
-"T,--------------...,...,---r-,------...,...,- -
1"', I
lNI AND.
I ~ANSPOR~T~AT:::I~O':':N-.
; DESCRIPTION
FOB EX-WORK
B <A-::;'~
>< "
<,,':r{:,::(-·-" )Fni'-~
.~ Local
Foreign (USO) Foreign (US!))
(lOR)
040 ':'7t:l I
1.., L. 1. _ 1. 1 1. -1 ..
111.1 ..~"..'!'.p.I.II.!.II ..~.O'.I1:~r..a.!~r. ..a..~~ .. ~a..I.I1.Q~!.e.~tll,)!.a.!~~ ~~:::I.~~ ..~.;;.1 ~~.!~.:..~..1.... . . : l ,.. ~.~!.~.:,':: ..+." ; :.;.;.+•.•.;.:::,i.:.;;;.;;-,;;.,+.,.;::·.,.:,:.,7..!:::..•..::.!~~:::.;.I.."._•.:.;;;.".::.,.; j
:.;.;.'::.7.;7.!.:::~~!,~~:::..j-;;..,,::.: ;..·..::;;.7..~.7..!.:..7..::4,,:.;;:;;.;:~~~.7.:·.:::~~!.~~:::;.
Aft
, , : 1
........ "Generetor"'compiete"wii'h excitaiion:' cooiing, auxiiiary,'
El.9.LJIPT I}L................................... __ .
necessary control, metering and protection and LS 191.864 95,577,375 202.664,2113 191.864 298,241,658
··7...... 1~~~i~~~iti~i"e::rt=:-~·era·ior
..compiele ..;;;ith ..nece'ss';;;;; .....
8
Batteries, battery chargers and DC distribution panels
complete with necessary control, metering ar.d 1 Lol 36,415 18,140.228 34,400.989 36,415 52,541.216
9·1~~~~;~:~~~~\;;~:~!f.~i~~:.~~~~:~~~:s..:::~c.~~:u.'~~:~~
10 Grounding and lightning protection system complete.
1 Lot
1 L.ot
198.140
.1. 6:S.g.~ .•
98,704.183 187,181.855 198,140 285,886,038
...8.:.?2!.:.S.?~. ,
!.5.S.9.1:?~5. J,~.~id.,i~;;;.ii:.~'f;.~+i~~id.';:~.'i~1i;:S.9.
'2"·L·lghting·a·nCi·smai:·power"instaliai'ion·com·piele. .
1'3
1 Lot
12:.284 61,414,489 116,465.964 j J 177,880,453 123,284
CommunlcaiiCin'systemscompiete 1 Lot
..... ~.4:2.62 ..L. j~:~i2.J6.!I·····
....'4 . Cl'oseCiCl';cuii"fVsysiem'equip'menlcompieie 1 Lot IncldItem 1t1.2 13 ~g:?0?'E'.?8i~~idli~;;;,if~'fy·h~~idii:!.'·iii~9.;:9S...
1'5" Power p'i~~i Metering and protection";;~nels complete.
, ;.;. . . J:I::::;:~:;.i:;i;:ii~;;.:l·::·::::.::: . :·::·::j:::::·::::2.i.:;·;;::;;;#H::·:":::::::::::::i:i.:;~;:f~;;J . :::J":i:;~~;';;'~;;'~~;:
2 Lot 19.827 6C!,OOO 4,677
·•. lii~·3·:· :'C();;;ptete'p;:;;;;"T;~'~si;:;;~;';:;;"""""""'"'''''''''''''''''''''''''''''' : · ·..304;70·8·· : .
101,371.865 182,240.825 203,496 283.612,690
ELECTRICAL & IC
. . . ;;;...... ; -"J~
.' .... '. . LOCal';; . .
8
l\9(elgN~~p,l 'JI~~l.·.fOrl!.I~'1)(P~P).
1 I.ot
Incld Seh. 1 1 lncld sen. 1.1 lncld Seh. 1.1 Ineld Seh. 1.1 lncld Seh. 1.1 Incld Seh. 1.1
Item? Item? Item? Item? Item? Item?
'.1,5$2,195 1" (; ;;;i~j~iimplipJ~; '[;'~;~~9;ip~;(i6~. ...'..,,,. Mil <'i:·2;~~g;1q5;66t!
A &{;
/
JOJJa le:>llew4JIJ"
,-------------------------------
I
BOOK IV PAR TS
I FORMS ANDSCHEDU ES
chedule Ll Summary Price Sched ule
PL TU SOFIFI (2 X 3 MW)
Local
Foreign Foreign Local Foreign Local Foreign Local Foreign Local Fcregn L<>eal
mAl
-- '--.- ---- ----_. -- .. _--- ---------- - - f - - - - - - f - - - - - - - - - - - -- -
COAL FIRED STEAM POWER PLANT
,-_.-
-_._- _.
---- - - - - -._---- ----- - - - - - - ; ; ; ; - ---- f-----.--
--,- -- ~-- ----- I
I CIVIL WORKS AND STRUCTURAL WORKS -_.
1--'--"-- _~~73,50!.~~ ---- 43,973~~
1 Civil and Structural Works inclu~ling works _ _ lS- ,-_ 1 --_.--=-
f--'--'--=- ~~7.~!.~~?. ------_:... -----=- ---= I---.--= _.--------
- - 43,973,548,445
----
---~.- 1--'-':'"
-_.- - - - - -----=:-;;-- - - - f----=-:._-- - - - - - f---.-- - - - - f-------~=_=_-
-II- I-- __Complete
MEC~~CAL W9RKS r-r-r--: ._---- 2,972,4~ 1-__ ~~1_2,45~
------ 198,285 3,015,000,000
4,500,00_0,000 5,~83,190 7,515,000,000
2
1
Untt1 &2
Steam Generator with Auxiliary
Lot
Lot
._-- 2
2 1,121,761
- - -
1,.122,829
-
-
--
74,981
r-'-'
-
-
797,738,395
676,454,986
-
-_.
1,482,305,225
898,487,526
I
1of22.829
L
1,r 96,741
2,280,043,620
1,574,942,512
~-
~ujQ!!!!!.ntUru~ ._-- -- f---.
Co",!,lete Balance of Plant
- 4 ~-C~J.t!~~.I!!!a.§Yste"!....":'_ _____._ _ _
Loi 2 1,406,507
-----= 'e76,377 93,614 1,265,462,645 1,631,004,701 2, -;6,499 2,896,467,348
332,357,560 -
'-
.
f--
-
- - --=- _._----_.__._-= r-
-~O,OOO
~(O,OOO 2,132,357 ,5S.~
332,357,580
2 Mandatory Spare Parts per Schedule 1.4
_.
L::;,_ _ 1 -
-
- _....3(;0"]00 - - - - - - - - , - - f---- - . ._------_.
- ~OO,OOO
---
1----":' ~- ~------
!?.£bedule 1 .0:
LS 1 - - f - -100,000 - - - ~oo,ooo -
---
4 Consumables Sch~~le 1.6 LS
r-=.-. 1
---- • 1~
-- · ..:.._ _...:... -_._._----_.:.. - C-o,Ooo.
5 Engineering Design Review and Manufacture & Shop
Test Ins~onJ1!l.u;chedule 1.7
LS 1 150,000 · - . .:0,000 -
- - - - I-- - -
6 Plant Inspection and Test prior to Final Acceplanca L8 1 - 900,000,000 · I---- - - - 900,000,000
----y-
-- Calculation and Studies Performed by Contractor
'----.-
_1.,,8_
--,- ---- ----- -:.-=-==-
=So,O.9Q.. _ _900,OQ,O,ooo
----
- - t:O,OOO 900!.~
-
o
VI PPN (Value Added Taxes) of Item V 351,978 - 439,465 4,610,590,602 23,677 409,500,000 . 636,910,666 !tf5,120 5.657,001,269
Total Prices InclUding VAT (Item No. V + VI) to be
VII
Carled Over to Bid Letter
3,871,753 - 4,834,114 50,716,496,627 260,452 . 4,504,500,000 - 7,006,017,328 8;ilaB,320 62,227,013,955
.;',~ ".
1,394.n3,317 1,394,n3.317
265,561.145 265.561,145
1,246,982,767 1,246,982,767
461,845,469 .. , , , 461,845,469
103.915,231 103,915.231
103.915.231 103.915.231
5n,306,636 sn,306,836
3,764,040,573 3,764,040,573
3,764.040,573 3,764,040,573
1 I I I 1,131,521,399 1,131,521,399
........ / ··· ·· 1 · · ..· / ..·.. · ·· ·..1 · .
i 1 I 1 I I 1,131,521,399 1,131.521,399
438,753,196 438,753,196
438,753.196 438.753.196
CIVIL WORKS
PLTU SOFIFI (2 X 3) MW
I1.2
INLAND ERECTION AND COMMISIONING
FOB EX-WORK TOTAL
TRAN~;PORTArION INCLUDING ERECTION
ITEM NO
DESCRIPTION CIVIL WORKS UNIT QTY INSURANCE
(A) (B) (D) IE)
F=A+B+C+D+E)
2,301,145,050 2,301,145,050
5
STACK
..............................
..................................................... .........................
.. ..................................
........................._.................
..........................................................
· ......._...................._..................._..
....
··········Th~····wo;:k~ ~hai·i ·"inci~de····bUi . ·..;;·c;t"···ii;:n~ed· ..·lo···ii·u·~···ii·n~~: ~
foundation (exclude piling works), structural works and all LS 1 2,301 :i 45,050 .. .. 2,301,145,050
realted civil work required and as directed by the Owner
.. "., ....... ,..... ,.... .........................................................................................................................................................
.................... ...................
................................ ............
.. .................
..................................................... ..........................
......................................
.................. ......................
. ......................................_...................
~ · ...·•__••·M.·•••__.·_ ....................
6
PARTICULATE EXTRACTION
··········Th~····wo;:k····shaii····i~ciude····b~i· . ·;;oi····ii;:nlted·····io··foundalion ...............................
103,915,231
.................................................. ...........................
......................................
................. ......... ...............
...... ,.................................................... :::~::::::~:::] · ............... .-
103,915,231
........ " ...........................
(exclude piling works) and all related civil works required LS 1 103,915,231 .. .. 103,915,231
........................ ..........~.!!cl..~~..cl.!r.~.~~ ..I:ly...!.~.e...9.w.!:l.e.r...~.~..!?!:l..~9!!!~I ..~.i.te.......................
....................
...................
.................... .......... ..................
...................
....................................................
.........................
...................................... ...........................................
......................................................... ................- .. _...............-............ _...-.. _...__.
7
........................
COOLING WATERWAY
...................................................... 3,278,640,985 _ 3,278,640,985
,.............................. _................................................................
...................... ............ .....
................................
.................
.....................
..................................................... ...........................
...................................... ..............................._...•... _...
........................................................... ............. .. · .......................................................
The work shall include but not limited to foundation and all
........................
.........................._............................................................................................................................
...................... ...................
............................
..................
...................
..................................................... ...................... ...
......................................
........................._..................
...........................................................
................_.. · ..............................._............_......
.............•.....-288,653,418
A
CWINTAKE
.........
~ ............................................................................................................. ,............................
.......~~.:.......
1 ................................
................................
......................................
.............................................
...........................................................
· ............ ....._28B,653,418
~ .................... _.....-...
B
1 431,363,668
CW_..SETLING
......... POND
,......................................................................................................... ...,.........................
-
LS ..... ,..........................
..................................................... ........................... ..........................._
......... .............................................
...........................................................
~ _........................_...
· ............ .........431,363,668
C CW PUMP STRUCTURE LS 1 1,593,366,G68 1,593,366,868
.................................... " .................................................................................................................
................................
.....................................................
......................................
.............................................
...........................................................
· .................................. ,....................
0
LS 1
INTAKE AND'OICHARGE LINE
.......................................................................................................................................... .............
............,...................
....................~:,;,?:,;?,9~9. .
......................................
.............................................
..........................................................
. .........................965,257,030
,.............................
8
COAL UNLOADING JETTY AND ACCESS TRESTLE
..................................................................................................................................... - .........•....
8,497,956,632
................................................... ...........................
......................................
.......................................... ...........................................................
8,497,956,632
................................
· ......................................... ,.............
..
and facilities required rmd as directed by the Owner based
........................
..............._............................................................ ,.........................................................................
...................... ...................
.................. ..........
.......... .......
.....................
.................................................... ...........................
......................................
...........................................
...........................................................
................ _.. · ._......._......................... ..............
A LS 1 6,477,362,704
_
JETTY
.......................................................................................................................................................
..............................
.....................................................
......................................
.............................................
...........................................................
6,477,382,704
.....__....................................
~ _......
.
B
........................
ACCESS
COAL HANDLING FACILITIES
TIll ESTLE LS 1 2,020,573,927
_
................. ,......................................................................................................................................
......................
...................
........... ...................
.................
.....................
..................................................... ... .....................
......................................
.............................................
...........................................................
................_.. _..................._.. ............................
2,020,573,927
2,749,827,923 .. ......................
.......................
......................
...................
.............. ................
.......... ......
......••.............
..................................................... ......................................
.............................................
...........................................................
................_.. -· .......................................................
2,749,827,923
·········The···wo;:k···~ha·ii· ..·inciude····b;:rt·.. ~·ot···ii;:n~ed .io.. ···fo~ndation
(excluding piling works), structural works and all related
..
civil works required and as directed by the Owner based
........................
........JI.O.<I~\,l<l1..$.~!O: ..I<QJ:J.gttiQJ:J......................................................................................
......................
.................
..
COAL STORAGE YARD, COAL DIKE, COAL RUN-OFF
............................
..................
.....................
.......... ................................ ,........
..........................
......................................
.............................................
.................................... ···················..l~···················
A
AND SETTLING POND
cOAi:·sHE"i5;·FO"UN·DATIO·N"·FOR·coN'veY·6ifGP:Le·Rv;···
LS 1
..............................
969,875,485
...................................................
..........................
.................... " ................
.......................................... .
. . . . . . . . . . . . . . . . . . . . . . . . . .~. . j.. . . . . . . . . . . ................................................._
I
969,875,485
......
C
FOUNDATION ; LS 1 163,493,296
········10····_· AsHH·ANDLING-FAc·iLines····..· . ·······················....................................................................................................................................................... ···············1·:55·1·:665·:942............................................................................................................................................................................................ .............. ........ .........._.._.........
1,551,665,942
~ _
163,493,296
CIVIL WORKS
PL TU SOFIFI (2 X 3) MW
1,682,964,889
The work shall include but not limited to foundation,
·..· · . · ·..+.· · · 1 / \ ··1······..···· ·..·+·· ·..· · ·. · · · ·..· · · · · ··I ..·..··· ······ ··I·..·· ·..·· ···..··..··..·····.. f..···..···..· ·..·..··· ·..····..···..·f..···..·..·..· ·..·· ·..··· ··..···· ·..·..·..··1 ·..· ·..·_·
. . . _A ~
20 kV Swit~hgear room and foundation (in steam turbine
, / / +·..· ·..· ·~ · · · ·..·.· I · · 1 ·..· ·/ · ·..· · ·/· · ·..· · I ·..· j{· · · .
~.~!I~!.~2... L LS 1 1 I 1 I 1 354,697,320
........................J. J... ·j· ·· .. · I · 1.· / · · 1 ·..· · j ·· · · I· · ·..· · ·. ·.. I·............................ . j .1L ..
B LS 36,947,638 36,947,638
20 kV Ge"erator Transformer and Auxiliaries Transformer
..............................................................................................................................................................................................·..
· ·,· · ·..·1 + ·+ · ·..· 1 ·..· · · · · · · +.._.· 1 + + , ~ .
1,050,698,442 1,050,698,442
::~FFl~~1~~;~~~:::=-:~IIf:fa:::=:::=:E:E~E~~~~E~==1~===E==~=I~===l==3=~~~
I
Soh 1.2 ..:; PLTU SOFIFI (2 X 3 MW)
I.
BOOKIV PAt 5 FORMS AND SCHEDULES
SChedulr 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
CIVIL WORKS
PL TU sOFIFI (2 X 3) MW
(A)
Local I Foreign
EX-WORK
(B)
Local Foreign
INUND
TRANSPORTATION
(0)
Local
!
ERECTION AND COMMISIONING
INCLUDING ERECTION
Foreign
INSURANCE
(E)
Local
F=A+B+C+D+E)
Foreiclll I Local
TOTAL
:::::::i:~:.:.J>.!:~·~:~::~~~~~:ii~~~:::::::::::::::::::::::::::::::::::::=~~~::::::::::::.:::::::. : :.: : : : :.:. :1::::::::=·:::::::r:::::::::::]::::::::::::::.:::::::]::::::::::::.:I:::::::::::::"]::::::::·::~~::?~:;~ ~Y.~?:~i::[: :": "·:: : ::: : [:":: : : :": :: : :: ~.~::: :[: : : :": : :: : .::: : : : :: : :]: : : : ::~": : :: :..: : : : : : : : : :~. ::..
The works shall include but is not limited to: Earth works
. r..:.~=][.. ...~?~"~~~1X~T
including excavation, back fill/embankment and
........................~~~
Work specifiel under this section includes but not limited to
-t .j. \ \ \ ) + + \ \ · ·.· · ·l· ··..·· ··+-J·..·······..··· ···· j
fumishing, Ilelivery, insllalion, joined, testing of piles, inclUding
wate~etlvibro or preboring Wrequired, etc.
'm 3,100 519,576,153 519,576,153
Circular hollow pre-stressedconcreta piles or bore pile in 400
mm minimum diameterwithdepth 15 m in accordance DePT
................................................................................................................................................................. ······..········•·· _········ ..··..•···..··..··· ··t····· + ······t········..···········t·..·······························..·..··············1················..·········,·· _ + , _ -+ -.
E IPARTICULATE EXTRACTION
CIV1LWORKS
PLTU SOFIFI (2 X 3) MW
INLAND
ERECTION AND COMMISIONING
(BI
TRANSPORTATION
,
(D)
INCLUDING ERECTION
INSURANCE
(E)
I
IF=A+B+C+D+EI
TOTAL
(AI
Foreign Local Forelan L.ocal Forelan
Local Foreian Local
Foreiiln
Local
INIAl INIAl IN/A) INiAl
INIAl IN!
.........-•......... ..
······....Wort<·Sj;;;ffiei·underlii'is·s-;,ctlo-;:;·iiiciudes..t;;:;t-;:;oi""iimii.dlc·..........
...................... .................
-_................ ....,....
...................
.............•....•..
.............. ............................._......
............. -...........
...... _............ ............. ........................................,..- ...._.........................__ ................ ..
..
~
~
_ _........_. t_. .............__...._..._.........__.....
furnishing. delivery. insllation. joined. testing of piles, Including
wate~etlvibro or preboring ff required. etc.
m 240 46.184.547 . . i 40.184.547
Circular hollow pre-stressedconcrete piles or bore pile in 400
.•........• .........
..··M_•....·····••·•····•·..···•······•·····••·••·•·•····• .....•,........._..........................................................................
......
~
_............ ..........-......
............................... ...................
.....................
, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ ••• • ••••••• OM . . . . .
...........................
.......................-..__
....... .....-.......................... .......... ..................................... ......_.._........
_ ..······_·'tf····· _..m_.... .........................._........
~
.........~!~rj".tI.v.i~~!?9.r.f.'~~1?.9.r!.n.Iil ..if..r~!!.~r.e.!!:.."..~'?"................................................
.....................
.............................................
.......
.....................
M . . . . . . •••••••••• . . . . . . . • . . .• •• , . . . ••••••• . . . . . . . . . .
.. ! ............. ................................
..
Circular hollow pre-stressed concrete piles or bore pile in 400
m - Incld Item 7A .. .. Ineld Item 7 A
_ _
mm minimum diameter with de~h 15 m in accordance DePT
..·....T ...... ......................... .............. ...........................................-............................................................
...................... ..................
...............................
................
....................
..................................................... ...........................
.......... ........................ .............................................
. .....-.................................................. .... ..........
I ............................... ....................
~.,
r"
~ _
.2Y"...S..§I~~~.~.~t:I!? ...................................................................................................
..............................
.....................................................
...................................... ...........................................
...........................................................
r-r ......................................................
i
3 ·
CW PUMP STRUCTURE
........................ .......................................... _............................................................................................................
......_............. ..................
................................
.................
.....................
....................................._............. ...........................
...................................... ..................................-.........
·..··....·..····..·····....··w··....···....··............
..................
I
Ineld Item 7C
I
...................................... ........................................ ....
.............................................. _.......
mm minlm.UlT, diameter with depth 15 m in accordance DePT
·....·..···;r···.... ..............................
....................................................
, j..... .......................................................
i~i~~~::~:~~:§i~~B.~~~~::~i:~E~~i.::::~::::::::::::::::::::::::::::::::::::::::~::::::::::::: ................................
.....................................................
.................................... .............................................
........................................................... I
.......................................................
~ _._
G COAL UNLOADING JETIY FACILITIES
........................
..
...................... ..............-...
.............................
...................
.....................
..................................................... .........................
. - ................................ .............................................
........._................................................
...................
·
.. ............................................ __
..........Wort<·specifi9i~~·d~;·lhis ..seciion·iiiciud;;;;..b·ul·iiol..iimii.:i'ic·..·......
................................
........................................... ........
~ ...................................... ...............-............................
.,...................................................... .................. .._-- .......... .......
.
~
ACCESS TRESTLE
........................
.........................................................................................................................................................
......................
.................
..............................
.......... .......
....................
............................... ...................
...........................
......................................
............................................. .. ......................-._...........................
..
................ __........._...........,..........
~
.................-.....................................
..............._.......__............ _-......
H COAL HANDLING FACILITIES
........................
.....
1\1i
ji ~ ~
\:
BOOKJ~ipART 5 FORMSANDSCHEDULES
ScHedule 1.2 Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE Ii
CIVIL WORKS
PLTU SOFIFI(2 X 3) MW
···j..·· ·•······ I..·· ·······..··\··,,···..···················I·..··········j· ·t ········..·······..·····..·····-·1··· ·..· ·····.. i·~-···· ..·····..·········J··,..••·············••··..•·..···••..\·..·..·• ·.····..··..•·•· ,· - J ·· ·4 -.J - -.- - -.-..
furnishing, d.livery, insllation, joined, t.stlng of phes, InclUding
furnishing. dell'l.ry, Insllallon, joined, testing of piles, including I I I ] Incld It.m 10 I .. .__. __ ._
..........................................................................................._
M InlSCELLANEOUS BUILDINGS AND STRUCTURES
- " , ·..· ·..·!· " ·[ ·I ·j · ·..· ·..· ·..f -·..· · ·..·,· ·..· , , - , ,
- ""_ __ _ -.~ _
. . .· ·. .i._·. :::~:t~~:.~:~=.~~~~~~~~~~~~.~:.~~~~.~~~~~~r. [
m Incld Item13
N
....................' .
OTHER FACILITIES STRUCTUREIBUILOING
··..··W;;;k·s~iiiei ..~;:;(j;;r·ihissectio;:;·i;;oiudes·blrt·;:, oi·ii;:;;~~d··to ···
I._ ~
.. ··j.. ·· ·•..·•·.·..·
I t J : .f. J
I· ·..···· l· ·····•· ··I·· ···..····..······ ··..•..··..···• ····..1..····· ·· ····..·I ..··..···.. ·_··· · ·····..··~
\ ,
j
,!
··
,
·..·.·j..·•
,
_..ll
,.._..
, ..
............................. I · j · · I ..
...................., , ·• ·..1..· ·· /.
::::::::::::::::~!;~~~;?7.I
·j ··1
~~ l ;~~~~.~::};++ ., + ·.
~ ··I········..·,~ ·+· . ;~~~~. ;:'~.;:.;:~
?
..,
I
1
InddltAm?~11 I • I l
............:; : 1················ ·······,·····················1···, , ,...•.••...,
I I I I
IncJd Item 2.3.1
Incld Item 2.3.1
·.·..•.... 1· ••••••••••••• •••••••• .. ··'·~:!~·!·~:~ ..2.~~~+
Incld Item 2.3.1
· : 1
1" ... 1.-11+....... ., "" ,
1 ·1 ·1 ·..· ·1 1..· ·1 · ·1 ·1
2 ( tncld Item 2.3.1 I I I I Incld Item 2.3.1
.............................. 1 + 1 1 1 ..
Inctd Item 23.1
... ..· ·1 ..
4 I lncld Item 2.3.2 I I I I lncld Item 2.3.2
z J ..
!~.:'~ It:.~.:z..3.::z..L : L L :. L.r~~!~ . It:.~.~:3.? ..
2 I lncfd Item 2.3.2 I I I I lndd Item 2.2·.2 Incld Item 2.3.2
..............·..-t· ..·..· · · t ·+·· · · ·..1
...;., ·..1 ·+ · ·+ · · .
MECHANICAL
ITEM
NO.
DESCRIPTION QTY
FOB
(A)
EX· WORK
(B)
.!Io
INSURANCe:
(C)
TRANSPORTATION
(D)
INCLUDIN0 ERECTION
INSURANCE
(E)
r
(F=4!+B+c+D+E)
Foreign (USD)
Local
I (lOR) Forei!!n
(USD)
I Local
(lOR.)
Foreign
(050)
I Local
(lOR)
Foreign
(USD)
Local
(lOR)
Foreign
(USD)
Local
(lOR)
Foreign
(US D)
II.Ii Local
(lOR)
Including following items specified in the specification and Ineld Item 2.3.3 Incld Item '23, Incld Item 2.3.3
B 2 lncld Item 2.3.3 Ineld Item 2.3.3 fncld Item 2.3.3
"Scope of Work" and other required for system operation.
;:~. I·"···'::::::::::l: : : : : : : : : :~: : : :I: : : : : ~: : : :I: : : : : : : : : : ~: 6.~ :l: : : : : : : : : I: : : : : : : ': : ::l:::::::::::::~i~:~~~;~~h::::::::::::: : ···1
; .. --:.. ------- ---- -"-r- I 2 Incld Item 2.3.4 lnctd Item 23.4
i!::'iH·
. -t...... . .. . ..
•. :.;..... . .
.:.. .
~
.:~~:.: ::::
..j~c·ld Item 2 5' 3
. ··..·:· ·..··· · ·:· 1 ,
5 2 Incld Item ~.3.5 Incld Item 23.5 Incld Item 2.3,5 Incld Item 2.3. Incld Item 2.3,5
...................j \ . . .. ~····..···..·· ..·····I········..·······I·····..·····..········· ~··· ..··· ······i·········· ··I·····..··················..··..······..·.. l····..··..······ ..········+········. . \ _ _ ,
. :z.:.~:.~ :Q2.9.i::i~~::f.9.W.§~:i~~i.:::::::::::::::: . :::::::::::::::::::::::::::::::::::::::::::..:::::::::::::::: ::::::::::::::::::::: ::::::::::::::::::::.::::":'::::: : ·1. ·. . ."...... : =:.. /.. :: ::: :..:'::':::~:..:": .:::'..::='::': ..:: :.:::::::~:::::::::.~:::::::::::::::::::::::::::::::::::::::::: ::::::::::::.:..::::::::::::..:::::::::::::::::::: : _..
1 Cooling lower inclUding fans, drift eliminator, waler .." _..... _
·:z.:·~. . ·..I?:~~i::W.~i§.~::~X~i.§~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::':::::::::::::::
. ·..2.4.1 DESALINATION PLANT
:::::::::::(:::::::I:::::::::~::::::::::::::::::~:::::: ::'::::::~::::::I:::::::::::::::::::::::::::::I::~::::::::~::::::I:::::::::::::::::~::::::~:::'::!::::::::'~::::::!.:::::::::::::~~:::: :::::::::~:::::::::::::::::::::~:::~:::~I'::::::::::::::~::::::::::::::~: : : : : : : : : : :~: : : : : : : : :~: : :~: : : :::::::::::::::~::::::~~::~==:::::::::::::::::::~~:::~::::
3 2 x 50% Reverse Osmosis Plant or Removal of dissolved 2 Incld Item 2.4.3 Incld Item 2.4.3 Incld Item 2.4.3 Incld Item 2.4.3 I lncld Item 2.4. Ineld Item 2.4.3
6 Water Reverse Osmosis skids (BWRO) including auxiliary 2 Incld Item 2.4.3 lncld Item 2.4.3 lncld Itt~m 2.4.3
Incld ltem 24,3 I lnerd Item 2.4. Ineld Item 2.4.3
............. _
,
Incld Item 2.4.3
, , .
..............!~~~~..~!~.~.~ ~:~..
10 All ~ems specified in the specificatIon & scope of work and 1 Incld Item 2.4.3 Incld Item 2.4.3 • Incld Item 2.4.3. .. Incld Item 24.3 I Incld Item 2.4. lncld Item 2.4.3
.... '" •..... 9.!,,~r..l!.9<fI.~:;Qr.ifl.~. @.Qy.ir.e;lJQr..~ylit~m. op-erallon . 1 1 ···I··············..· · ·· J · ··..·.··.··· ·..1 1 _.•~ .
................................................................................................................................................................· · ·..j· · ·..·..···..· · I· · · 1······..·· ·..·:···..·1·..· ·..·..··..·1..····..· ·····..· :.······1····· ··· 1..·..·····..··..· 1 ·..·..· ·····..· ·..·· ·· 1··..·..·..·· ·····..····..1 ···· · ·· ·:.···..·I..·..·····•..· ··_ ·~ -······..· ·..· .
....~:~:.~ :r.~t,l.~.~.............................................................................................................................. . . ,...............
1 Raw Water Tanks 2 Incld Item 2.4.3 IneJdItem2.4.3 Jneld Item 2.4.3 Incld Item 2.4,3 ~ Ineld Item 2 4,3 Incld Item 24 f. _
lneld Item 2.4 31
.
.~ NN N ..
..................,. ~:
~:.~ _g~~.!~.~.~.~!~~L~!!~!~E
b.
••
Pre - filter
..P..~~P.~.,~.~~.T!'.~.~9.r,~,"
~!?:<..~~.,P.:«?!~~~.~.~ , ,
,
,
, ~
2
~ ~.,
~~~'~.!~.~.3.~~:~,
lnctd Item 24.3
!~~.~.~!!.~.~',~:~
:
:
.• ,,:
~
:
:.,
~~~!~..~.r:'2.3:~:~
lnctdItem 2.4.3
, ~~~~..~!~.~.~:.~:~
: ,
~ , : ,
: I.~.~!~..~~..~;~:.~. . , ,
inctdItem 2.4.3
I.~~!~..~~..~~. ~ ~
!~~.l~..~~.~.~.:~:~
Ineld Item 2.4.3
!~~.1~.!~.~.3:.~;~.
~.~~~.!~~.~~:. ~
lneld Item 2..d.
__
_ !~.:~~.~~~..~:.~: _ _ ~~~!~..~.~.~:.~;~ ..
~.J~~!~..~!~.~ ..~:.~:~..
Indd Item 2.4.3
•:~~: E_~~~·:::~~.==:.~~~:~: ~l~ ~~~ 3~ ~~~:~:~ ~::~~:f~ ~~ ~t~ ~~1~~il ~~~:.~~• ~~~i ~i ~f~l
~~~:1~.~~ i!~~~r.~~~~~~~~~:.:::·:::::~:::::::::~~:::~~:::~::::::::::::':::':':::'. ~: .·: I: : : : : : : : : .: : :.:~: :.: f.: :.: ·: ~: L·: : 'j~;~~:~i~~'~~l: : :': : : ~: : :'.
.........~ _ .'?~~.~.~.r:1S..Y.Y~~I..I~D~ , , ~ , ,..~ ,., : ,!~.:.I.?.~~.~.:.:. ~;~ :
:::::::::::.::::.:::.:::'f:::::::
, :
: :.:.: : : : : :t: : : : : :~ :.: : : .: :.: : ·.: ~{~ ~f.~ f;.;:t.:·: : : : : : : : : : :.: : .:": ·.:: · : .· · : ·.: :~;~:~ :},~1: :::::~i.~·~:.~{fiJ . ==::::::1~~~~~~[;1:1
_.,..: , : I.':~~!~,.~~.~:~:~ ~ , ~~~.l.~.~.~.,~.~:~ . .
!.~.~~!!:.~..~;:.:. ' !~~:~ ~~.~.~:.~:~
..._ ~ ~~!.J!I.!~~, ..~~~.~m , ,.. ,, ,..;: , ~ , , ~, : " ~~~~.~..~~.~.~:.~:~. , :, , ,.: : : ,, , 1,~~~..1~~..~;~:~. , , : , !~~.l~..!~~.~_~.~:~._ ~.~.~~..~~..~::.:.. :.~ !~~!~..~~~.r:'2.~ ~:~..
~::::i~=: ~f~~~i~j;;.~~;~i!?~:~~~:9.~~ir.~!::6:::::::::::::::::::::::::::::::::::: : : : : 3~: : : : : : : : : : : : : : : : : :~: : : : : : : :~: : ~:. ::::~~~:~:~:~:~:i : : : : : ~: : : : : : : : : : : ~: : : : : ~: ~: : : : : ~:~: : : : : : : : : : :~: :.: : .~::::::::::j~:~::~~:#:;':~: .: : : : : : : : : : : : : : : : : : : : : : : : : : : :~ i~:~;0.:~ ~·;,: :::::i~~~:i~::~i:: .~: : : : : : : ~ :~: ~;.~:~;:~:~:
7 All items specified in the specification & scope of work and 1 3,456 ~.953,500
1,491,408 3,456 3,444,908
.................. Q!hfl.r..~.9.2~r.lfI.~ ..@.Qy.lr.~.f9.r..liY.~I~.m ..9.P.fI.Ul!!.Qn 1 _ 1 / j. 1 1 _ .
MECHANICAL
FOB EX-WORK
MARINE F'REIGHT
&
INLAND
TRANSPORTATION
ERECTION AND COMMISIONING
INCLUDING ERECTION
I TOTAL
ITEM
NO.
I DESCRIPTION
I QTY
.~
INSURANCE
(C) (0)
INSURANCE
(E)
I
Oi,*A+B+C+D+E)
Local
(lOR)
Fo,eign
(USD)
Local
(lOR)
Foreign
(USD)
I Local
(lOR)
Foreign
(USD)
I Local
(lOR)
~oreign
(USD)
Local
(lOR)
Forej~b i
(USO]! i
I Local
(lOR)
::::::~t=:= ~!~~~~~~fu~~~~;'~~:~~~:9.?i!ii.?i.:6:::::·:::::::::::::::::. .:: : . ::~~. :~. .:::::i~f.i.~.:~~:;·4·:i.: . .: :.~. .:" .:".'.: : .: : : ": :.' : . :.: .::.. . : :::.:I~~id:·~i~~.2 ~i~. : :".:.~: : : : :::::::: :":.:':j ::=.:.. :.I.~:~i~ I~~. ~.~.~ ': : :'.: : :': : : ': .: :.~ : :. :::::::.:::".i~~ii·~~:~:~.~:3.: ":j?d!d..~~~.~, :~:3.' ::::=:::::::!~.~!#.~~i.~'~ .
