Professional Documents
Culture Documents
Copyright
Description
Polling Question
1. What is your profession?
a) Architect
b) Engineer
c) Code Official
d) Building Designer
e) Other
66
Load Path
• Wind
• Seismic (Earthquake)
Motion
• IBC Section 1604.4 requires
complete load path
Point of origin
Resisting element
Image courtesy APA – The Engineered Wood Association 2003 8
10
C Chord C Diaphragm
reaction
goes to
shear
walls
T T
Chord
11
Load Path
• Seismic Design Category (C, D, E, & F)
• Diaphragms shall be provided with continuous ties or struts between
C Chord C Diaphragm
reaction goes
to shear walls
Ties
T T
Chord 12
• Diaphragm
• Collector beam (or drag strut) Horizontal Plane
• Shear wall
• Drag strut (or collector)
Vertical Plane
15
•Importance
•Distribution of load to shear wall
•Flexible
•Diaphragm load is distributed to
shear walls by tributary area
•Rigid
•Diaphragm load is distributed to
shear walls by wall stiffness and
torsional component
17
Stiffness 2K K 2K
L/2 L/2
18
19
20
Wall shear
21
2 wood
structural
panels wood frame
1
3
nails
5
hold downs
plate
4 anchors
22
25
• 2012 IBC
• References 2008 SDPWS in
Section 2305 for lateral
design and construction
• 2015 IBC
• References 2015 SDPWS in
Section 2305 for lateral
design and construction
26
General Overview
• Scope
• “The provisions of this
document cover materials,
design and construction of
wood members, fasteners, and
assemblies to resist wind and
seismic forces.“
• ASD and LRFD
27
Outline
• Chapter 1: Flowchart
• Chapter 2: General Design
Requirements
• Chapter 3: Members and
Connections
• Chapter 4: Lateral Force
Resisting Systems
28
29
30
31
32
• General
33
• Terminology
New Definitions
35
36
• Framing
• Sheathing
• Connections
37
39
40
New
41
New
42
43
• General
• Wood Diaphragms
• Wood Shear Walls
44
Diaphragms
45
• 4.1.5.1 Anchorage of
Concrete or Masonry
Walls to Diaphragm
• SDC C, D, E, or F
New
46
Source: APA 47
48
Source: WoodWorks
49
• Wood Diaphragms
a) b)
50
Polling Question
2. The 2015 SDPWS provisions for anchoring
concrete or masonry walls to wood
diaphragms:
a. Require use of continuous ties or subdiaphragms
to maintain load path
b. Apply to Seismic Design Categories A through F
c. Are not referenced in the IBC
d. None of the above
51
• Wood Diaphragms
52
• Wood Diaphragms
53
• Wood Diaphragms
• Deflection example
• 2008 SDPWS Commentary
54
55
56
Wood Diaphragms
57
Revised
58
Revised
59
Revised
60
Revised
61
62
63
Revised
64
Revised
• L’ < 35’
65
40’
20’
66
67
Revised
68
69
71
Polling Question
3. Open front structures are limited to a
maximum diaphragm length of _____
in the 2015 SDPWS.
a. 25 feet
b. 35 feet
c. 50 feet
d. Open front structures are not allowed per
SDPWS
74
Shear Walls
75
76
NEW
77
78
79
• LRFD = 0.8
• Wind vw x 0.8
• Seismic vs x 0.8 = vw x 0.8 / 1.4
= vw x 0.57
80
6. Where panels are applied on both faces of a shear wall and nail spacing is
less than 6" on center on either side, panel joints shall be offset to fall on
different framing members. Alternatively, the width of the nailed face of
framing members shall be 3" nominal or greater at adjoining panel edges and
nails at all panel edges shall be staggered.
81
82
83
Deflection (4.3.2.2)
• Less stiffness
• Deflection
amplified by Cub
v
Cub
84
85
86
87
88
Revised
89
Revised
4.3.4.3 – Perforated Shear
Walls
• h/bs > 3.5:1 Not considered
• h/bs > 2:1 Li = L (2bs/h)
• Aspect Ratio Factors (4.3.4.2)
do not apply
• Shear distribution exceptions
(4.3.3.4.1) do not apply
90
4.3.4.4 – Force-transfer
Shear Walls
• h/bs > 3.5:1 Not considered
91
92
93
Table
94
Revised
Source: APA
95
Polling Question
4. Maximum allowable shear wall aspect
ratios:
a. Are not included in the 2015 SDPWS
b. Vary depending on the wall sheathing material
c. Are independent of wall sheathing material
d. Vary depending upon shear wall anchorage
96
NEW
97
98
99
109
110
111
112
113
• Vertical sheathing
• Horizontal blocking
Photo: APA
114
Panel Orientation
115
• Critical details
• Note minimum edge distance is 1/2"
116
(for shear)
118
Uplift
Shear
Combined
Uplift
Shear
120
121
122
Double row
8d nails @ 4″ o.c.
4 x 12
4x8
123
Single row
8d nails @ 4″ o.c.
4 x 12
4x8
124
4x8
125
4x8
126
127
128
129
NEW
130
131
Polling Question
5. Shear wall foundation anchor bolt
washers must be:
a.Not less than 0.229”x3”x3” in size
b.Placed within 1” of the sheathing material
c. Both a) and b)
d.None of the above
133
135
• www.awc.org
• Online eCourses
• FAQ’s
• Calculators
137