Oscilloquartz SA

Commissioning Document
OSA 5548C SSU-E60 & SSU-E200

Equipment shelf type: OSA-5548C E200 OSA-5548C E60

Equipment Serial Number:       Equipment Site :      

Document Title : Page :


390945697.doc 1 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
1 INDEX
1 INDEX 2

2 INTRODUCTION 5

2.1 Document Revision History 5


2.2 Document Information 5
2.3 Requirements 5

3 COMMUNICATION 6

3.1 Local Communication Verification* 6


3.1.1 POWER-B LOCAL COMM. Port 6
3.1.2 MGMT TILE LOCAL COMM. Port 6
3.2 Remote Communication Verification* 7
3.3 Remote Communication Parameters Settings* 7
3.3.1 Communication Tests Engineering Comments 7

4 5548C UNIT CONFIGURATION 9

4.1 Chassis and Model Details* 9


4.1.1 Shelf Inventory 9
4.1.2 Date and Time Verification 9
4.2 Configuration Table* 9
4.2.1 Cards Inventory 9
4.2.2 Tiles Inventory 11
4.2.3 Unit Configuration Engineering Comments 11

5 CARDS 13

5.1 Cards Status Verification* 13


5.1.1 TL1 Commands Required 13
5.1.2 Report Table 13
5.1.3 Cards Status Engineering Comments 14

6 INPUT 15

6.1 Input Line Configuration* 15


6.1.1 TL1 Commands Required 15
6.1.2 Report Table 15
Document Title : Page :
390945697.doc 2 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.1.3 Input Line Configuration Engineering Comments 16
6.2 Input Line test* 16
6.2.1 Input Verification 16
6.2.2 Input Line Engineering Comments 18
6.3 Holdover functional test* 19
6.3.1 Verification of the Holdover mode 19
6.3.2 Holdover Engineering Comments 22

7 INPUT LINE SWITCHING 23

7.1 Switching mode* 23


7.2 Input Priority Configuration* 23
7.2.1 TL1 Commands Required 23
7.2.2 Report table 23
7.3 Input Priority Switching Test* 24
7.3.1 TL1 Commands Required 24
7.3.2 Report table 24
7.3.3 Input Switching Engineering Comments 25

8 OUTPUT 26

8.1 Output configuration* 26


8.1.1 TL1 Commands Required 26
8.1.2 Report table 26
8.2 Output Port verification 27
8.2.1 Testing Method 27
8.2.2 Output Port Engineering Comments 28

9 POWER 29

9.1 Verification of POWER cards operation 29


9.1.1 POWER Cards Operation 29
9.1.2 Verification of POWER Cards Redundancy Operation 29
9.1.3 Power Engineering Comments 30
9.2 D.C. Power, Ground/Earth potential Verification 31
9.2.1 POWER Test, POWER FUSE, DC SAFETY Engineering Comments 31

10 TEST OF ALARM LEVELS 32

10.1 Minor Alarm (MN)* 32


10.1.1 TL1 Commands Required 32
10.1.2 Verification of the MAC card state 32
10.2 Major Alarm (MJ)* 32
10.2.1 Verification of the MAC card state 32
10.3 Critical Alarm (CR)* 33
Document Title : Page :
390945697.doc 3 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
10.3.1 Verification of the MAC card state 33
10.3.2 Alarm Levels Engineering Comments 33

* Test could be done using Element Manager or SyncView Plus.

11 Commissioning Document Acceptance Form 34

Document Title : Page :


390945697.doc 4 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
2 Introduction
2.1 Document Revision History
Rev Date of Change Description Authorised
1.00 22 Jan. 07 Creation BIGR
1.01 28 Mar. 07 Correction and improvements BIGR
1.02 26 Aug. 08 Some corrections NOIA
1.03 25 Sep. 08 Augmented for field use, North America RAJO

2.2 Document Information


The following document details the recorded results of the commissioning process for the OSA
5548C SSU-E60 and SSU-E200 Rev 1.x. The results will apply after the installation of the equipment;
the commissioning process will be performed by a fully trained Oscilloquartz Engineer. Before
commissioning commences, the Engineer must allow for a relevant stabilisation period, for the
equipment under commissioning, to have elapsed.