.2 All ijems specified in the specification and "Scope of work" 1 Inold Item 2.43 . ". Inold Item 2.4 3 . . • Inold Item 2.4 3 " lncldItem 2.43 Inold Item k3 Inold Item 2.4 3
and other accessories required for system operation. I
~ll(g~;~~~~~~I~~~~~~~::~~iiU~-::~:~:~~l~~t:~~~~1i1~~~:~~~~-~iil~!~?l~
::::::::t::::: ~~~g1:~ir.;~E~r~~~~~~~;.;r:::::::::::::::::::::::::::::::::.:::::::::::::::::.::::: : : : : {: : : : : : : : : : : : : : : : : : : : : : : : : : :~: : : : ::::::!.~~:~.:~~:~:;': : : : : : :': : : : : : : : : : : : : : : :~: : : : : : : ~: : : : : : : : : : '~: :': ::::::::::::':::~~i~:;~~;'}~: : : : : : : : : : : : ~: : : : ::::::::::::::::::::::i:~~:~:~;:~:~: ::::::::1~~:i.:;:: :lt~: ::::::::::::::::::::~:;;~:~~::~:~::
~i~li~:~~~~~::~=:~: :~l:~~:~~3Hi~~~:~=~~~~1~~I·~~~~~~::~i'i~tl::::~~f~
~j=~~!r~~~:~~=: _:~~~=~=~~---~~~~~===~=:======~~~~=~~= :-:==:~~.~=~~~
~ii:~~2-t:[~;~~;\;- ~1~~~~~~~~~~~I;[~i~.~~~~~~~~~~~;~~~:~111~ii~1
~i i~~~-~~~~~:~~:~~-::~:-:: ~¥=~~~-- ;~_:::!~1:~::~:: :::~:: ~:1~~~~~~~ ~::-~It!:~l~~ ~iI
II
"
• ....-...,J...... n •
MARINE FREIGHT
ii
INLAND ERECTION AND COMMISIONING TPTAL
~~~~~~~~~~1~~~~~-\-~\[f;~1il~~~.~~~~1\~--i~~~f~~if~~~~~JIII[\:\:II
10 !ncluding all items specified in the specification and "Scope of
work" and other accessories required for system operation.
lnc!d Item 2.6 Incld Item 26 Ineld Item 26 lncld Item 2.6!1 j Incld Item 2.6
i ilj;~~~i~~~]~~ f~t~ .~~~] ~=-~~~j ~\~~~~\~~~_ ~~~I ~~-j ~~~~1j{ ~:~~=)~ ~~~!i ~i~l. [~~~
;~l§~i~~i~~~~~~--;~~~~~t~ ;_:~::~;~~:~ s=~ =!gi ~:i:~ ~:~~~: ~~~ .. ;~;§t~~~:E;~:~;;f~I!:;~!jit-:;;l~1
.
.........e. . . ,, ,.,._ .: : , ' ,'
~~I1~:~;r~=;.= :r~~~=~:.:.~~j~;~.~ :'~~~: ~r..:~~:: . • ~ ~.~~~~.~~~ '~~'~.:~_~.::~ ~.~~~~.'.t~~.:.7 _.~~~~. ~~.=.:j .i , ,.'~.~:~~~:.:::.
::::::::::::::::::::::::::::::::::::: ::::::::::.::::: :: =:::::::::3.I,@:: :::::::::::::::::: ::::::::::::::::::::::::::::::::
......................................................._.'lncld Item
_ 2.8
, ..
............, ,., .
•••••• , ••••••••••••• N .
.:::::I::::: ~~:.;~~~:I~~~~!~~~~::::::::::::::~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.: : : : : :~: : : : : : : : : : : : : : : : : : .: : : :.: : : : : : : : : ·:::~~i::;g:~:;~: : : : : : : : : : : : : : : : : : : : : : : : : : : .: : : : : ~: : : ~ .: : : : : : : : : : ' :::::::~::::::;~~~::~~:~~i~: : : ~: : :~ : : : : : : : : : ::::::::::::::~:::::i~~i:~:~:i~~ ~::::~~:~:~~:~i~ ±::~:::~-j~;:':~;';'~~~~~~
5. MUffiefumace . 1 nctdltem2.10 Incld ltem 2.10 \ncld Item 2.10 IncJdttem2.10 i lncld Item 2.10
:::::::::::::::::::. ~:~~::Q(ii~i:~~~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::3:::::::::: .:::::::::::::::::::::::::::~::::::: :::::::~:::=: :::~.~:ii~~.:2.;i~: ::::::::::~::::::: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : .: : : : :::::::::::::::'.~~ii.:~~T.:~:!:o.: .:::::::::::~:::::::::::::~:::: ::::::~::::::::::::::!~:~~:~~0.::2.;~~: ~::::!~!~::~~::~~:o. :r::::::::::!~~:~~X1.~~
I
Sch 1.2 - 6 PLTUSOFIFI(2 X 3 MW)
II
;1
liI,
I'
IIu
iI ."
I,
ITEM
NO.
DESCRIPTION QTY
FOB
(A)
Foreisn
(8)
I Local
MARINE FREIGHT
Foreign
&
INSURANCE
(C)
Local Foreign
INLAND
TRANSPORTATION
I
(D)
Local
ERECT,ION ANI:' COMMISIONING
INCLUDING ERECTION
Foreign
INSURANCE
(El
Local
Fe-reign
r
(F=A~\3:+C+O+E)
III
AL
Local
(lOR) (USD) (lOR) (USD) (lOR) (USD) (lOR) (USD) (lOR) (1.150) . (lOR)
10. Shaker 1 Incldltem210 IncldJtem2.10 Incld Jtem 2.10 Incidltem2.'0 I Incldltem210
.........., J.~: ~.~!.p..!~~~ ,., ,........................................................................ . ~ !~5,1.~.!!!~..~,~.9. ..'.~~J~..~~~.~:.~.~ ,.., ~~.~.? .!!~..~:~.~ I.??~..I~~~..?::'...~. l.~ _.!~~~~.~~.~.~:~.~..
13. Oemineralizer 1 lncld item;' 10 Inerd!tern 2.10 Incld Item 2.10 lncid Item 2.1J I lneld Item 2.10
15. Jar tester 1 Ineldl1em~J10 lncld ltem 2.10 Incldltem2.10 Ineldltem210 I Incldttem2.10
".._ ~ ~~~..9.i.t~!:'.~.~.i.~ ..~g~!p.~~t ,...... . !~.::~?!~!:~.?.~.9 , , , ,., , ~~~!~..~~~..~:.~,~ , !~~.~.~.~:2~ ,l.~:~. ~~.~:.!..~ l.w !~~}.~..~.~..-?,..~~ .
.................... J.:.. E!~~.~ ..I??!.l)t!~ , , ~ , , ~~~.~.. !!~~ . ?..~~ n J,~:!~..I.!!~.~:.~.~ ".!~.:I.~.~~~ ..~:~~ .'.r:!?~~..I~~..?:.!?. L _.~~.~. !~.~~}.~ ..
....., 1.:4.:..?.~Jf.1JL,,~!:'!~~t..!9!:!ip.'.').~.~!.. ., ., ., ., , ! ., .,.'~.c1.d..!~~.,~'.:? . ., ,..., ., ., .,..., !.~:I~..~~~~ ..~;.~.O'... .,.,.,.,.,...,.,., ...,." ., !~~~d..!~~.,2.::? .,.,.I."."'~.,~~..2,~.o. .. ! .,!~~.k;I.~.~.2:.~,O'..
.........~ ~.r:!!M!~! ..~~~!~~~.~t _ , , !~.?I.~.~!.~,?.~£ , ~~~!~.~!~.~:.~.~ , !~.~.~~.~~~.3.:~9.. , !.~!~..~~..~;.!p. . .:.__ !~:}.~.~.~.~.~.~ ..,
1. Calorimeter • 1 InCldItem 2 10 Incld Item 2.10 Incld Item2.10 Incld Item 210 i Incld Item 2.10
hu SOFIFI (2 X 3 MW)
o!I a..
I
BOOK IV PART ~ 'ORMS AND SCHEDULES
Schedule 112Detailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
I
MECHANICAL
ITEM
DESCRI"TION QTY INSURANCE INSURANCE
NO.
(A) (B) (C) (D) (E) (F=-,*,B+C+O+E)
Local
Foreign (USD) I (lOR)
Foreigll
(USD)
I Local
(lOR)
Foreign
(USD)
I Local
(lOR)
Foreign
(Usn)
Local
(lOR)
Foreign
(USD)
Local
(lOR)
Foreign
(USD)
III Local
(lOR)
::::::::j::::::::. ~l~ ~i~ ;,t~ ~t~ : ~:~I~:~: : : : : : : : : : : : : : : : : : : ;: :; .:; : ;: :. : -r.:":;·: .1: :·:;·: ~l~ l}j: :::::'i' H
I ,•• ~, ..
lncld Item = 12 Incld Item 2.12 Incld Item 2.12 Inckt item 2::2 Ineld Item 2.12
!ncld Item :212 Incld ttem 2.12 lndd Item 2.12 (ncld Item 2.12 Incld Item '2 12
_~?·""·""""""""·
. . . . .+.. :::]::::::::1::::::::::::::::::::::::::::.:::::::1::::+ :~: :.: ~..::!~f.i:~~~l;H:::·. ·: ~:.: :l: : : : : : : : : : : : ·: : : : 1
·......·......·......·..........•·....·....J...· ....·......·........:........I
lneld Item 2.12 Ineld Item 2.12 lneld Item 2.12 IncldItem 2.12 Incld Item 212
......." " ·..·..· "· · ·..· · · ·· ·• · ·1..· · ·..· ··1 ·+ · ·+ ·..·+..· · 1 1 •· ·1 ·..· ·· · +· · ·..· · ·1 ·..·..· _" .
-1~j[~~~~-~:~:;~~~:_:~:~:~:~~~:~f;_:~I:~~~,,;-_-~I:::~~=~~f:~I:~~~~~~~~:::~==~:,:t:::::::=:t=:~=
I I I
........ v- I I NA 1 NA I ~IA
NA NA NA NA
N6]::::::::::::::::::::::::::::::::::::::::H~:: ~::::::::::=::=::::~EL:=::::::~~::::::::::::=:~EI
All ~ems specified in the specification and "Scope of werk"
3 NA NA NA NA NA NA NA NA NA
and other accessories required for system operation.
MECHANICAL
:::::::::::::::::::I:':::.:~~~~i.~~E.o.~~~::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::.. : : ::::··::3:.::::::: :::.::::~~i~::~;:j:i~: : : : :.:. : : : :::::::::::::::::::. : : : : : .: : :. : : : :. : : :. :10.::i.:::~0.·~:;):: :::::::::::::: ::::::..::::::::::::: : : : : : : : :I; ; :ftF.:~;:i:~: :.:::::::::::::::..:::::::::::::: : : : : : : : : : : : : ~: ;~: ~;': ~:i~: ::j~i;:i~~:~;: ! :::::::::::::::i~;;:~g:~:i~::
: ?,~!!',~.'Y..~ ..~~~~.~.ry_~..!n~~.~~.!:!~~..~!!~, , "......... . 1....., !~:!.~.~..~:~.~.. . , ~~:.~~.~.~.~:.~.~ ~~~!~..~~!::'..~:.!~ , _ !~~,l.~.!~~~..~:~:: !.~3.~~..t.!~~..~~ ~~:.1.?.. ~!:'.~.3.:~,~ ..
: : :~: ~.:~: : :!
6 Truck Crane 1 tncld Item 2.14 Ineldltem2.14 Incldltem2.14 Ineldltem2.14 IncldltemZ1 I
.~:~:~=~~:~~:~~Jt1.:'
lneld Item 214
:::::::X:::::: ~~:~~i~!~j~s.ii!~~~!~ij£~:~~~:§;;~!r.~i:~(i:::::::::::::::::::::::::::::::: ::::I:::::·: ::::::::i~iid.:!~~·2.:ii.: : : : : : . :::.:::::::::::::::::::::
. .; : + :::;~;:.:.:::.:::.;.;
.
:::~:~ :::::.'.:.~: . :=+ :::;:.... . ;.;
;:::::.~
·······:········1·············:·······1·,········,,····:::~:~ ::~::.:.~:.:.~+
. " ~
····················;::·:~··;::::·~·;·;·······7::;:··,;::.'~";.;, _
I····················································· ""." ,
:::;~.;:;::.:.:::.; ..;..
All ttems specified in the specification and "Scope of work"
a and other accessories required for system operation.
tnclc item 2.14 lneld Item 2.14 Ineld Item 2.14 lneld Item 2.14 Incld 'tern 21 Incld Item 214
·_·..·4· ·..· Dri·ii.. Pre~· ·····..·····..· ··..····..·······..·.. · ..···..· ···..··1········ ,., ,." ' ·'··j~~ld·i;;;;'2~15' ., , ,··..··..·'· ..
i~~id it~'2:·.;·5· , ··.. ·I~~id·it;;·i1·· _··_·· . ;·5··
·i~;;id·tt;·;;;·2
6 Work Benches 2 Incl1ltem 2.15 rneld Item 2.15 lneld Item 2,1 Ineld ttem 215
.........! Ibr.~~!!:!lit~.~g,~.~!':I.~..~..9.E~.9~~~.Q..M~~.~~.ry~ , ,." ",.1 , , ,..:, "." , !~.?~~.!~~.~.~:~~ .., ,.,.,., , , , , , " _ ." , , , !~:!~..t:t:~,~;.~.~ "" , , : !!2:!~.!!t;.~..~:.~ !~~.I.~.~.~_~~.~..
I
9 Vises 4 Ineld fterr- 2.15 lneld Item 2.15 lneld Item 2.1 lncld Item 2.15 I
14 All items specified In the specification and "Scope of work" Incld Item ·~.15 lncld Item 2.15 Ineld Item 2.15
and other accessories required for system operation.
............""." " "." " "." _" "............................................................................... . ".... . " J " "" "."" _ " " _. ."" " " " .
:::I~I:: @~!h§.:§.§Qi.~~§.~i=::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.::::::: :::::::::::::::::::: ::::::::::::::::~8.§,:ii§O:: :::::::::::::::: ::::::::::::::::::::::::::::::::: ::::::::::~::::::: ::::::::::::::::?'~;'ii§.§:: :::::::::::::::::: .::::::::::::::::::: :::::::.::::::~?~;@;@: :::::::::.::::::::::::::~:::::::: :::::::::::::::::::::::::::::::::::::~::::::: ::::::=::=~Q~:;q(~: :~"~::::::??~;,@;§§o.::1
1 Buldozer 2 Incldltem2.16 ~ ~ Incld Item 2.16 ~ - Incldltem2.16· - Indd ttem 216 Inc1d Item 216
.... L ~\~.~er..~~~,,!3~.~~.i!1""~.(~.~L "............ . ".. . " "...... . . " "................. . "._" " _.. 1..." .
:=:1--::: ~!'i,[~-==~~::~~:==:~~:::~ .:-:t: :::!~:~ ~: :~~:ii :::-::S~f~ ::i_~::~:;': :~::::l~~t~ -:=:.:.: ::.::_=j~ff;! ~~ ~~=~~~l
Sch 1.2" 9 ! LTV SOFIFi (2 X 3 MW)
'.
BOOK IV PARTSlfORMS AND SCHEDULES
Schedule l.~ betailed Price Schedule
SCHEDULE 1.2 DETAILED PRICE SCHEDULE
MECHANICAL
PL TU SOFIFI (2 X 3 MW)
MARINE FREIGHT
INLAND
ERECTION AND COMMISIONlrJG
II
rpTAL
ITEM
NO.
DESCRIPTION QTY
FOB
(A)
EX·\VORK
(B)
&
INSURANCE
(e)
TRANSPORTATION
(D)
INCLUDIrJG ERECTION
INSURANCE
(E)
II
(F=At!:l+c+D+E)
(USD)
II !I Local
(lOR)
•u _.? 9:~.~y.!y.~.~ '" _ , _ ~ .. _.!~=I.d ~~~..~.~~. ...: 1.!~.?~~2~e~ ? !!.. : . t~?!~.!!!.~.~ ~! ~. .w .••• _.... .. l.~~!d. ~t~~"~"~.?'I"· _: , !~~I.~.~.~..~:!? 1~!~.:~~ ..~;.~.?., .L1 !~.'.~..~.~.~~.? ..
Incld Item 2.17
..................................
_ Item_2.17.
.........lncld
Incld !tem217
9
._
Other items and accessones required for system operator
_..............................................................................................................................
1 jncloItem 217 ~ lncldItem 2 17
..
...............................·......·..1......·....:··......·1..........··..•·......·..·....·..·..1..·..........·
......................................1 ·: ·..·..1 • •..· ·..·:·..·..1 · · ....::.::.:~:::::.:: ..~ .:~..I··..····..:····..·I ··..·..·..·..···..··:· ·I..······:..·· I···..·····..·: I·..·..·..·.. ···::·:~:~ ..:~~::·:·~::·~.j. ~ ··1·
.........................................................................................................1 .a. _ 1
; , , , · 1· · · · ·..· + ·..· · -1 ..
Sch 1.2 • 10
" ".
MECHANICAL
.........6........
!:ip..i~.~.,.v.~.Iy~, ..~!!.i~.~.,..~~.~LP.i~.~!l<:t..g!.'\S~.."".!.'p..1\!l9.......................
......................
......................_....!'I.~.. ····_M••·.·"·
••• u .................... •• . . •
...................
................................... ...........,...... .............,........
.................................
..................,..............................,.. ............,..............." .....
_...........................................
n .........................................
~.,
~._
lneld
rncld Sch. 1.1 Incld Sch. 1 [ Ineld Soh. 1.1 lneld Sch 1.1 Incld Sch. 1.1 [neld Sch. 1.1 Indd Soh. 1.1 Inetd Sch. 1.1
2.21 STUDIES I CALCULATION Lot Item 7 Item 7
Sch.1.1
ltem 7 Item 7 Item 7 Item 7 Item 7 Item7
....................
................. " ...
.•......,............"., ............
................. ..... ,,,.,, ....,, ..............
Item 7 ........................... ,...... , .................. ,..................
............ ,...........................,.. ........................ ,...... , .. ................ " ............................
..... ,......._.......... ,..... ...,....,............ ,......,.............
..
:{iie·Siudi;;;icai~ui;;tio;:;·r;;:q·;;i·;ed t~··b;;··p;;·if~r;;;ed·3s··stipuiateCi'
~
.......-...........
i.Q_e.9.9K.1J..f..~r.tA.§.W..i.9.Q..4.,i1,........................................................................
1
............ " .... ,..,...............
, ................
............................... .................
' ............... ",.."" .......... .................. ...... ..... ,........
.,..........,............. ,......,..........
.................................
..................................................
.......... ,...-................ - , ...... _........................._.....
SubTotal 2972451 2112,454 198285 3015000,000 4,500 000 000 5,283190 7515000000
!
BOOK IV PART 11FORMS AND SCHEDULES
SCHEDULE 1.2 DETAIL PRICE SCHEDULE Schedule 1 ¥Detailed Price Schedule
El.ECTRICAL & IC I
PLTU SOFIFJ (2 x 3 MW) I"
!
MARINE FREIGHIT INLAND ERECTIONAND 1\
FOB EX-WORK & TRAN:;PORTATION INCLUDING ERECTION pTAL
:::j
m It.1.,C::III>,,.,,..., INSURANCE I
s: DESCRIPTION
A B l e D E F=A+$+C+D+E
z
9 _ Local
ForeIgn (USD) I (lOR)
I - ForeIgn (USC)
I Local
(lOR)
I Foreign (USD)
I Local
(lOR)
I Foreign
(USC)
I Local
(lOR)
I Foreign
(USD)
I Local
(lOR)
I -
ForeIgn (US
nil
ii
I Local
(lOR)
1· ·· · 1 · · · ····_· ·•..· _ ..
----; ~ Lot : :.. I 7,2€ l 6,476,818 7,283 10,104,865
...................I... J J... I... ,J ,J.
::j
m
&INSURANCE INSURANCE I
3: DESCRIPTION
z A B C o E F=AI~B+C+D+E
5='
Foreign (USD)
Local
(lOR)
Foreign (USD)
Local
(lOR)
Foreign (USD)
Local
(lOR)
Foreign
-JSD)
Local
(lOR)
Foreign
(USD)
Local
(lOR) Foreign (U$P) I Local
(lOR)
20 120 kV. metering and prot~ion pa~e1S, control and 1 275 11471 026 20478171 23 ~7 31 949197
l
monrtonng system and associated equipment complete. 1 Lot 21,753 , , , , , , , •
~~i~~~~~~~~~.~~~~.~~:_~~~;-.~~~~~~~~·~~~~~~~~~~~::.
. . :.: : : : I.6~::~:~:b.i~i~:.a.~:~::~c.~~~~?~~~:~y§:~~~~!~~::J~~i~~~~::: . : : : : ~~::::.:::~: ·:::::~:c.!~~i!i.~:~:~5::::: .~:.: ..:::::::::::: :::::::.:::::.:::::::::::::::::: .::::::: ::::~~:~~:::::~~:~ ::::::!:~9!~::~~~~:!:~!§~:. ::~:~::::::~~:::::~ :::::~::~~::~:;.:~: :·::!~~~~ii~~~~s.~:: ::~::::~::::;.:::: :::~:~~i~:~~~i!~5.:::: :::~:!~~d~!i~~~~i r.== "·::~~i~~~~!0._ .
.......~.:? ~~.~.'~~ . I!<?..<:;.a.r.~ ~n.:19..'.t:~.!II.:~ I.n.:.~~..'t.:~.I.I.I:~.... .. : ~.n.:.I.~..~~:~ll.I:.5. : _.!.n.:.'~..'!:n.:'..I!L5. !~!~~.:n.:'..:.~! .r.-... ...._I.n..'?!.~.~.7.!!!.~lc5. .._
:::::::i::t.
2
~~~1\~W.:~~::::::::::::~::::::::::::::::::::::·:::::::: : : : : : ~: : : : : : :.: : : : : : : : :~:: :::::::::::::..::j;~:~:;~:g:::ii:~::::: : : : : : : : : : : : : : : : : : : : :.: :.:: : : : : : : : : : : : : :::::i~;~~:i;~~:;,~::~::::: : : : : : .: : : ~: : : ': : : ~: : : : : ': : ' :~:i~~~~I:~~:fi\:~:::~ : : : : : : : : : ': : :::::G;i~~I:~~jIi:~:::: :::::j~~j~~~~: t: :::::~0.i.i~:~~~::~&~~::
Power plant operation control desks. LS InoldItem 111.5 Inold Item 111.5 .. lncld Item 111.5 .. Incld Item 111.5 Icold Item '115 InoldItem 111.5
~1~4~~~{:~~_Ii~~_~~~j~~~:~~~fl~~=~::~+-~!~~~~~~i~~~~l~-~~L
The studies required to be performed as stipulated in
Book II Part 4 Section 4.2.
LS Incld Soh. 1.1
Item 7
InoldSoh. 1.1
Item 7
InoldSoh. 1.1
Item 7
InoldSoh. 1.1
Item 7
InoldSOh 1.1
Item 7
Incld SOh. 111'
Item 7 II
lncid Soh. 1.1
Item 7
TOTAL III (ELECTRICAL & IC) 547,325 1,582,195 38,490 1,080,000,000 1,869,106,662 2,168,1:!10 2,949,106,662
No.
DESCRIPTION QTYI I I :
Local Foreign
local (lOR)
(lOR) tUSDl
l~: :~ J.~f: ; ~r:~V.~g5L: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : .::::::1:::::: :::::::::::::::::::::: : : : : : !~ ;~:;: ~;:;:;.: ~ : : : : : : : : : : : : : : : : : : : : :;:~ ;:~:;: i; :0.:~:1
.?:?...1j.~.O'~ ..~~.~.9 ~.P.~Q.Q.~.r. 1 !.~.~!.?: ~!~.~.. ~ ~.~.~!.?: I.!.~.~ ..3..
3.7 Pulling hook 1 Ineld. Item 3 Ineld. Item 3
~~~: :~~~i~~~:[~~~t~~i~:;,~:;:~i.~:::···::.:::.:··::·:·::·:::.::::::::::.::.:::::.::: : . :::; ::: .:.: .: ': . : ': : · :·:·:·: !·6~:~: ·}t~:~: ~ .':::'.:.:::::'::.:::'.'::::':.::' ··::::·::~~r~:::::r~:~:~:
3.10 Spanner 1 Ineld. Item 3 Ineld. Item 3
~: :t~~~i:~ii~q~:!e~~~~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::t:::::::::::::::t:::::::::::::::::::::~::::::::::::::::::::::~:~;:~~~ ::::::::::::::::::::::::::::::::::,':::::::::::::::::3:§,;:QQ§.:
.~.:.) ~.~~.~ ..?!.I ?~~!.~.?!:'.i.? . ~~~~~~.!~ . ~~~~~~ ~ .I ~.~.?!9.: I.~:.~.. ~ !.~.~!.?: I.t.~.~ ..~'
4.2
Digital dual-clamps phase voltammeter 1 Ineld. Item 4 Ineld. Item 4
~:.?. §§;::f.~~!j~~~~~§f.~~~~::::::::::::::::::::::::::::::::: : : : : : : : : : : : : : : : : : : : : : : : ::::::::r:::: :::::::::::::::::::::: ::::::::::~~:~!~:·::i~~~~:~
4.4 phase sequence meter 1 Iheld. Item 4
: : : : : : : : : : : : : : : : : :::::::i:~:~~~~:::~!:~:~::~:, Ineld. Item 4
4':5' ·distaj"·ins'l:iiatlo·ii..co·ii'Hii·uitY'·te·ster ·······..· · 1"" ····..·..·j"i CiCi· ·ite·;;:;·4 · TiiCi·,i" ·iie·m··4·1
:4':6' ·tiigh"·voitage·Tiis"li·iatlon·testers ···· · · · . ·..·· ·..·..·1 · · · j·iiciCi· 'iiem.. 4 ·.. i·i ·ciCi· iie·m·4·1
4':7' ·m·uitim·e'fe·r..o·perati'o·n· · · . ···..·..·· ,· ·.. · ·· ·2· · · ·j·ii·ciCi·:·'ite·m·4 · ..·j·ii·ci·;r..i ·e·m··4·'
4j3' ·Ciig"fta'i"groun'ding..re·s"fsta·ii·ce··te·ste·r··..·..·.. · · 1" ·.. ·j·iiciCi·.··iie·iii.. 4 · ·j·ii·ci·;(..ii·e·m·4
4':9' Wi:i'ftmeter · ·..· ·..· · · . 1·..· · riiCiCi·:..iie·iii..4 ·.. j·iici·;i:..iie·m..4·
4'.'1'0' 'Acii5c··current··mete·r·.. · . ·· ·..· ····..·····..·.. · ····.. ··1· ······ j·iici'd·.···ii·e;·m·4 ·······j·i ·ci·(j·:..ij·e·m·4·
........................................................................................................................................................................................................ •• • •.. • •.. •.. • ·1
.' The Bidder shall list all consumables required for the Plant to be provided under the Contract until the issue of the Final Acceptance
Certificate.
The oonaumebles shall inGlude all that iSlIpecffied in Section 4.3 Subsection 4.311 including bulllnllilllil .. c1 h.. fuses, indlcatina and
IiQhtinQlamps. filters. battery acid. chemical, qaskets, cleaninQ anents. paper roll. ink, oil. nraasa, etc.
Any additional consumable item found to be necessary for the erection and Warranty Period shall be providedfree of charge to the
Owner.
All prices shall include cost of supply, insurance for transport to site and off-loading suitable packaging for off-loading, suitable packaging
for long term storage under tropical conditions and delivery to site.
1
Grease for 410
kg 1.5 615
2
Lubricant oil for 5530
Ilr 2.3 12719
:3 Anaiyzer
pH analyzer
14
set 29.5 413
Electrode
No", So" Analyzer 14
btl 42.5 595
Gas cylinder
02 Analyzer
Cell assembly
14
set 103
1442
4
N2 bottle
N2gas
1000
Itr 2
2000
5
Boiler chemical
Trisodiumphophate (100%)
2000
kg 1.3 2600
Hydrazine (100%)
5200
kg 1.5 7800
erices
6
Water Treatment Plant
6.1 Polymer (99%) 200
20
4000
-.
6.4 NaOH (98%) 200
5
1000
7.1 Set of fuse and lamp for local fire control panel 2
50
100
- 3.0 kg pack
20
50
1000
- 15.0 kg can
2
242
484
Consumables
Include
8
Waste Waler Treatment
Plant
,'
8.1 HCL 100U
9
Chlorination Plant
HCL 1000
10
Coal Handling & Handling 12360
12 Fuses 2,000
14 Filters 8,000
16 Gasket 5,000
19 Ink . 1,000
20 elc
I
I 1,000
30,000
TCTAL CARRIED FORWARD TO GRAND SUMMARY SCHEDULE 1.1
100,000
TOTAL CARRIED FORWARD TO GRAND SUMMARY SCHEDULE 1.1
The Bidder shall list all items required for all plant to be inspected during manufacturing and shop
test.
Any additional inspection found to be necessary for the quality assurance specified in Part 4.3
SubSection 4.3.7 shall be provided free of charge to the owner.
Total Cost
NO. Description
Local (IDR) Foreign (U5D)
1 Air fare's, hotel accommodation and other living expenses for 20 80,000
round trip at 7 days each, of owner visiting the Bidder or Bidder's
vendor home office during design review approval meeting as
specified on Part 4 SubSection 4.3.2 Clause 4.3.2.3.2.
2 Air fare's, hotel accommodation and other living expenses for 20 70,000
round trips at 7 days each, excluding contractor's fee, of owners
inspectors during manufacturing and shop test.
,,>
6u!u!eJl e: ~ alnpall~S
S J-Ied
BOOK IV
PART 5 FORM5 AND SOiEDUlE5
. ~ule 1 Base P~
~u1e 3..3 Training
KONSORSIUM INOOMUOA - PUSAKA
---------·-------·-----rnEfBiader shall enterTnlhls schedule, Bid Pricesfor trainingas spe-crfieif In Section 4.3. SUbsectiM 4.3-:13. Other detaiis-'-'--------
required per Section4.3. Subsection 4.3.13shall be attached herewith on a separate sheet.
TOTAL COST
No. DESCRIPTION
LOCAL FOREIGN
1 Bidder's fee for Owner's operation and maintenance personnel training, 32.357.580 20.000
excluding trainees travel, living and accommodation expenses as specified in
Part 4, Subsection 2.13 'Training'.
2 Site training of the Owner's operation and maintenance personnel. 100.000.000 10.000
, ~\
.'• ..F'
3 Provision of one f.J1I time Instructors at site from commencement of assembly 100.000.000 20.000
of Unit 1 through 12 montnr ,'il!ter the date of full commercial operation of Unit
1
4 Provisional lump sum for trainees air-fares, hotel accommodation and other 100.000.ouO 50.000
living expenses.
5 Adjustment rate for training of Owner's staff at manufacturers per man month. 12.500.000 4.500
Not Withstanding the number and periods Specified in Section ".3 Subsection
4.3.13 the prices for items 1 and 2 shall be based on 20 (twenty) of Owners
trainees being located at the manufacturer's works each for a period of 20
(twenty) weeks and on 20 (twenty) trainees receiving Site training. Items 1 and
5 shall Include for the cost of inSUringtrainees while undergoing works training
against - Accidental death to a value of US$ 190,000.00 and 100% of
Note: medical, dental and hospitalization expenses.
1t t -tJ-e
S JJed
Expected replacement parts of two (2) years of normal operation for all
1 STEAM TURBINE
...........................................................................................................................................................,..................................••.•.....................•.............,...........•+...................•.......... +•••....•••..•..•....••..•••..••
,
f. Turbine bearing assembly (HP and LP) set 1 .,. .
,
g. Atmospheric relief diaphragn pieces 2 +
.
h. Control valve - sleave, burket, valve stem, spring pieces (1 each)
....................................................................................................................................................................................................................................................................+ .
a. Seal set 1
.......................................................................................................................................................................................................................................................................................·..· ·· 1
4 ICONDENSATE PUMP .. . .
:::JII~~~~~~~:f~~;(:~~~;~;~;;~~a~;:;~~:~~eand,,~e)::~::;:;::;':;
, c. Economizer tubes (5% of istalled surface area of each · 1· · ·· ·· .
type and size) set 1
..........8 · ·s6oi·s'Lo\iiiE·RS· · · ·..· ·..· ·
.
, · · · · · 1·..·..· · 1 · ·• · ·..· .
1 Schedule
..............................................................................................................................................................................................................................................................................................
" .
~ r 14 -1 P~Z;0fifi; j 3; ;
BOOKIV PART5 FORMSAND SCHEDULES
Schedule 1 Base PricesSchedule
1.4 Mandatory Spare Parts
ITEM
NO.
...y;.,;1;1,~~J:r:(I~LJA~iltY
.••..
. 1 REMARkS
..:·z·· (USD)
,~-.I~~;~~t!~~~~?~;~~~~~~::_:::::-'::~~ij:::::.::::::::~:::::::::.::::
fans
b. to Set 1
: : : :.: : : :
fio-,~~;~,~~~¥~~;~~~;j:,;i;§~::-'-'::::=::I:.~::::
..........................~.~.~I~~~.~~.~ ~y.~.~~.~~
* Filter Bag ,
Set 1 5
.
· Tubes
12 ICOAL FEEDERS
I•••••••••••••••••••••••• 1
+.........................•.....
·
·•·•·•••••·••••••·•·•••· •• 1··· ••••••••.•••.•••••••.••.•••••••••••••••••••••••••••••.••••••••••••••••••••••••••••••••••••••••••••..••••••••••••••••••••••••••••••••••••••••••••••••.••••••••••••••••••••••••••••••••••••••••••.•••••••••••••••••••••••••••••••••••••••••••••••••••
M~r ~ 1
,·························.1
· Coupling
• •• ••• •••••••••••••••••••• 1
·
,
Set
, •••• " ••• ,." ••••••••••• , ••••••••••••••••••• , ••••••••••••••••••••••••
,
1
+ " .
....••...... ,
feed, Polyelectrolyte, line feed, caporite feed Alum, , +.•.•.••.•••••.•••. + + .
