Professional Documents
Culture Documents
WORK BKDN
TASK TITLE START DATE DUE DATE
STRUCTURE
2 Site Preparation
3 Construction
3.3 Erection
112
6 4%
2 2%
1 1%
6 6%
35
100
100
PHASE ONE
WEEK 2 WEEK 3 WEEK 4 WEEK 5
SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE
PHASE TWO
WEEK 5 WEEK 6 WEEK 7
WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT
P
7 WEEK 8 WEEK 9 WEEK 10
SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED
PHASE THREE
WEEK 10 WEEK 11 WEEK 12
THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN
PHASE FOUR
WEEK 13 WEEK 14 WEEK 15
MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU
WEEK 15 WEEK 16
FRI SAT SUN MON TUE WED THU FRI SAT SUN
GANTT CHART
WORK BKDN
TASK TITLE START DATE DUE DATE
STRUCTURE
1.1. Mechanical
1.1. Piping
1.1. Instrumentation
2 Site Preparation
3 Construction
3.3 Erection
112
100
PHASE ONE
WEEK 2 WEEK 3 WEEK 4 WEEK 5
SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE
PHASE TWO
WEEK 5 WEEK 6 WEEK 7
WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT
P
7 WEEK 8 WEEK 9 WEEK 10
SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED
PHASE THREE
WEEK 10 WEEK 11 WEEK 12
THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN
PHASE FOUR
WEEK 13 WEEK 14 WEEK 15
MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU
WEEK 15 WEEK 16
FRI SAT SUN MON TUE WED THU FRI SAT SUN
DURATION
TASK TITLE START DATE DUE DATE
(days)
02/26/18 03/03/18 0
Project Management
Design and Engineer
Design and Engineer
Mechanical
Mechanical 26-Feb-18 03-Mar-18 6
Piping 05-Mar-18 07-Mar-18 Piping
2
Instrumentation 08-Mar-18 09-Mar-18 Instrumentation
1
Geotechnical Investigation Works Geotechnical Investigation Works
Soil Testing 27-Apr-18 04-May-18 Soil 6Testing
Tank Foundation Design Tank Foundation Design
Obtain Permits 24-Mar-18 Obtain Permits
Procure Materials
Procure Materials
Site Preparation
Soil Clearing and Soil Excavation Works
Back Filling Works
Construction
Construction of Tank Foundations
Fabrication Works
Annular & Bottom Plate Fabrication
Shell Plate Fabrication
Roof Plate Fabrication
Appurtenances
Erection
Annular Plate Laying
Bottom Plate Laying
Shell Course Erection
Erection of Cone Roof Plates and Structures
Appurtenances Installation
Stairways, Roof Access and Handrailing
Tank Testing and Inspection
Fabrication and Installation of Pump, Pipelines & Support
Pipe Edge Preparation and Aligning
Erection and Fit up of Pipes including Fittings,
Flanges, and Valves
Pipe Supports Welding
Pump Installation
Construction of Bundwalls
Painting Works
02/26/18 03/03/18 03/08/18 03/13/18 03/18/18 03/23/18 03/28/18 04/02/18 04/07/18 04/12/18
Engineer
echanical
Piping
mentation
on Works
oil Testing
on Design
n Permits
Materials
04/07/18 04/12/18 04/17/18 04/22/18 04/27/18 05/02/18 05/07/18
DURATION (days)
START DATE