2.3 Requirements
The following tools are required to execute this commissioning document:

 Small Flat Blade Screwdriver [1mm slot] for System Card Front Panel Screws (card removal
or insertion)
 A laptop or computer with at least the SyncTerminal® installed. The Laptop should have both
Ethernet and Serial port capability.
 As an option, the laptop can be provisioned with SyncView Plus Element Manager® Software.
 A Null Modem RS-232C cable (DB9s – DB9s, pins 2<>3, 3<>2 and 5<>5 connected) to
communicate locally with the OSA 5548C SSU
 An oscilloscope with minimum 30MHz bandwidth, BNC cables, external 50 and 75 Ohm
through-termination adapters (BNC<>CEI 1.0 adapting cables if so equipped on outputs)
 At least one input reference signal connected to the 5548C SSU, with a Phase Quality Level
equal to, or higher than the quality of the THC cards installed in the 5548C SSU
 A Frequency reference source
 BNC-BNC cables less than 5 meters long, with 50 ohm impedance for any 2.048 MHz
signals, and 75 ohm impedance for any 2.048 Mb/s signal source
 GPS Antenna, and Lightning Protection, installed and connected, if any GPS card installed
 Anti-Static Protection Wrist Strap for removal and insertion of cards if required, temporary
Anti-Static mat or bag available for any cards removed
 Digital Multi-Meter (DMM) capable of measuring Voltage to 3.5 digits with < 1% error to
200 Volts Direct Current (D.C.) and Resistance Measurement to a resolution of
100 milliohms (0.1 ohms) {minimum}

Document Title : Page :


390945697.doc 5 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
3 Communication
3.1 Local Communication Verification
3.1.1 POWER-B LOCAL COMM. Port
Connect a Null Modem Serial cable end to the front “LOCAL COMM” port located on the POWER-B
card front panel and connect the other end to the serial port of your laptop or computer. Run the
SyncTerminal and configure it to access the OSA 5548C via RS-232.

Test topic OK Partially Failed N/A


Verify that the SyncTerminal show the following
message once connected:

Connecting to COM1/2
Connected
Send the following TL1 command:
RTRV-HDR:::CTAG;
And check that the following answer has been
responded:
SID DATE TIME
M CTAG COMPLD
;

3.1.2 MGMT TILE LOCAL COMM. Port


Repeat the Test 3.1.1 by connecting a Null Modem cable end between the Rear Management Tile’s
“LOCAL COMM.” Connection on the serial port of your laptop or computer. Run the SyncTerminal
Interface and configure it to access the OSA 5548C via RS-232.

Test topic OK Partially Failed N/A


Verify that the SyncTerminal show the following
message once connected:

Connecting to COM1/2
Connected
Send the following TL1 command:
RTRV-HDR:::CTAG;
And check that the following answer has been
responded:
SID DATE TIME
M CTAG COMPLD
;

Document Title : Page :


390945697.doc 6 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
3.2 Remote Communication Verification
Ensure that the Ethernet Network Parameters have been correctly configured via local connection
with this TL1 command: RTRV-COM-SYS:::CTAG;. Connect a CAT-Ve cable with RJ-45
terminations between the Management Tile’s “LAN COMM.” port and the Ethernet network where
your computer is connected to. (Alternate method: Use a crossed-over RJ45 cable to the Laptop’s
Ethernet port). Configure the Laptop TCP-IP to the same subnet segment as the 5548C IP. Run the
SyncTerminal and configure it to access the OSA 5548C by TCP/IP.

Test topic OK Partially Failed N/A


Verify that the SyncTerminal show the following
message once connected:

Connecting to XXX.XXX.XXX.XXX:XXXX
Connected

Send the following TL1 command:


RTRV-HDR:::CTAG;
And check that the following answer has been
responded:

SID DATE TIME


M CTAG COMPLD
;

3.3 Remote Communication Parameters Settings


Record the IP address and Sync View Plus communication parameters settings.

 Record the IP address configured for the 5548C    .   .   .    N/A

 Record the Default Gateway configured for the 5548C    .   .   .    N/A

 Record the Subnet Mask configured for the 5548C    .   .   .    N/A

3.3.1 Communication Tests Engineering Comments

Engineering Comments
     

Document Title : Page :


390945697.doc 7 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
SyncView Plus® and SyncTerminal® are both capable Commissioning Tools

For Serial connections, use the right Null Serial DB9s – DB9s cable, and set the COM port correctly.
For Ethernet connections, ensure that the Laptop/CPU IP settings are in the same subnet segment
as the 5548C under test. For 5548C IP connection, use port 8000/8023. If the Laptop can PING the
5548C successfully, SyncView+ and SyncTerminal will work correctly. The bottom pictures indicate
locations of front and rear COM serial connections on the E200 model.

Document Title : Page :


390945697.doc 8 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
4 5548C Unit Configuration
Record the configuration of the OSA 5548C shelf.

4.1 Chassis and Model Details


4.1.1 Shelf Inventory
Article Number (Order ref.): A0      (normally 5 numerals)
Serial Number (No.):       (normally 3-4 digit numeral)
Sub rack type: 5548C SSU-E60 or E200

4.1.2 Date and Time Verification

4.1.2.1 TL1 Command required


Purpose TL1 Command / TL1 Answer
Retrieving the shelf name (SID), date and RTRV-HDR:::CTAG;
time SID DATE TIME
M CTAG COMPLD
;

4.1.2.2 Reported Value (user setting)


Shelf name (SID):       Compliant: Check with Client
Date:       Compliant:
Time:       Compliant: Compare to NTP if possible
Check Local UTC Offset       Completed
5548C ALARM HISTORY INITIALIZED Completed

4.2 Configuration Table


Record the configuration details of the 5548C to be commissioned in the table below. The inventory
can be found via TL1 command, in the Inventory page of SyncView+, and by physical inspection for
part number on the front card “pull lever” label, and serial number on the label on the rear connector
of each card.