:;;::t~;i:f~ft~:~:~~::~~::;~~~;t=~r_::::-.:~:_):;;:~{"5:;"::
BIDDER TO DETERMINE
18 MOBILE EQUIPMENT
,
...........!:!:
.............b.:
YY.~~.~.I ..t.~.~ . ~!:!.~.~ ..~.y.p.~ ..'?t... ~.~.b..~I~ ..~g~!p..~~~~
~.~~I ..~.r.~.~.~.~~~.P..~.~p..~
::::: ~ ~.~~..... .
~.~~
~
~
j .
,+ •................•......•...••.
All prices shall include costs of supply. insurance for transport to Site and off loading, suitable packaging for long
'.~
ITEM
NO.
QU~N:t1tv I REMARKS
(USD)
,
b. Couplings -
. Set 1
······························t······················· .
21 MISCELLANEOUS PUMPS
1:2~1~~~~!~~~1~~~1,rf~~~~~~~,~;~~~~~~~~~~~~:~::~~:-~:~~:~~~tl:~~:
····..·.. i3 . I.~~'ii~~~~cilg:~tJi:f~.:~.?c~~~~~~6: ~.~.~?
L... ~.~~ L .
:::::::::::~:.::::::::::. :~!.~p.:~L~~~·:~(~~~:::::::::::::::::::::::::.::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.::::::::::::::::::::::::I:::::~~L::I:::::::::::::T::::::::::::[::::::::::::::::::::::::::::
, b.
24
a.
........·b·
Chain & attachment
RO SYSTEM (If Applicable)
Mebrane filter
E~rt;idg·~ . fiit~·~ ·
" " " " " " ·" , ·, ·.I ·
" " ·
Set
Set
S~t
·1 · ·
. ·
· ·1 ·
5
...............................................................................................................................................................................................................................................................................+ .•••.•••••.••..••........••.••.
···t .. ·· ····· .. ·
.
b. Distribution Nozzle
c. iFihi
d. IDrift Eliminator
I: : : : : : ~: : ·: : : :I
a. Generator
.: : : : : : : : :.: : : : ,:::::::::::::::::::::::~~:6:~:~~:~~~::~:~~~~~g~::~~~~::~~~~::~!::~:~:~:~::~~?~L:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::I::::::~~~:::::I::::::::::::::~:::::·:::::::::::::::::::::·::::::··::::::::::
. . . . . .b.. . . . . . . IExcitation"..~equipment
:~::.~~~.~,~::.~.i.~.~.~ . ?~.~,~.i.~,~,~ ~~~.,,~:~~ .. ?.~.:.~~~ . !X~:J.
.
" "" " ~:~ " ~ .
...........: ·~····S·pa·;:e . drod·e'8'·or·thyris·t(irs..(ha·f(of'one..c·ompj·e'te..s·ei..fo·;:..each..ij'e'n'eriiioiy · seC·.. . 1 · ·•···..· ·..· · · .
·..·..··..····..·· 1· ·
1- 200% brushes (if furnished)
· " " " " " ", "
set
· ·· · ·
1
·".. 1."· · . · · · · · .
I .
- One bushing for each type excitation transformer (if furnished) set
,•••.•.••••• 1 ~ .
- One set field breaker spare parts set 1
.. ···•··.· •••....•.•.•••.• 1 .
- 10% (min. one) instrument, indicator switches of each type set 1
···.· ••••••.••.••.•.•• 1 ~ .
- 10% (min. one) of each type of control selector and push button switch set 1
·•· 1 +..•.••...••••••..•.•..•........
- 10% (min. one) anti condensation space heater of each type set 1
•.•••.••••••••.•...•..••• 1 .
,
2
,MV SWITCHGEAR 200% use of each type for control circuit set 1
..
.........................
·C'onduci"and"re·piac·eme·n'i"parts"r.eedeei"for"m·aj'or·Clrcuit'overhaui ·..· ,..· · · . · • · ·t ..
~ tt
Schedule 1.4 - 3
PlT~fiI2X~~
BOOK IV PART5 FORMS AND SCHEDULES
Schedule 1 Base PricesSchedule
1.4 Mandatory Spare Parts
All prices shall include costs of supply, insurance for transport to Site and off loading. suitable packaging for long
ITEM
NO.
l
· : : : : : : : ~: : : : : ::: : :!~~~~::~~:~~:~:~~~:Iy~:~~~?~~~~~::?~:~~~~::~i.~~::::::::::::::::::::::::::::::::::::::::.:::::::':::::::::::::::::::·:::::::::::::::::::·:::::::t::::::~~~::::: : :': .: : : :~: : : : : :'.: : : : : : : ': : : : : : : : :
n Three solid state trip units of each type set 1
......................: ··································r..·1::.··············
.
I 0 One motor of each type , set. 1
I : ..
p 10 sets of motor brushes of each type set 1
I•••••••••••••••••••••••••••••••••••••••••••••.•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ' + •.•••••••....••••••••••••••••.
q 10% of control and auxiliary connectors and cable assemblies of each type set 1
. . · j- · 1·5o/c,. fus·e·cartrfdges·of"e;·a·ch..ty·pe..or..a.mini'mum.. of'five · ·..· ·..· ·.. seC..· 1" ..
·..· s ·Twenty·Tnd·fcating.. ia·mps.. o(e;·a·c·ii. ty·pe ·..· · · ·..· · ·..· set..· 1" .
......·..·..6 3·80\TjijjOTOR.. c6NTROL.. · ..
l .
CENT'i~RS·
r .
.
I
1
· ·c· · '1'oo/c,"'(mini'mum"o'n'e'j"cu'rre'ii'i:"voitage:"a'n'(j"coili'ro'i'Clrcuit·trans·fo·j-mers..o(ea·c·h · ·seC..· 1" .
I _.•••••••••••••••••
I
~
10% (minimum one) selector switches of each type
.
~.?~~ (.~.~~~.~~~. ?.~.~:. ~~.~i.~.~~~~~ ..i~~.t.~.~.~:~~ ..~.~.~..~.~.~~: ..~.i.t.~..~!~.~~.:~ ~.~. ~.~.~.~ . ~y.?.~
set
~:~ j 1
.
............................................................................................................................................................................................................................................... ······························t·,,,···················· .
m 10% (minimum one) terminal blocks of each type set 1
I + •••• ,•••••••.•••••••••..••••••.
n 10 % (minimum one) anti condensation space heater of each type set 1
...............................................................................................................................................................................................................................................................................+ •.••••.••••••••••••••••••••••••
.. .
~ It
Schedule 1.4 - 5
PLTUSOf~r~~
BOOK IV PART5 FORMSAND SCHEDULES
Schedule 1 Base PricesSchedule
1.4 Mandatory Spare Parts
All prices shall include costs of supply. insurance for transport to Site and off loading, suitable packaging for long
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . j
9
a
ILOWVOLTAGE MOTORS
10% Resistance Temperature Detector of each type set
.
············b··········· . o(eacii··typ·e················..······..························· ·····set····· ········..····1··························..············· .
I
,
c
d
·10··o/~··anti··concj'E;·n·satio·n··space·hea·ter
+ ••••••••••.•••••••.•••••••••••.
~\i
Schedule 1.4 - 6 PLTU SOfif~2 X3 MW)
f~ ~
All prices shall include costs of supply, insurance for transport to Site and off loading, suitable packaging for long
.
:~
ITEM
NO.
~UANtjty
.'. .....
IREMARKS
(USD)
............(j"
·1·0"0/o···(mlili·mum··o·;;·e"j""swii·dies··ot'each··type····· · . ·set·············.. ······.. ········..···•···········..· .
· · ·e · '1'O%"(m'lillmum"o';;'e'j"i'e'rmlna'l'bi'o'c'ks"of"eacfi"typ'e · · · · · · · · · seC..·• .
............f" '1'o' oA;"(m'fn'im'u'm"oilej"a'n'ii"condensation"s'pace"heate·r·ot'ea'Cti. i·ype · · · ·..· set ·•· · .
I.· + •.•.•••.••.•.••••••••••••••••. .••.•..••.•.••..••.•••••.•..•..
~
g 10% (minimum one) test points of each type BECKMAN HD 110 MULTIMETER set 1
AND CU/CU 204 HALK CELL
· ·1·4 ·· 'i3'lj'jLD'i'NG"AND"EQlj'jpM'ENT'G'R'OliNDiNG"AND"j::i"GHT'N'iNG..PROTECTi6N..·• · ·• · · ·..· •· · .
............a · 1·0%.. O·ro·u·n·(j". co·;;·;;·e'Ctioil . ot'each·type· · · . set' • · · •..·.. · · .
,. ............................................................................................................................................................................................................................... ••••••.•••••••••••+ ••••••.•..•••..•••••••..•..... -10•••• , ••••••••••••••••••••••••••
..............
~ .
d 10% Emergency iighting of each type set 1
........··e 1·o0i0. ·Exit·Wg'hi 'n·g.. o(e·a·c·fi..type · ···seC..· ·..· 1.·..· • ·..
a
AVIATION OBSTRUCTION LIGHTING
Two complete sets of flash tubes set
.
·One..tfa·s"h"·unit"p·o·wer·suppiy··o{each·type ······
...........i) ·set' •..· · •· · ··
·..· ·c · 'Oile"o{each"p'rfn'ied"Circuit'boa'rd"or'ci'rcuit'a'ssem'b'iy·used··ln..ihe..m·ete·r..c·on·iroi'"· set..·..•· · · ·..• · · ·
unit
..........................................................................................................................................................................................................................
····.. ·1·..·..· ·1 · ··· · ·..· ·
d One day-night SWitching unit. Two of each type of surge arresters set 1
I .
1-- t t ~
BOOKIV PART5 FORMS AND SCHEDULES
Schedule 1 Base PricesSchedule
1.4 Mandatory Spare Parts
All prices shall include costs of supply, insurance for transport to Site and off loading, suitable packaging for long
ITEM
NO•
;1.J~lf
.
IQiJANTITY ,.REMARKS
. (USD)
...........'i)
·One..o{each..type·o{operaifn·g·coi'i · · ·. · · ·..· ·. · · · · ·..· · · ·..·set" .
I•••••••••••• • + .
C One of each type of relay set
....· d.· 1·0·o(eac'h. ty·p·e..of'fuses..usecj"inCiudj·ng.. th·e·fus·e..di·s·co·n·n·e·c;t"s;;;.iftch..· · · · ·..set"..·•..· • · ·..·..
........·1·8·..· ·MAi·N·TE·t·j'"j:ic·E.. j::i'GHT·j·NG..SYST·EMS..·..·..·..· · ..
.......................... · · · ·· ·.. ·1 ··.. ·····..·1 · · · . ···..····..·..· ···.. ··.. ·
a Three of each type of high pressure sodium lamp set 1
. . . . . i) ·Two..oi'each..type..o(s·u·rg·e·arreste·rs..·..· . · · · ·..· · . ·. · · · · ·..·seC··· "1"
.
........·19··..· ··j::i'GHT"iNG..P·oviiER..6isTRi·BUii·ON..PANE·C ·
.
·· · r · 1 · · ·..· · ·..·.· .
I,...........................
·2: · ·.·~0:~~~~~·~~~~~~·::·~·~~~~·~~[OCK ·.· , ~~~
..·..· ·· r
~
• ·
.
·..·..·..·
a 10% card or module used in master clock system for each type2 set! 1
I !~~~~i~i~tr~~:~~:~~~~~:::_::=::=:::::m: :F:::
- 10% of each type of battery for hand held radio telephone transceivers set 1
,· · · ·..1 · ···· · .
'- Five coaxial cable connectors of each type set
..........................\ !
.
b PABX system
, ,
- 3 of each type of printed circuit board or module used in the telephone
· ·..1 ·set········ · ·..·.·.· · ····· ·..· .
......· ···· ·..r...3.oTeach..oTte'(e·phone..inst'rument" · ·..·..·set"·..•· · · · ·•..· · ·..
..· ·..·..···..· ··1 · · · · ··..· · ..
c Public Address System
..........................
.,. 3.pui)jjc..address.. sy·stem..ampijfiers·o(each.. ty·p·e· · ·.·.· · · ·. · ·..set".... . "1" ..
1·•••••••••••••••••••••••••1 + .•••••••••••••••••..••.......••
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .[
d Telephone System
- 10 maintenance teiephone jacks set
! 1
·1 · ·..· · ·..
· ..· ···..· ..('min·:..2).. o(e·a·ch·i'ype..ot'batte·ry..for..m·ain·tena·nce..t·eiephone..h'and..s·ets
,·~···1·0o;~ · ·set' :~ .
..........................
e
,Miscellaneous .
I + .
- 10 fuse cartridges of each type set 1
•••••••••••••••••••••••••1 + .
- 10 indicating lights of each type set 1
I · • 6n·e..met·e·r..or·othe·r..indicator·orea·c·h..i·ype..· · · · ·..· · · · ·
~.. · ··set..· ·..1· · · •·· ·..·. · .
t· · · . i\vo·o{e·a·c'h. i·ype..ot'switch
·~ ·..·.· ·..· . · ·set· 1" ..
.......................... . 6n·e..moided..c·a·s·e..brea·ker..oreach·typ·e ·..· ·
·~ : · . ·sei"' · ·1"· · •..···· · ·..·
·..·..· · · t;..Two.. fuse.. horde·rs..ot'each..iype..· ·.. set·..·..· f ·· ·..· ·..··..· ·..
•••·•·•··••· .••••.••••..•• 1 + .
..........................
22
,
- 10% terminal blocks of each type or minimum of five
AUXILIARY POWER CONTROL PANEL
set 1
..
...................................................................................:
.
~ tt
Schedule 1.4 - 8 PLTU Sofif (2 X 3 MW)
~~
ITEM
Nd.
fciN,i'lqQAN,TITV!. ~1~~~r$
............................................................................................................................................................................................................................····f··················
.
a 10% of each type of control, selector, and push button switches set 1
,· ·..·..·b ·..·..1·0% ..o(ins·trum·enCindicator;..and..d·e·ii'i·c·e·s..of'eaGh..type · ·..· ·..· · · set·..·..· · ·..f ·..· · · ·..· ..
.· · c . onuses..o(e;iich.. t};-p·e ·
1·0o/~ ·..set"..· 1' .
I.····.· +.••••••••••••.•.••••••••,••••.•
d 10% of fuse holders of each type set 1
r · ···· · · ·· · · · · .
e 10% of indicating lamps of each type set 1
I
I·: : : : : :~·: : : . : :~ ~ ~ ~?~: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : .: : : !: : : : : : : : :L~: : : : : : : : : : : .: : : : : : : : : : : : : : : : : : : :
.................................................................................................................................................................................................................................................
b 10% auxiliary relays of each type set
)
1
..
I .
c 10% of each type of control, selector, and push button switches set 1
·..· · · d···..· · . '1'o'Yo"'iii'strum'eii{"'voitm'e'te'r':"a'mm'et'e'r',"'j'ii·dicat·o·r·:··transducer..ga·u·g·e·;..pres·s·u·re·..· · . ·..···set..· '1" .
switch, limit switch and similar device of each type
··························1················..·········· : ·······t··················+···..······.·······.· "' .
. e '10%, moided case breaker of each type . set
...........f" '1'O°io"contro["p'ower'Ci'isconnecCiilCiuCi"fri'g"fuse"assem·iJiy.. ofea'C'ti..type ·..· · . · ·..· · ·..··set'..· '1"
.
......g . fus·e ·ti·o·iders.. of'e·a·c·ti..type..· . · . · ·
·1·ooi~ · ·. set····· ·..· r · ······..·. · . · · . · · · ·
·..·.. · · . h···.. · · · ·1·0'Yo··term·fii·a'i"ti·iock·of"e·ac'h. t'Y'pe·..· · . · · ·. · · · . ;;ei""..··· · · . · 1 •..· · . · ·..· ·
....·····.. ··i· ....··....·'1'o°io"ofindicai'i'ii'g"ia'iY,'p"hoiCi'e'rs"with"gi'a's'ses··ofeach. typ·e···· · · . · · . · . · · . · · ·..·. · · . set'· · · · . r· · · . ·· · . · ·.. · . · ·
· ·..··k··..·..·..··1·o°io·..fi ·d·lca·t"fri·g..i'a·r,lps..ofeach·ty·pe ·..· · ·set·..· · ·····'1"·· · •..·· · · . ·..··
I , ••• , ••••• , , , , , •••••••••••• 010•••••••••••••••••••••••••••••••
I + .
r 10% of each type set 1
····· ·s · . ·.. ·1·0'Yo..cabi'e. pi'ug..conileGto·rs··o{each..type· · ·..· ·..··set"'.. . r·..·.·. ··· · . ·.· · . · ·
·..· . · · . t. · 1·0'Yo···a·ia·rm..ca·rd·s··o{each..type· · ·. set..· · f ..··..·..·····..·· ·..····..·
.......................................................................................................................................................................................................................................................................................................................
~ It
Schedule 1.4 - 9 PLTU Sofif (2 X 3 MW)
!\t?
ITEM
NO.
~;v~~lh~~IR· EMARKS
J (USD)
.•.•••.•.•. '
.·
".
POWER TRANSFORMER
..................................................................................................................................................................................................................................................+
.
1 One (1) bushing of each type set
..........................................................................................................................................................................................................................................· ·r ·· · ·
·set..·. j
2 One (~) neutral bushing of each type set 1
............3 0ne..(1')"Prote·ctlng..(j·evice..o(ea'Cfi..type · · 'l ·..·..• .
. : : : : : ~: : : : : : :~~:::~:~t~~7;~:~;~:t~~::~~~~~t~/~~:~:~::~~:~~::~:~~::~~~:~~~:~::::.:::::::::::::::::::::.:::::::::::::::::::::::::::: :::::::~::::: : : : : : : : ~: : : : : : : : : : : : : : : : : : : : : : :
............sOne..comp·l·e·te..fa·ii. uniT'a·ii·(j. ·p·u·mp..u·nit(ii'used) ··· set..· '1"
.
..........·g one..windl·ii·g.. tem·p·e·j-ature..indicator..· · · ·..·..·set 1" .
. . . . . '1"0 ·one..oii..t·e·mperature..i i·(j·icato·j- · set · 1" .
· ·1"1· ·1·0oi;·a·u·xHiary. reiays..o(e·a·cfi..type..o{min..oi'one· ·seT'..· :r .
. · Tf ·One.. . co·ii·troj"switdi..and..s·e·iector..s\vi·tch..oi'each..type · · · ·
pus'h~hu·tton set · 1" .
. . . . . .1"3" 'One"inst'rumenCm'ete'r;"j'ii'di'c'a'tor:'traii's'd'u'c'e'r'gauge';"pre'ssure"sw'i't'ch"and"srmriar' ·seC· 1" .
· · 14 .
I·<:!·~~·i.~.~ 9.~ ..~.~g.~.Jy.I?~:
One disconnected of each type set
·l 1
· ·
. . . . . '1"5 . compiete..motor·comhination..start'e·rs..oi'each·type..o·j-. m·in:..o{o·iie..·..·
·1·0oi~ · seC ·1"
.
. . . . . ·1·6 0ne..fuse..swit·c·fi..uni(o(e·ach.. ty·p·e seC..· 1" .
. . . . . w one..m·o·u'ld'ed..ca·se..breaker·of'ea·c·fi..t'yp·e; ·seC · 1" • ·
..........·18 ·1·ooi;·fuse. h'o·i(j·ers..o{each..t'ype..or..min:..of"one · · set '1" ..
. . . . . '1"9 ·1·o°!o.. term·iii·ai..ti·iock·of"e·a·ch..t·ype..or..min· ·of'ti'iie · · ·set · '1" .
. . . . ·2'O ·..Transfo·j-·mer..a·ii·d'Ti ·s·Li'j-ance..t'o. sit'e·for·aW..Mandatory·S·pare..Parts · ·..· ·seC · 1" · ·• ·
·:::::::::::::::::::::::::I:~:~~!.:~:~:~~~:!.~!.~~~:A~;~::g9~1~~~ftf~Mij~I~~lfi~~~{iJ~~~~ji~ffilll:.~lft{~i!~!~i~;:f~~;::;~f':: .f;,;!};,., , :i\f~:::;;:;:::::::::::::::::I::::::::::::::::::::::::: : : : : :
1 For each type of instrumentation and control devices supplied by the Contractor .
........................ ·1 · · · · r r · ·
2 For each type of analyzer supplied by the Contractor, one spare complete with set 1
. .· I.~gg.~.~:?'?r.!~:? ..~.~.~.I.!..~.~..f.~.r.!:'.!~.~.~~J~!.9.9.~.r.JgJ~~~!9.~~ ..~.I.! ..~p.~.r~..f.~.fn.i.~.~.~.<:!.L .
3 Programmable controllers, annunciators etc
................................................................................................................................
For each type of plug-in module and card supplied by the Contractor, 10% spare set
· · · · ·..· ·..· ·..· r · ·r · 1
· • ·
I ~
· 1.. · .. · · ·
, l set
•••••••••••••••••••••••••1•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••.•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• t
..
+.•••••••••••.••..•••••••••.•••.
- Two magnetic tape drive unit set
••••••••••••••••••••••••• 1 ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ' ". "" .
f/~ .fP
BOOK IV PART5 FORMS AND SCHEDULES
Schedule 1 Base PricesSchedule
1.4 Mandatory Spare Parts
All pnces :>"all Include costs of supply, Insurance for transport to Site and off loading, sUitable packaging for long
··..·..·..···············1······························· .
- Two hard disk drive unit set 1
J •••••••••.••••.•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••.••••••••••••••••••••••••••••••••••••••••••••••••••••••••••.••.••••••••••••••••.•.•..••••••• + .•••........•.•••.•••••••••••••
...........•.••.....•..•....,
AI! the items above listed will be delivered by the Contactor to the Owner
in terms of the Contact shedule, but the related cost has been included in
the Price of Material and Eauipment mentioned in Schedule 1.2 for supply
, insuance for transport to Site and off-ioading,
suitable packaging for off-loading, suitable packaging for long term
storage under tropical conditions and delivery to Site.
rAe Bidder SA811. list ell ooAstJffiellles re~tJired fer IAe PleAI to Ile I'lFO\'idedtJAderIAe COAtrast lJAtiithe isslJe of the fiAal ASSel'ltaAse
The consumables shall include all that is specified in Section 4.3 Subsection 4.3.11 including but not limited to fuses, indicating and
Any additional consumable item found to be necessary for the erection and Warranty Period shall be provided free of charge to the
All prices shall include cost of supply, insurance for transport to site and off-loading suitable packaging for off-loading, suitable packaging
~i9
BOOKIV
PARTSfORMS AND SCHEDULES
Schedule 1 Base PrIc<!s
Schedule 1.6 Consumables
KONSORSIUM INDOMUDA - PUSAKA
3 Analyzer
pH analyzer 14 set 29,5 413
Electrode
No" Sox Analyzer 14 bU 42,5 595
Gas cy1ind~r
02 Analyzer
CEil assembly 14 set 103 14·2
4 N2 bottle
" ", N2 gas 1000 ttr 2 2000
I I
.'
5 Boiler chemical
Trisodiurnphophate (100%) 2000 kg
I 1,3 2600
Hydrazine (100%) 5200 kg 1,5 7800
t t1 Schedule L£ . 2 Pl TU Sofifi P
~;!
X 3 MW)
BOOk IV
PART 5 FORMS AND SCHEDULES
ScheduJe 1 Base Prices
Sthedu'e 1.6 Consumables
I<ONSORSIUM INDOMUDA - PUSAKA
7,1 Set of fuse and lamp Ior local fire control panel 2 50 100
8
Include
9 Chlorination Plant
HCL , 1000
32.212
TOTAL CARRIED FORWARD TO GRAND SUMMARY ...... ,.
-
\~OOMUD4
* KONSORSIUM '*
~
.
--
~t i
Schedule 1.& - 3 Pl TU Solifi (2 X 3 MW)
Jp;
800KIV
PART 5 FORMS AND SOiEDULES
Schedule 1 Base Price'
Schedule1.6 ConsUl"nables
KONSORSIUMINDOMUDA - PUSAKA
12 Fuses 2000
14 Filters 8000
16 Gasket 5000
17 Cleaning agents
. I 2000
18 Paper Roil
I I 11000
19 Ink 1000
20 etc
1000
~tt
Schedule 1.6 - 4 PLTUSofifi (2 X 3 MWj
~1t
uO!l:>aful dOllS ~ JaJnl:>eJnuew pue
Ma!Aa~ u6!saa 6u!JaaU! 6u3 l· ~ alnpaLJ:lS
S lJed
BOOKIV
PART S FORMSAND SCHEDULES
Schedule 1 Base Prices
Schedule 1.7 Engineering Design Review and
Manufacture Shop Test Inspection
KONSORSIUM INDOMUDA - PUSAKA
The Bidder shall list all items required for all plant to be inspected during
Any additional inspection found to be necessary for the quality assurance specified in
Part 4.3 SubSection 4.3.7 shall be provided free of charge to the owner.
Total Cost
NO. Description
Local Foreign
TOTAL 150.000
I
t tt
Schedule 1.7 - 1 PLTU Safifi (2 X 3 MW)
JJtl
In accordance with the requirements of the Term of Reference and Technical Specification Document the
Contract will be on the basis of a lump sum firm price to complete the Works as specified. All design objectives
specIfied and all the Works which are described m, or Implied by, the Specification and allillatteis omitted limn
the Specification which may be Inferred to be necessary for tile safe, reliable and efficient operation and
completion of the Works, shall be deemed to be included.
The Bidder shall complete the Schedule 1.8 for the items ltsted herein. Unit Prices are to be all inclusive and
include all head office and Site overhead costs. materials. plant. transportation and workmanship required to
erect, commission and complete the Works in respect of the items against which Unit Prices have been
requested. and adhere to the criteria as set forth in the Technical Requirements and General and Special
Conditions. The Unit Prices set forth will be used as 3 basis for any changes in scope, whether they be additions
or deductions. as instructed by the Owner.
If a change in scope should be required and the Unit Prices herein are not directly applicable but can be applied
by adjustment the Contractor shall adjust them. These adjusted Unit prices. as all changes. will be subject to
approval by the Owner.
Where Unit prices are not app!icable, or where required by the Owner, variations te Works excluding any plant
items only shall be performed on a Force Account basis in accordance with Clause 1 of Part 3 Special
Conditions.
SCHEDUI...E 1.8 UNIT ADJUSTING PRICES
Diameter 350 mm
LOCA TION COAL SHED 1 M 103,915.23
Diameter 400 mm
LOCATION STEAM TURBINE BUILDING AND CENTRAL CONTRUL 1 M 167.605.21
A
BUILDING. EMERGENCY DIESEL AND AIR COMPRESSOR ROOM
L08ATION STEAM GENERATOR (BOILER) STUCTURE AND AUXILIARY 1 M 55,510.27
B
~
It t Schedule1.8 .. 1 PLTU Sofifi (2 X 3 MW)
aAIJeUJaJIY pa!j!:JadS
~·Zalnpall:JS
BOOK IV
PART5 FORMS AND SCHEDULES
Schedule 2 Optional Price
Schedule 2.1 Specified Alternative
(Not Used)
f';S/.;ri......,
r:
(NOT USED)
r"'"
(~'
S JJed
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 1 Base Price
Schedule 2.3 Recommended Spare Parts
Konsorsium Indomuda - Pusaka
The Bidder shall list all recommended spare part in the table below:
All prices shall include costs of supply, insurance for transport to Site and off
loading.
ITM : PRICE
DESCRIPTION UNIT ,, QTY RMRKS
NO. ,: , (US $)
,
A .~ BOILER PARTS
: - nozzle,
i - Std orifice,
i-actuator
- Press gauge,
- Press Transmitter,
- Thermal Resistance,
- Thermocouple,
- measuring devices
(control valves)
,
5 ESP / Bag Filters parts lot : 1
Rer"f t
Schedule 2.3 - 1 PLTU SOFIFI (2 x 3 MW)
1?
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 1 Base Price
Schedule 2.3 Recommended Spare Parts
Konsorsium Indomuda - Pusaka
ITM PRICE
DESCRIPTION UNIT QTY RMRKS
NO. (US $)
Press gauge,
bimetal
Themometer,
Press switch,
Press Transmitter,
Control valve
Actuator
Level switch
C : Special tools:
~rt
Schedule 2.3 - 2 PLTU SOFIFI (2 x 3 MW)
fl
,~.
BOOK IV
PART!i FORMS AND SCHEDULES
Schedule 3 Bid Infonnation
Schedule 3.1 Addendum Receipt
KONSORSIUM INDOMUDA - PUSAKA
Bidder shall acknowledge receipt of each addendum by listing hereunder each addendum
receipt.
1h,201
Addendum number: - Email Bid Doc no 1 dated August 18 0
7, /)f?
(alqe:)llddy JON)
Juawn:)0a PIS
~.£ 81"pa!l:)S
This form can be used only for deviation or exception to the Technical Specification, as stipulated in Book I Part 1 Clause 1.9.
The Bidder shall specify in detail below all deviations from and the exceptions to the Bid Document. (Additional sheets shall b].:.··.·
included and numbered should the space provided be inadequate). Any entry shall be state Section No. __ and Clause No. •
to which they refer.
The Bidder shall be deemed to be compliant in all respect with the content and intent 07the Technical Specification set forth in the Bid
Document except in respect of deviations and exception listed hereunder. Owner at his sole judgment shall decide whether the!
proposed deviation and exception listed hereunder is acceptable.
In the event that the proposed deviation(s) is accepted, the Owner may request for supplementary price information correlated to th~
deviation, prior to opening 2nd of Envelope (Price Proposal).
~
Schedule 3.2 - 1 PLTU Sofifi (2 x 3 MW)
S lJed
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 3 Bid Information
Schedule 3.3 Contract Payment Schedule
1. INTRODUCTION
1.1 The Contract payment schedule shall be completed by the Bidder in chronological
order.
A1 - Down Payment
A2 - Payment Manufacturing Progress
A3 - Payment upon Shipment
t A4 -
:\5 -
Payment upon delivery at site
Payment upon issue of a Taking Over Certificate
A6 - Payment upon issue of a Fina! Acceptance Certificate
C1 - Advance payment
C2 - Progress payments during erection & commissioning
C3 - Payment upon issue of a Taking Over Certificate
C4 - Payment upon issue of a Final Acceptance Certificate
C5 -Insurance for erection and commissioning
o - Spare Parts, testing Equipment, training and Plant Inspection Prior to Final
Acceptance.
1.3 The total invoice amounts in Schedule 3.3 shall match the amounts quoted in
Schedule 1.2. In case of a conflict in vaiues, Scheduie 1.2. shall take precedence over
Schedule 3.3.
A FOB Portion
Down Payment A1 1st mo 15.00 % 0.00%
A3 8th mo 25.00 % 0.00%
Payment On Shipment A3 9th mo 20.00 % 0.00%
A3 10th mo 15.00 % 0.00%
It
Payment On Delivery te Site .
A4
A4
10th
11th
mo
mo
8.00%
4.00%
0.00%
0.00%
I A4 14th rna I 3.00% 0.00 %
Payment Uponlssuance of TOC AS 20th mo 5.00% 0.00 %
Payment Uponlssuance of FAC A6 32th mo 5.00% 0.00%
Total 100.00 % 0.00%
A Ex - Works Portion
Down Payment A1 1st mo 15.00 % 15.00 %
A2 4th mo 27.00 % 27.00 %
I Progress Payment During A2 6th mo 13.00 % 13.00 %
. Manufacturing
A2 7th mo 5.00% 5.00%
A4 10th mo 15.00 % 15.00 %
A4 13th mo 10.00 % 10.00 %
Payment On Delivery to Site
A4 13th mo 5.00% 5.00 %
t
Payment Upon Issuance of TOC
Payment Uponlssuance of FAC
AS
A6
20th mo
32th mo
5.00%
5.00%
5.00 %
5.00 %
100.00 % 100.00 %
10th mo 0.00 %
35.00 %
12th mo 0.00 %
20.00 %
Total I 0.00 %
100.00 %
i i
D
No.
Description of Invoice Invoice
Code
Date of
Month
Invoice Amount
Foreign
Invoice Amount
Rupiah
Invoice (%) (%)
Note:
1. Date of Invoice (Project Month) is calculated from the effective Date of Contract;
2. Total invoice amount is Sch. 3.3. shall match the amount quote in Sch.1.2. In case
conflict arise, Sch.1.2.shall take precedence over Sch.3.3. amount excluded VAT 10 %;
and
3. The date of invoice and invotce amount (for both USD and IDR denominations) as above
schedule is subject to revision according to the actual progress during execution of
contract
(A ._
~, Schedule 3.3 - 4 PLTU Sofifi (2 x 3 MW)
,~
speallJaAQ IIOJAed p.£ alnpall~S
S lJed
BOOKN
PART5 FORMS-ANDSCHEDULES
Schedule 3 Bid Information
Schedule 3.4 Payroll Overheads
KONSORSIUM INDOMUDA· PUSAKA
Payroll Overhead
t ~f ;V( ~
Il)
~
co
o,
,.,
, '
, '
BOOK IV
PART 5 FORMS AND SCHEDUlES
Schedule3 Bid Information
Schedule 3.5 Labour Rates
KONSORSIUM INDOMUDA - PUSAKA
The prices of any additional work which has been agreed between the Owner and the
Contractor to be executed as Force Account Work in accordance with the provisions of
Part 3, Clause 3.1, shall be charged at the under-noted schedule labour rates. Labour
rates shall be fixed within the applicable year. Only expatriate labour rates shall be
varied on a yearly basis. Local labour rates shall be fixed.
Monthly and hourly rates for any other grade of employee shal! be separately listed below.
t ~t
Schedule 3.5 - 1 PlTU Sofifi (2 x 3 MW)
/~ ~
en
Q)
......
co
~
-co
......
e
Q)
~
tn
......
e
an U)
~ E
co
o. .C
::s
C'"
W
CD
•
M
-::s
(1)
'"C
Q)
.t:
o
en
IlOOt< IV
PART S fORMSAND SCHEDULES
5<he<lule3 BidInformation
5<he<lule 3.6 Equipment Renut Rites
KONSORSIUM INOOMUOA • PUSAKA
Introd"diQo
The terms and"';~di\;';;;;;'flh;; schedule shall apPlv-orlly loequipmenCW11en-usecfOil
Force Account Work in accordance with Part 3, Clause 3.1.
The rental rates which are entered in this schedule shall apply to the equipment wI1ich
the Contractor provides on the Site for the execution of the Works and shall be paid to
the Contractor only in respect of equipment engaged on Force Account WorK authorized
by the OwJier in accordance with Part 3. Clause 3.1 and this introduction.
Unless otherwise specified, the rates in this schedule shall include for the cost of
servicing, fuels, oxygen, acetylene. lubricants, and welding rods.
