You are on page 1of 2

RISK MANAGEMENT SERVICES

Well Control Equipment Survey

The rig-ready equipment experts


When you receive our Well Control Equipment Survey, your rig undergoes a visual
inspection of 16 major areas of the BOP equipment and related systems. A detailed
outline of our findings follows the inspection, giving you the information you require to
perform successful well control operations.

Recommended for all wells, the Well Control Equipment Survey delivers critical
findings for horizontal, deep, and high-temperature/high-pressure wells.

Comprehensive visual and Quick, effective identification of


external inspection: potential issues:
ŽŽ Focuses on well control equipment ŽŽ Unique evaluations designed for
as a system client-chosen specifications
ŽŽ Covers extensive checklist of more ŽŽ Survey results delivered in easy-
than 100 components to-read Immediate Concerns,
ŽŽ Guided by established API and IADC Recommendations and
industry-best practices Suggestions format
ŽŽ Immediate Concerns discussed
in detail on site
ŽŽ Clear explanation and written analysis
of all findings, including a prescription
of recommended corrective measures

+1.281.784.4700 // wildwell.com
W E L L C O N T R O L E Q U I P M E N T S U R V E Y, P G . 2

Trending now: Your rig, your site SAMPLE TRENDS REPORT


The Trends Report provides customers with a Category Observation Percentage

comparison evaluation based on 50 random, Blind ram safety bracket 44%


anonymous Well Control Equipment Surveys, cover insufficient size
showing how your operations stack up against
other jobsites. Nuts not full thread; 34%
Immediate engagement/studs
Real-world results in the palm of your hand Concerns missing completely
Each completed survey includes a table of
contents that directs readers to an extensive 90°/45° offsets do 32%
list of topics covered in the survey. The easy- not have targeted
to-follow report layout provides images of components
equipment along with a caption of findings and Choke line hose does not 56%
a collection of reports that include the following: comply with API SPEC
ŽŽ Survey Checklist – a practical question/ 16C
response/comments format making survey
results accessible No handwheel installed 34%
ŽŽ Ram-Type BOPs – an easy reference guide on the choke line valves
delivering verified BOP specifications for Recommendations
your convenience Threaded connections 38%
ŽŽ Completion & Signoff – a functional form within the choke
clearly stating the findings and recommended manifold system
actions so each survey result is given
full attention No vent line installed on 30%
degasser or not vented
to safe area

+1.281.784.4700 // wildwell.com

You might also like