4.2.1 Cards Inventory

4.2.1.1 TL1 Commands Required


Purpose TL1 Command / TL1 Answer
Retrieving the inventory of each card RTRV-INV::ALL:CTAG;
embedded

Document Title : Page :


390945697.doc 9 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
It is important to identify the components in the shelf at the time of commissioning for future
reference. As shown in the example on the next page, each card is identified with part number, serial
and revision number (shown as highlighted for INC-1-A).

4.2.1.2 Cards Inventory Report


Paste the TL1 command’s answer below.

     

     

Document Title : Page :


390945697.doc 10 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
Tiles Inventory

4.2.1.3 For 5548C SSU-E60

Slot
Tile Description
Number
A21 POWER A TILE A014124
A22 INPUT TILE A014448
A23 OUTPUT TILE (GROUP 1) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A24 OUTPUT TILE (GROUP 2) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A25 OUTPUT TILE (GROUP 3) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A26 MANAGEMENT TILE A014594
A27 POWER B TILE A014125

4.2.1.4 For 5548C SSU-E200


Slot
Tile Description
Number
A101 POWER-B Tile POWER B TILE
A014125
A102 Management Tile MANAGEMENT TILE
A014594
A103 OUTPUT TILE (GROUP 3) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A104 OUTPUT TILE (GROUP 2) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A105 OUTPUT TILE (GROUP 1) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A106 Input Tile INPUT TILE A014448
A107 POWER-A Tile POWER A TILE
A014124
A121 OUTPUT TILE (GROUP 10) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A122 OUTPUT TILE (GROUP 9) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A123 OUTPUT TILE (GROUP 8) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444

Document Title : Page :


390945697.doc 11 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
Slot
Tile Description
Number
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A124 OUTPUT TILE (GROUP 7) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A125 OUTPUT TILE (GROUP 6) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A126 OUTPUT TILE (GROUP 5) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166
A127 OUTPUT TILE (GROUP 4) o CEI 1.0/2.3 ASYM: A014438
o 20x SUB-D SYM A014444
o 2x 20 pins IDC ribbon cable A014635
o Blank A014166

4.2.2 Unit Configuration Engineering Comments

Engineering Comments
     

Document Title : Page :


390945697.doc 12 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
5 Cards
The STATUS of every card in the shelf will be recorded in this chapter.

5.1 Cards Status Verification


5.1.1 TL1 Commands Required
Purpose TL1 Command / TL1 Answer
Retrieving each card status, one after the RTRV-EQPT-OP::INC-1-A..INC-2-B/GPS-
other among the following cards: A/GPS-B/THC-A/THC-B/SGC-A/SGC-
INC-1-A..INC-2-B/GPS-A/GPS- B/OUC-1-A..OUC-10-B/MAC-A/MAC-
B/THC-A/THC-B/SGC-A/SGC-B/OUC- B:CTAG;
1-A..OUC-10-B/MAC-A/MAC-B "CARD:STATUS"

NOTES:
The GPS CARD STATUS LED may indicate RED if a GPS ANTENNA is not connected, or a faulty
signal is received. This does not indicate that the GPS CARD is faulty. On GPS card STATUS RED
indication, check the details of the number of satellites in view. Satellite Vehicles (SV) that indicates
Signal/Noise Density levels of less than 30 dB should be considered too low to track. Five (5) or more
SV’s in view is acceptable for GPS operation.

All other cards should indicate STATUS LED’s as GREEN. Investigate any alarms and correct all
alarm conditions before proceeding. If input alarms are accepted and known, as for Inputs that are
not yet connected, either disable those Input Lines, or note the condition in the Engineering Notes of
this section.