No paymerrt shall be made for the use of any item of equipment on the Site which is not
listed in this schedule or has no rental rate entered against it, except that if the
Contractor brings to the Site acditional equipment for the construction of the works and
submits a quotation for a rental rate which is approved by the Owner such equipment
and the approved rate shall be deemed to be entered in this schedule.
The rental rates listed herein for each item of equipment will be paid
10 the Contractor for
the number of operatioq hours the said item of equipment is engaged on Force Account
V,~f1\ at the request of the Owner whether such rime is worked on day shift or night shift,
or both,
The time during whlch the equipment is l>eing maintained, repaired, replaced
or modified for 0 dittoront USQ,
2 The time during which the equipment cannot be used because of breakdown,
fault of the equipment of Contractor, or because of inclement whether
conditions.
Unless otherwise specified, the rates entered in this schedule shall be on hourly basis. If
equrpmern IS required for special conunoous Force Account Won., month',' rates wi!: be
established as may be mutually agreed upon.
Bidders shall state the present location of all equipment and whether new or used
PUSAK~
...............
---
t Itt
Schedule 3.6 • 1 PLTU Sofifi (2 x 3 MWj
/
(C"t( I'
~) {/
/1
BOOI< IV
PART5 FOR~ AN;) SCHEDULES
SChedule 3 Bkllnfonnation
Schedule 3.6 Equipment Rental Rates
KONSORSIUM INDOMUDA • PUSAKA
Prices are not subject to escalation and apply for the year stated.
3
1 Genset 250 kVA
75.000
4
1 Compresor 10 Bar 100.000
I L
NOTE: Bidders shall state the location of all equipment and whether new or used.
Separate forms to be used for each year.
l (t
Schedule 3.6 - 2
.cr»
Sluawa..l!nba~
S lJed
~OOKIV
PART 5 FORMS AND SCHEDULES
Schedule 3 Bid Information
Schedule 3.7 Construction Power and Water Requirement
Konsorsium Indomuda-Pusaka
WATF;.BmBt=QUIBEMENT
Introduction:
Pursuant to the proYISIOnS of Part 3, Clause 3.14 the Bidder shall state below his
requirements for construction power (high voltage) and construction water.
SUPPLY CATEGORY
DATE
1 2 3 4 5 6 7
OF ,-
ARRIVAL
I
ELECTRIC POWER AT
(a) KVA load 250 250 300 450 500 500 400
(b) Enerqyconsurnpticn
275 275 330 500 550 550 440
(MWh)
- - ,.~~
POTABLE WATER
Liters per day (Drink) 60 140 260 280 300 280 190
OTHER CONSTRUCTION
WATER
- .
f tr Schedule 3.7 - 1
._-- f{ J) .'!?
sJuawaJ!nbatj
S Jjed
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 3 Bid Information
Schedule 3.8 Construction Storage Area Requirements
-.-...- . - - - - - - - - - - - - - - - - - - - Konsorsium Indomuda -Pusaka
The Bidder shall state below the storage area requirements for both his own and his sub
contractors plant and materials. Space for site office and building shali be stated
separately hereunder.
- - -1
OFFICES STORAGE TIME REQUIRED
DESCRIPTION AND AREA
BUilDINGS
(M 2) (M 2) FROM- TO
- ..
3. WORKSHOP 80 O-COD
2
TOTAL 750 M2 3OO0M M2
S Jjed
, '
i BOOK IV
or
Job Title
T I I 3 I
1 I 1 2 4 I 1 I 2 3 I 4
1 2
3
4
1
2 3
4
fl
3 4
LOCAl..: I I I I I I I I
Install 1 I 1 1
I I I I II
~
~
Civil work 30
150
110
110
90
60
50
,i
EXPATRIATE:
Suvervisor 10 2 4 :6 6 6 6 I
II
!
I
A I I I I I I I I I I
S lJed
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 3 Bid Information
Schedule 3.10 Indonesian Manufactured Goods and Services
SCHEDULE 3.10
fNIJONESIANMANUFACTURED"GOODsm](NllSERVICES
Pursuant to Part 1 Clause 1.31, the Bidder shall fill up all tables listed below to indicate
the value of local content (TKDN) of goor.ts and services to be used.
The Method to fill up all tables as described on the schedule listed above based on Self
Assessment by Bicder and the instruction to fill up as described below each tables.
Bidder shall include / state clearly the TKDN percentage in the Bid Proposal for
consideration in the bid evaluation.
Bidder shall give priority to the usage of local/domestic products. Every Bidder shall
specify the TKDN in details and during work execution bidder shall be able to provide
evidence of the actual TKDN.
The Procurement Committee shall ask for a. clarification in writing when the TKDN
volume (%) is not present or unreliable. In case of no response until the expiration of the
time limit stated on the Clarification Letter the TKDN volume offered shall be considered
nil.
The Proposal of Bidder may be rejected by the committee of the procurement during
evaluation if the TKDN level which offered by bidder deviated and/or unreliable from the
actual condition base on data & information during clarification, verification and
evaluation.
Note:
1" 'Produksi Dalam Negeri or Local Products means all the goods and services
made or provided locally, whilst during its production process, imported
component is permissible to be used.
2. Tingkat Kandungan Dalam Negeri' or Local Content Level which further stated as
TKDN, is the process of activities in providing estimation on local content value in
the form of goods and services based on the analysis of objective and relevant
facts, using full costing method, taking into consideration the weight of
economical benefit to the country.
3. 'Kandungan Dalam Negeri' or Local Content further stated as KDN, means the
percentage of local products which consists of goods and services.
4. 'Kandungan Luar Negeri' or Foreign Content further stated as KLN, means the
percentage of foreign products which consists of goods and services:
rtf I~ j) t(
SCHEDULE 3.10-1. SUMARY OF INDONESIAN MANUFACTURE GOODS
<,
TOTAL WEIGHT
'. .'. ""',' '" m ,.
1.000
_ ...... ,
, . " , ..
Stated by,
DIREKTUR
l tIL t
;t~~(
"
tWU / ~
SCHEDULE 3.10-2.2 BREAKDOWN OF INDONESIAN SERVICES
TKLN OFS.ERVlq~$;·(%)'·('
r ~i :I
~(~
~S!l JopuaJ\ qnS ~~ 'e alnpa4~S
s~ed
BOOK IV
PART 5 : Forms arid Schedules
SCHEDULE 3 : Bi~ Information
Konsorsium Indomuda ~ Pusaka
Bidder shall include / state clearly the Foreign Manufactured Goods and Services to be used for consideration in the bid evaluation
The Bidder shall fill up the !ollowing tables to indicate 1 (ibe) or more the ForeiQn Manufactured Goods and Services to be used.
The Bidder shal' submit supporting letter from nominated Foreign Manufactured Goods and Services to be used which selected by bidltler.
---+---,,_.._...
i . WUXI (PUSj\KA)
=·~lC--:=·······
STEAM
·---+-1- ······j··il·..· - - , , -
2 "TURBINE &
i AUXILIARIES
- China Chang Jiang
Energy Corp. (Group)
~~__} lACtORY
Fax: 0531-88010684
- _i ..
. . . . . . . ,.l. ,
Sch.3 i 1- 1
..-1 iF
,
"
-,
Energy Corp.(Group)
China Fax: 027-87801455 -
- - -
- Nanjing Turbine Go. Ltd - Nanjing, China - -
- - - -
FAN - ANHUI ANFENG - Lujiang, Anhui Province, - Tel: 0565-7322293, - Mr. Wang Yong
- China
- -
FENGJI Ltd, 13605651015
- Fax: 0565-7326101
- -
-
[
- Shenyang Fan Ltd. - Shenyang, China - Tel: 139040542113, - Mr. Liu Qirui
4 I
I - Fax: 024-.25364889 - - -
f -
I i
I - Jinan Fan Ltd. - Jlnan, Shandong, China - Tel: 13954184174 - Mr. Xing Min
II !
•
- -
H
- 1_ Fax: 0531-85952809 -
'.
- - - - - -
PUMPS - Shandong Shuanglun - Weiha!, Shandong, China' - Tel: 0631-5786666 - Mr. Zou Jjyou
5
Group Co., Ltd
- 13012551818
- Fax: 0631-5759488
, -
- SHANDONG BOSHAN - Zibo, Shandong, China .- Tel: 13508942497 E - Mr. Wang Jikui
PUMP Science
mail: -
and Technology Co., Ltd xiaoshou@boshanpump.eo
- m.en
-
- SHANGHAI KAIQUAN - Shanghai, China - Tel: 13780863028 - Mr. Deng Changht..
PUMP (Group) CO., LTD - E-mail: -
- I xww99121 i@126.com
>- \0
,,~
---.
Sch.3.11- 2
, ,'"
.,
BOOK'N
PART 5 FORMS NO SCHEDULES
Schedul 3 Bid Information
Schedule 3 j 1 Subvendor List
7""" Konsorsium Indomud - Pusaka.
-
~o
1
GOOD &
SERVICES
FOREIGN
COMPANY
LETTER REMARKS
7
- Shandong Shankuang - Jining, Shandong, China
- Tel: 13608919141
- Mr. Huang Guangling
Mechinery CO.,Ltd
Fax: 0537-2228529
-
- Hengxin Mechinery - Linqu, Weifang, Tel: 13853676881 - Mr. Zheng Huachun
ManUfacturing CO.,Ltd Shandong, China 1 Fax: 0536-3713690
- - - -
;1
A
>
Schedule 3.11 - 3
~ ~ ~~ I
-.r BOO; IV
PART 5: Forms and Sch 'dules
SCHEDULE 3 : Bid Info ation
~---
Konscrslum'lndomuda-P saka
LETTER ~EMARKS
SERVICES COMPANY
:1 DUST - Beijing Green Mountain I - Beijing, China - Tel: 010·80102233 - Mr. Yu Xianmln
:1 REMOVING Environmental Protection 13911070870
II
'i Technology Co., Ltd Fax: 010·80112065
- Tao Huan Dedusting I - Dalian, China - Tel: 13898429389 ~ - Mr. Dong Peiqing
8 Equipment co., Ltd I -
::
Ii
II
Ii
! - Zhejiang Mechanical and i - Zhejiang, China - Tel: 136Cl5804619 ~ =Mr.Lin Feng
::
"
I, Electrical Equipment
I,
Ii :i
Institute
Ii i
Ii ~ - i - _
Ii ~LAl:.i - Alstom Sizhou Electric - Jiaozhou, Shandong, China :1 - Mr. Xiang
"Ii REMOVING Power Equipment
II (Qingdao) Co., Ltd.
Ii
- .,
--._-------
Sch.3.11· 4
BOOKi;v
PART 5 : Forms and Sched les
1:7" SCHEDULE 3 : Bid Inform" tion
Konsorslum Indomuda-Pu aka
Zhongyuan
~ I[ - New
Hoisting
ADDRESS
- TeJ: 13905329503
, E-mail:
I
CONTACT PERSON
--;~
- Mr. Jiao Qiliang
I
I
LEi?TER I R!EMARKS
II I
Equipment Factory
! qdfeiyanxin@163.com
I
1
-
I
Shandong Tianli Hoisting I - xintat. snanconc,
Equipment Co., Ltd
cnma
-1. -- ___ -
1 - Tel: 1395381<:'032
I _ . . .-
I - Mr. He Hongbo . -.>T-i~
) E-mai!:
I he;ijixie@126.com
I
":!
1
i,::
I
- Mr. Li Ronghua
~ - Tonghua Hoisting ] - Tonghua, Jilin, China - Tel: 13314355588
~ Equipment Factory E-mail:
wangjlng6503@126.com
~
I f
I II COOLING
TOWER
1= Changzhou
Kehui Refrigeration
-
- cnanqzhou, Jiangsu, China
-
---L- -
i - I er. .Uo1l:h)otibb~2
,13506110361
_.- --_._-
!
- Mr. Fan Jinzhong
I
II I
11 iI , rJiangyan
I Machinery
Jinhang I - Jiangyan, Jiangsu, China
Manufacture
j
- Mr. Liu Quehua
! Co., Ltd
1 \
· i
I ;,
l- Zhong YI FRP co.. Ltd - Jizhou, Hebel, China Mr. Wang Jlan
~l-·H
I _
1
~ - Shandong Sid a. Electric I- Zlbo, Shandong, China ~ Tel: 0533-8520651
- Mr, snen Chao
12 II 1 Co., Ltd - i]! 13505338801 l
I ,I - SHANDONG AIPU 1 - JinRn, Shandong, China
!; Fax: 0533-8518846
~ - Tel: 13806415545 - Mr. Du Xianjun
~
I:
ELECTRICAL J ~
:1
71
EQUIPMENT CO" LTD
I
I
\
!
~
~ Sch.3.11-S ----II
BOOK IV
-.:r PART 5 : Forms and Schedules
SCHEDULE 3 : Bid Information
Kcnaorulumlndornuda-pusaka
GOOD & FOREIGN
SERVICES COMPANY
ADDRESS 1 PHONEI FAX! E-MAIL CONTACT PERSON I LETTER I REMARKS
I
- SHANOONG TAl SHAN - Taian, Shandong, chlna - Shi xinwei
HENGXIN SWITCH
GROUP CO., LTD
,~----i--- !'
i
LPP
I
[-- China Electric I
L
- Nanjing, China
--l::
- Mr. Kang Qing
I f I
~. Corporation
-+l--;;::-:~~=~_+l~----;-;-~----=-----1---fl
I \ f !
II 14 !
i
i-~ - Shandona_ Luneng I - Talan, Shandong, China
_ _----j
Ii ~
:' MountTa/electric
~
'I
I:
L__L_
I
..\' i-
_LQingdaO Junlirg Electric
Co" Ltd
-.
- Qingaao, snanoonc, -", -. ---- ---- --. I.
cruna
i
: - lei: UO;.iL-IH tol
I
~~l
Fax: 0532--87751331
I
Mr. Sun
I I
..... . - I
~~ Sch.3.11- 6
, '
"";~
----rr eOOK IV
PART 5 . Forms and Schedules
SCHEDULE 3 : Bid Information
\.~ , Konsorsiurn1ndomuda-Pusaka
y--'
GOOD & FOREIGN SU~~ORTIN\l
~ No SERVICES COMPANY
ADDRESS PHONE! FAXl E-MAIL ! CONTACT PERSON . LETTER REMARKS
I
I
- - -J -
PROTECTION & - SHANDONG LUNENG - Jinan, shandonq, China I- Tel: 0531·82999758 - Mr. Ji Hong wei
MONITORI~G Intelligence Tehnology - 13396407882
DEVICES Co., Ltd !Fax: 0531·82999766
-
- Nari Relay Engineering - Nanjing, China
I - Tel: 13770951114
I
- Mr. Yang Fang
15
Technology Co" Ltd Fax: 025-52100511 -
- -
- NANJING HOHAI NANZI - Nanjing, China , Tel: 13505193654
i- - Mr. Su Changqi
Science and Technoloqy Fax: 025-66620300 -
Co., Ltd
1I -
I
-
- 1 !, -
TRANSDUCER, - Jinan Dalu Mechanism & - Jinan, Shandong, China 1- Tel: 0531-88871096 Mr. Sun Chao
DCS, ElectIOn CO., Ltd. - i 13305310515
"
j
I
i- Siemens China - Shanghai, China =Tel: 12505322652 - Mr. Wang Xlnyu I
- Shanghai Zonfa UPU - Shanghai, China i-Tel: 15802162261 - Mr. Huang Cunxing
-, -
Automatic Control
Equipment co, Ltd 1: - E-mail:
huangshanso@126.com
...::"> I
i I
Sch.3.11· 7
• e
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 3 Bid Information
Schedule 3.11 Subvendor List
~~
~
Schedule3 Bid Infonnatlon
Schedule3.1'1 SubvendorList
Konsorsium Indomuda - Pusaka
~ LEVEL 2
"
1 All Faris and Associated Motors Shenyang Fan ltd
2 All Pumps and Associated Motors Shandong Boshan
Pump
3 FeedWater Heaters Albok
4 RadiatorI Heat Exchangers Surya Radiator
5 ClosedCoolingWater System 3handong Boshan
Pump
6 Circulating Water System (InclUding Screen. Shandong Boshan
Duct & Piping) Pump
7 Chlorlnation System ShlnMaywa lndustrlas
8 Water Treatment System ShlnMaywa Industrles
9 Waste Water TreatmentSystem ShlnMaywa Industries
10 Desalination System ShlnMaywa Industries
11 Bag Filter House Tao Huan dedustinq
Equlprne-itco.Ltd
12 Ash Handling System Tao Huan dedusting
Equipment co.Ltd
13 Air Heater Albok
14 Auxiliary Boiler (N/A) .
15 BollerRecirculation Pump and Associated Motor (If any)
I
16 All Piping, Insulation and Supports for Equipment or System on Local !
."; ".<
BOOKIV
~ PART5 FORMSAND SCHEDULES
SChedule 3 Bid Information
Schedule 3.11 SUbve.ndor list
~
Konsorsium indomuda - Pusaka
28 POC Transfonners & Swltchgears UnIndo & Trafindo
29 Motor Control Centers ABB
30 20 kV Switchgear Equipment ABB/Areva
IV OTHER
-
:1
'./
~
~ g $ ~ I ~ ~ ~ ~ ~ 0 ~
Jii
WUXI HUAI3UANG INDUSTRIAL BOILER CO., LTD
Date :2011-04-06
Ref :SDMECO-OOl
SUPPORTING LETTER
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3
MW SOFIFI, we:
Company:Wuxi Huaguang Industrial Beiler CO.,Ltd
Address: 197# Xixie Road, Hongshan Town, New District, Wuxi, Jiangsu, China 214145
Equipment Name: Boiler
State hereby our fully support to Shandong Machinery & Equipment Import & Export
Group Corporation with (the Supply, Erection and Commisloning] (Engineering,
Procurement; and Construction) of above mentioned Power Plant project.
t ~ ~
••
~ s \tii~j~]
~
fiT AlOOk Boiler lndustri Tef : +62.21 .4610569
JL Rawa Sumu: II BIoi< Ill, Kav, CC 6-7 Fax . +62.21 .4610568 ~--~ ~
'",
Kawasan lndustri Pulogacung E-mail: a!bok@albok·boiler.ccm
Jakarta TImur 13930. lndones.;a hHp:l,'wY.'\'.'.a1bok.boiler.com ill f.,.tr.rm~
~ 5=((JI:i:O)
'Ji1tJCC"JJ
Date : 26 February 20 I I
Ref : ABI/Q004/S0ffS12011
SUPPORTING LETTER
Dec~ Sirs.
In connection w!!h the Tender for "PENGADAAN COAL FIRED STEAM POWER
PLANT 2 X 3 MW sonrr'. We. PT. ALBOK BOILER INDUSTRI. hoving its office at JI.
Rawa Svmur II 8:ok III Kav CC 6-7 xowosoo lndustd Pulogadung Jakarta TirYlur
13930 , state hereby that we will fully support PI. INDOMUDA SATRIA INTERNUSA.
"
novmq 1Is office at Jolon KH. Mas Mansyur No. 98, Jakarta 10230 with the supply
or.d manufacture of BTG USi:'"lg Albok Technology in the event PT. INDOMUDA
SATRIA INTERNUSA is successful with the scid tender for the above project.
Your sincerely,
PT. ALBOK BOILER INDUSTRI
f tL
~[M]D ~ONES~
I~
Wire and Cable
Kepada Yth
Sulawesi,Maluku,dan Papua
Makasar 90222
Jabatan Direktur
Jakarta 11480
SOFIFI
(2x3 MW)
Demikian surat dukungan ini dibuat untuk dapat dipergunakan sebagaimana mestinya.
METERAI
!«~~E~~
TGLf1J. 2Q
52Aa6AAF
~~up.ui _
({'i'~"7e~
A.\!JA.\!I..4.~
IMING SUJAN4
Direktur .
ff
SAU';:;;
[SO ~tom
t f~ 1.:\'11 '''lire and Cabk·! hi;
.u. i':' /'F (.:7 I\'ol>/-/
;1 f'~8VA Bokc~si '<n"!,
fJf(j';UC··II' "j / ..
2'-~'~
1".J
(>1~:~;:~ ~
1:-'0 I iWll Jakarta 1~1SJ 10. iNtJ<>~,fL~...':'·.
r:'~')1 J1G(117:3:·~. Fil>~ (:,2 ~)\ ;il~~·l'· •.
I .H~·<\> 1KHHI
;",n<~(L\n:' ~ ",I It.! It'.'(/I.\.:. .!,n""'
~[M]D ImmmuImJj
I~ONES~
Wire and Cable
SURAT PERNYATAAN
No Ref: KMIINDL/ 0363 /IV/2011
Kepada Yth
PT. PLN (persero)
Unit Induk Pembangunan Jaringan
Sulawesi,Maluku,dan Papua
Jl.Let. Jend. Hertasning Panakkukang
Makasar 90222
SOFIFI
COAL FIRED STEAM POWER PLANT
(2x3 MW)
Demikian surat pernyataan ini dibuat untuk dapat dipergunakan sebagaimana mestinya.
Jakarta, 7 April 20 II
PT KMI Wire and Cable Tbk
~~.
IMING SUJANA Sr
Direktur
SMK;;
;'!', '. : " .•..•.
rfli
I 1;f\1I Wuc <111<1 Clhk I"bL
tf
rlv J"J (;! ;\(dh'!lnt'iUI:, .i,; !'/,,/.:j
ISO ~lO(ll.
11<'
Bertindak atas nama PT. KMI Wire and Cable Tbk, sebagai pabrik pembuat kabel dengan
merk "kabelmetal INDONESIA", dengan ini menyatakan bahwa kabel yang kami supply
untuk proyek :
SOFIFI
C) (2x3i~W )
diproduksi sesuai dengan spesifikasi yang disyaratkan dalam tender dan kabel tersebut
dijamin baik selama penanganan bongkar muat, pengiriman, cara pemasangan dan pemakaian
dilakukan sesuai prosedur yang benar.
Kabel tersebut diberikan garansi selama 12 (dua belas ) bulan terhitung sejak dioperasikan
Demikian surat keterangan garansi barang ini dibuat untuk dipergunakan sebagaimana
mestinya
~-~
IMING SUJANA0
Direktur
Sl\lIG~
IS() BOO!
tI~ I' ( 1(1,,11 vVire and C,hk
; ",fl" VI" G"I" Kabc! fr:i!ul/'o,w
)1 Raya Bnkasi Km 23.1 . C;~hl::>~~
ff
n,h
u.; i
, "'
ISO 1 wm Jakarta 139HJ, Ir~[l(lNc-, :,'r'.
:,:,-: 2"; 1~f301733. r3x 62 21 'H~'!~l:l:j:;
OHS:\:-- 1.";/10\
k!nirfDkrnj co.ut, Wl'\,'l·V. k rl1i .( .' ,'I
PT VOKSEL ELECTRIC Tbk
'Ie Factory: Jalan RayaNarogong Km. 16,Cileungsi, Bogor 16820, Indonesia
CertificateNo. ; 'UUJi'U1v~
I SUPPO'RTING LETTER I
No. : 857/SD/KLl/V/11
Hereby is the confirmation that PT. Voksel Electric Tbk having address in Menara
Karya 3st Floor Suite D, JI. HR. Rasuna Said Block X-5 Kav. 1-2 Setiabudi Jakarta
Selatan 12950, as an exclusive agent of Cable brand "Voksel Kabel", give their full
support to the company detailed below:
.f" ).
INTERNATIONAL
We further guarantee that all materials supplied by us are brand new and genuine
spare parts.
We trust the above meets with your full approval but should you require any further
clarification, please contact t.he undersigned.
lectric Tbk.
c'M
. ~ 1-'
.:~.i";2C'TCC'm::; "rb~~.
I'
,::.. iF] 'fA
~; (
IUle
tt~ if
OUke:
Menara Karya 3rd Floor, Suite 0 JI. H.R. Rasuna Said Block X-5 Kav. 1-2 Jakarta 12950 Tel. (62-21) 57944622 Fax. (62-21) 57B04-*4;;
~
Date :2011-04-06
Ref :SDMECO-012
SUPPORTING LEITER
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3 MW
SOFIFJ, we:
Company Jinan Ventilator Factory Co., ltd
r>,
.,"; Address 66, Fenghuangshan Road, Tianqiao District, Jinan, Shandong, China.
Equipment Name: Ali Fan and Associated Motors
State hereby our fully support to Shandong Machinery & Equipment Import & Export Group
Corporation with (the Supply, Erection and Commisioning) (Engineering, Procurement, and
Construction) of above mentioned Power Plant project.
Company
,r
.;'7
..
,~.
.
signature :Jt IH
~
t ~f ?
~~
PT VOKSEL ELECTRIC Tbk
Wi Factory: Jalan Raya Narogong Km. 16,Cileungsi, Bogar 16820,lndonesia
f}'
i':~
!:ri
1':1
To. :
PT. PLN (PERSERO) PROYEK INDUK PEMBANGKIT DAN JARINGAN SULAWESI,
MALUKU DAN PAPUA
JL. Let. Jend. Hertasning, Panakkukang
Makassar 90222
Should any malfunctioning and l'br latent defect in equipment under normal use and service
be found during the said period, PT. Voksel Electric Tbk, shall promptly commence to repair
and make good such malfunctioning and / or defect.
Name : HERUGONDOKUSUMO
Signed
DUly authorized to sign the Authorization for and on behalf of: PT. Voksel Electric, Tbk.
t ~i If
Office:
Menara Karya 3rd Floor, Suite 0 JI. H.R. Rasuna Said Block X-5 Kav 1-2 Jakarta 12950 Tel. (62·.2'0 i 5794 4622 Fax. (52-21) 5794 4649
Date 2011·0.~·06
>:l.:f SOMfCO,013
SUPPORTING LEITER
Makassilf 90222
Dear Sir.
In connection with Iender for' Perigadaan Coal fired Steam Power Ptant (Pl TU) 2 " 3 rvl\V
SOFI FI Wf' ,
Stilt;: lier cbv our .fully '..l/pporr'to Sharidong Machinery &: Equ,pr;l·."" irnp or t & hpor!. Group
C~;pcr~tlO;; -:;,"vith tthe S'lipp!\~, Er~(t;on and c.on'1m~~!cn!ng . f.(I~~!rRI(.('rlnf:.. Prn(Oreq14.~rq (lnd
Your Sincerely.
Company
,
~l~natllre
. ,
, l if..
..~~I
, t,A\.f" \1 I J~ :
.' ...;':;):1· ~" .
./ ~..
t Itt ~
Date :2011-04-06
Ref :SDMECO-016
SUPPORTING LETTER
.'
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU)
x 3 MW SOFIFI, we :
State hereby our fully support to Shandong Machinery & Equipment Import & Exp
Group Corporation with (the Supply, Erection and Commisioning) (Engineering I
Your Sincerel~.",
I; .:
Company,....; ,~1.i ft "$
11 ch,wt.<J
.
;'!' '.' ,.. ~ 1!)18-fil~·
"", ,~,
x.
~.;~'
-~~:...
1.
;\ ':r.--A.
~
.. ~~.~ ~::.~ ~
.... ~ .. ~.
, "'-..\\......
(·~rv·
'1;1,
',.>~... ~
~~ ".
,~- --
... ..
v
-
I ~1 (?
Date :2011-04-06
Ref :SDMECO-015
SUPPORTING LETTER
Dear Sir,
In connection with Tender for: Pencadaan Coal Fired Steam Power Plant (PLTU)
2 x 3 MW SOFIFI, we :
t\
:... j'
Company .. Yixing Suha Power Equipment Co., Ltd
State hereby our fully support to Shandong Machinery & Equipment Import &
Export Group Corporation with (the Supply, Erection and Commisioning)
(Engineering, Procurement, and Construction) of above mentioned Power Plant
project. -----
Your Sincer
Company
/
signature
I ~t
,.
Date;2011-&4..n6
R(r~SO~~I'
SUPP0RTING :LE·~R
Dear Sir.
f""\.
.; ~
In connection with Tender for: Pengsdaan CoIiI Fi~_Steam Pc)'wer PIQn1 (pLHI) 2 x
.", /
3 MW SOfLFI.,,~:
State hereby our fuJ ly support to Shandong Machinery &. Equipment import &:. Export
Group Corporation with (the Suppl)·. Erection and Comrnisioningj (Engineering.
Procurement, and Ccnstructioc) of above meatiencd Power PbUll project.
i qf tf
Date :2011-04-D6
Ref :SDMECO-OlO
SUPPORTING LEITER
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3 MW
SOFIFI, we:
State hereby our fully support to Shandong Machinery & Equipment Import & Export Group
Corporation with (the Supply, Erection and Comrnistonlng] (Engineering, Procurement, and
Construction) of above mentioned Power Plant project.
Your Sincerely,
Company
,C
'\
"... j
Signature t"re CO.Ltd
l ~t z?
KSBbJ
April 5, 2011
SUPPORTING LETTER
No: 063fSUKSBIfIVf2011
Dear Sirs,
We, P.T. KSB INDONESIA, group of KSB Worldwide, pump manufacturer of "KSB" brand hereby authorize:
Jakarta 10230
'r"
: }
To offer our products for: PLN UIP RING Sulawesi Maluku Papua
Bid Subject :
In case PT.lNDOMUDA SATRIA INTERNUSA is awarded with a contract, we wili provide full professional
services for the successful supply and/or installation of our equipment in the Employer's country and support
in execution of the works as per the requirement of the bid,
This supporting letter will be effective from bid opening date and remain in full force until the contract
completion,
Yours faithfully,
Rajeev Jain
President Director
fAR
t
PT.KSB INDONESIA
! 1
Head Office: JI. Timor Blok 02·1. Kawasan Industri MM2100, Cibitung 8ekasi 17520, Tel. +62 21 89983570, Fax. +62 21 89983571 www.ksb.co.id
Sales OffICe: Cawang Kencana Building, Floor O. Suite 002, JI. May Jend. 5utoyo Kav. 22, Jakarta 136?0 Tel. +62 21 80886509 Fax. +62 21 80886504
Deutsche Bank: Deutsche Banlc Building, Jl.lmam Bonjol80. Jakarta 10310, Account No. 002 1014-05-O(US$). 002 1014-01-O(Euro). 0021014-00-0 (Rp)
--_II.. •• __ .....1::--= _ . , G _ _ D-&'_. It"'_ 1Q '~sri21 T"""'-IIF 6 __ nll"t Nn· ."c;,....0094001625 tRo\
~ UNINDO
Kepada Yth,
PT. PLN (PERSERO) UNIT INDUK PEMBANGUNAN JARINGAN
Dengan hormat,
Kami, yang bertandatangan di bawah ini, dengan ini bertindak, dalam jabatan tersebut, untuk dan atas
nama PT UNELEC INDONESIA (UNINDO), selaku p8rusahaan yang memproduksi Transformator
Distdbusi 3 Phase, Mli. Switchgear, Gardu Compact Substation, Trenstorrnetor Tenaga, dan
Transformator Kereta, beralamat di JI. Swadaya PLN, Klander, Jakarta Timur dengan in; menyatakan
bersedia untuk mendukung perusahaan berikut ini :
I
(\ Nama Perusahaan Consortium of PT Indomuda Satria Intern usa - PT Pusaka Jaya
::..., }
-,
International
Alamat Ji. Anggrek Cendrawasih Xl No. 18 Kemanggisan, Jakarta 11480
(selanjutnya disebut "Perusahaan Yang Didukung"), yang mana sepanjang pengetahuan kami
berdasarkan inforrnasi yang disampaikan oleh Perusahaan Yang Didukung, adalah perusahaan yang
didirikan secara sah berdasarkan ketentuan hukum negara [Republik Indonesia] dan rnerniliki bidang
usaha diantaranya mencakup Perdagangan Sarang dan Jasa.
Dukungan yang kami berikan dalarn Surat Dukunqan ini hanya diperuntukkan untuk rnenyediakan/rnen
supply [produkl'jaSa] berikut ini ("Produk") : GENERATOR TRANSFORMER, UNIT AUXILIARY
TRANSrORMER., untuk proyek berikut ini ("Proyek") :
menyatakan bahwa jika Perusahaan Yang Didukung berhasil mendapatkan kontrak untuk Proyek
tersebut, yang mana akan dibuktikan dengan surat penunjukan atau kontrak yang telah ditandatangani,
i<ami akan menyediakan Produk tersebut sesuai dengcn ketentuan dan persyaratan yang disepakati olen
perusahaan kami dan Perusahaan Yang Didukung.
Kami memberikan Garansi Barang selama 1 (satu) tahun terhadap kerusakan karena kesalahan pabrikan
{ " dan kami rnenjarnin bahwa barang yang akan disuplai adalah asli dan 100% baru dengan tahun produksi
\. j 2011, serta rnernberlkan jaminan puma jual dan dukungan suku cadang terh~dap baranq yang disuplai.
Jika (i) Perusahaan yang Didukung tidak berhasil mendapatkan kontrak untuk Proyek, atau (ii)
Perusahaan yang Didukung memutuskan untuk tidak mengikatkan diri dengan perusahaan kami untuk
pengadaan Produk atau (iii) jika Perusahaan yang Didukung dan perusahaan kami tidak berhasil
mencapai kesepakatan tentang kondisi dan persyaratan pengadaan Prod uk maka Surat Dukungan ini
tidak lagi berlaku. Surat Dukungan ini hanya berlaku untuk periode 6 (enam) bulan terhitung sejak tanggal
Surat Oukungan ini.
Surat Dukungan ini diberikan hanya untuk keperluan memenuhi persyaratan tender/pelelangan Proyek,
ditujukan untuk Perusahaan yang Didukung dan tidak dapat dialihkan kepada pihak lain rnanapun.
Atas perhatian Anda kami ucapkan terima kasih.
6221. 460 6 ~ 59 (Secondary Distribution), 62.21 . 460 6158 (Power Transformers), 62.21 . 460 4181 (General)
Date :2011-G4-(}6
Ref !SOMECD-007
SUPPORTING lETTER
Makassar 90222
Indonesia
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PlTU) 2 x 3 MW
SOFIFI, we :
r";;.. .J Company : Shandong Luneng Mount Tai Electric Equipment Co., ltd
<
Address : nanzhufeng Road, Development District, Taian, Shai'ldong, China. 271000
Equipment Name: Generator Transformers, Unit Auxiliary Transformers
State hereby our fully support to Shandong Machinery & Equipment Import & Export Group
Corporation wi eSupply, Erection and Commisioning) (Engineering, Procurement, and
Constructjet .;o,f~bG('vjJ entloned Power Plant project.
, .\..:::,.. \ ~ . 0-.1 ....' ~
:~~;6' ~'i .
'v~$../ ~~ _e ,,~~ _~
Your ~tI""
:.;;.:.-' I
,.;g*-~":~.::,
~ :_._
n.'l~
.~.
.-' . - ..
.J -
...
"1t;
~
"
Signature~~.
.. L
~) 1.J"\
1 f t
';~
. $ t . t H n,~;fJL~
HTC Hangzhou Steam Turbine Co.,Ltd.
1n*'R ~~
if1T ~I l~H.it #I $1' f;6X ~:tl tJH!357-5 It! it/Tel:(0571 )85780114
~ ~Fax:(0571 )85780433 ~ nl: WWW.HTC.NET.CN
Date :2011-04-06
Ref :SDMECO-002
SUPPORTING LEITER
C)
Sulawesi Maluku dan Papua
JI. Let Jend Hertasning Panakkukang
Makassar 90222
Indonesia
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant
(Pl TU) 2 x 3 MW SOFIFI, we :
Company : Hangzhou Steam Turbine (0., LTD
Address : No.357 Shi Qiao Rd,Hangzhou,China
Equipment Name: Steam Turbine & Auxiliaries
State hereby our fully support to Shandong Machinery & Equipment Import
: -l & Export Group Corporation with (the Supply, Erection and Commisioning)
" r
(Engineering, Procurement, and Construction) of above mentioned Power
Plant project.
Your Sincerely,
Lil\~tr'
Company 11tll ~J
7'~J!,i(JU QTEA
v lVI,TURBli\iIL C·O 'LTD.
u C
I 'l'
l tfJ
Date :2011-04-Q6
Ref :SDMEC0-008
SUPPORTING LETTER
Dear Sir, .
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3 MW
SOFIFI, we:
Company : Shandong Luneng lntelligertce Technology Co., Ltd
() Address : 500,Erhuan South Road, Shizhong District,
Jinan, Shandong, China. 250002
Equipment Name: Unit Metering and Protection
Distribution Line Metering & Frotection
DC Distribution Equipment and Panels
State hereby our fully support to Shandong Machinery & Equipment Import & Export Group
Corporation with (the Supply, Erection and Ccmmisioning) (Engineering, Procurement, and
Construction) of above mentioned Power Plant project.
Your Sincerely,
Company .-; ~
,,,,. -. -.
.i
signature
t ! ~
~ate :l0l1-04-,()6
Ref :SDMEC@-009
SUPPORT1NG LETTER
Makassar 90222
Indonesia
bear Sir,
,
C)
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant {PLTU} 2 x 3 MW
SOFIFI, we:
State hereby cur fully support to Shandong Machinery & Equipment Import & Export Group
Corporation with {the Supply, Erection and Commisioning} {Engineering, Procurement, and
r ~f
,y
:",""
..
'
-,
".
" .
..,'
,.. :- ..
L_
. -'
~
'.'1; c::.; (03. v..
:>. ",
~~
o ,. ..
~-'.
c~
.-y' ." '"
cc '.'
..... _c
r-. j
1.. • .:.
--
·.. /~
UJ ~
., r-...: ~.;
:1,
1..;.-. t ....
J;
vr-' ',.:
:,>" ~:~~
C'
'..0 0
C
Lw '0
C;.. ..::":'
... c: "'fo'~
r:
0 ...J .c.
:...; ';
c
,',
q
-7
-c:
"
'..,:
",
..... ,-,
\..) !.:J .,
.... '-:"; >.
,
::) ;."
2 o: :> ((.,
..
;..-"
.. .: .
~ ,'"'= .:::r.: .. ~ ~
(jj
,--< 2 I- i-- ~
'"
e--: "¥.' ",
....:....: .~ 0
0 ': c.. · '- ....., .::J
('" '/', cr. I......
""
;-
'.. ;
:0 >
a
c,
c.,.;
~
':.:: t:
l_I",
':,:
r.:
Q
..:......
c: '. ','
~
~
QJ
-e--, r.: .. c;
rv :1.. -.I ',."
,~
~ c: Vi • ' . "
I r ,'
eBBE
jt5ljtR~=;g2fD~Be£:5J
Date :2011...()4.{)6
Ref :SDMECO-OO6
SUPPORTING LETTER
,. Dear Sir,
.. 1
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant
(PLTU) 2 x 3 MW SOFIFI. we :
China. 100176
20 KV Switchgear Equipment
State hereby our fuliy support to Shandong Machinery & Equipment Import &
Export Group Corporation with (the Supply, Erection and Commisioning)
(Engineering, Procurement. and Construction) of above mentioned Power
Plant project.
Your Sincerely,
Company
:,'
JlIllJ!:, ~tBB:iffl5i*R'.61.IZ~~~~5§ 811J!li:, 100176 ~l('j~f\., (010)67888838 ~Jl, (010)67802622 ~lJ!:, www.bsf.com.cn
t {t
Sc~.,eider
("FElectric
Kepada Yth:
Untuk mengikuti proyek .. SOFIFI COAL FIRED STEAM POWER PLANT (2X3 MW)"
Jika Perusahaan tersebut diatas menjadi pemenang dalam pelelangan ini maka kami akan mensuplai
Peralatan sebagai berikut :
Demikian Surat Keterangan Dukungan ini kami buat, untuk dapat dipergunakan sebagaimana mestinya.
Hormat kami,
PT. Schneider Indonesia
Irzan MARTAKUSUMAH
Sales Manager for Power Generation Energy BU
"
t~L~i'
.R. PUo Buaran Raya Blolt,. EE Kav.
Kawasan In6.JsIriPUogadung
Jakarta 13!I2ll ~S1A
Ph. 62lll21) 2E l'5 100 (Humng)
2-~ po Box 1258. Jakarta 13012, INDONESIA
www sctmeider-e!ectri:: co jd
F"" 62 I02"TI C60 32 Oi I 4682 69C2 ~SO 9001. ISO 14001. OHSAS 1800 1 Cer1iied
Date :2011-04-06
Ref :SDMECO-004
SUPPORTING LEITER
Makassar 90222
Indonesia
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3 MW
f .~ SOFIFI, we:
Company : Qingdao Changlong Power Equipment Co., Ltd
Address : 87, Changjiang Road, Development zone, Pingdu,
Qingdao, Shandong, China. 266705
Equipment Name: De-aerator,
Auxiliary Boiler,
State hereby our fully support to Shandong Machinery & Equipment Import & Export Group
Corporation with (the Supply, Erection and Commisioning) (Engineering, Procurement, and
Construction) of above mentioned Power Plant project.
.
Yl;~r :Sin~er~ly,
Company '~ ..
~. , .. " ' : ~ . j !'~t .
\ .. ~~. I
\. . .' !
signature. -, ...... ... ..-/
.;.1 "
'. l ~I
~ x ~ ~ ft I ~ ~ ~ ~ m* ~
WUXI HUAGUANG INDUSTRIAL BOILER CO., LTD
Date :2011-04-Q6
,~~
SUPPORTING LETTER
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3
MW SOFIF1, we :
Company:Wuxi Huaguang Industrial Boiler Co.,ltd
Address: 197# Xixie Road, Hongshan Town, New District, Wuxi, Jiangsu, China 214145
Equipment Name: Boiler
State hereby our fully support to Shandong Machinery & Equipment Import & Export
Group Corporation with (the Supplv, Erection and Commisioning) (Engineering,
Procurement, and Construction) of above mentioned Power Plant project.
t ~ t
Date :2011-04-06
Ref :SDMECO-003
SUPPORTING LETTER
t' '.~ To : PT. PlN (Persero) Proyek Induk Pernbangkit dan Jaringan
.I
Sulawesi Maluku dan Papua
JI. let Jend Hertasning Panakkukang
Makassar 90222
Indonesia
Dear Sir,
In connection with Tender for: Pengadaan Coal Fired Steam Power Plant
(PLTU) 2 x 3 MW SOFIFI, we:
Company . Hangzhou Steam Turbine Co., lTD
Address : No.357 Shi Qiao Rd,Hangzhou,China
Equipment Name: Generator & Exciter
State hereby our fully support to Shandong Machinery & Equipment Import
& ,Export Group Corporation with (the Supply, Erection and Commisioning)
(Engineering, Procurement, and Construction) of above mentioned Power -
Plant project.
Your Sincerely,
Company
\ ff
*
~ UJ tUJitii~J!H~ Q ill?n 1}ii.I
D .... e C
Shandong Machinery & Equipment Tel: (86)-532-85724411
~ Imp. & Exp. Group Corporation, Fax: (86)-532-85724412
....N.e.w ~~J:ldM;,g§iQn(SnMECQ]>I.~~l. E.:m3il;~eccp@pu blic.gd.sd.cn
9, Fuzhou Road,Qingdao,P.R.China
To: Our Ref(2011 )SDMEC01121058 Total Page: 1-1/1 Date: April 7, 2011
SUPPORTING LETTER
Dear Sir,
In connection with Tender.for: Pengadaan Coal Fired Steam Power Plant (PLTU) 2 x 3 MW SOFIFI, we :
Company: Shandong Machinery & Equipment Import & Export Group Corporation
State hereby our fully support to PT. INDOMUDA SATRIA fNTERNUSA with Engineering,
Your Sincerely,
., #M~.
'; t. ~ ..
Hubert Yao
Commercial Manager
. Shandong Machinery & Equipment
Import & Export Group Corporation
r tf
JPE.F W*ml¥J~Egi&~r
SHANDONG JINAN POWER EQUIPMENT FACTORY
'-~'-""='-'--.-----_.,-==-==-
Shandong Jinan Power Equipment Factory confirms the readiness for supply
and technical support for the Generator within the project period and offers the
better service to our customers.
Best regards,
.
r
,
, '
t *..}.\ , '
Sh~~~ Power Equipment Factory
~
'I--sr:.)v JA, J:I
11:"" -.,
~i~.
Jr.'i' ':
'1 'K I~.~ ,.
'-:~: . ~l
. ,I, I. ·-f. ~ •
/j.
\ II r:l H "J " I f1-f- J'
~Ge/D.i:;¢r
".01~.::. \.,., ..' ..-.~-
l t f
tt ~~ ~ M
Qingdao Jieneng Power Station Engineering Co., Ltd.
Office Add: 5th Floor. C Building, World Trade Center 6, Hongkong Middle
Road, Qingdao
Tel :86·532·85910116,85910386 Fax: 86-532-85910383.85910385 Postcode:2G6071
Qingdao Jieneng Steam Turbine Co.,Ltd., confirms the readiness for supply
and technical support for the Boiler within the project period and offers the
better service to our customers.
\ "'- J
Best Regards,
Qin~leamTurbine Co., Ltd.
p / , ' /<-.,.
/ ";S'~ '. ~~r.,~
"....:~
."
r::~~~·
~.'. . ~.~
11,-!..;-~
~ ..:.~~ ..'::}j .
b '
'f;t.. r (y
~}~" :;.;~.;;,. 0~;· ~#
Lin 'F,q.llli.fJ.P~.htt:6eneralManager
":';-".:;".:.:.. . .
\ !j
[II
PT. NW INDUSTRIES
Komplek Sentra Niaga Kav. No.12 & 15,Bulevar Hijau, Pejuang
COMPLETION CERTIFICATE
'---'
I
I CONCLUSION
I
I
~.~.
,r....
~.
..... -
~
".
I ---'--'-lI
This certify RETUBING BOILER TUBE, EXPAND BOILER TUBE, & WELDING At PT. SOUTH!
PASIVIC VISCOSE according to Time Sheet. Has beer. complete accordance with the technical Ii
I specification required by customer. This job fully handed over from the Contractor to the Customer I
I !
i from this date for further operation under Customer responsihility. i
I, I'
i i
f ..- - - - - - . - - · ... ·-· ...· ...- - ]
I I
! This Certificate is accepted and Approved by both Parties I
I ~
r'Prepare<I'By-- -. ---------.-. Customer Approval
..,-~._--~
~~
REPRESENTATIVE
1 .v::/ "J"
\ ""V
, i(
I
.l...1..
/
__ TEGUH SUMARYAqJ L._--.L...... ~.
t~t
PT. NANI \'/AHYUNI INDUSTRIES - Wedareto be yourpartner in Boller andIndustries 5elvIces
,~; ,
"',-;1:·"
: ....
•/" pr;'MiilbA(}~JNOust#fE$ , ~~
. ~::;; ..
'c.' .......
i ;~~::;';:'~1i!{::;;:!~~:i cq
~~:
,~aMPLETIONANO
.
,
'
~~~~! . . '."
#liadatlCTl'!f
PbOho :+52.21 4.6105~ ':~"Ht\~\~VER CERTIFICATE
',;"... . .,- _.~-..r':p, ..
....-;.
IConClliSio n
t==.~4t.~Of<AJ
· w" .. 4'--.-. - . , H-2i"
'~'-": ".~:: ~-=:=::.
. _.;•..., , ..: .~-"
£'~~,.~;"-~;.
.? .
'J'
,.J:
.~.~r\_:-:'; -
.~ > ~I~.-...:.s
' ••
1
.
;s :
'F..4-'c, '''''''""l ev
-~~J~:71. ~~·Y··~~~ .
. ""'" JI'v.'1TH
A1 '.L-L,c..~t3:.J::L.E.lC4 ne: • .......".'•".
- c:;...®-:P~~~~'1- 'TV&·~S..,&Y 7C,.Jx $~~;7t,':K X.
L.!;N~fJ1 ..::C-~1?~ir'·,: 40 p£~ ·"'F....vA~1 IfUS CS'i~nf
~ 1"1
' I 'V;",.
t::=;-, ~." ,.~,•• ' " , r-r- ,.; 1<- .. " .. f~~.
r , ~ '. M ........
-u.;.~ .. .M'- c--v J)IN'f::;1:·:;;;;;,J,~~..,,:pQ
I L...l:O .....,It,.... .. .. L.••
. ~'-o~'''';'(jJA
']) ( '0i;~S.[J:diL._.. "._,o.~,· j.
~.'--....~r~·;·
#. ~ tiro.r+Af,e_N' ~r.
c
¥_.:.... :---,~.
d· •.•
.... -"- ..
.• ,!,. __ ,~~ ........,
.,_.._......'_. ~';~"'-~, ..
.._-_:.,"
--J:~~%~
Customers Approval '. ., (
.
·ft~S<
.'_ .....
AtctLJ~ .~'
319-01<Cnlev"~1197~
"~"., .; ; t "."1,".-,;"
..
. ~-~.. "."h .~""~,,,
. .. ~" .·~".~~4;:'.'.N- .,'~~->: - .-. -....~ ~.'-~.:..:
n, AALBORG-INDUSTRIES
Conclusion
This is to certify that replacement of 8 boiler tubes on rear wall of Kan Won Boiler have been completed
in accordance with the Technical Specification required by the Customer.
[)
'.
Scope of work I supply includes .- I
.. a) Completed repair crack on Steam drum
- b) Completed repair tube hole on steam drum I
.. c) Completed Non Destructive Test
.. ;1) Performing hydrostatic test
The equipment handed over from 06 December 2001 and stil! under quarantee up to the period-
and condition as specified in the contract aqresment. j
I
I
--1 II
I
I--
I
iI
I
I
---i
1.
s
I
I
This Certiticate is Accepted and f>.pproved by both Parties
Signature anCl-Sate-above Printed Name Signature and Date above Printed Name
319-01-C/Rev OO/LA1197
\ t t
J."vtI T/frWJr
~.:.~.21.~1 ...~
D41te : 28-01·02
•,
..
'
' . ". ; .
.
FIT; AAtBORGINOOSTRIES
..
Conclusion
This Is to certify that Aslborg SIJnrod Steam Boiler CPH300 hllVG been repaired and tested
r>«: in acoordsnoe Wih.the·o~r requirement.
~
':.., / o~otworit:
Team 1 !22-25Jan :atlO2):
COmpleted repair ~ 3 fUT1\ace tubes (5 tubes W13r<il piugge<l and-/, Nare built·up) and 000 smoke tubes (plugged)
&JPPIY mQt'l:
-2~argon
• 2 bo~ OL<liQan
1 botfkt acetyfen
• ~OO Iitre~;-d~ oil illClvde one steel drum
• 125 kgs ~ccy mat'l ~O KtiS wer;? m:ssir1g whe:1 'oadir.g to the va..sse!) I
_-------l
·20 kg5 ofwlpinQ cotton (wiping clcth).
Hydrotest up to5 k.gJom2g (as per customer rQqtfin'lment) and steam test. Ill! 0 '" f. (6'1
have been carried out with S3'JsfactOI\'. I .\../-11 f' (1ltff
-i if I' \" i :. 1\.1.(-\- ~
/ f - - .- ... t:- :.:,-
•• -".f"
'j~ ~ t- i=- -: r::, 1-'-". l\\,~n r v!. ~ : \ -::. (:..I;- i\,\~'\l.1,\ ,. ...·;,C C
- ~~.: c. Lt-; ; v/,:'
t- (/' ,,:--. ~ f.\ AI -rc It f '>M.:
r
Custome7 Approval"...... presentative
1
.- / c~8fF
is>:: ,
I
... ) 3!led (
~'. , r:
~10>
MT VIcky one Chlef\:nQin~rlMaste-r
<.(J(,,-!
rtf~ I
I
Signature and Osta 800w Prtrrted Name SIgnature and Date above Printed Name I
r> ;1.1
)<;, lL-Y~ .I l L ('Jt;,
"J Wi .->
. --
.
--'.........
.
, ~
-.
. ',
,
,
;1.. ....
' .
ro-;:L p.03
Conclusion
This is to certify that repair nozzle of Babcock Omnical Boiler have been completed
.,/." 1.
f in accordance with the Technical Specification required by the Customer.
, .»
Scope of work / supp!y includes
• a) Completed replaclnq Nozzle 4" with new one
- b) Completed replacing Nozzle I" with new one
- c) CornpleteqNonDestructlve Test conducted by third party "B4T"
- d) Performing hydrostatic test
The equipment is handed over from 11 Dec. 2001 with satisfaction.
'1
C
usto
~p
ro v a l
. 'X.?4':'0/.
. PT. Aalbora lndustries Representative
D-.~#'r; UI'l~
.
. : .'• , . I" f .L. /~ PT. Aolborg Industries
--;;f; 19., fYtl <:'1
'o·(('.j"J.:( t'l.'('l<j Ib
Signature and O~e above Printed Name Signature and Date above Printed Name
''\. 319-01-C/Rev.OO/LA1197
t t t
Jakarta TImur
HAND OVER CERTIFICATE .
Jjjjjjh
• . •
.: Phone :+62 214810569
Fax: +62 21 461 0568 PI..AALBORGINDUSTRIES
Conclusion
"
Thisis to certify that PT. Aalborg Industries scope of work as per above contract no.
()
has been satisfactory finished in accordance with customer requirement.
The equipment handed over from 21 Sept 2001 and still under quarantee up to the period-
and condition as specified in the contrack agr~~.m.~nL~ __ ..
---
" ~l
'J
~ Itf
.,
PT.Aalborg Industries Tel +62-2I-46I0569 Bankers
jiiiii~ . JI.Rawa Sumur II Blok III Knv CC 6-7 Fax +62-21-4610568 ADIIo AMRO Dank 1i\1I
i&WWi
AALBORG
Kawasan Industri Pulogadung E-mail aalborg@rad."cUd JI. Ir. H.
Juanda 23-2;1~
~
INDUSTRIES Jakarta Timur D·nO. Indonesia http ! /www.aatborg-industries.com Jakarta Pusat -,._
C) ~
.
CONCLUSION
,
This is certify that Steam Boiler package have been tested and Commissioned
Attachment:
0/ 1. Function Test
)
0/ 3. Efficiency calculation
.I 4. Maintenance report
~-~I
/l
~710"
i Mr Helmi Marsono ) ( Budfu K Wlbowo)
1\..
- Er/H'Ijc; f1'(,{ ~"-d--
-SjJ<rt /r'-'f f"1"-<I. /
> /tJ k.u'.
J('l/
G..f-'*-I . ...
f~!J
'!r'lrl. ~
_fr"d-'~ /Jw # " a..r- /5" / - F
l itt
f
PT. AALBORGINDUSTRIES
.
........
Conclusion
This is to certify that Stearn Boiler package have been tested and Re-Commissioned
in accordance with the Technical Specification required by the Customer.
..
,0'., "
~, J
- a) Completed Erection and lnstalatlon Bumer Accessories.
- d) Completed test safety defices low/low low water level and High - high pressure Interlock.
The equipment handed over from January 03 th 2002 and still under quarantee up to the period-
~.
.1'
..
"
319-01-C/Rev.00/LA1197
tit
~ ../\
Customer's Inspector !\1r Rudy Prasel'.'a Capacity/Size li) OOQ Kglhr. 18,20 Barz
CONCLUSION
,,--.,
;)
This is certify that Completed supply, supervision installatlon and tested
pressure and flow monltorino system.
The Equipment which supply by contractor as follow:
I'}
,I
~-OJ
1t
( Rudy Prasetya ) ( Budhi K. Wibowo )
-
[ ~f
I -
.
AALBORG
.
IN 0 U fT • I E S
rr.Aalh()l1~ Industries
.J1.Rawa Sumur \I Blok 11\ Kay t:C (...7
Kawasan lndustri Pulogadung
Jakarta Timur 13470, Indonesia
1'('1
fax
: -Hi2-21-4<,J 050'1
: ~-61-21-46Hl568
F.-lIlail : aalborgl1i'rad.nct.id
http : I/w"iw.aalbore-indlls1ri~.(om
Ranl..,'n;
Bank :"il.·\GA
.1I.Mll Tharnrin 5..'
Jakarta I'usat
.,
.....
m
.~
Customer's lnspector &-.£~A RtF.I~~ (f£"R0 .TR. . Capacity/Size I ~ £"" Tg~ hc,_.2:' Ban:
?
M~g~cu Kepada PKT PO no. 2023-C-TA1-105-BE-JBC dan quotataron AI no. 11. 1400/Alilf2000 dr &
011. 14.00/AI/I/2000 dr Rev-1 , dengan scope of supply untuk pekerjaan Scope of Vendors Worl<s I
,r')
~' ..
i(lnstallation) sbb.:
1. Supply Manpower ie. Supervisor, Welder Ceitificate and Boilermakers.
2. Dls,'(Tantling insulation (old superheater elemBnt and header).
'3. instaiiing new superheater element and header.
4. Supplying all necessary sa~ equipment and supplies for the work
5. Arranging transportation and aceomodation for manpower during the work on job site.
6. Supplying of welding rod and any other weldinq consumable.
PT. AI telah melakukan semua pekerjaan diatas dengan baik dan rnelakukan radiography. PWHT dan hyoro
static test bersama-sama dengan PT. PKT
Untuk selaniutnva PT. AI menyer",f.kan sepenuhnya kepada pihak PT PKT untuk dioperaso.ao sesuai dengan -
spesifikasinya dan mengenai warranty sesuai rang tercantum dalam quotation P'I.Al tersebut diatas.
-_._.
)(. - ,~
•
This Certificate is Accepted and Approved by both Parties
Customer's!Jfroval .. p~_,ndu",;e,., Representative
)7 /
, /" t'J J .~
~ - 0,:1 0/
.~Aalborg Indusmes
1-U<: ~ \~
I • r
-t «,
/"
) . )...·"1l1
.Y,
(.......X...................................) (.Hery Sohe)
."'Il1;-.
l t t
-:
..
..
AALBORG
INDUSTRIES
.......
:.:..
. PT Aalborg Industries
JI. Rawa Sumur II Blok III. Kav.CC 6-7
Kawasan Industri Pulogadung
Jakarta Trrnur 13930. Indonesia
Tel.
Fax
; + 62.21.4610569
; + 62.21.4610568
E-mail: jkt@aalborg-.ndustries.com
http://www.aalborg-industries.com
Bankers.
ABN AMRO Bank
JI. lr. H. Juanda 23-24
Jakarta Pusat
fi
b~d
"·2J
. ~.... ,.' ~~, .::.,..... !"\.! ; .• ! ?~,! . ,t!- :;....... ~ :,'vit);:-F; uate .~,iJ·;J1 i~·l 2.:..~ql(,:~; !
of\.
l~ .f
'!'--:·'-:::~·"'I~-_r '-l·:-,,-,p.-·r(..:
1''.
Pij~':
j .... l-.~.
H':"";'.1,hr~i:~-,
,-"
'... ./ \j '-...... .: £~/ . ~; /0/\/ ,t
I
!
\
...,........,...
~ ~~-.n=~r_-~.~ __ ~ ~
----_.---------_._--_._. -----;-::---,-----,--:;:--_.
. .:.:r-.•
:...
!<·'-'-:-t /~! ·:~te; ~"e e-.l-=-,,:e! ~t~.f",l)a~~· i..: ':::'8;'?~- -_._--_. __ _------_. __
.. .. - .... _ . _ . __ ..-.. - _._-._.~
!
/ ;
:L.-\\.-;y "<IJI
~/
I .
'/ 'j - -4:- - - _
/ ;, .··f· . .
£,
'\
I 1
INTRODUCTION
1. The Bidder shall, wherever possible, incorporate the key dates given in Schedule
4 here with in this Bid Proposal Schedule, together with other detailed information
specified in Part 4: Technical Requirements.
2. The Bidder shall indicate in column 4 any key date which the propose for item 2,
3, 4 and 5 which are marked with a double asterix (**).
"'
3. The Bidder shall not propose delays to the key dates given in Schedule 4
herewith for with liquidated damages are applicable and which are marked with
an asterix (*).
This key dates are subject to liquidated damage assessment as specified in Part
2 Clause 2,46 and Part 3, Clause 3.4.
a. CPM
b. Barchart for completion key date schedule
<.
.•.....•..............
:
.- KEY DATES
INCLUDING
- ITEM OWNER
CONTRACTOR
THOSE
NO. MONTH FROM
MONTH FROM SUBJECT TO
THE DATE OF
THE DATE OF LIQUIDATED
CONTRACT
CONTRACT DAMAGES
EFFECTIVE
EFFECTIVE FROM THE
DATE
\ DATE DATE OF
CONTRACT
EFFECTIVE
DATE
1. CONTRACT SIGNING .- I -
.
,.
2. CONTRACT EFFECTIVE 0 (**)
..
DATE
-
3. SUBMISSION OF DESIGN 0 (**)
AND DETAIL DRAWING
-
". 4. FIRST PILING 0 (**)
-
5. MAIN CONTROL ROOM (**)
FUllY OPERATIONAL
, 6. 1st SYNCHRONIZATION 17 16 *)
.
. 7. STEAM TURBINE & AUX 20 18 *) Ii Add.I
. UNIT 1 READY FOR
COMMERCIAL
~.
OPERATION ..
t
Note *) Subject liquidated damages, except for item no. 6 & 7 the liquidated
damage only prevails for one or both items (not cumulative lD) which over is
more longer based on reference key date each.
E
"
And
'.
Schedule 5 - 2
..
... :~L: '..i .,
-\ -.'
.'};/ ., -.:~:.~ ~ ':.:. ; .. t , ;;':i( :;).::~:-:;.:. ~:. :'iB~~,1V
" ' .
PART5 FqRMS' AND S'CJ:i1=t>qLE~ ..
c ' '.1 •., L '
. . Schedu.le·5 Qualjfi~tionProfile
Konsorsiuin Indomuda -Pusaka
.,
2.2. . Attachthe document confirming the,internal agreements' between, the joint
.. '. ''; .operatlon ·parlneJ's.( As·per attached) . - ; _ '.' '..' '.: I:· .t. :;'.'
. "l:.' . , . .'. . .. ,~.. --; .. -
3. Identificatioli of manufacturers of rhajor
~.. .
equipment, itncit id~ntified in 1j.and .--~
. Name' ,.
. ,:,., . %·ofTotal
. Amount· Address' EXtent of Supply
Bid
JI. Rawa Sumur ll, Blok
a. Albok Boiler III, Kav. CC6-7
Kawasan Industri Boiler -
PUlogadung, Jakarta
'13930 Indonesia
b. Oingdao Jieneng China Oingdao
Turbine or
Nanjing Turbine Nanjing, China
Turbine -
r)
.. . .-
" ... ~
c. Shandong Jinan Power
Equipment Factory
China Jinan Generator -
!~
:: '\,
Name Address Extent of supply
.~ l Fabrication &
JI. Mayjenci"Sungkono XII No,
1 PT. Bangun Sarana Baja Erection Steel
8 Gresik, Jawa Timur
Structure
Erection
2 PT. PJI Rukan Artha Gading H124 jKT Mechanical &
Electrical
3 PT. Gumaya Eng Nusantara Kom PTB I/O 12 Jakarta Civil Work
Schedule 5 - 3
-,
lILt
'",
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 5 Qualification Profile
Konsorsium Indomuda-Pusaka
5.2. Attach a copy of the Bidder's power of attorney to sign on behalf of his major
subcontractors.
L SEE ATTACHMENT I
I
7.
I I I I I
Give financial statements of the Bidder and if applicable, of the Joint
II
\ Operation partners, designers and manufacturers of major equipment and
~ l'
prime erector for the past five years.
8. Show financial structure of the Bidder and if applicable, of the Joint Operation
partners, designers and manufacturers of major equipment and prime erector.
a. TO BE LATER
b.
c.
etc.
-~t"H--il------::-----
, .
........
.: " ~.'" ..: 'BOOK IV
PART 5FOR,~S'AND'SCHEDUl,ES
Schedule_5 Qualificatipn Profile '
Konsorshm Indomuda ' Pusaka
r. ,,~
Note:
Volume of current order bookx:100
=~~~~~~~~--==:T~"'1Od~~~~ia.giif:·~
1O. Show if applicable; how the Joint Operation partners, 'subcontractors and
licensor are bound to undertake jointly and severally' the performance
guarantees
. -
~.
and
",... . maintenance requirements
... .
of the Bid"
'-...
.'
:
11. List the major items of erection equipment, their present Ownership and
location and the dates of their unrestricted availability. .
12. Show the proposed project organisation (home office) and Site organisation.
" Indicate for key site personnel their experience on comparable work in a
climate. The Site organization shall reflect the requirements of Part 2, Clause
13 and 14.
The Owner reserves the option of making his own arrangements for the
insurance requirements. The Bidder shall identify the proposed insurer and
.~
provide details on comparable insurance cover provided by the insurer
together with full financial statements for the past five years.
Schedule 5 - 5
\ ~i
I ' ~ "
.'
.: BOOK IV
PART 5 FORM & SCHEDULE
Schedule 6 Plant Performance Guarantees
KONSORSIUM INDOMUDA - PUSAi<A
The Bidder guarantees that the Works described in his Bid Proposal will
conform to all the requirements of the Contract Document, be suitable for the
service specified, and that all equipment will be designed to meet the
\ performance requirement related to operation under seismic conditions as
specified and be free from design, manufacturing and material defects.
The Bidder also guarantees that he will, at the convenience of and without
charge to the Owner, replace or repair any of the works or portion thereof
which prove defective as a result of faulty materials or workmanship within the
Warranty Period.
6.2 PLANT
. . PERFORMANCE:GUARANTEE:'
-. ",' . , -
The Bidder shall guarantee the following Plant Performance Data based en the
following TMCR (Turbine Maximum Continuous Rating) conditions:
Ambient air
Temperature 30.0 ° C
Relative Humidity 96.5 %
Barometric pressure 999.6 mbar
The worst Sea water temperature 30.5 C
~
•f Schedule 6 - 1
,I .j
Ii.
I)'" /
r.,
j>
\;.
' l ~ I ' Iv{
,/
/~),
i t'.--/
-----
BOOK IV
PART 5 FORM & SCHEDULE
Schedule 6 Plant Performance Guarantees
KONSORSIUM INDOMUDA - PUSAf:A
The Bidder gU2r3r.tees the total power consumption for the following
auxiliaries correspondinq to the operation of the each unit at MeR.
Equipment
Power
Consumption
Number
Of Equip. in
Total
(a) x (b)
I
I.. in kW Operation in kW
(a) (b)
1. FO Fans - ,I 38 1 38
2. 10 Fans 58 1 58
3. SA Fan 14.8 1 14.8
4. Traveling Grate I 2.4 1 2.4
5. Condensate Pump 6.0 1 6.0
6. Boiler Feed Pumps 70 1 I 70 !
7. Main Cooling Water Pumps 90 1 90
8. Closed Cooling Water .
Pump 8 1 8
9. Cooling Water Booster .
Pump for Closed Cooling .
System (if required) 1.5 1 1.5
10. Coal Feeder 4.0 1 4.0
11. Bottom Ash Handling 3.2 1 3.2
12. Chemical Injection System 1 .3 1 1 .3
13.
14.
Oil Conditioner
Gland steam exhaust
N/A...
. .
I
blower N/A . .
15. Main oil tank vapor _. .
extractor 1.5 1 1.5
16. Precipitator .
16 Cooling Tower Fan Motor . .
.............. . .
.............. . .
.............. . .
/ \
Schedule 6 - 2 SOFIFI 2X3MW CFSPP /c ''.\ 'A
«;: ,?,. (
/
, 1:
/~
.: BOOK IV
PART5 FORM & SCHEDULE
Schedule 6 PlantPerfonnance Guarantees
KONSORSIUM INDOMLJDA - PUSAKt\
~ I
- Filter feed pump
- Neutralizing pit agitator
- Purified waste water pit
1
I
N/A
N/A I N/A
N/A
j N/A
N/A
-f
-
M .
,
I,
/
" . BOOK IV
PART 5 FORM & SCHEDULE
Schedule 6 Plant Performance Guarantees
KONSORSIUM INDOMUDA - PUSAJ.<A';
---,
6. Service Air Compressor 5 1 '5
8. VACSystem 10 1 10
- Fan motor in 'rurbine
Hall
- Air Conditioning in
Central Control Room &
"'" Administration building
4. Transformer Losses
5. Environmental Control
a. Emission
• Sulphur Dioxide : 750 mg/m 3
3
• Nitrogen Oxides : 750 mg/m
• Total Particulate : 100 mg/m 3
b. Noise : 85 dB (A)
) ,
/ /~,
!~ I /'/)
i I
I
BOOK IV
PART 5 FORM & SCHEDULE
Schedule 6 Plant Performance Guarantees
KONSORSIUM INDOMUDA -.PUSAKA
0
Main steam temperature at turbine throttle is 435 C
0
Main steam temperature at turbine throttle is 435 C
111
/v~\ / /)
It rl
Schedule 6 - 5 SOFIFI 2X3MW CFSPP
\ ;
I'~
BOOK IV
PART 5 FORM & SCHEDULE
Schedule 6 Plant Performance Guarantees
KONSORSIUM INDOMUDA - PUSAKA·
0
Main steam temperature at turbine throttle is 435 C
at BMCR is 80%
at 75 % MCR is 79%
at 50 % MCR is 78 %
f.