Use the selection of EMPTY for card slots that are not equipped.
Use the selection OK for normal operation (STATUS=GREEN)

5.1.2 Report Table

5.1.2.1 For 5548C SSU-E60


Card Status Compliant Card Status Compliant
INC-1-A
INC-1-B OUC-1-A
GPS-A OUC-1-B
GPS-B OUC-2-A
THC-A OUC-2-B
THC-B OUC-3-A
SGC-A OUC-3-B
SGC-B MAC-A

Document Title : Page :


390945697.doc 13 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
5.1.2.2 For 5548C SSU-E200
Card Status Compliant Card Status Compliant
INC-1-A OUC-4-A
INC-1-B OUC-4-B
INC-2-A OUC-5-A
INC-2-B OUC-5-B
GPS-A OUC-6-A
GPS-B OUC-6-B
THC-A OUC-7-A
THC-B OUC-7-B
SGC-A OUC-8-A
SGC-B OUC-8-B
OUC-1-A OUC-9-A
OUC-1-B OUC-9-B
OUC-2-A OUC-10-A
OUC-2-B OUC-10-B
OUC-3-A MAC-A
OUC-3-B MAC-B Unavailable

5.1.3 Cards Status Engineering Comments

Engineering Comments
     

Document Title : Page :


390945697.doc 14 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6 Input
The Input Line Configuration of all INC cards in the shelf will be recorded in this chapter.

6.1 Input Line Configuration


Record the configuration of the nine (9) input lines for the E200 model.
Record the configuration of five (5) input lines for the E60 model.

6.1.1 TL1 Commands Required


Purpose TL1 Command
Retrieving each input line configuration RTRV-EQPT-IL::ALL:CTAG;
one after the other among the following
input lines:
1-1/1-2/1-3/1-4/2-1/2-2/2-3/2-4

Note: Only Input Lines 1-1 to 1-4 apply to


the E60 Model Shelf

6.1.2 Report Table


Paste the commands answer below.
     

Document Title : Page :


390945697.doc 15 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.1.3 Input Line Configuration Engineering Comments

Engineering Comments
     
6.2
I

nput Line test


The purpose of this test is to check the functionality of the INC and GPS cards of the OSA 5548C.

6.2.1 Input Verification

6.2.1.1 Step 1
Ensure that at least one input frequency reference per each INC group is connected, configured and
qualified by the shelf (the corresponding INput LED on the INC card should lit green permanently)
and all GPS cards should be currently tracking a valid GPS signal.

Note: If there is no customer supplied frequency reference source at time of commissioning, a


suitable source from an OSA 5565 STS, or any output signal of the 5548C being commissioned may
be used as a temporary source for the duration of the test only. If an output signal is used, ensure
that it is disconnected at the end of testing in section 6.2, due of the risk of accidentally looped timing.
Use the NA checkmark for redundant slots that are not equipped or empty. A GREEN SOLID
LED is one that is not FLASHING {as in the WTR or Wait To Restore cycle}.

Test topic OK Failed N/A


Observe/Confirm that STATUS LED is GREEN on INC-1-A
Observe/Confirm that STATUS LED is GREEN on INC-1-B
Observe/Confirm that STATUS LED is GREEN on INC-2-A
(for SSU-E200)
Observe/Confirm that STATUS LED is GREEN on INC-2-B
(for SSU-E200)
Observe/Confirm that STATUS LED is GREEN on GPS-A card
Observe/Confirm that STATUS LED is GREEN on GPS-B card
Observe/Confirm that the LED related to the Input fed with Sync
Frequency is illuminated GREEN SOLID on at least one input from
IN1 to IN4 on the active INC cards of the Group 1
Observe/Confirm that the LED related to the Input fed with Sync
Frequency is illuminated GREEN SOLID on at least one input from
IN1 to IN4 on the active INC cards of the Group 2 (for SSU-E200)
Observe/Confirm that the GPS LED is illuminated in GREEN on the
active GPS card
Verify that the “SELECTED INPUT” digital display on the active THC
card does not display a “-“ character (dash).

Document Title : Page :


390945697.doc 16 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.2.1.2 Step 2
Manually remove all the input frequency reference sources from the Input Connectors and GPS
antenna cable from GPS connectors.

Test topic OK Failed N/A


Observe/Confirm that STATUS LED is GREEN on INC-1-A
Observe/Confirm that STATUS LED is GREEN on INC-1-B
Observe/Confirm that STATUS LED is GREEN on INC-2-A
(for SSU-E200)
Observe/Confirm that STATUS LED is GREEN on INC-2-B
(for SSU-E200)
Observe/Confirm that STATUS LED is illuminated RED on
GPS-A card
Observe/Confirm that STATUS LED is illuminated in RED on
GPS-B card
Observe/Confirm that the LED related to the Input fed with Sync
Frequency is illuminated RED SOLID on at least one input from
IN1 to IN4 on the active INC card of the Group 1
Observe/Confirm that the LED related to the Input fed with Sync
Frequency is illuminated RED SOLID on at least one input from
IN5 to IN8 on the active INC card of the Group 2 (for SSU-E200)
Observe/Confirm that the GPS LED is illuminated RED FLASHING
on the GPS card(s), allowing enough time for the system to recover
the GPS signal.

Document Title : Page :


390945697.doc 17 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.2.1.3 Step 3
Re-connect the frequency reference source to the Input Connectors and GPS antenna to the GPS
connectors.