I~ ~ ! l.
Schedule 6 - 6 SOFIFI 2X3MW CFSPP
I I
. L\~)
I'~
BOOK IV
PART 5 FORM & SCHEDUI.E
Schedule 6 Plant Performance Guarantees
KONSORSIUM INDOMUDA - PUSAKA
L~t.-/" I~ t I
-_._. ---_..... --~~~ '/
/ '., "\v{
' \/'1/
/
\
..'
I_
I
,~'
-
ctS
o
a
t:
.J::
o
Q)
l
I'
-
Q)
:1
-c
Q)
J:
o
en
, , ' , ! J s I ~:
.'
Technical and Administration Proposal
PLTU Sofifi (2 x 3 MW)
TABLE OF CONTENT
...
1 ...._
,
1.;
. tlt .
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
1. STRUCTURAL STEEL
2. STEEL GRATING
3. HANDRAILING
4. WELDING
Wi t--+--t
. Sch-7.1 - 1
~~
PLTU Sofifi (2 x 3 MW)
I~
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
,
Bidder's Data Sheets Konsorsium Indomuda - Pusaka
(Bidder's Name)
6. ANCHOR BOLTS
8. GROUT
ltt-+-t----~ 1
'~
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 CMI and Structural Works
14 DOORS
16 WINDOWS
17 LOUVRES
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
a. Manufactures TBA
19 SHOTCRETE MATERIAL
20 GABION
21 RENO MATTRESS
22 POND LINING
23 ASPHALT PAVING
\,
27 GEOTEXTILE SHEET
. vt t f ----~~
Sch-7.1 - 7 PLTU Sofifi (2 x 3 MW)
1
.~'
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
30 BORED PILES
Maximum depth 50 m
.
. \~ t t Sch-7.1 - 8 PLTU Sofifi (2 x 3 MW)
/
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
-' '\
33 STEELL!NER
lf
.. .:
35 SECURITY FENCING
\.."
\.
It If
Sch-7.1-10 PLTU Sofifi (2 x 3 MW)
/~
.'
P'"
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
Name of
Name of Wall CellUng/Cover Roof Wall Door Window
No. Floor
Bulldinq Room/Floor , -~.
Insulated
E:xspose Insulated Steel flush Anodized
metal
metal roofing cladding door aAluminlum
Double I double window with
skin metal sWing/ 6mm thick
+ reinforment single blue tinted
concrete swing/ rollup polished float
Monolithic block wall of shutter) glass with
Steam Insulated metal with reflective
Steel trowel 1m high
1 Turbine Turbine Hall cladding/
Finish with along semigloss out board
Building
hardener the periphery paint finish 6mm ciear
and painted polished
+Cement float glass in
mortar plaster board.
painted Anodized
Aluminium
louver with
insect screen
Brick wall with l
Electrical GelllvaniZ~ Idem Idem Idem Idem
Cement with Cement
Equipment
Area
harderner mortar r
»rotlled
----
piaster _.
<,
".
BOOKN
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
r-~
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
., T\l 7.1 Civil and Structural Works
F ..L....
Bidder's Data Sheets K9nsorsium Indomuda-Pusaka
(Bidder's Name)
sus: snslon
polished float
svst e m glass with
! reflective
out board
Electronic
Equipment
Glazed Cement Ace ustic tile Builtoup ~all Steel flush Anodized
<.
\ -
Revision 0 Sch-7.1 - 13 PL TU Sofifi ( 2 x 3 MW )
·' \ l
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural WorKs
---;;;r
~
BIdder's Data Sheets Konsorsium Indomuda·Pusaka
(Bidder's Name)
--- _-
._ ..... ,'. • ••.• - __ ,_• • _ _ • ~"< •• O"
Room
ceramic mortar panel with roofing and cement door with aAluminium
Tile and plaster aluminium waterproofin . mortar plaster semiogloss window with
PVC tile painted suspension g+ and painted paint finish 6mm thick
I
(raised system Insulation blue tinted
floor ( if polished float
any))
I glass with
reflective
out board
Acid resistant Non Builtoup Cement Steel flush Anodized
cCement suspension
type) polished float
mortar systemNon glass with
plaster combustible
reflective
high) aluminium
suspension
system
~-
~
I Revision 0 Sch-7.1 - 14 PLTU Sofifi ( 2 x 3 MW )
"
/'
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
rr:»:
Bidder's
--- - Data
----- Sheets
_.---~-
Konsorsium
. -_.--_. ----- ..lndomuda-Pusaka
-.~-~".-~- . --_."
~' (Bidder's Name)
,
Interior Finishes Exterior Finish
Name of Name of
No. Floor Wall Ceiling/Cover Roof Wall Door Window
Building Room/Floor
SWGR PVC tile painted suspension g+ and painted paint finish 6mm thick
Room, MV system
(raised Insulation blue tinted
SWGR
Room floor ( if polished float
any)) glass with
reflective
out board
Monolithic Reinforment Checkered BuiltOup Brick wall Steel flush Anodized
Cable concrete steel plate roofing and cement door with
steel aAluminlum
Trench
trowel Monolithic painted waterproofin mortar plaster sernlncloss window wIth
finish with steel trowel g+ and painted paint finish 6mrn thick
hardener finish with Insulation blue tinted
hardener polished float
glass with
reflective
,
out board
Glazed Brick wall and Acoustic tile Insulated Cement Steel flush Anodized
3 Cooling Electrical cCement panel with doubel skin mortar plaster door (single aAIL.'minium
ceramic
Water Room
Pump tilePVC tile mortar aluminium metal roofin painted swing/ rollup window with
House plaster and suspension • + single skin shutter) 6mm thick
painted _system I metal with blue tinted
semigloss polished floot
paint finish glass with
reflective
I
out board
>'
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural WorKs
~
<:r Bidder's Data Sheets Konsorsium Indomuda-Pusaka
~
(Bidder's Name)
Interior Finishes
-- Exterior Finish
Name of
Name of Ceiling/Cover Roof Wall Window
I No. Floor Wall Door
BUilding RoomlFloor
Plant Room
Monolithic Brick wall and Galvanized Insulated Cement Steel flush Anodized
steel cement profiled doubel skin mortar plaster door (single aAluminium
trowel mortar metal roofing painted swlng/ rollup window with
finish with plaster and + single skin shutter) 6mm thick
hardener paintedUnins metal with blue tinted
ulated semigloss polished float
metal paint finish glass with
cladding reflective
-_. out board
Monolithic Brick wall and Fair faced BuilteJup Brick wall Steel flush Anodized
4 Water Control steel cement concrete roofing and cement door with aAluminium
Treatment Room
Control
trowel mortar painted waterproofirn mortar plaster semluoloss window with
Building finish with
plaster and g+ and painted paint finish 6mm thick
floor paintedCem Insulation blue tinted
hardener ent polished float
mortar plaster glass with
painted reflective
out board
Electrical Epoxy Brick wall and Fair faced Metal roofir'lQ Cement Idem Idem
Room multilayer cement concrete mortar plaster
flooring mortar painted painted
plaster and + single skin
paintedCe~ metal
r
ent
J /
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
'-;;r
Bidder's Data Sheets Konsorsium Indomuda-Pusaka
~. (Bidder's Name)
~
Interior Finishes Exterior Finish
Name of Name of Ceill ng/Cover Roof Wall Door Window
No. Floor Wall
Building RoomlFloor
,
mortar plaster
I
painted
Acid Acid resistant Acoustic tile Builtoup Cement Steel flush Anodized
Laboratory resistant ceramic tile panel with roofing mortar closter door with aAluminlum
Ceramic (up alurninium waterproofin painted semiogloss window with
tilePVC tile to 1.5m high) suspension g+ Insulation paint finish 6mm thick
Brick wall system blue tinted
cement polished float
mortar glass with
plaster reflective
painted out board
(over 1.5m
high)Cement
mortar plaster
painted - ---
Grazed Glazed Non Insulated
metal Bricks Wall
ceramic ceramic tile combustible
Toilet Plastering and
tile mineral fibre roofingSingle Painted Aiumunium Alumunium
board with skin metal
olurnlnlum
suspension
system
Monolithic Brick wall and Fair faced Builtuup Brick wall Steel flush Aanodize
5 Chlorinati Control steel cement concrete roofing and cement door with AlIumlnium
on Room
~
I Revision 0 Sch-7_1 -17 PLTU Sofifi ( 2 x 3 MW )
·' ,'
.$-,;>'
BOOK IV
PART 5 I=orms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
-~-------~-~-~---------
-~
Bidder's Data Sheets Konsorsium Indomuda-Pusaka
~ (Bidder's Name)
~---
Building
trowel mortar p a inted wateruproofi mortar plaster window with
semiogloss
ng+ Insulation and painted 6mm thick
paint finish
. blue tinted
polished float
glass with
reflective
out board
Plant Room finish with plaster and proofing+ mortar plaster semiogloss window with
(Generator Ex spose
floor painted Insulation and painted paint finish 6mm thick
Room)
hardener blue tinted
polished float
glass with
reflective
out board
Emergenc Monolithic Cement Fair f aced Bujltuup Cement Steel flush Anodized
6 Y Diesel Plant Room mortar plaster cor« .rete roofing mortar plaster double door aAluminium
steel
Generator (Generator
Building Room) trowel painted P' Jinted waterproofin •I painted with louver
finish with g+ semigloss with
hardener Insulation oaint finish insect screen
Monolithic Insulated Ga /onized Insulated Single skin Steel flush Anodized
7 I Workshop Workshop
steel metal p rofiled metal metal and door (single aAluminium
I
trowel
cladding roofingSing Ie brick wall of swing/ rollup window with
finish with skin metal 2m high and shutter) 6mm thick
hardener cCement with blue tinted
<.\
Revision 0 Sch-7.1-18 PLTU Sofifi ( 2 x 3 MW )
"
,.,.~
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
~ ------------------- ----------_.----+------------------------- 7.1 Civil and Structural Works
----v
Bidder's Data Sheets Konsorsium Indomuda-Pusaka
~ (Bidder's Name)
~
\
Revision 0 Sch-7.1 - 19 PLTU Sofifi ( 2 x 3 MW )
·'
.'
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7,1 Civil and Structural Works
~
.---;;:r Bidder's Data Sheets Konsorsium Indomuda-Pusaka
(Bidder's Name)
~
Interior Finishes Exterior Finish
Name of Name of
No, Floor Wall Ceiling/Cover Roof Wall Door Window
Building Room/Floor
mortar plaster
mortar plaster glass with
painted painted reflective
out board
I window
with sheet
, glass 4mm
~ thick
Acid
Acid resistant Acoustic tile Builtoup Cement Steel flush Anodized
!
Laboratory resistant ceramic tile panel with roofing mortar plaster door with aAlumlnium
Ceramic (up aluminium waterproofin painted semiogloss wlndow with
tile PVC tile to 1.5m high) suspension g+ paint finish 6rnm thick
Brick wall system lnsulot'on blue tinted
cement polished float
Mortar plaster glass with
painted (over reflective
1.5m out
high)Cement board
mortar plaster
painted
Grazed Glazed Non Exspose/
Toilet Zinkalume Idem Alumunium Alumunium
ceramic ceramic combustible
tile
tile mineral fibre
I
'S::
J
Revision 0 Sch-7,1 - 20 PLTU Sofifi ( 2 x 3 MW )
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.1 Civil and Structural Works
\7'
Bidder's Data Sheets Konsorsium Indomuda-Pusaka
~ (Bidder's Name)
-- Interior Finishes Exterior Finish
!
I No.
Name of Name of
Floor ' Wall Ceiling/Cover Roof I Wall Door Window
Building Room/Floor
aluminium
I
suspension
system
storage Grazed Brick wall and Non Insulated metal Steel flush Anodized
9 Building Storage
combustible metal roofing cladding door (single aAluminium
ceramic cement
for B3
Waste tileO mortar mineral fibre swing/ rollup window with
I
and
, Monolithic plaster and board with
shutter) 6mm thick
Material
steel painted aluminium with blue tinted
trowel Insulated suspension semigloss polished float
finish with metal system paint finish glass with
hardener cladding Galvanized
reflective
profiled
out board
Bricks wall
10
Laborator Office/lab Ceramic tile Bricks wall Gymsum Zinkalume plastering With Steel Alumunlum
y Building plastering Painting
-.
) Revision 0
.~----._--------_._.
Sch-7.1-21
----
F'LTU Sofifi ( 2 x 3 MW )
-s
Technical and Administration Proposal
PLTU Sotiti (2 x 3 MW)
TABLE OF CONTENT
TABLE" OF CONTENT
SCHEDULE 7.2 MECHANICAL WORKS
'\
SCHEDULE 7.2.20 ASH HANDLING SYSTEM
z
<:
c: 0r
N .
~
....O -.;:
-- ......
w
C/.l
::J
E~ ...J
~
I
"1;;(11') :J <:
-2 >< c
-- N
E~
W
J:
o
~
0
"'0;:
«a
en ~
e
"'Oi= ::s
"C;;
c:~ ....
0
CIl
C g
-c
u
~
--
e
.J:
U
....
0)
~
"
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxiliary Equipment
Bidder' s Data Sheet Konsorsium Indomuda-Pusaka
(Bidder' s Name)
1. MAJOR DATA
"
1.2 Manufacturer/Designer ALBOK BOILER or Equivalent
1.3 Number 2
1.4 Steam generating capacity at boiler
maximum load (main steam flow) (T/H) 25
2
absorption rate (KcaI/H/m ) 119800
2
other than water wall (m ) TBA
2
other than water wall (KcaI/H/m ) TBA
Drum (Ton) 19
Steam: 2.95
3
Hydrostatic test (m ) 8.6-9
14/'
Revision 0 Schedule 7.2.2 - 1 PLTU Sofifi (2 x 3 M
~
BOOK IV
P.t..RT 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule .7.2.2 Stoker Boilerand Auxiliary Equipment
H: 12
WA
Weight (max. ton) 15
1
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxmary Equipment
1-0 FLOW
1-1 Main Steam Flow Uh 22 18 15
1-? SH 1st Spray Flow t1h 1.0 0.75 0.5-
1-3 SH 2nd Spray Flow t1h
1-4 SH Total Spray Flow t1h 1.0 0.75 0.5
1-5 % SH Total Spray Flow than Main Steam % 3 17 16
Flow
1-6 Blow Down Flow t1h 0.8 0.62 Q.5
1-7 SIB Steam Flow (From PRJ. SH Outlet) t1h 22 18 15
1-8 Aux. Steam Flow (From PRJ. SH Outlet) t1h N/A I N/A N/A
1-9 Feed water Thrcuoh ECO t1h 22 18 15
1-10 Feed water At Terminal Point t1h TBA TBA TBA
1-11 Fuel Flow ka/h 3775 3050 2610
1-12 Comb. Air kQ/h 14 12.6 11
1-13 Comb. Gas kQ/h 15.5 13.2 12
1-14 Sec. Air flow (FDF our x 2) ka/h Later Later later
1-15 (% Of Windbox In Air) % Later Later later I
1-16 (% Of SEC.AH In Gas Flow) % Later Later Cater
1-17 PRI. Airflow PAF OUTx 2) kQ/h Later Later Later
1-18 PRI. Airflow AH IN) ka/h Later Later Later
1-19 PRI. Airflow Temo.Air) kQ/h Later Later Later
1-20 (% Of PAF Out Flow) ~o Later Later . Later
1-21 Gas FlowJAH-.!!!L ka/h Later Later Later
1-22 (% Of Comb. Gas Flow) % Later Later Later
1-23 Gas Flow ( EP In) ka/h Later Later Later
1-24. Gas Flow (IOF in x 2) ka/h Later Later Later
1-25 Air IFuel Ratio -
'\
t 'L j
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker. Boiler and Auxiliary Equipment
"~
KONSORSIUM:lNDOMUDA- PUSAKA
3 PRESSURE
3-1 TSV Inlet (Terminal) bar a
3-2
--'----'=-
Sec. SH (CONV SH) Outlet bar a 35 35 35
3-3 . Inlet bar a
3-4 PRI.SH Outlet bar a 37 37 37
3-5 Inlet bar a 35 35 35
3-6 Drurri bar a 39 38.5 37
3-7 Econ Outlet bar a 39 38.5 37
3-8 Inlet bar a 39 38.5 37
3-9 FNV Terminal bara 40 57 57
3-10 SIB Steam To Control Valve bar(a)
3-11 SIB Steam Leaving Control Valve bar(a
PRESSURE DROP
3-'12 SH Outlet to TSV bar 1.0 1.0 1.0
3-13 SEC. SH (CONV..SH) bar 2.9 2.3 1.9
f'"'[ t
Sched ule 7.2.2 - 4 SOFIFI 2X3MW
13
BOOKIV
PART5 FORMSAND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 StokerBoilerandAuxiliary Equipment
:i KONSORSIUMHJDOMUDA - PUSAKA
5-0 MISCELLANEOUS
5-1 Ex. Air Ratio (ECO Out) % 35% 40% 50%
5-2 Q Heat Output MW 36 27 18
LOSS 6.14 7.64 10.14
5-3 Dry Gas Loss %
5-4 Moisture In Fuel %
5-5 Hydrogen In Fuel %
5-6 Moisture in Air %
5-7 Carbon Loss %
5-8 Radiation Loss %
5-9 . Unaccounted Loss %.
5-10 Total loss %
5-11 Boiler EFF (HHV) % 80 78.5 76
5-12 Boiler EFF (LHV) % 87.5 86 83.2
HEAT RELEASE
(Bidder' s Name)
2g±
VWO (105 % TMCR) 35 kg/cm 1 kg/em 1
VWO
BMCR
(105 %
(108 % ™
TMCC~» 1~;:g ~;:g /4Iff- / f
Revision 0 -~~3MW)~
.~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 TechnicalData
Schedule 7.2.2 Stoker Boiler and AuxiliaryEquipment
KONSORSIUM INDJMUDA - PUSAKA
100~o rated 435:..Q.± .§..°C
75% rated 435°C±.§..°C
50% rated 435°C±.§°C
.' \
2. DETAIL DATA
a. Tubes:
Furnace :
2
Water wall heating surface (exposed) (m ) Later
2
Other healing surface (exposed) (m ) Later
Dimension Width (m) Later
Length (m) Later
Height (m~ Later
Volume (m ) Later
Furnace Total:
Total Helght(m) TBA
Tctal Volume (m3 ) Later
Total weight of furnace with
full water and highest level of solid (kg) Later
lTil ~
.~.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule7.2.2 Stoker Boiler and Auxiliary Equipment
'.:... ;. KONSORSIUM INDOMUDA.- PUSAKA
Diameter (mm) Later
Thickness (mm) Later
Detail of refractory lining Later
Boiler tubes:
Material TBA
-..:.
Diameter (mm) Later
b. Headers
.: "\.
,
~ Furnace:
Material TBA
Diameter (mm) Later
it~ ~
BOOK IV
PART 5 FORMSAND SCHEDULES
Schedule 7 Technical Data
Sc.hedule 7.2.2 Stoker Boiler and Auxiliary Equipment
••.. f
KONSORS/UM INDOMUDA - PUSAKA
Distance between tube and tube (mm) Later
Diameter (mm) Later
Required thickness (mm) Later
Minimum thickness
o Materia Later 0
Length (mrn) Later
Traverse pitch Later
Traverse row number Later
In flow row number Later
Distance between walls:
Length (m) Later
Width (m) Later
Flue gas velocity
(each section at boiler max.) (m/s) Later
(o0l Header.
-," i
-; .'t Number TBA
Diameter (mm) later
Thickness (mm) Later
Length (mm) Later
Material TBA
Manhole number and size (rnrn) Later
Recirculation line of economizer Yes
Header:
Number 1 1
Diameter (mm) 219 219
Thickness (mm) 16 16
Material TBA TBA
Size of cutlet connection TBA TBA
Nozzles (mm in nominal) TBA TBA
o Design metal temperature 435C 435C
Number of thermocouples for metal
temperature 1 1
Maximum temperature (0C) 435 350
)
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Bo:ler and"Auxiliary Equipment
.,'
KONSORSIUM INDOMUDA - PUSAKA
Attemperator: "
Type Spray nozzle
Number
" Location Between Primary & Secondary SH
Material Stainless Steel
Control method Automatic.
2.5 Casing, Brick Works, Refractory, Insulation and Lagging:
(for the areas have not been described in other data sheets)
The Bidder shall make copies of the form and continue filling it if necessary to complete the
data sheets in his scope
\. Inner casing:
Name/Location Later
'j'1 Material
Thickness Later
Outer casing:
Name/Location Later
Material
Thickness Later
Brick works:
" Name/Location Later
Material
Thickness Later
Refractory:
Name/Location Later
Materia!
Thickness Later
Insulation:
Name/Location a) Boile b) Econ & AH c) Ducting
Material Minera! Wool Mineral Woo! Mifleral Woo!
Thickness 3 inch 2 inch 2 inch
Lagging:
Name/Location a)Boiler b) Econ & AH c) Ducting
Material Carbon Steel Carbon Steel Galvalum
Thickness 3mm 3mm 0.3
Number 1 unit
Cold section:
Tube material N/A N/A
Tube diameter N/A N/A
Tube plate
Cold section:
Materia! Carbon Steel
Thickness (mm) N/A
Hot section:
Materia Carbon Steel
Thickness (rnrn) N/A
Insulation:
Materil Mineral Wool
Thickness (mm) 2in
Lagging:
Type Flat
Materia! C::;
Thickness (mm) 3
b. Spreader stoker
\
Number of stoker 2 set
Manufacturer ALBOK BOILER or Equivalent
Size of grate 19.2m2 area app
Revision 0 t
Scheoule 7.2.2 - 11 SOFIFIT
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxiliary Equipment
Bidder' 5 Data Sheet Konsorsium Indomuda-Pusaka
(Bidder' 5 Name)
Type of stoker
Spreader stoker equipment
Performance data:
d. Coal bunker:
Type & shape
Material CS
Thickness(mm) 8
Number 1(for each boiler)
Capacity (Ton) 28
Net Volume (m3) 35
Net weight of storage (Ton) 28
Total volume for 16 hours operating at boiler maximum
Total weight of storage (Ton)
Major dimension:
Width (or Diameter) (rn) 3
Length (m) 4
Height (m) 3
Lining material N/A
Inlet size 3x4 ..
Outlet size 3xO.8
Installation include
Support method Steel Structure
Emergency coal discharge
Chute
Material
Size
\ Capacity (T/H)
Level monitoring
- Type Transmiter
- Manufacturer TBA
- Number 1
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxiliary Equipment
Bidder' s Data Sheet Konsorsium Indomuda-Pusaka
(Bidder' s Name)
f. Coal feeder:
Type & manufacturer Spreader
Operation & control Variable Speed Control
Number 2 sets
Size TBA
Capacity (T/H) 2.5/2
Turn down
Accuracy (%) ±5
Cleaning method Manual
Materials contacting with Coal
2.9 Sootblower
2.13.1 Dust
~~.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 1 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxiliary Equipment
Type Horizontal
Manufacturer Southem or Equal
Number 2
Material SS 304
Size or Serial No. DN40
Capacity (T/H) 12.5
2
Pressure (kg/cm ) 3
Revolution (RPM) 2900
Feedwater pipe:
SOF:A:;r'
ReTl f
Schedule 7.2.2 - 14
-~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxiliary Equipment
KONSORSIUM INDOMUDA - PUSAKA
Route From HP Heater to Ekonomizer
Material A53
Diameter (mrn) 89
Thickness (mm) 7.6
Total length approx (mm) 30000
Design pressure (mm) 75 Bar
R'~rlf
Schedule 7.2.2 - 15 SOFIFI2X3~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.2 Stoker Boiler and Auxiliary Equipment
.;
KONSORSIUM INDOMUDA - PUSAKA
Name of Bidder:
.> 121. PARTICULATE EXTRACTION
Particulate Extraction
I
1. Manufacturer/Country of origin bT.ALBOK BOILER INDUSTRI
-;
2. rrype lectro Static Precipitation
3. Number
I
4. ~as mass flow kg/s Later
3/s
5. ~olumetric gas now Nm Later
6. as temperature at inlet °c Later
7. tatic gas pressure at inlet (gauge) mmWC Later
3
8. Dust concentration at inlet mg/Nm Later
3
9. bust concentration at outlet (AT O 2 6%) mg/Nm Later
10. ~as velocity at outlet m/s Later
11. Power consumption kW Later
12. Draft loss mmWC Later
13. lAsh hopper capacity h Later
14. !collection efficiency (with all fields in % Later
operation)
15. !collection efficiency (with anyone field out % Later
pf operation)
l{ t SOFIFI2X
d
Schedule 7.2.2 - 16
Revislon O
l ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.3 Steam Turbine and Auxiliary Equipment
1. TURBINE
1.7 Bearing
Number 2
1.9 Material:
Casing TBA
Blade TBA
BOOKIV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7,2,3 Steam Turbine and Auxiliary Equipment
--=--:r
\~ 1.10 Performance daia 50% rating 75% rating Rating Turbine Maximum
Capability Output.
~
Output (MW)
1,5 2,25 3 3.5 4
Gross turblne-qeneraor heat rate (kcal/KWH) 3400 3345 3335 3350 3370
'L
l.l t Extractio I steam conditions at turbine connections (at Ratinq) Flow (kg/H) Pressure (kg/cmLg) Temoerature fC)
v-
v
.~
Extraction number
1.13 Dimensio , ..
Dimensi 4000x2t300x2300mm(LxWxH)
Rota length (rnm)
Wid I (mm)
Type
Group Valve and Lift Board
Number
5
( Material
ZG2OGrMo\38CrMoAl\35CrMo
.... ,
).
2.8 Vacuum breaker
No
Type and size
I-btl.
Revision 0 Schedule 7.2.3 - 4 PlTU Soflfi ( 2 x 3 ~
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2..3 Steam Turbine and Auxiliary Equipment
Capacity (m)
Material 0235-a
Type
Centrifugal oil pump
Capacity (IImin)
400
2g)
9
Discharge and suction pressure (kg/cm
Type
Type Tube-type
2 10
Cooling surface area (m )
Revision 0 t
"-~""'"""~f"
'''"'"1''
s-« . , , .
. .., .. ---_ _._ -----------------
Schedule 7.2.3 - 5 PLTU Sofifi ( 2 x 3 M~
BOOK IV
PART 5 Fonns and Schedules
SCHEDULE 7 Technical Data
7.2.3 steam TUrbine and Auxiliary Equipment
Type CHY18
Capacity (m
3{H) 10
Number
400
Capacity (UMIN)
2g)
Discharge pressure (kglcm
8
3.12 Emergency oil pump
CHY18
Type
1
Number
3/H)
Capacity (m 10
Motor 5.5
4. TURBINE EQUIPMENT
N3.S':'2.35
Type
(rpm) 3000
Turning speed
3.5MW
Motor
Revision 0 U··f·····-·····---··-·-·----··--·····---·--·---·
Schedule 7.23 - 6 '. ~
PLTU Sofdi ( 2' 3 MWI.,-# )
t --
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Size
50\100
Type
Number
3
Capacity (m JH)
2 250
3
(m JH)
1200
Design pressure
2g)
Tube side (kglcrn 3
2g)
Design temperature
100
Manufacturer TBA
Number 3 UNITS
2g)
Total head (kg/cm TBA
2g)
Discharge head (kg/cm TBA
2g)
Shut off pressure (kg/cm TBA
Motor 100
Number of stage 9
Type of bearing GB
~
Type of coupling resilient clutch/fluid coupiing
Revision 0
l !
Schedule 7.2.3 - 8 PLTU SOFIFI ( 2 x 7 MW) ~
BOOK IV
PARTS Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Connection size:
Material:
Casing ZG230-450
Shaft 40Cr
Type CHY18
Capacity (m 3/ H) 10
Oil cooler:
Type YL-10
3
Cooling water flow (m /H) 10
Oil reservoir:
Type V=1
tit
BOOK IV
PAR1 5 Forms and Scheoules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Capacity (rrr') 1
Type
Size
Motor
-.
Type
Manufacturer
Material:
Drive gear
Driven gear
Type
Capacity (m 3/H)
3g)
Discharge pressure (kg/cm
Type
Manufacturer
.4 Capacity (ton/H)
2g)
Total pressure (kgfcm
Motor
Type SD100.63.01-1
Strainer mesh 40
Material:
Strainer Later
Type J4iH-100/H41 H
2g)
Fluid pressure (kg/cm 100
6.8 Orifice
Type Throttle
0
PLTU Sofifi ( 2 x 3
BOOK IV
PART 5 Forms end Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Flow (m
3/H) An
Iv
,.4'"",
1. CONDENSER
1.1 Condenser
Performance data:
6
Design heat duty (at Rating) (kcal/H) 22 X 10
Tube:
Tube sheet:
6
Material 40X 10
Design pressure
..
Material TBC
\
Type·
butterfly (CW valve)
Size
(mm) 600
Material
Q235A
Type DN600
Ball:
Material
rubber sponge
Number
383
Type CS-7.5
Number of Units
Type KQSN800-M24/666
Performance
3
Capacity (m JH) 6999
~,.::,
Type DWG371X-1.0
Number 3
Material Later
Type JGD-l
Number 3
1.
.~
-~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.4. Condenser and Feed Water Heating Plant
Material Synthal
4. CONDENSATE PUMP
Type 4N6
~-
-, Manufacturer SHENYANG
Performance:
Capacity (ton/H) 60
2g)
Total head (kg/cm 70
2g)
Shut off head (kg/cm Later
Number of stage
Connection size:
Material
Impeller ZCuZn16Si4
Casing HT200
Motor 37 tQN
5. DEAERATOR
Type XMC-50
Manufacturer CHINA
Dimension:
Material:
Re~~rn 1({" I
t Schedule 7.2.4 - 6 PLTU So," (2 x s MW~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.4. Condenser and Feed Water Heating Plant
Shell Q235-A
Tray Q235-A
2g)
Design pressure (kg/cm 0.098
Weight:
Relief valve:
Type A47H-16
Dimension:
Weight:
." Type
12'f
n (2 3M'd
RTo T
Schedule 72.4 - 7 PLTU Sofifi x
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.4. Condenser and Feed Water Heating Plant
Manufacturer CHINA
Number 2
2
,~
Tube surface area (m ) 105
Water velocity in tube (m/sec) 2
Outlet (0C) 33
Inlet CC) 31
Outlet (0C) 39
Tube:
Material:
Speed (rpm)
Material:
Casing
Shaft
Impeller
Motor
7.2 Differential water level relay facility and device Later Later
Type
Manufacturer
Number
Screen Q235A
'7f t 3M':,j
Schedule 7.2.4 - 12 PLTU 500fi (2'
t
Re.;SiO
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.4. Condenser and Feed Water Heating Plant
.J-
Type
2
Area (m ) approx.
Material
Thickness .- (mm)
Mesh
Material to be used
Pipe diameter
Quantity
Terminal point
Objectives
Material to be protected
Intake pipe
Setting of cathode
\
Note: The Bidders shall indicate others equipment sprcification with not specified above
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule7.2.5 Plant Water System
(1) Type RO
(3) Number 2
Type Vertical
Manufacturer CHINA
Number 2
Number of stage 2
Size and thickness (rnrn) TBA
Surface area (rn") TBA
Friction loss (mAq) Cj) 500
(13) Pump
\~n
Schedule 7.2.5 - I PLTU Sofifi (2 x 3 M~
.~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
Material
Casing TBA
Shaft TBA
Impeller TBA
Motor TBA.
Type HOrizontal
Manufacturer CHINA
Number 2
3/Hr)
Capacity (m 60
Discharge head (rn) 20
NPSH (m) TBA
Shaft horse power (KW) 11.
Material
Casing TBA
Shaft TBA
Impeller TBA
Motor TBA
~
y-
ri I
Schedule 72.5· 2 PLTU Sofifi (2 x 3 MW~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
Type TBA
Manufacturer TBA
"
Number 2
3/Hr)
Capacity (m 100
Material
Casing TBA
Shaft TBA
Impeller TBA
Motor TBA
(d) Pump
Type TBA
Manufacturer
Number
3/Hr)
Capacity (m TBA
Material
Casing TBA
Shaft TBA
"
Impeller TBA
(e) Pump
Type TBA
Manufacturer TBA
Number
3/Hr)
Capacity (m TBA
Material
Casing TBA
Shaft TBA
Impeller TBA
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
.Number TBA
Material
.,
Casing TBA
Plunger TBA
Valve TBA
Diaphragm TBA
Type TBA.
Manufacturer TBA
Number TBA
Material TBA
Type TBA
Manufacturer TBA
Number TBA
(i
vt t1 SChedule 7.2.5 - 6 PLTU SoOO (2 x 3 ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
2
Discharge pressure (kg/cm ) TBA
Material
\. Casing TBA
Plunger TBA
Valve TBA
Diaphragm TBA
Motor TBA
(15) Decarbonator
Type TBA
Manufacturer TBA
;""
Number TBA
3/Hr)
Capacity (m TBA
(a) Material
Shell TBA
/,
'AtI t SChedule 7.2.5 - 7 PLTU So" (2 x 3 ~
-~,.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
Type TBA
Manufacturer TBA
Number TBA
3/Hr)
Capacity (m TBA
Static pressure (mmAq) TBA
Motor TBA.
(16) Piping
Material Size (mm)
Note: The -Bidders shall indicate ohers equipment specification which not specified above
1. Type NA
2. Manufacturer NA
3. Number NA
4. Capacity (ton/day) NA
Fe (ppm) NA
pH NA
8. Pump
Type NA
Manufacturer NA
Number NA
Capacity ~m3/Hr) NA
2g)
Discharge pressure (kg/cm NA
Material _.
Casing NA
Shaft NA
Impeller NA
Motor NA.