Test topic OK Failed N/A


Observe/Confirm that the LED related to the Input fed with Sync
Frequency is illuminated GREEN SOLID on at least one input from
IN1 to IN4 on the active INC cards of the Group 1
Observe/Confirm that the LED related to the Input fed with Sync
Frequency is illuminated GREEN SOLID on at least one input from
IN5 to IN8 on the active INC cards of the Group 2 (for SSU-E200)
Observe/Confirm that the GPS LED is illuminated in GREEN on the
GPS card(s), allowing enough time for the system to recover the
GPS signal (aprox. 300 seconds)
Observe/Confirm that ALL Related Alarms are cleared on the MAC
card
Verify that the Alarm is cleared with the software using the following
command:
RTRV-ALM::ALL:CTAG;
Note: SyncView+ EVENT VIEWER can also be used to verify that
the ALARM has CLEARED

6.2.2 Input Line Engineering Comments

Engineering Comments
     

Notes:
Although only one Input Line is suggested for testing, all Inputs can be tested for functional status in
the same way, by commissioning, enabling a test signal, removal of same test signal, and a re-
connection of that test signal to test the Input STATES of the INC LEDs.

Document Title : Page :


390945697.doc 18 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.3 Holdover functional test
These tests are designed to check the holdover capabilities of the OSA 5548C and verifying the
Oscillator parameters.

6.3.1 Verification of the Holdover mode


Prior to perform the below test, verify that there is at least one input line qualified by the INC and/or
GPS card(s) and selected by the THC card(s). Completed

6.3.1.1 Step 1 REMOVAL OF ALL INPUTS TO HOLDOVER MODE


Remove all INC and GPS cards from their slots. Completed

Test topic OK Partially Failed N/A


Verify that HOLDOVER LED of the active THC cards is
ON [RED] permanently/steady
Verify that there is a “-“ (dash) indicated in the
SELECTED INPUT display on the active THC card
indicating HOLDOVER mode
If there are two THC cards in the shelf, verify that the
stand-by THC remains STATUS GREEN without any
HOLDOVER or OSCILLATOR LED indication, during
this manipulation.
Verify that all SGC cards continue with all LEDs
illuminated GREEN permanently/steady
Verify that all installed OUC cards continue with two
group selector LEDs (E1 and/or f in each group) and the
STATUS LED illuminated GREEN permanently/steady

Document Title : Page :


390945697.doc 19 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.3.1.2 Step 2 RECOVERY OF HOLDOVER, INPUT RESTORAL
Re-insert all INC and GPS cards and wait until at least one input line is recovered (after the WTR
time expires). Completed

Test topic OK Partially Failed N/A


When one line has recovered (after WTR time has
elapsed, if applied) verify and observe that the THC
active card indicates HOLDOVER LED FLASHING for
approximately 1 minute and then extinguishes
Verify that a line is reselected and that there is no “-“
(dash) in the digital display, and that a number, or a
letter “g” corresponding to the selected line is displayed
on the THC digital display

Note: On E200 models, valid THC digital Indications are “1”,”2”,”3”,”4”,”5”,”6”,”7”,”8”,”g” or “-“ . On
E60 models, valid THC digital Indications are “1”,”2”,”3”,”4”,”g” or “-“ . The “period” indicator
illuminates if there is one qualified input available if the current THC input is disqualified.

6.3.1.3 Step 3 THC PAIR SWITCHING ON THC FAILURE


If two THC cards are installed in the shelf, remove the active one from its slot.
If there is one THC in the shelf, skip to Step 7.1.1.3 Step 4.
One (1) THC/Not Applicable/skipped: Completed

Test topic OK Partially Failed N/A


Verify that the HOLDOVER LED is RED SOLID on the
remaining THC for a short period; changing to RED
FLASHING for approximately 1 minute on the remaining
THC; and finally HOLDOVER LED extinguished (OFF)
Verify that the previously selected line shown on the
SELECTED INPUT display is the same as the first THC
before it had been removed (i.e. if “1” was previously
selected before THC removal, “1” should also be
selected on the remaining THC after the locking
process is completed)
Verify that no effects are observed any of on the SGC
card(s) LED’s during the manipulation
Verify that no effects are observed on any of the OUC
cards LED’s during the manipulation

DO NOT RESTORE THE REMOVED THC AT THIS TIME

Document Title : Page :


390945697.doc 20 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.3.1.4 Step 4 SINGLE THC IN HOLDOVER
Remove all INC cards and GPS from their slots. Only one THC in Holdover will feed the outputs.
Completed:

Test topic OK Partially Failed N/A


Verify that HOLDOVER LED on the remaining THC is
ON permanently
Verify that there is a “-“ (dash) indicated in the
SELECTED INPUT display on the active THC card
Verify that the SGC cards remains with all their LEDs lit
in GREEN permanently.
Verify that the OUC cards remains with their two LEDs
(E1 and/or f) and the STATUS LED lit in GREEN
permanently

6.3.1.5 Step 5 RESTORAL OF INPUT TO SINGLE THC IN HOLDOVER


Re-insert all INC and GPS cards and wait until that at least one input line is recovered (i.e. after WTR
time). Only one THC will recover to feed the outputs. Completed:

Test topic OK Partially Failed N/A


Once that a line is recovered (after WTR time elapsed)
verify that the THC active card get its HOLDOVER LED
is ON, then blinking during approximately 1 minute and
then getting extinguished.
Verify that a line is reselected and that there is not a “-“
(dash), but a number corresponding to the selected line
displayed on the THC digital display

Document Title : Page :


390945697.doc 21 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
6.3.1.6 Step 6 RESTORAL OF THC
Re-insert the previously removed THC card in Step 3. If there is one single THC provisioned in the
shelf, skip to the next step. One (1) THC/Not Applicable/skipped: Completed

Test topic OK Partially Failed N/A


Verify that the newly inserted THC card is observed
with OSCILLATOR LED RED/SOLID state,
extinguishing after a warming and stabilization period,
followed by a period with the HOLDOVER LED as RED
SOLID, and changing to a FLASH status during
approximately the last one (1) minute
Note that the OSC LED period is dependant upon module
temperature at restart and the type of THC module.
Verify that upon/following insertion of the THC card that
no effects are observed on the other THC card LED’s
Verify that upon/following insertion of the THC card that
no effects are observed on any SGC card LED’s
Verify that upon/following insertion of the THC card that
no effects are observed on any OUC card LED’s

6.3.2 Holdover Engineering Comments

Engineering Comments on THC, Holdover Actions


     

THC restoral after removal does require a period of stabilization and warmup.

Document Title : Page :


390945697.doc 22 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
7 Input Line Switching
This testing cycle verifies correct switching functionality between the inputs of the OSA 5548C.

7.1 Switching mode


Record the switching mode provisioned in the OSA 5548C SSU: [AUTOMATIC]

7.2 Input Priority Configuration


Record the priority settings and input availability in the table below.

7.2.1 TL1 Commands Required


Purpose TL1 Command / TL1 Answer
Retrieving the current priority RTRV-PRIO:::CTAG;
configuration "IL-1-1=PRIORITY,IL-1-2= PRIORITY,IL-1-3=
PRIORITY,IL-1-4= PRIORITY,IL-2-1=
PRIORITY,IL-2-2= PRIORITY,IL-2-3=
PRIORITY,IL-2-4=PRIORITY,GPS= PRIORITY"

7.2.2 Report table


E200 Model E60 Model
Input Line Priority Input Line Priority
IL-1-1 IL-1-1
IL-1-2 IL-1-2
IL-1-3 IL-1-3
IL-1-4 IL-1-4
IL-2-1 GPS
IL-2-2
IL-2-3
IL-2-4
GPS

Document Title : Page :


390945697.doc 23 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
7.3 Input Priority Switching Test
7.3.1 TL1 Commands Required
Purpose TL1 Command / TL1 Answer
Disabling an input line ED-EQPT-IL::1-1/1-2/1-3/1-4/2-1/2-2/2-
3/2-4:CTAG::ADM_STATE=DISABLED;
Enabling an input line ED-EQPT-IL::1-1/1-2/1-3/1-4/2-1/2-2/2-
3/2-4:CTAG::ADM_STATE=ENABLED;

7.3.2 Report table


In the order of the priority setting record, systematically disable each available and qualified input in
priority order. Verify that the SELECTED INPUT display of the THC active card is the same sequence
as the input priority settings. Go to the last point of the following test when the last qualified line is
disabled.
Test topic OK Partially Failed N/A
Disable the priority 1 input and verify that the selected
input is now the priority 2 as per shown on the active
THC card SELETED INPUT display
Disable the priority 2 input and verify that the selected
input is now the priority 3 as per shown on the active
THC card SELETED INPUT display
Disable the priority 3 input and verify that the selected
input is now the priority 4 as per shown on the active
THC card SELETED INPUT display
Disable the priority 4 input and verify that the selected
input is now the priority 5 as per shown on the active
THC card SELETED INPUT display
On completion of the E60 model testing, reactivate all
input fed to the OSA 5548C.
Verify that all inputs are re-qualified.

Document Title : Page :


390945697.doc 24 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
For E200 models, continue testing below.
Test topic OK Partially Failed N/A
Disable the priority 5 input and verify that the selected
input is now the priority 6 as per shown on the active
THC card SELETED INPUT display
Disable the priority 6 input and verify that the selected
input is now the priority 7 as per shown on the active
THC card SELETED INPUT display
Disable the priority 7 input and verify that the selected
input is now the priority 8 as per shown on the active
THC card SELETED INPUT display
Disable the priority 8 input and verify that the selected
input is now the priority 9 as per shown on the active
THC card SELETED INPUT display
On completion of the testing, reactivate all input fed to
the OSA 5548C. Verify that all inputs are re-qualified.