Type TBA
Manufacturer TBA
Number TBA
3/H)
Capacity (M TBA
2g)
Total head (kg/cm TBA
Material:
Casing TBA
Impeller TBA
Shaft TBA
Motor TBA
--~H ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
.~ (3) Number 2
~
(4) Capacity (rrr') TBA
(5) Material
Wall plate AL
Bottom plate AL
'Roof plate AL
Floating deck AL
','t
Demineralized water tank TBA
Demineralized transfer pump TBA
Make up water tank TBA
For water analysis room TBA
For Coal analysis room TBA
(9) Demineralized water transfer pump
Manufacturer
Number
3/H)
Capacity (m TBA
Discharge head (m) TBA
NPSH (rn) TBA
Shaft horse power TI3A
Discharge (mm) TBA
Material
Casing TBA
Shaft TBA
Impeller TBA
Motor
i
tt t. Schedule 7.2.5 - 11 PLTV Sofif (2 x 3 M~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
Material
Raw water tank TBA
- Service water pump
Service water pump TBA
- Water treatment system
- Drinking Water system TB.A
Service water main pipe TBA
(b) Pre-filter
Type TBA
Manufacturer TBA
Number TBA
3/H)
Capacity (m TBA
J,,' Filter element
Number TBA
2
Filter area (m ) TBA
Mesh (u) TBA
Material
Filter element TBA
Sheet TBA
(c) Mixed bed polisher
Type TBA
Number TBA
Ion exchange resin Cation Anion
Manufacturer TBA TBA
Capacity (I) TBA TBA
Vessel material TBA
(d) Chemical measuring tank NaOH HCl:
Type TBA, TBA
Number TBA TBA
Capacity (I) TBA TBA
(e) NaOH unloading pump
Type TBA
Manufacturer TBA
3/H)
Capacity (m TBA
Head (m) TBA Casing
Shaft TBA
Impeller TBA
Motor TBA
(f) Mixing air receiver
" Type TBA
Number TBA
3
Capacity (m ) TBA
Material TBA
-;'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.5 Plant Water System
Material Specification
TBA TBA
TBA TBA
TBA TBA
(i) Vacuum generation equipment
Type TBA
Number TBA
Manufacturer TBA
Operating vacuum TBA
tt
Note: The Bidders shall indicate others equipment specification which not specified above.
Chemicals type
a. Coagulant PAC/alum
a. Pump
Type SOWFB-1 centripugal
Number Two
3/H)
Capacity (m 15
Head (m) 25
Material Later
Shaft ss
impeller S5
Casing (m) 5~
Motor 2.2
b. Level indicator
Type RF-OH21DO ultrasonic
Manufaciurer TSA
Number 1
a. Pump
Type 50 WFB-1 centripugal
Manufacturer indonsia
Number Two
3/H)
Capacity (m 15
Head (m) 25
Motor 5.5
b. Agitating blower
Type
.
Manufacturer
HC-100S
indonesia
Number Two
3/min)
Rotor later
Casing later
C. level indicator
Type RF-OH21 DO ultrasonic
Manufacturer TBA
Number 3
c. Pit agitator
Type paddle mixer__~ _
Manufacturer TBA. _
Number
1 _
Material
Rotor 88. _
Casing 55 _
Agitating propeller 88, _
Motor TBA
5. Coagulation sedimentation tank equipment
a. Driving unit
Type PJ-750 Lamellia settler
Manufacturer China
Number One
Up flow rate (m1H or less) Later
Material later
Rotor none
Casing none
Rev;';Or t 1I 1,
Schedule7.2.6 - 3 ~
PLTU Sofifi( 2 x 3 MIV
;).'~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2...6 Waste Water Treatment Plant
Rake none
Motor (KW) none
b. Sludge pump
Type piston
3/min)
Capacity (m 5
Manufacturer indonesia
Number Two
b. Level control
Type RF-OH21DO
Manufacturer indonesia
Number Three
7. Filter equipment
a. Filter
Type CLGLF-80A sand filter
Manufacturer indonesia
Number Two
3/H)
Capacity (m 25
Filters Sand
Washing rate by
Cleaning rate by
~~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.6 Waste water Treatment Plant
c. Painting TBA
a. pH control system
Type Later
Manufacturer indonesia
Number 1
b. Level control
Type RF-OH21.DD
Manufacturer indonesia
Number 3
Material SS
Rotor SS
Casing SS
Agitating propeller TBA
a. Pit pump
Type 50WFB·1 IF ANY
3/H)
Capacity (m 15
Manufacturer indonesia
Number Two
Head 25
Motor. 5.5
b. Level control
Type RF-OH21DD
Manufacturer indonesia
Number 3
a. Driving unit
Type Thickener
Manufacturer TBA
Number One
Up-flow rate (mtH or less) Later
Material Later
Rotor Later
Casing Later
Rake Later
Motor (KW) 0.37
b. Sludge pump
Type 40KDZJ-A15 piston
3
Capacity (m /H) 10
Manufacturer indonesia
Number Two
Motor 6.5
c. Level control
Type RF-OH21DO
Manufacturer indonesia
Number 3
a. HCL Tank
Type Vertical
Manufacturer TBA
Number 1
Capacity (rrr') 1
Diameter (mm<!» later
Height (mm) Later
Material and lining HDPE
R~S7 t If-----
I _
SChedule 7.2.6 - 7 ~
PLW Solifi( 2.3 MW
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.6 Waste Water Treatment Plant
f. NaOH tank
Type vertical
Manufacturer indonesia
Number 1
Capacity (ms) 1
Diameter (mmc) TBA
Height (mm) TBA
Material and lining HOPE
Number 2
Head (rn) 10
Motor TBA
Material and lining PVC
Casing None
Agitating propeller None
Motor None
Material and lining None
.-;;"
i. NaOH tank agitator
PLTUSO"(2X3_~
Re~'Tr
Schedule 7.2.6 - 9
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.6 Waste Water Treatment Plant
a. pH meter
Type Later
Manufacturer China
pH detector Later
pH indicator Later
pH recorder Later
pH metering range and sens. PH=1-14
pH detection spots. Later
13. Dehydrator
a. Dehydrator
Type DLY-100 Filter press
-:~
'~
BOOKIV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.6 Waste Water Treatment Plant
Manufacture China
Number One
Treating Capacity (tonlhr) 4
Dewatering percentage (%) 10
2
Filterating area m 4.2
Size (Dimension) (mm) 2400x1000x1190
Weight (kg) approx. 2740
Motor (KW) 1.1
Material
Filter Later
Dehydrator (Main parts) Polypropylene
b. Hopper Later
Type
Manufacture
Number
Capacity
~. .
uimensron
Material
Type
Number
Painting
Type
Manufacturer indonesia
Impeller HT200
Motor Later
c. Level control
Type RF-OH21DD
Manufacture indonesia
Number 3
Type IS65-40-200,Q=240m3/h
Manufacturer China
Number One
3
Capacity (m /H) 100
2g)
Discharge pressure (Kg/cm 3.5
Shaft horse"power (leW) 7.5
Material
Casing FC200
Shaft SUS420J2
.
Impeller
Engine ( IF Any)
LBC2
Later
Type XBC5/50llS
Manufacture China
Number One
Horse power (leW) 45
Starting method of the engine electric start
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.7 Fire Protection System
Engine NA
Type
Manufacturer
Number
Horse Power (KW)
(c) Air foam hydrant NA
l ype
Manufacturer
Number
Hose Connection (mm)
f
BOOKiV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.27 Rre Protection System
BOILER AREA
Remote
3 -Air Heater De!uge system Line Thermister Manual
Note: The bidder shall provide other location in boiler area that not include in description location
above.
~
Revision 0 Schedule -7.2.7 - 5 PLTU Sofifi (2 x 3 MW)---;J;
1t
BOOK IV
PART 5 FORMSAND SCHEDULES
Schedule 7 Technical Data
Schedule7.2.7 Fire Protection System
Bidder's Data Sheet Konsorsium Indornuda-Pusaka
(Bidder's Name)
Portable CO 2 Remote
7 -Electronic Room Extinguisher Ionization Manual
Note: The bidder shall provide other location in power house that not include in descrtption'location
above.
r~
PART 5 FORMS AND SCHEDULES
--- ....
Schedule 7 Technical Data
Schedule 7.2.7 Rre ProtectionSystem
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
-Coal Handling
4 later Electrical Portable CO2 Ionization Manual
Room Extinguisher
-
-DAS Operation
5 later Room None None None
-Electrical
6 later Equipment Portable CO2 Ionization Manual
Room Extinguisher
Thermisterl
7 later -Coal Conveyor Deluge System Continuous Remote
Thermal Wire Manual
Sensor
Thermisterl
8 later -coat Dust Deluge System Continuous Remote
Collector Thermal Wire Manual
Sensor
Note: The bidder shall provide other location in coal and ash handling area that not include in
description location above.
,f
1 later -Administration Indoor Hydrant Ionization! Masnual
Building Frame! Smoke
Detection
Chemical
Extinguisher
15 • Auxiliary NA NA NA
Boiler
17 • Foam
TBA TBA TBA
Injection
Facility
Note: The bidder shall provide other location in that not include in description iocation above.
- - ~---'
t t.
Note: The bidder shall provide other location in that not include in description location above.
.~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.8 Compressed Air System
Manufacturer TBA
Number 1
Motor (kW) 5
b. After cooler
Type TBA
Number 1
Capacity (m3/min at free air) TBA
Material
Tube (mmOD) TBA
Shell (mmOD) TBA
Diameter
Tube (mm) 250
Shell (mrn) 300
Length (mm) 1000
c. Air receiver
Type vertical
Number
1
Capacity (m3) 2
Material 16MnR
Shell thickness (mm) 6
d. Air dryer
Type common with service air
Manufacturer TBA
Number
1
Dimension Later
e. Piping
Material seamless steel pipe
Size
KW (mm) TBA
Voltage 380
Phase 3
a. Air compressor
Type screw, OIL FREE
Manufacturer Local
Number
Discharge pressure
b. After cooler
Type TBA
Number 1
Material
Tube (mmOD) 50
Shell (mmOD) 60
Diameter
Tube (mm) 500
Shell (mm) 600
Length (rnm) 1200
Outlet air temperature (0C) 40
Outlet cooling water temp. (0C) 55
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.8 Compressed Air System
e Control Panel
Type embedded in the equipment shell
a. Air compressor
Manufacturer TBA
Number 1
;P Discharge pressure (kg/cm 2g) 7-8
Number
Shell (mmOD)
Diameter
Tube (mm)
Shell (rnrn)
Length (0C)
Number
§
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.8 Compressed Air System
Capacity (m3)
Diameter (mm)
Height (mm)
Material
Shell thickness (mm)
Manufacturer
-I:,. Number
Width (mm)
Depth (mm)
e. Piping TBA
Material
Size
Compressor outlet to equipment
Voltage
Phase
Note: The Bidders shall indicate others equipment specification wich not specified above
Type JZ65-5
Manufacturer TBL
Number 3
Capacity (max.l/min) 1.08
Capacity adjustment variable •. T.S.L
Type of adjustment provided T.B.L
Discharge pressure (max.kglcm<:g) 20
Motor 0.75kW
Connection size:
Suction (mm) T.S.L
Discharge (mm) T.S.L
Material:
Cylinder 304
Ball check T.S.L
Ball seat T.S.L
Plunger r.ai.
Agitator T.B.L _
Type T.B.L. _
Number T.B.L:- _
l;'~ Speed (rpm) T.B.L. _
Material T.B.L _
Motor T.B.L:- _
. Manutacturer TBL_~ _
Number 3- - - - - - - - - - -
Capacity (max.l(min) 1.08 _
Capacity adjustment variable T.B.L. _
Type of adjustment provided T.E3.L _
Discharge pressure (max.kg/cm 2g)
50 _~ _
Motor 0.75kW _
Connection size:
Suction (mm) T.B.L:- _
Discharge (mrn) T.B.L _
Material:
Cylinder 304 _
Ball check T.B.L:- _
Ball seat T.B.L. _
Plunger T.B.L. _
Type
Manufacturer T.B.L
Number 2 -
Capacity (I) 1000
Size:
Inside diameter (mm) 1000
Height (mm) 1250
Thickness (mm) T.B.L
Material 304
Dissolving screen material T.8.L.
-R-fN-iS-io-n-o-t-Ij Schedule 7.2.9·2 PlTU Sofifi ( 2 x
3 MWJJ
.~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.9 Chemical Feed System
Agitator T.B.L _
Type T.B.L _
Number T.B.L _
/
Speed (rpm) T.B.L _
Material T.B.L _
Motor T.B.L _
t7£f
PLTU Sofffi ( 2 x 3 MW
rJ
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.9 Chemical Feed System
Capacity (max.l/min)
Capacity adjustment variable
Type of adjustment provided
Discharge pressure (max.kg/cm2g)
Motor
Connection size :
Suction (mm) of _
Discharge (mm)
Material:
Cylinder .
8. Control panel :
Type:
Height (mm) T.B.L _
Width (mm) T.B.L _
Depth (mm) T.B.L _
1. Sampling rack
Type TSL-05
? Manufacturer
chtna
'",-
Number
one
Analyzer
online
a. pH
Type Later
Manufacturer cntna
Number TBA
Range 7-14
b. Conductivity:
Type Later
Manufacturer China
Number TBA
Range 0-10us/cm
c. Dissolved oxygen :
Type Later
Manufacturer chtna
Number TBA
Range 0-60 u gIL
d. Hydrazine:
5> Type Later
Manufacturer . Later
Number Later
Range Later
e. Silica :
Type Later
Manufacturer Later
Number Later
Range Later
ft t
Revision
Schedule 7.2.10 - I PLTU Sofifi ( 2 x 3 MW~
BOOK IV
PART 5 FORMSAND SCHEDULES
Schedule 7 Technical Data
Schedule 7.210 S8mp1ing Rack System
b. Conductivity:
Type Later
Manufacturer China
Number Later
Number of pen Later
Range Later
c. Oxygen and hydrazine :
Type Later
Manufacturer China
Number Later
- (,
Number of pen Later
Range Later
3. Uni-sampler :
Type Later
Number Later
Manufacturer China
R, 7( Jl
mi Schedule 7.2.10 - 2 PLTU Sofifi ( 2 X.:J')
'.:..
BOOK IV
PART 5 FORMS AND SCHEDULES
SChedule 7 Technical Data
Schedule 7.2.10 Sampling Rack System
1-,.
Noise (as a complete set) (dB (A» Later
8. Feedwater piping
Material and size (mm) 20#steel,273
2
Design pressure (kglcm g) 10
Schedule thickness (mm) 6
. _._=~----------
t~ -J
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
~I Description
r- Unn I Data
'-',,
OPERATING AND CONSTRUCTION
DATA
Manufaet..!./rer II IShimadzu
Model numberltype
I UW 82008 or equel Cap
Country of origin Japan
Range g TBA
Accuracy mg 11
Quantity PCS Ii
1.2 IPRECISION BALANCES
: Manufacttlrer ! I~h'unadzu
~I
/)
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11, Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
'. I
1.4 POCKET THERMOMEfER
Manufacturer Shinwa
Model number/type Tba
Country of origin Japan
Range
.' °C 100
Accuracy °C 1
Quantity PCS 2
I~O
),.. I •Scale min .
Accuracy min.
Quality PCS 12
Manufacturer Casto
Model number/type Tba
Country of origin Japan
Scale S 60
Accuracy S 0.1
Quality PCS 2
Manufacturer I t.,
/~
~
i"
Revision 0
Model number/type
Country of origin
Material Hot plate
- ." Quantity for:
-100 m! pcs -
I
-250 ml pcs . !
-300 ml pcs -
-400ml pcs -
I
-600 ml pcs -
\),
- 1000 ml pcs 1
-2000 ml pcs 1
1.8 REAGENT BOTTLE
Coming \
Manufacturer
Model numberltype tba
Country of origin
Capacity ml 250
Material glass ..
1.9 SURRETTE .
Manufacturer Shinwa
Model number/type tba
Quantity for 10 ml pcs 1
Quantity for 50 ml pes 1
x 3 M~
R.~SYt
Schedule 7.2.11 - 3 PLTU SofifL ( 2
~
?
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
I Manufacturer Shinwa
Model number/type Tba
Quantity for 2000 ml PCS
1
. Quantity for 1000 ml PCS
1
I
1.11 SCALED TUBES
Manufacturer Coming
';; Model number/type Tba
Quantity PCS
5
Manufacturer Secchi
Model number/type tba
Scale ml
Quantity PCS
1
1/
R~A''7 t Schedule 7.2.11 - 4 PLTU Sofifi (2 x 3 M )
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
,~
I
1.15 ERLEN MAYER FLASK
Manufacturer
Model number/type
1
.;
Quantity for
I
-50 ml pes 1
-125 ml pes 1
.-250m! pes 1
I
- 500 ml pes 11
-1000 ml pes 11
-2000 ml pes \1
Manufacturer i IShinwa
,Moue! number/type
Scale ml
Quantity pes i1
Manufacturer I ISinwa
Model numberltype
Scale
Quantity required for: .
- 50MI pes 11
-100 ml pes 1
- 500 ml pes 11
-1000 ml pes 1
"
R~;s;onT ( ! Schedule 7.2.11 - 5 ..Jj
PLTlJ Sofifi ( 2 x 3 MW
.OJ,'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
Manufacturer Shinwa
\.
Model number/type
Length for:
- S mm diameter 1
- 8 mm diameter 1
- 10 mm diariieter 1
!
Manufacturer Shinwa
Model number/type
Length for:
.: 3 mm diameter 1
- S mm diameter 1
- 8 mm diameter 1
Manufacturer Shinwa
Model number/type
Quantity required for size
-SOml PCS 11
-100ml PCS 11
1.21 IMEASURING PIPETTE
Manufacturer Shinwa
\-10 ml pcs . 1
-25ml PCS 1
-50ml PCS 1
-100 ml pcs 1
Manufacturer I IShinwa
Model number/type
Quantity for size
I I
-1 ml pcs 1
-2m! pes 1
- 5 ml pes 1
-10m! PCS 11
-25ml PCS 1
-50ml PCS 11
-100 ml I res 11
Manufacturer I IShinwa
Model number/type
Quantity I res 11
Manufacturer Shinwa
I
Model number/type tba
Quantity
PCS 1
,..
Manufacturer TANAKA
Model number/type
tba
Capacity
IIh 5
Quantity PCS 1
Manufacturer TANAKA
I ,Model number/type
Capacity l/h 5
Quantity Sets 1
1.27 HEATER
Manufacturer
Shinwa
Model number/type
I Tba
Capacity I m1 ,500
I
Quantity
pes 11
1.28 I DISK WITH CAPS NB
Manufacturer
Coming
Model numberltype
Quantity
PCS 1
A
Schedule 7.2 11 - 8
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
Manufacturer Tba
Model number/type Tba
Quantity pes 1
1.31 STIRRER
!
Manufacturer I Coming
Model number/type tba
Quantity pes 11
Manufacturer Coming
Scale rpm
40-1200
Quantity pes 12
1.33 IPINSET
Manufacturer I ITba
1.34 FUNNEL
Manufaqt}lrer II tba
Modei number/type ! tba
Scale mm
Quantity fer short neck PCS 2
Quantity for powder pouring pes 2
1.35 GLOVES
Manufacturer tba
!
Model number/type tba
Quantity for Rubber PCS 5
Quantity for Asbestos pes 5
Manufacturer tba
Model number/type tba
Scale
Quantity pes 5
Manufacturer tba
Manufacturer tba
Model numberltype
Quantity
,'
tba
tba
I
!
I
1.39 MAGNIFYING GLASS
Manufacturer tba
Model number/type kba
Magnification 5
Quantity 2
i t
i 1.40 MAGNET BAR
Manufacturer ~ba
Model number/type tba
Quantity PCS 12
Dimensions (I x w x h) Mm 1200x30x10 .'
Manufacturer tba
I
Model numberltype Itba
Quantity Set 1
Manufacturer Sibata
R~S7 t ff I A
Schedule 7.2.11 - 11 PLTU Sotifi ( 2 x 3 ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder'sName)
Manufacturer tba
. Model number/type ~ba
.
!
Quantity PCS
Manufacturer Dunlop
r
Model number/type a
Quantity ba
Manufacturer I
Model number/type
Capacity kg
Quantity PCS
Manufacturer
Model numberltype
Quantity Sets
Manufacturer
')'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
Model numberltype
Quantity PCS
Manufacturer
I
1.49 TEST TUBE RACK
Manufacturer
, Model number/type
Quantity PCS
1.51 HOSE
Manufacturer Dunlop
Model number/type tba
Quantity for Tygon hose size
- 6.4 mm x 3.2 mm (m): PCS 1
- 9.5 mm x 3.2 mm (m): PCS 1
-13 mm x 3.2 mm (m): PCS 1
Quantity for Rubber hose size
- 6.4 mm x 3.2 mm (m): 14 158D PCS 1
,.
Revi'7 r'
Schedule 7.2.11 - 13 PLTlJ Sofifi ( 2 x 3 M~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
1.52 ISPATULA
Manufacturer tba
Model number/type
Quantity for flat blade shape PCS 11
Quantity for spatula blade shape PCS 11
1.53 I CORK BORER
Manufacturer Tba
Model numberltype Tba
Quantity Set 1
1
i.54 lCORK BORER SHARPENER
Manufacturer tba
Model number/type tba
Quantity PC 12
,;
Manufacturer
Model number/type
Quantity for cork caps Pack
Quantity for rubber caps Pack
1.56 ICLAMP
Manufacturer
Model number/type
(I
Quantity for plastic damp PCS
Quantity for asbestos clamp pes
.-."
1.57. CLAMP HOLDER
Manufacturer
Model number/type "
i pes
I
I Quantity
Manufacturer
Model number/type
Quantity PCS
Manufacturer
Model numberltype
Quantity for size
- 7.6 em pes ..
- 15.2 em pes
. 1.60 RING SUPPORT
Manufacturer
Model number4pe
Quantity for size,:
- 7.6 em PCS
- 15.2 em PCS
1.61 ITRIANGLE
1.62 ITRIPOD
i Manufacturer tba
Model number/type
Quantity PCS 11
Manufacturer tba
Model number/type
Quantity for size
-7.6 mm PC 11
-15.2 mm PC 11
1.64 IBOTTLE
Manufacturer
Model number/type
Quantity for capacity
. pcs
- 250 ml
- 500 mi pcs
-750 ml PCS
- 1000 ml PCS
Manufacturer Shinwa
Model number/type
i
1.66 TUBING UNION
IManufacturer
i
Model number/type
- 4.8mm-9.5mm
PCS
- 9.5 mm - 13 mm
PCS
, Manufacturer , Secchi
i
.... Model number/type
Quantity Pack 11
I
1.68 I BOILING CHIP
Manufacturer Shinwa
Model numberltype
Quantity
Btl 1
Manufacturer Shinwa
Model numberltype
-38em PCS 1
-56em pes 11
Manufacturer
Modernumberltype
Quantity I PCS
I
1.71 BURETTE CLAMP
I
I
Manufacturer I IShinwa
Modp.1 number/type
I
Quantity I PCS 11
Manufacturer I ·ITba
Model number/type
Quantity I PCS 12
1.73/0VEN
Manufacturer
Model number/type
.
Range of temperature °c
1.74 IQuantity PCS
1.75 IREFRIGERATOR
Manufacturer
Model numberltype I I:
R~'7t 'f
Schedule 7.2.11 - 18 PLTU Soli. (2.3 MW~
800KIV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
Manufacturer Tba
Mode! number/type
Quantity .- PCS 5
I I
,..,
L. WATER ANALYSIS EQUIPMENT
Manufacturer TOADKK
Model number ftype CM-30R
Capacity uv/cm Tba
Accuracy I % tba
's. Quantity Sets 1
2.2 pH METER
Manufacturer TOADKK ..
Accuracy ph
,
Quantity Set
1
Manufacturer Shimadzu
Model numberltype UV-1700
..f/
R~';°"ft ! Schedule 7.2.11 - 19 PLTU Sofifi ( 2 x 3 M\~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
Ouantity
Set 1
Manufacturer Shimadzu
Model number/type
ppm/ppb
,.
Range of measurement
I i
Accuracy
Ouantity
Sets 1
.~
METER
Manufacturer
;
Model number/type
I
Range of measurement
Quantity
Set
Manufacturer Central
Model number/type
Unit HC
Capacity
cal
Accuracy
Quantity
Set 1
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
4.1 HYDROMETER
f
\ Manufacturer ITANAKA
Model number/type IA - 490
Range of measurement
Accuracy
Quantity [1
4.2 VISCOMETER
Manufacturer TANAKA
Model number/type KV6
~ange of measurement
~
cps
ccuracy
Quantity
!
Sets /1 i
Manufacturer
Model number/type
Quantity Sets
Manufacturer
Model number/type
IManufacturer IHACH
Model number/type 100 AN
Quantity Set 11
/
R~S;°"Tt l Schedule 7.2.11 - 21 PLTU Sofifl ( 2 x 3 MW )
1
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
7.2.11 LABORATORY-EQUIPMENT
lName of Bidder:
Konsorsium Indomuda - Pusa
~escriPtion
I
Unit
Set
f,8ta
I
I 6. b.H.N ~NAlYZER
I
Manufacturer HACH
Model numberltype DR8200
Quantity Set 1
I .
7. iArome ABSORPTION
I
Manufacturer himadzu
Quantity Set 1
Manufacturer I dvantec
IQuantity Set 1
8.2 IDRYING-FAN I I
Manufacturer ~dvantec
Model number/type
t
8.3 CRUSHER
uanuw
Manufacturer
I Set 11
~dvantec
Model number/type
Iouantity I set 11
,;/
Revision 0 tt t Schedule 7.2.11 - 22 PLTU Sofifj (2 x 3 MW)
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7 .2~ 11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
8.4 PULVERIZER
Manufacturer lAdvantec
Model number/type
Quantity
set 1
8.6 !AGITATOR
Manufacturer Advantec
Model Number/type
Quantity
sets 1 I
I I
~, 8.7 SIEVE
Manufacturer
Size pm
Quantity sets 1 .
8.8 BALANCES
Ishimadzu
Manufacturer
Model number
.
Capacity
kg ~.2
SensitiVity 9 1
Iouantity sets 1
EN
R~'iOntr f
---~~-~~~-.---~~=.-.,._,.._"-.
Schedule 7.2. -:1 - 23
.=
PLTU Sofifi (2 x 3 MW }
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
-.
7.2.11 LABORATORY EQUIPMENT Name of Bidder:
Konsorsium Indomuda - Pusaka
Item Description Unit Data
8.9 MOISTURE OVEN
Manufacturer IAdvantec
Model numberltype
'" Range of temperature °C 40·270
Quantity set 1
9.1 TENSIOMETER
I !
Manufacturer Kyoto Eie
,
Model number/type
Quantity set 1
Model number/type
Quantity
set 1
, ~ "! "!
. DEW POINT METER I
1\ ••
Michell
Manufacturer
Model number/type
I Cermax Is
Quantity
sets 1
._HW I
8.4 PULVERIZER
!/ I
Manufacturer ~dvantec
Model number/type
Quantity I set 11
8.5 ISAMPLE DIVIDER
I
IManufacturer '-1 \Advantec
Model numberltype
Quantity I sets h
8.6 ~GITATOR
Manufacturer I kdvantec
Model Number/type
Quantity I sets 11
.<~
I 8.7 ISIEVE
Manufacturer
Size pm
buantity I sets 11
8.8 IBALANCES
I
Manufacturer
I
I
bhimadZu
Model number
t
ICapacity kg 2
Sensitivity 9
Fuantity sets
EN
~
1
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.11 Laboratory Equipment
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
(Bidder's Name)
7.2.11 LABORATORY EOUIPMENT Name of Bidder:
Konsorsium Indomuda - Pusaks
Item Description Unit Data
8.9 MOISTURE OVEN
Manufacturer Advantec
Model numberltype
Range of temperature
°C 140 - 270
Quantity
set 1
Manufacturer
iAdvantec .-
j
IModel number/type
I puantity set 1
EQUIPMENT
9.1 TENSIOMETER
I !
Manufacturer Kyoto Eie
Model number/type
Quantity
set 1
!Manufacturer
Kyoto Ele
Model numberltype
tAT 510
lOuantity
set '1
Manufacturer
Kyoto Ele
Model number/type
puantity
set 1
EQUiPMENT
A
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7. Technical Data
Schedule 7.2.12 Chlorination System
2. NaOCI Tank
Manufacturer Cylinder
3
Capacity (m ) TBA
Number TBA
Material fiber reinforced plastic
3. Bromine Tank
Manufacturer TBA
" (m
3
TBA
Capacity )
Number TBA
Material fiber reinforced plastic
·f
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.12 Chlorination System
Material
Casing TBA
shaft TBA
impeller TBA_
Motor The Bidder shall indicate the motor specification.
Note: The Bidders shall indicate ohers equipment specification which not specified above
Application
\ Manufacturer Later
Total efficiency at design conditions (%) Later
Static efficiency at design conditions (%) Later
Equipments:
Capacity (t) Later
Compressor Power Input (kW) Later
Unit EER (kcallW) Later
Motor Power (kW) later
Revision yt-{ il
Schedule-7.2.13 - 1 PLTU Sofdi ( 2x3 MW~
BOOKIV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2..13. /JJ.r Conditioning And Ventilation
Desiml Requirements
Inside Conditions
NO LOCATION NAME ROOM CONTROL r -r_":'_. Noise
I ernperature Relative
SYSTEM Level
(0G) Humidity
(dbA)
I I I ~~.
I
...._ _ . ~ _•. L_~~
-,
..... "... .____ _
I
(.0Yo)
_
I I
1 I TURBINE
\
BUILDING
A. Auxiliary
Bay
1. Ground - Laboratory A I
I 24°C ± 1°C SO% 45
Floor
1- Chemical
Storage
A
I
I
24°C ± 1°C 50% 45
j
-?O'-
-
Switchgears
kV .I
.
A 1 !
_~._I
,.....
- Battery ...., soc Rise N.C 45
- Rectifiers C 5°C Rise N.C 45
- Compressed C SOC Rise N.C 45
Air Plant
- Lockers C N.C N.C 45
- Cable Void C SoC Rise N.C 45
- Toilet C N.C N.C 45
I I
I I 2u~~~r~I~;~ling :'Ck
- Electronic
I__ C~_~_ 5~iS~ I~~~;
A
I.
J
- Other Room
.r-. _ .
I C I SoC Rise I N.C I 4S
!---.
3. Operating
- LV Switchgear
Floor
(EI.4.5..Ql
.~-gea.'
and MCC
- Electronic
Room
~_
A
A
r !
24°C ± 1°C 50% 45
~
tt t
Revision 0 Schedute-7.2.13 - 2 PLru Sofifi 12x 3 MW
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule7 Technical Data
Schedule 7.2.13. Air Concfltioning And Ventilation
Design Requirements
CONTROL Inside Conditions
NO LOCATION NAME ROOM Noise
SYSTEM Temperature Relative
Level
(lC) Humidity
(dbA)
.. - .. (%)
2. ADMINiSTRASJ
I BUILDING I
-
LI - Room Air
conditioned
A 24°C ± 1°C 50%
I 45
~
- Auditorium A 24°C + 1°C 50% 45
~ .. - Lobby A 24°C ± 1°C 50% 45
- Kitchen C SoC Rise N.C 60
- Toilet C N.C N.C 45
(men) ..
- Toilet C N.C N.C 45
(women)
1
I - Room Air A 24°C ± 10C 50010 45
f conditioned
- Toilet C N.C N.C 45
(men)
- Toilet ~ C N.C N.C 45
(wom~
Rev"'O", r 11 I I
Design Requirements
CONTROL Inside Conditions
NO LOCATION NAME ROOM Noise
SYSTEM \ Temperature Relative Level
. (oC) Humidity
(dbA)
. (%)
3. 20 kV
SWITCHGEAR
ROOM
I
BUILDING .. .. -- - ... - .-.
~'C
~~
.~ Revision 0
rt---·--- Schedule-7.2.13 - 4 PL TU Sofrti ( 2 x 3 Mt/V )~
BOOK IV
PART 5 FORMS AND SCHEDULES
SChedule 7 Technical Data
Schedule 7.2..13. Air Conditioning And Ventilation
Design Requirements
CONTROL Inside Conditions
NO LOCATION NAME ROOM Noise
SYSTEM
Temperature Relative
Level
COq Humidity
(dbA)
(%)
5. WAREHOUSE
WORKSHOP - Office B 24°C:::!: 1°C 50% 45
- Toilet C N.C N.C 45
- Storage C ~C Rise N.C 45
- Garage C SaC Rise N.C 45
7. GUARD
HOUSE
- Personel B 24°C + 1°C 50% 45
- Toilet & C N.C N.C 45
Kitchen
~ L
Design Requirements
Inside Conditions
NO "CONTROL Tempe.rature Relativ Noise
LOCATION NAME ROOM
SYSTEM (oe) e Level
Humidi (dbA)
ty(%)
- - +--
,~
11. DIESEL - Diesel C 5°C Rise N.C 75
GENERATOR Generator
BUILDING Floor
Note: The bidder shall provide other location that not include above.
7.2.14 ELEVATOR
(NOT APPLICABLE)
"
/ . ...-....
PLTV Soflfi ( 2 x 3 MN )
f
(;
Schedule 7.2.14 - 1
ReViSiOnj
AJ
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.15 Crane And Hoist
3T aux
TBA
-----+-----'ffiJ t AJ
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.15 Crane And Hoist
Note: The Bidders shall indicate others equipment specification which not specified above
"
.<i'
f~ r
Schedule 7.2.15 - 2
~
..,.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2..16 WorkshoJl and Machinery Equipment
1. Welding machine
ACWelder Engine welder
Type ZX500 NSA2-250
Manufacturer TBA TBA
2. ,'_ Lathe
5100 1500
Type 400 1500
Manufacturer TB8
Number One (1) set
~
w , Grinder
Pedestal Bench
,
Type Horizontal ?pindte. Hectanoutar
Manufacturer TBA
..
4: DriIJ press Pedestal Bench
Type Z32K Max. Drilled 12mm
Manufacturer TBA TBA
5. Hydraulic
Type Four Coulumn
Manufacturer TBA
Number One (1) set
Capacity 5.5kW
rt~ - _.-..
)
". --_."- - - -
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.16 Workshop and Machinery Equipment
6. -Hydraulic press
Type Series Open
Manufacturer TBA
Number One (1) set
Capacity (ton) 5.5 kW
7. Threading machine
Type Electrical with Cuter
Manufacturer TBA
Number One (1) set
Capacity (ton) 750 W
8. Vise
Type 150 mmwide
Manufacturer TBA
Number T!lree (1) sets
9. Work bench
Type 1.8 x 0.9 x 0.85 m
Manufacturer TBA
Number Two (1) sets
Note: The Bidders shall indicate others equipment specification which not specified above
."-:-.
-+i _ ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.17 Mobile Equipment
Name of Bidder:
7.2.17 MOBILE EQUIPMENT Konsorsium Indomuda-Pusaka
1. BULLDOZERS
.
.,
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.17 Mobile Equipment
Name of Bidder:
3 DUMP TRUCK I
3.1 Manufacturer TBA
3.4 ICapacity M3 5
3.6 Engine
- Ignition
Diesel
- Cycle
4 stroke
- Cylinder Capacity
cc 7545
Revision O t ..,.