7.3.3 Input Switching Engineering Comments

Engineering Comments
     

Notes; To Simplify this test, configure the SSU-E60 to use one E1 or Frequency Input, and then
configure all virtual Input Lines to the one physical Input (i.e. FREQ1 or E1_1). For the SSU-E200
model, two physical inputs are required. Reset the priority to run in numerical order similar to the IL
line numbers, with 5 steps for SSU-E60, and 9 steps for SSU-E200. Set the GPS as the last priority
input in both cases. Observe that for every input rearrangement where that input is locked on the
THC, there is a brief two~ minutes period where the THC goes into protective Holdover mode,
followed by “Fast-Holdover” recovery (signalled by Holdover LED flashing for 1 minute). During this
interim period, the THC is testing the new Input selection for validity.

Document Title : Page :


390945697.doc 25 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
8 Output
8.1 Output configuration
8.1.1 TL1 Commands Required
Purpose TL1 Command / TL1 Answer
Retrieving output group configuration, one RTRV-EQPT-OG::1-1..10-2:CTAG;
after the other.
Retrieving Shorted Alarm detection state RTRV-EQPT-OUC::1..10:CTAG;
for each OUC, one after the other.

8.1.2 Report table


OUC Output Shorted
OUT
Group Configuration Detection
1-10
OUC-1
11-20
1-10
OUC-2
11-20
1-10
OUC-3
11-20
E200 models have 10 output groups
1-10
OUC-4
11-20
1-10
OUC-5
11-20
1-10
OUC-6
11-20
1-10
OUC-7
11-20
1-10
OUC-8
11-20
1-10
OUC-9
11-20
1-10
OUC-10
11-20

Document Title : Page :


390945697.doc 26 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
8.2 Output Port verification
8.2.1 Testing Method
Use an Oscilloscope to verify output signal shape, frequency and level on some randomly selected
ports. (The acceptable sample rate is 10% of the number of ports installed, randomly selected.) All
5548C output ports are tested at the Oscilloquartz Factory.

Port OUC
# 1 2 3 4 5 6 7 8 9 10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

8.2.2 Output Port Engineering Comments

Engineering Comments Outputs can be tested at


Deported panel BNC ports
     
or at CEI 1.0 connections
as Asymmetrical Signals.
Testing Symmetrical DB15
Connections will require a special
test BalUn adapter.

Testing using an automated Pulse Mask


Compliance Test Set such as the
Sunrise E20 is acceptable as long as
Document Title : Page :
390945697.doc 27 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
Such tests are witnessed by both
Client and OSA-Engineer.

Document Title : Page :


390945697.doc 28 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
9 Power
9.1 Verification of POWER cards operation
This test is designed to check the correct operation of both A and B POWER cards of the 5548C.
Verify that power is fed to both POWER A & POWER B connectors.

9.1.1 POWER Cards Operation


Test topic OK Partially Failed N/A
Observe/Confirm that STATUS LED is illuminated
GREEN on POWER A card
Observe/Confirm that STATUS LED is illuminated
GREEN on POWER B card

9.1.2 Verification of POWER Cards Redundancy Operation


This test is designed to test the redundancy and switching between dual power supply modules when
fitted to the 5581C

Test topic OK Partially Failed N/A


Remove POWER A card and verify that the shelf is not
down, without power supply A
Reinsert POWER A card and verify that its LED
becomes GREEN again
Remove POWER B card and verify that the shelf is not
down, without power supply B
Reinsert POWER B card and verify that its LED
becomes GREEN again

9.1.3 Power Engineering Comments

Engineering Comments LOCATION:


Front Panel ,
     
LEFT and RIGHT SLOTS,
LOWER CARD SHELF.
GREEN STATUS LED’s are
just above FUSE HOLDERS.
POWER A (LEFT)
Slot A1 on E60,
Slot A21 on E200
POWER B (RIGHT)
Slot A17 on E60,
Slot A37 on E200
Document Title : Page :
390945697.doc 29 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
9.2 D.C. Power, Ground/Earth potential Verification
Use caution when measuring DC Voltages, and take care when handling the DMM probes on the live
DC terminals of the shelf. Use caution to ensure that the mode of DMM is set to Voltage (not current),
and that the probes are in the proper meter ports. Use a dull large slot blade toll to remove the fuse
holders with care. Zero the DMM for ground cable resistance testing.