Schedule 7.2.17 - 2 PLTU Sofifi (2 x 3 MW
1
,~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.17 Mobile Equipment
Name of Bidder:
. 1t'.2.17 MO~ILE EQUIPMENT Konsorsium Indomuda-Pusaka
4.4 Capacity M3 1
I
4.5 Engine
I
-Ignition Diesel
- Cycle 4 Stroke
",'i
I
5.3 Number of units 1
- Capacity
Lpm 120
- Discharge Pressure Bar.g 10
/"
M~
Revision 0
7 EXCAVATOR
-
7.1 Manufacture TBA
7.4 Capacity M3 2
..
Note: The Bidders shall indicate others equipment specification which not specified above
~';',;.
BOOK IV
PART 5 BID FORM
Schedule 7 Technical Data
---- --~-_.~~._,-_ .. _.,-_._----.----_. Schedule 7.2.18 Coal Handling System
Power
1i kW
h-
..
2 .
Speed
Number
CONVEYOR AND
I TRANSFER CONVEYOR
Type
.
CHUTE"··------~--
.
,"
. --·_·_···-··~---T--
Belt
- .. I
center distance)
Conveyor Belt
Type of belt
Rubber with cotton
core
Manufacturer
C China Co.
Permission operation temperature
Density of
Tensile strength
3
- cover rubber Kglm TBA
3
- core rubber Kg/m
TRIPPER CONVEYOR
Type NONE
Manufacturer and country of origin
Rated Capacity t1h
Number
Belt Speed m/s
Conveyor inclination degree
t til
._----._----_._------------'----_.
Schedule 7.2.18 - 1 PLTU So1ifi ( 2 x 3 M'<~
Revision 0
BOOK IV
PART 5 BID FORM
Schedule 7 Technical Data
._.__..~9hedule 7.2.18 C~~ Handling System
Chute Materiaf
Materiat
1 Thickness of wear elate m
I Chute Accessories
Dust suppression system type
Capacity tfh
Chute blocked sensor type
Others
CRUSHER~-->"'-"'---""-'-'-"-'-'---
4
Type crusher
Manufacturer and country of origin
- - - .-.- - -
Capacity tfh
Number
Re~Srtl--
---~.
Crusher Driver
Motor type
Power
kW
Speed
rpm
5 BEl.T WglGHER
Type
Accuracy
%
Number
Power requirement
kW
BRIDGE WEIGHER
, Type
Method of measuring
Range Capacity
Kg
Accuracy
%
Number
Power requirement
I kW I
6 METAL DETECTOR
.Type of detector
, Power requirement I kW .
7 METAL SEPARATOR
Type
Manufacturer and country of origin
Number
Weight taken by magnetic drum
- Maximum Kg
- Minimum Kg
Drum dimension M
Power requirement kW
8 COALSAMPUNG
Type
Manufacturer and country of origin
Number
Power requirement I<W
.........--I:-A".
I I. I
"
ReT"
0
9 OTHER EQUIPMENT
[ I -
Note: The Bidders shall indicate others equipment specification which not specified
above
BOOK IV
PART 5 FORMS AND SCHEDULES
. Schedule 7 Technical Data
Schedule 7.2.19 Fuel Oil System Including Tanl<..
1. Receiving header
2. Water separator
Type Later
Manufacturer Later
Number Later
Design flow (KIIH) (Max.) Later·
3. Strainer
Type CR312.3-28
Manufacturer TBA
Number 1
Design flow (KliH) (Max.) Later
I~
1.3 OlLORA!N
1. Oil drain collecting tank
Type Later
Number Later
Capacity (m~ Later
3. Strainer
Type Later
Number Later
-:
a. Pump
Type Later
Manufacturer Later
Number Later
Capacity (kItH) Later
b. Accessories
Strainer
Type Later
Manufacturer Later
Number Later
Pressure regulator
Type Later
Manufacturer Later
. Number Later
Control range (kg/cm2g) Later
1. Type Later
2. Manufacturer Later
3. Number Later
4· Capacity (k1) Later
"
6. Number of manhole
Wall Later
Roof Later
7. Welding line required non
destructive test Yes
RrOY
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.19 Fuel Oil System Including Tank
HSD Oil Pump House and facUities shaH be provided and be of superstructure.
Note: The Bidders shall indicate others. equipment specification which not specified above
0
e
....o -.
.- ~
....e:E
CI)(lI)
.-
c:: ><
.... N
E~
"C- :s
«V>
:::J
"C~
C::Q..
C
-.
C
U
.
c::
.c:
U
~
!.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.20Ash Handling System
TROUGH
I
6 Trough width x depth mm TBA
TROUGH MATERiAL
FLIGHTS
--"VI.
11-'--'--- -----.-----.----------------.---------------.------ J
(7
Schedule 7.220 - 1 PLTV Sofifi ( 2 x 3 M'N )
I .
I
I
BOOKiV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7220 Ash Handling System
~~me of Bidder:
ii,
RAILS
15 lType
I Square bar
16 Material
17 Length of rail centers m
~istance between mil centers
18
RAVEL WHEELS
m
.- l
!
19 Number of wheels .
i
IABRASION RESISTANT LINING OF
TROUGH
20 Extent of lining ~
21 lType of material Abrasion resistaflt:-Plate
22 IThickness mm MiA. 15
! I
.DRIVE I
i i \
'1ariator
24 ~nstalled power kW ~
tf If
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.20 Ash Handling System
'-
Name of Bidder
7.2.20 ASH HANDLING SYSTEM Konsorsium lndomuda- Pusaka
GENERAL
2 Volume m 3 2X3
MATERIAL I
3 Plate Matena!
- Carbon Steel
4 IPlate Thickness mm W
~
Name of Bidder
7.2.20 ASH HANDLING SYSTEM Konsorsium Indornuda- Pusaka
I I
1 Type TypB mounted
6 Number of wheels
Xi
rrlt-------· Schedule 7.2.20 - 3 PLTU Sofifi ( 2 x 3"MW ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.20 Ash Handling System
Name of Bidder:
7.2.20 ASH HANDLING SYSTEM Konsorsium Indomuda-
Pusaka
GENERAL
1 Type Later
I I
PUMPS I
6 Type Later
Name of Bidder:
7.2.20 ASH HANDLING SYSTEM Konsorsium. Indornuda- Pusaka
Gravity
PIPING
12 Nominal diameter mm Pressurized
13 Pressure Class Bar
-W
"
VALVES W
16 Pressure ctass
,"
Bar
I ~
----I
-l)
~
Schedule 7.2.20 - 5 PllU Sofi. (2x 3
t ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.20 Ash Handling System
Name of Bidder:
7.2.20 ASH HANDLING SYSTEM Konsorsium Indomuda-
Pusaka
Item Description Unit
_., .. .........
Data
BOILER BANK REMOVAL SYSTEM·
GENERAL
1 Number of system
ISOLATING VALVES
Hopper
4 Type I manufacturer
=HaRsmitter
5 Nomina! diameter mm ..
~
.. ... . J I· I
Name of Bidder:
7.2.20 ASH HANDliNG SYSTEM Konsorsiurn tndomuda
Pusaka
"- . --.-- - .. -_. --
Item Description Unit Data
ECONOMIZER ASH REMOVAL
SYSTEM
GENERAL
I
1 Number of system
I
_.
I /11 I
TJ)
[I~
Schedule 7.2.20 - 6 PLTU Sofifi ( 2 x 3 MW
-";
800KIV
PART 5 FORMS AND SCHEDULES
Name of Bidder:
7.2.20 ASH HANDLING SYSTEM Konsorsium Indomuda-
Pusaka
Item Description Unit Data
AIR HEATER ASH REMOVAL SYSTEM
GENERAL
1 Number of system
3
Type of transfer Pressblrir.ed Dense Phase
ISOLATING VALVES
:.'7; Heppef
I 4
5 IType I manufacturer
Norronal diameter I mm II __
:r.:r~nc:mitt"-t:
n_... I
HA~DUNG SYSTEM
Name of Bidder:
\7.2.20 ASH Konsorsium Indomuda- Pusaka
I
GENERAL
."~1
Ii
PLTU Sofifi ( 2 x 3 MIN V
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.2.20 Ash Handling System
Name of Bidder:
7.2.20 ASH HANDLING SYSTEM !Konsorsium Indomuda- Pusaka
Irype Later
I
Manufacturer Later
COMPRESSOR Later
I [Type
IManuf8cturer
Number Unit
I Capacity NM3/hcur
FLYASHSfLO Later
Type
Manufacturer
Capacity M3
8. Dry outlet system
Number
b. Wet unloading system
~umber
:~:~;:':.:.;
TABLE OF CONTENT
BOOK IV
Schedule 73 Sofifi 2 x 3 MW
t t~ 1?
J'"
0::
-o
S
~
w
z
c. w
s
0
C)
e ~
..
......
o
-- ('t)
.... ..3:
~~ W
..J
'ti
--
e
fJ')
)(
::)
C
-- N W
E~ J:
(J
"C~
«en
::::t
UJ
"O~
t:1:L.
.C
C
U
--e
..c:
U
~
if
BOOK IV
PART 5 FORMS AND SCHEDULES
. Schedule 7 Technical Data
Schedule 7.3.1 Generator
7.3.1 GENERATOR
,:?
Rev;';7 7 vt
I r .
Schedule 7.3.1 - 1 PLTU Sofifi 2x3 MW
#
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.1 Generator
110% (hours) 1
Insulation class F
Dielectric strength
Stator (kV) 22
<~<
Influence of speed and
voltage variation
Frequency (Speed)
variation (%) _ _ _ _ _ _+2
Mechanical strength
Temperature
Standard of ambient
temperature COG) $40
t
~
BOO~
PART 5 FORMS AND SCHEDUL
Schedule 7 Technical ta
Schedule 7.3.1 Generator
Generator bushing
Quantity 7 units
Quantity 3 6 3
Burden· (VA) 30 30 30
Weight of generator
Surge absorber NO
Manufacturer CCJEC
Type TEl-100-4
Quantity 1
Rating
Class of rating F
Characteristic
Insulation level
Type T.b.a
Dimension (Approx.)
.
Depth (mm) 380
Excitation cubicle
Manufacturer EEJEC
Type WWlT-1
Dimension (Approx.)
Manufacturer TBA
Type TBA
Rating
Current (A) DC 50
lnterruptinq
'" capacity (kA) 5
j
(t t>: Schedule 7.3.2 - 1 PL TU Sofifi 2 x 3 MW ~
",'.
'»
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.3 Generator Circuit Breakers
'!!-'
Manufacturer Siemens
Number of poles 3
Current rating
Phase-to-ground insulation
One minutes 50 Hz
withstand test voltage (kV) 23
tf ~
Schedule 7.3.3 - 1 PLTU Sofifi of/'
,/
2 x 3MW lJ'
,~-
'W!:'
"\
1. GENERAL
1.2. Type
I 2. CIRCUIT BREAKERS
I
- . - -
"'%;;I
2.2. ! Type vD4 i
,"',:,'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.4 Low Voltage Switchgear, Control Gear and Fuse Gear
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
Bidder's Name
"'"'!.
3 BUSES AND ENCLOSURES
a. Phase-ta-phase mm 125
yes or no
31.5
NO
a. Does the bus insulation pass the ANSI yes or no ·-,...··e.1· .. ,-_.
4. RELAYS
a. Manufacturer SIEMENS
'\
b. Type of catalog No. 7SJ62
a. Manufacturer
SIEMENS
b. Type of Catalog No.
7SJ62
4.4. Under load relay
,
a. I Manufacturer SIEMENS
i 5. I AUXiLiARY RELAYS , , ;
5.1'1 Manufacture
5.2. Type/Model
6. CONTROL SWItCHES
7. INDICATING INSTRUMENTS
\ I
7.1. Manufacture Jiangyin Changjiang Group
~;j.
( -f-~i7A-~=~~~-
VJL. -~
Schedule 7.3.4 • 3
~' PLTU SOFIFI (2 x 3 MW) cP
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule7 Technical Data
Schedule 7.3.4 Low Voltage SWitchgear, Control Gear and Fuse Gear
Bidder's Data Sheet Konsorsium Indomuda-Pusaka
Bidder's Name
8.4. Ratio
I 9.2. Type
:~~
UNE10-S
10. OTHERS
~ I
!
_I
I
I
-4.
r"~ ...
t i ~
.).'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.48 Motor Control Centers
I
OPERATING AND CONSTR. DATA
\
I
1. I GENERAL
2.' Type
a. Phase-to-phase I mm
I MNS
150
4. Vertical Bus
n
c. I If answer to "2.7.b above is yes, provide
type and description
tt
800KIV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.48 Motor Control Centers
-\
e. Size of bus mmxmm 30x 10
5. Ground Bus
6. Neutral Bus
b.
I Size of bus mmxmm 30 x 10
2. Type ISOMAXN
4. System frequency Hz 50
5. Specified continuous current rating A 16 - 800
t
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.48 Motor Control Centers
~\
1.2 MOTOR STARTE.R UNITS
b. Type MNS
b. I Type ISOMAX
e. I Duty AC 400 V
'<.
RrjO ~
Scheduie 7.3.48 - 3 PLTU SOFIFI (2 x 3 MW) r
800KIV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.48 Motor Control Centers
'
1. Manufacturer's name AB8 or equiv
2. Type/model MNS
4. Rated voltage V
! 400~ !
7. Senrice phases!
I 3 phase I 4 wire
wires
8. Rated frequency Hz
150
1.4 R.ELAYS
a. Manufacturer ABB
(
a. Manufacturer ABS orequiv
I
b. Type of Catalog No. general
I
a. Manufacturer
!
ABB or equiv
I
I
2. Type/Model tba
....
I
I
:;;~
2. Type/Model OTM
6. I No of poles 2
R77 ~
Schedule 7.3.48 - 5
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.48 Motor Control Centers
I 1.9
I
I OTHERS I t BA
~
"'
t
.../f'
it
~
~
w
::i
..
-
c&n 0
~
U.
(.
L.
r.' ,
0 en
0 z
0
~
0 ~
l
I: ~
~
0
--
.... 3:- ~
.
1ZJ
:::>
....e:£
U; Po<
......
....
)
M I
--tAM ~
~
I: >< W
-- N -I
E~- :::) 0
-e~ c
«a
w ~
:::::> J: e
-e ..... o ~
1:;:
en 'C;:;
I-<
0
C ell
-C
I::
~
.-:
--U
I:
J: -~
U
...
'(1) ~.
~
.J I.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.5 Transformer
"'.
Bidder's Data Sheets Konsorsium Indomuda - Pusaka
(Bidder's Name)
Class of rating
Voltage
On load tap
.;,.,
(kV) ±8 x 1.25%
Frequency (Hz) 50
Connection
Impedance voltage
(at rated kVA base) (%) 8
Insulation ciass
2g)
Pressure test of tank (kg/cm TBA
P
rf~.
Schedule 7.3.5.1-1 PLTUSOFIFI (2 x 3MW)
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.5 Transformer
.:
Voltage regulation
Impedance
(at rated kVA base) 8%
Degree of vacuum
(at case) (mmHg) 10
Rating capacity on
self cooled basis 60%
Oil (DC) 60
tTif
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 TechnicalData
~ Schedule 7.3.5 Transformer
Manufacturer TRAFINDO
, Rating
Class of rating
Voltage
Frequency (Hz) 50
Connection
Insulation class
Insulation level
\ ..
Cooling equipment
¥
rtf~
--:/ .:
Schedule 7.3.5.2 - 1 PLTU SOFIFI (2 x 3 MW)
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.5 Transformer
Dimension (Approx.)
Weight (Approx.)
Insulating oil
Kind Diala B
Manufacturer Sheli
Manufacturer tba
Quantity 3 3
Efficiency
t P.F 0.8
Losses
..
tt . J
~
II... ~ __.._.
Schedule 7.3.5.2 - 2
. __
PLTU SOFIFI (2 x 3 MW) f/
BOOK IV
PART 5 FORMS AND SCHEDULES
sChedule 7 Technical Data
Schedule 7.3.5 Transformer
""
Bidder's Data Sheets Konsorsium Indomuda - Pusaka
(Bidder's Name)
Voltage regulation
within ;to.25%
Temperature rise limit
;;.,
Winding ('C) 70
Oil ('C) 60
t:
...;;;~ -.:
rtt . . ~.- Schedule 7.3.5.2 - 3 .~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
1. 220 VDC
1. Battery
Manufacturer China National Commercial Electron
Rating:
Dimension
~~'
tT/1 Schedule 7.3.6.1 - 1 r?
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Frequency fluctuation
range (Hz) 50 ± 10%
Frequency fluctuation
RAnge (with in Hz)
Power factor
(more than %) 90%
Set voltage
Current (A) 20
;~-
Set voltage accuracy ±0,5%
Dropping current
(less than A) 2
Counter eel!
Current (A)
Cubicle
2. 110VDC
1. Battery
Manufacturer
Type
u «
I Jill
Schedule 7.3.6.1 - 2 PLTU SOFIFI (2 x3 MW) of
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Mounting method
Rating:
Voltage (V)
Maximum discharge
current (A)
-----.-~---
Maximum temperature of
electrolyte
Dimension
High (rnm)
Width (mm)
Depth (mm)
Weight
2. Rectifier
Manufacturer
Type
Rectification system
Cooling system
n Schedule 7.3.6.1 - 3
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Rating:
Frequency (Hz)
Frequency fluctuation
range (Hz)
Voltage (Hz)
Frequency fluctuation
Range (with in Hz)
Power factor
(more than %)
Set voltage
Floating 0J)
c.
Equalizing (V)
Floating M
Equalizing (V)
Current (A)
Dropping current
(less than A)
Counter cell
Current (A)
Cubicle
_. _.. --_._..~
tf1t Schedule 7.3.6.1 - 4
.. ~ ...... ~
,).'
BOOK IV
PART 5 FORMS AND SCHEDULES
. Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Width (mm)
Depth (mm)
3. 48 VDC
1. Battery
Manufacturer
Type
Mounting method
Rating:
Voltage (V)
Maximum discharge
current (A)
Maximum temperature of
electrolyte
Dimension
High (mm)
Width (mm)
Depth (mm)
£
rflf Schedule 7.3.6.1 - 5 PL TU SOFIFI (2 x 3 MW)
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Weight
2. Rectifier
Manufacturer
Type
Rectification system
Cooling system
Rating:
Frequency (Hz)
Frequency fluctuation
range (Hz)
Voltage (HZ)
Frequency fluctuation
Range (with in Hz)
Power factor
(more than %)
Set voltage
Floating (V)
Equalizing (V)
Floating (V)
Equalizing M
Stage voltage in voltage
adjustment
~~-1T"~·<··_-·'"·~--·---··-·~-·
t I IIf- . .... .~_._----.-----
Schedule 7.3.6.1 - 6
_.- _.. cf
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Current (A)
Dropping current
(less than A)
Counter cell
Current (A)
Cubicle
Height (mm)
Width (mm)
Depth (mm)
4. 24 DC
1. Battery
Manufacturer
Type
Mounting method
Rating:
Voltage (V)
Maximum discharge
current (A)
,'J;'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Maximum temperature of
electrolyte
Dimension
High (rnrn)
Width (mm)
«<
Depth (mm)
\flieight
2. Rectifier
Manufacturer
Type
Rectification system
Cooling system
Rating:
Frequency (Hz)
Frequency fluctuation
range (Hz)
Voltage (Hz)
Frequency fluctuation
Range (with in Hz)
Power factor
(more than %)
.e,'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Set voltage
Floating (V)
Equalizing (V)
Floating (V)
Equalizing (V)
Current (A)
Dropping current
(less than A)
Counter eel!
Current (A)
Cubicle
Height (rnrn)
Width (mm)
Depth (mm)
1.1 GENERAL
.«
3. Degree of protection IP 41 41
2. Minimum clearance
.~~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.6 Batteries and Charger
Bidder's Data Sheet Konsorsium Indomuda - Pusaka
Bidder's Name
c. Rating 63 63
d. Voltage V 110 48
e. Load current A 40 40
f. Interrupting current A
i. I Voltage V 110 48
I IP , 41
141
c. Rating 125 63
i. I Voltage V 110 48
--_._. -- -.... ~
rrt
_. -_. "
SChedule 7.3.6.2 - 3
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.7 Unl:1terruptible Power Supply
1. GENERAL
2 INVERTER
;
2.3. Distortion % 2
'~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.7 Uninterruptible Power Supply
2.9. % 88
3. N/A
3.1.
3.2.
I
3.3.
! 3~4.
I
4. T.b.a
I
4.1.
4.2.
4.3. r
4.6. I No of poles
5.1 I Manufacturer
6. OTHERS .-
!
I I I I I
r-r A
Schedule 7.3.7 - 3 PLW SOFIFI12 x 3 MW) ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.8 Emergency Diesel Engine Generator
1. GENERATOR
Rat1ng
Current (A)
Frequency (Hz) 50
Phase 3
Pole 4
Connection
Insulation class F
Excitation system
Type Brushless _
Automatic voltage
regulator Solid state _
Dimension
II Ii - . . .. ...... 'fl
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.8 Emergency Diesel Engine Generator
.
2. DIESEL ENGINE
Number of cylinder 8V
Overload (%) 10
~.
Starting time from sial1ing
signal to full speed (sec) 15
Dimension
in SChedule 7.3.8 - 2
- - _. - - - ---_.- _.... ") ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Sctledule 7 Technical Data
Schedule 7.3.8 Emergency Diesel Engine Generator
Dimension
Length (mm)
2 2
GD effect (kg.m )
Weight (kg)
3. CONTROL PANEL
Diesel engine Auto. start
generator panei
control panel
Manufacturer Yanmar~ _
Dimension (Approx.)
Space heater
Capacity NA) 5o _
Manufacturer Local
Type Metalclap
Rating
Numbers 1 _
Air compressor
Manufacturer
Type
Number
Cyiinder number
Stroke (mm)
Speed (RPM)
3/min
Capacity (m at free air)
?
Suction pressure (kg/em-g)
Electric Motor
Manufacturer
Type
Class of rating
Rating
Output (kW)
1fl
Irq .
Schedule 7.3.8 - 4 PLTU SOFIFI (2 x 3 MW)
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Techraical Data
Schedule 7.3.8 Emergency Diesel Engine Generator
Voltage (V)
Frequency (Hz)
Speed (RPM)
Vertical or horizontal
Insulation class
Starting method
Dimension (Approx.)
Height (mm)
Width (mm)
Depth (mm)
~
Weight (including air
compressor (kg)
(Approx.)
Air Receiver
Manufacturer
Type
.ir
Number
Capacity (m~
Diameter (mm)
Height (mm)
2
Design pressure (k,gJcm g)
1. Power Cable
Voltage 1 kV
Manufacturer
Type YGC-F46R-1!<V
Number of wre 3
Voltage 12 kV
Manufacturer
Type Y.JV-12kV
Number of cafe
""
Total length (m)
2. Control Cable
!\~anufaciufer
Number of core 4 or 5 or 7 or 10
Type
Number of core
3. Communication Cable
Use
Manufacturer
7-r~
Schedule 7.3.9.1 - 1 . '-. PLTtJ S6F(FI(2-~-3 MWlf!?
-.;,.,.
",
BOOK IV
PART 5 FORMS AND SCHEDULES
" Schedule 7 Technical Data
Schedule 7.3.9 Cables
Type
Number of core
Manufacturer
Type
Number of core
4. Speciai Cable
Use
~,,'ianljfacturer
\.,
Type
Use
""'::..'"
Manufacturer
Type
5. Others
Manufacturer
Type
-)I'
~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.9 Cables
1. Manufacturer MOBr
. '\.. j
I \
(t l I 1,,·
. . Schedule 7.3. 9.2 - 1
-- . ep
;y
- ..
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
SChedule 7.3.9 Cables
7.3.9.3 CABLES
400 V
Voksel
NYY
2,3,4
Tba (rn)
5/10 kV
Voksel
XLPE
1,3
Tba (m)
voksel
NYMHY
4,6,10,12
Tba (rn) ..
3. Communication Cable
Use telephone
Manufacturer Voksel
Type Tba
I .I
Schedule 7.3.9.3 - 1 - -- ---1(
tf7!i
BOOK IV
PART 5 FORMS AND SCHEDULES
.Schedule 7 Technical Data
Schedule 7.3.9 Cables
Type RG
4. Special Cable
Manufacturer tba
;'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.10 Lighting, Receptacle and Clock System
7.3.10.1 LIGHTING
'"i
DATA
Indoor Outdoor
1. FLUORESCENT LUMINAIRES:
2. EMERGENCY LIGHT:
3. MERCURY LIGHTING
RECEPTACLES:
5. PANELS:
.:;.
';. ~'''('. : ..<,.; ~:. . '...... ,~" ..:-r,.;::·S';'·"··";"":~~":'':''~~~·1:!'".t~:·~~r~;:~~~~;·?~~~~~~~~~:!~
"
:CI,11Qd'f($Y$tSM
Manufacturer tba
Type & model tba
Nominal voltage V 400
Power consumption VA 60
Enclosure IP 41
Line voltage Vdc 110.
Pulse duration Sec tba.
Accuracy Sec/day tba.
DATA
,
1. GROUNDiNG AND UGHTNING ROTECTION
2.
2.1
'.
3.3 Dimension:
Quantity Tba
4.
Manufacturer
Ref. Catalog No
BOOK IV
PART 5 FORMS AND SCHEDULES
.Schedule 7 Technical Data
Schedule 7.3.12 Equipment Grounding
DATA
.".
\.
1. Manufacture Local
Dimension 6X2
'i
"
220AC V
Output voltage of power su~-;;ly unit 110 DC V
Burden of power supply input 60 VA
Panel structure
Dimension
Height 2000 (rnrn)
Width 600 (rnrn)
Depth 900 (mm)
Accessories N/A
,~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule7 Technical Data
_~ ......__ ~_S.~hedule 7.3.13 Control, Protection and Metering
7rIt .
2f lock function yes
2. Synchronizing device
Panel structure
Thickness of steel plate (mm) . 1.5
Dimension
Height (rnrn) 600
Width (mm) 400
Depth (mm) 400
Weight (Approx.) (kg) 20
'" Accessories Under Carriage Tray
-~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule7.3.13 Control, Protection and Metering
" Height
Width
(mm)
(mm)
2000
600
Depth (mm) 900
Weight (Approx.) (kg) 110
Accessories N/A
Specification of TRD(transducer)
Manufacturer Tba
DC output 0-1mA/1-5V
0.4-6kV bus
voltage 0-150V 1 0.2
frequency 45-55Hz 1 0.2
4. others
.~
Notes:
m Schedule 7.3.13 rf
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.14 Communication System
Indomuda-Pusaka
NAME OF BIDDER
1 TELEPHONE EXCHANGE
(PABX) SYSTEM
"
1.10 Maximum shunt susceptance ......•.. (uS): I T.b.a
r;t
Revision 0
.............•....................................... (H z):
power :
2 TELEPHONES
2.8.5 Acoustic booth type for indoor and I Only outdoor type
3.2.1
.........................................:I
3.3.3 Name of area where used ..........••....•.... : I Turbine House and outdoor
Rev;,;oo 0
"'"lfl
~._..,.r"' __ ·-··"·f""·
{'
"'11-"-'-'---'' - .~,--".-~'---. - . .._-~-
Schedule 7.3.14 - 4 )~
4.1.1 Manufacturer I
: Erisson
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.14 Communication System
4.1.5 Battery:
Revision 0
r ttj--- Schedule 7.3.14 - 5 )cif
,~~>
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.14 Communication System
(c) Inputpower. :
""
-
,..
..
NAME OF BIDDER
l. TELEPHONE SYSTEM
Rev;,lo" 0 ft I~
....
···""··_·_:~·_[z··
.~ . . ..- - - -
~-_."._-"._~-_ ~
Sohedule 7.3.14 - 7 )rf
... ~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.14 Communication System
NAME OF BIDDER
...
30
Control room
I .~
Control room
Control room
i
2.2.2 Weight (kg): i 5
I
Loudspeaker unit.. :
Handset (kg): I 2
NAME OF BIDDER
NAME OF BIDDER
1. TELEPHONE SYTEM
'.
< Exchange ..........•....................... " (mrn): I 800x600x400
Telephones:
" .
DImenSlons (mm,:
\ lOOxlQO
Microphone station:
Amplifier unit:
Loudspeaker unit:
Power (kW) 3
Rating (kVA) 3
Insulation (class) B
~
It r
Schedule 7.3.15.1-1 PLTU SOF/FI (2 x 3 MW)
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.15 Cathodic Protection
4.12 Enclosure:
Material Steel
Thickness 2mm
5. Reference Cell ;
5.1 Manufacturer Telemagnetlca
5.2 Model Tba
5.3 Type (Ag-AgC1, Zn, etc.) Zn
5.4 Number required for each rectifier 10
5.5 Reference eel/life (years) 10
6 Anodes:
6.1 Manufacturer Telemagnetica
6.2 Model
6.3 Substrate material
6.4 Platinum thickness (urn)
6.5 Anode diameter (rnm) 35
6.6 Anode total length (mm) 1000
6.7 Length of active area (mm) 60
6.8 CurrentperaoQde (A) 5
6.9 Anode life (years) 4
6.10 Number of anodes required tba
1 l
I I ,
U Schedule i.3.15. i- ,; _. PLTV SOFIF. (2 x 3 MW) tf
');.
BOOK IV
PART 5 FORMS AND SCHEDULES
Scheduie 7 Technical Data
Schedule 7.3.15 Cathodic Protection
Current (A) 50
Current (A) i5
Power(kW) 3
Number of phases 1
1.11 Enclosure:
Material Steel
Schedule 7.3.22 - 1 ~?
ft~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.15 Cathodic Protection
Thickness 2 rnrn
surge arresters
surge arresters
2
current density per anode (A1mm ) 10
3. Distributed Anodes:
3.1 High silicon cast iron anodes:
Manufacturer Telemag netica
t: !It
Schedule 7.3.22 - 2 PLTU Sofifi (2 x 3 MW)
..
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.15 Cathodic Protection
Model number
Tba
Anode composition
SiMgC
(top or center)
Top
2
current density (Almm )
2
Dimensions (1 x dia) 51 mm
t( Ii
.~'
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.416 20 kV Switchgear
7.3.16 20 kV SWITCHGEAR
""
OPERATING AND CONSTRUCTION
-" DATA
1. GENERAL
I
1.1. Manufacturer AREVA I ASS I eqv.
2. CIRCUIT BREAKERS
I
I
2.1. Manufacture AREVA I ASS I eqv.
",,-J
2.3. Nominal system voltage V 20
,,:":"'"
Copper Bar
a. Phase-to-phase I mm I 200
a. Capacity of bus A
200
yes or
yes or
a. I Does the bus insulation pass the
ANSI C37.20 fire test I no
I Yes
tj «
tt
Revision 1 (8/4111 ) Schedule 7.3.42 - 2 PLTU Sofifi 2 x 3 MW
eo
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.416 20 kV Switchgear
I
b. Size of bus mmxmm 40 X 100
5. AUXILIARY RELAYS
6. CONTROL SWITCHES
6.2. Type
7. INDICATING INSTRUMENTS
af·
Revision 1 (8/4/11 )
7.1. Manufacture
7.2. Type
\
8. CURRENT TRANSFORMERS
8.2. Type
....
! V.A 30
8.3. ' Capacity
9. VOLTAGE TRANSFORMERS
9~.2 .. Tvoe !
10. r OTHERS
. / -
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.3.17 CCTV for Security
"'_.
r-.
Schedule 7.3.17 - 1
t?
~
ttt
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.4 Control and Instrumentation Works
7.4.1 G~NERAL
(Yes I No)
1. Is the future enhancements to hardware and software
will not obsolete Existing system
Yes
l7~4~2!:::QPE;RATORSTATioN'PCBASE
2. Manufacturer DELL
- Type
- Power Consumption
- Voltage (Vac)
7. Color Printer:
- Type I model no. COLOR LASER JET 5550 n
- Manufacturer HP
- Brochure attach NO
8. Log Printer:
- Type I model no. LASER JET 5200 L
- Manufacturer HP
- Brochure attach NO
2. Manufacturer DELL
- Type
- Screen Size
4. Printer:
<. - Type I model no. Color laser jet 5550n
- Manufacturer HP
- Brochure attach No
:iI414)IJ\ASiSl'ATION .
1 . Type I model no. Insoiron 560
2. Manufacturer DELL
- Type
- Screen Size
4. Printer:
- Type I model no. Coior laser let 5550n
- Manufacturer HP
- Brochure attach No
7)iIs·,'PROCESSCONTROL·STATION
1. General:
- Type I model no. TBA
- Manufacturer TBA
2. Processor Unit:
- Model No. Honeywell EPKS system C200
.:l~:lli' .; . [jATP-HIGHwAY
1. Highway construction Ethernet
2. Manufacturer TBA
!~14r~;~ : . ,!JfOR§Il\l§:i·gQNIROI....S¥$Ta;fJi':;'(tisfl'GJ".::!·.';::;::.;,;""'"
1. Manufacture and Model No.
3. Redundancy
5. Operating model
- Diagnostic function
2. VIBRATION MONITORING
Manufacture
Type
- Probe sensor
- Vibration transmitter
- Digital microprocessor
- Diagnostic Function
• Serial link
- Display Monitor
- Mounted Cabinet
i;'
- Diagnostic Function
- Display Monitor
- Mounted Cabinet
5. ACTUATOR:
- Type
-Size.
tt~
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedllie 7 Technica! Data
(j Schedule 7.4 Control and Instrumentation Works
- Type
7. HANDHELD CALLlBRATOR
- Type
!Tt.~~11::BLAf;JT::jNSTRUMEN1PANEl
-Type KG221/KG231/KG321
- Manufacture & Model No. China
- Size (V/X 0 x H) mm 800*600*2100
- IP degree IP55
:7.4~1.Z,F1~:.FIGHTIj\jij"PANa
- Type KG221/KG231/KG321
- Manufacture & Model No. China
- Size (W x D x H) mm 800*600*2100
-IP degree IP55
t.4.13','CEOS~Q'CI~CO~tTEu=.VI$ION(¢Ctvj,,
-Type
- Manufacture & Model No. Samsunq
- LCD Based Sarnsuno
- Size (W x D x H) mm 21 inch
Manufacturer
Type & model
Nominal voltage V
Power consumption VA
Enclosure IP
Line voltage Vdc
Pulse duration Sec
Accuracy Sec/day
~
af
Revision 0
t t .~ . Schedule 7.4 - 5 PLTU Sofifi (2 x 3 MW) tl
,::;.
BOOK IV
PART 5 FORMS AND SCHEDULES
Schedule 7 Technical Data
Schedule 7.4 Control and Instrumentation Works
GENERAL
3. Manufacturer
4. Model No
CONTROL MODULE
I/O MODULE
l' ,
if
Revision a
It [ Schedule 7.4 - 6 PLTU Sofifi (2 x 3 MW)