Test topic OK Failed MEASUREMENT


REMOVE THE FUSE IN POWER-A CARD [front/left]
MEASURE THE VOLTAGE AT THE POWER-A TERMINALS
      VOLTS
ON THE SHELF, use DMM probe test leads RED to “+”, and
BLACK to “-“ terminals in correct polarity Correct Polarity
OBSERVE STATUS LED ON POWER-A CARD IS RED
RESTORE FUSE IN POWER-A CARD,
OBSERVE STATUS LED ON POWER-A CARD IS GREEN
REMOVE FUSE IN POWER-B CARD [front/right]
MEASURE THE VOLTAGE AT THE POWER-B TERMINALS       VOLTS
ON THE SHELF, use DMM probe test leads RED to “+”, and
BLACK to “-“ terminals in correct polarity Correct Polarity

OBSERVE STATUS LED ON POWER-B CARD IS RED


RESTORE FUSE IN POWER-B CARD,
OBSERVE STATUS LED ON POWER-B CARD IS GREEN
Measure the GROUND RESISTANCE from the CHASSIS
GROUND CONNECTION POINT ON EACH SIDE OF THE       OHMS
SHELF to the GROUND BAR in the RACK or CABINET (averaged)

9.2.1 POWER Test, POWER FUSE, DC SAFETY Engineering Comments

Commissioning Comments and Recommendations for applicable corrections


     

Observe the Installation of DC power and feed cables. Ask for the main breaker details , Bay
numbers and proper Fuse Ratings. To maintain safety, 5548C models should always be fed from 10A
breakers, and maintain proper distribution for the Main DC feed, and for the Relay Rack or Cabinet in
which the Equipment is mounted. The Ground from the Rack or Cabinet (copper) bar should be no
more than 1.0 Ohms and no longer than 2 meters in length.

Document Title : Page :


390945697.doc 30 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
10 Test of Alarm Levels
This section is the procedure to test each alarm level such as Minor, Major and Critical. Prior starting
this test, confirm that no alarm is reported by the 5548C.

10.1 Minor Alarm (MN)


Enable an input line to a port which is not connected with an input reference signal or set an incorrect
input signal type.

10.1.1 TL1 Commands Required


Purpose TL1 Command / TL1 Answer
Retrieving the current priority ED-EQPT-IL::
configuration 1-1/1-2/1-3/1-4/2-1/2-2/2-3/2-4:CTAG::
INPUT=E1_1/E1_2/E1_3/E1_4/
FREQ_1/FREQ_2/FREQ_3/FREQ_4,
ADM_STATE=ENABLED;

10.1.2 Verification of the MAC card state


Test topic OK Partially Failed N/A
Verify that at least one MN LED is illuminated on the
MAC card
Check that the minor alarm is reported after sending the
following command: RTRV-ALM::ALL:CTAG;

10.2 Major Alarm (MJ)


Clear all alarms prior doing the following test.

10.2.1 Verification of the MAC card state

Test topic OK Partially Failed N/A


Remove any card from its slot and verify that the MAC
lights at least one MJ LED.
Check that the major alarm is reported after sending the
following command: RTRV-ALM::ALL:CTAG;

Document Title : Page :


390945697.doc 31 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
10.3 Critical Alarm (CR)
Clear all alarms prior doing the following test.

10.3.1 Verification of the MAC card state

Test topic OK Partially Failed N/A


Remove fuse on a pair of output card and check that
the MAC card shows a Critical alarm (CR)
Check that the critical alarm is reported after sending
the following command: RTRV-ALM::ALL:CTAG;

10.3.2 Alarm Levels Engineering Comments

Engineering Comments LOCATION:


Front Panel,
Slot A16 on E60,
      Slot A17 on E200

STATUS = GREEN at all times


MST [MASTER] = GREEN

USC = [USER CONNECTED]


when communication is active

CR = CRITICAL = RED / OFF


MJ = MAJOR = AMBER / OFF
MN = MINOR = AMBER / OFF

ACO = Alarm Cut Off = RED / OFF

Document Title : Page :


390945697.doc 32 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/
11Commissioning Document Acceptance Form
Commissioning Engineer:       Date:   / /     

Signature:      

Customer Representative:       Date:   / /     

Signature:      

Customer Company Name:       Date:   / /     


Equipment Site Address: Date:   / /     

Complete address:      


     
     
Country:      

Commissioning Issues and Comments:

Attachments;

INVENTORY PRINT OF SITE SHELF, ALL CARDS

GPS ANTENNA SITE PICTURES

LIGHTNING PROTECTION AND CABLE TRANSIT PICTURES

PHASE TEST RESULTS, (optional) if applicable

Document Title : Page :


390945697.doc 33 of 33
Document Type : Document Rev. : Author:
Commissioning Document 1.04 2008 BIGR/RAJO (Verified 1.04)

OSCILLOQUARTZ S.A., CH-2002 Neuchâtel 2, Switzerland / ++41 32 722 5555 / Fax ++41 32 722 5556
E-mail : osa@oscilloquartz.com / World Wide Web : http://www.oscilloquartz.com/