Periodo(t) Dt

1 813.25 13 773.28
2 825.64 14 750.88
3 765.52 15 686.81
4 704.43 16 520.25
5 798.88 17 817.78 n =
6 867.35 18 798.17 α =
7 724.50 19 675.55 Ft =
8 804.45 20 646.55
9 823.50 21 837.34
10 736.8 22 789.06
11 840.9
12 716.2

Promedio Móvil Simple


n 3

Pronóstico
Periodo(t) Dt Et (Ft+1 - Dt) Abs(Et)
(F t+1)

1 813.25
2 825.64
3 765.52
4 704.43 801.47 -97.04 97.04
5 798.88 765.20 33.68 33.68
6 867.35 756.28 111.07 111.07
7 724.50 790.22 -65.72 65.72
8 804.45 796.91 7.54 7.54
9 823.50 798.77 24.73 24.73
10 736.8 784.15 -47.35 47.35
11 840.9 788.25 52.65 52.65
12 716.2 800.40 -84.20 84.20
13 773.28 764.63 -64.63 64.63
14 750.88 776.79 -32.22 32.22
15 686.81 746.79 -98.12 98.12
16 520.25 736.99 -307.32 307.32
17 817.78 652.65 -548.92 548.92
18 798.17 674.95 -1105.38 1105.38
19 675.55 712.07 -2235.49 2235.49
20 646.55 763.83 -4423.64 4423.64
21 837.34 706.76 -8899.92 8899.92
22 789.06 719.81 -17715.65 17715.65
SUMA -35495.92 35955.28

Promedio Movil Ponderad


n 3
Periodo(t) Dt Pronóstico (F t+1)
ENERO 1 813.25 0.2
FEBRERO 2 825.64 0.3
MARZO 3 765.52 0.5
ABRIL 4 704.43 793.102
MAYO 5 798.88 746.999
JUNIO 6 867.35 763.873
2016
JULIO 7 724.50 814.225
AGOSTO 8 804.45 782.231
SETIEMBRE 9 823.50 793.045
OCTUBRE 10 736.8 797.985
NOVIEMBRE 11 840.9 776.34
DICIEMBRE 12 716.2 806.19
ENERO 13 773.28 757.73
FEBRERO 14 750.88 769.68
MARZO 15 686.81 750.664
ABRIL 16 520.25 723.325
MAYO 17 817.78 616.344
2017
JUNIO 18 798.17 702.326
JULIO 19 675.55 748.4684
AGOSTO 20 646.55 740.7816
SETIEMBRE 21 837.34 685.574
OCTUBRE 22 789.06 747.744
SUMA

Suavizacion exponencia
α = 0.3
Periodo(t) Dt Pronóstico (F t+1)
ENERO 1 813.25
FEBRERO 2 825.64
MARZO 3 765.52 759.8675454545
ABRIL 4 704.43 761.56
MAYO 5 798.88 744.42
JUNIO 6 867.35 760.76
2016
2016
JULIO 7 724.50 792.74
AGOSTO 8 804.45 772.27
SETIEMBRE 9 823.50 781.92
OCTUBRE 10 736.80 794.39
NOVIEMBRE 11 840.90 777.12
DICIEMBRE 12 716.20 796.25
ENERO 13 773.28 772.24
FEBRERO 14 750.88 772.55
MARZO 15 686.81 766.05
ABRIL 16 520.25 742.28
MAYO 17 817.78 675.67
2017
JUNIO 18 798.17 718.30
JULIO 19 675.55 742.26
AGOSTO 20 646.55 722.25
SETIEMBRE 21 837.34 699.54
OCTUBRE 22 789.06 740.88
TOTAL

Regresión

Periodo(t) Dt Pronóstico (F t+1)


ENERO 1 813.25 819.85
FEBRERO 2 825.64 809.87
MARZO 3 765.52 800.53
ABRIL 4 704.43 791.83
MAYO 5 798.88 783.77
JUNIO 6 867.35 776.35
2016
JULIO 7 724.50 769.57
AGOSTO 8 804.45 763.43
SETIEMBRE 9 823.50 757.93
OCTUBRE 10 736.80 753.07
NOVIEMBRE 11 840.90 748.85
DICIEMBRE 12 716.20 745.27
ENERO 13 773.28 742.34
FEBRERO 14 750.88 740.04
MARZO 15 686.81 738.39
ABRIL 16 520.25 737.37
MAYO 17 817.78 736.99
2017
JUNIO 18 798.17 737.26
JULIO 19 675.55 738.16
AGOSTO 20 646.55 739.71
SETIEMBRE 21 837.34 741.90
OCTUBRE 22 789.06 744.72
TOTAL

REGRESION
1000
REGRESION
1000
900
800
f(x)
700
= 0.3201969226x^2 - 10.9421859119x +
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

PRONOSTICO DE LA DEMANDA

NOVIEMBRE
2017
0.32 DICIEMBRE
10.94 ENERO
830.47 FEBRERO
2018
MARZO
ABRIL

DEMANDA 748.1898 752.2972 757.045 762.4332


PRODUCCION 963.5294117647
3
0.10
759.8675454545

medio Móvil Simple

Et2 Abs(Et)/Dt Et/Dt

ENERO
FEBRERO
MARZO
9416.762 0.14 -0.14 ABRIL
1134.567 0.04 0.04 MAYO
12337.285 0.13 0.13 JUNIO
2016
4319.118 0.09 -0.09 JULIO
56.852 0.01 0.01 AGOSTO
611.738 0.03 0.03 SETIEMBRE
2242.023 0.06 -0.06 OCTUBRE
2772.023 0.06 0.06 NOVIEMBRE
7089.640 0.12 -0.12 DICIEMBRE
4177.037 0.08 -0.08 ENERO
1038.128 0.04 -0.04 FEBRERO
9628.189 0.14 -0.14 MARZO
94445.582 0.59 -0.59 ABRIL
301313.166 0.67 -0.67 MAYO
2017
1221864.944 1.38 -1.38 JUNIO
4997430.443 3.31 -3.31 JULIO
19568561.359 6.84 -6.84 AGOSTO
79208635.339 10.63 -10.63 SETIEMBRE
313844136.818 22.45 -22.45 OCTUBRE
419291211.013 46.83 -46.29

edio Movil Ponderado

Et (Ft+1 - Dt) Abs(Et) Et2 Abs(Et)/Dt Et/Dt

-88.67 88.67 7862.72 0.13 -0.13


51.88 51.88 2691.64 0.06 0.06
103.48 103.48 10707.49 0.12 0.12
-89.73 89.73 8050.58 0.12 -0.12
22.22 22.22 493.68 0.03 0.03
30.46 30.46 927.51 0.04 0.04
-61.19 61.19 3743.60 0.08 -0.08
64.56 64.56 4167.99 0.08 0.08
-89.99 89.99 8098.20 0.13 -0.13
15.55 15.55 241.80 0.02 0.02
-18.80 18.80 353.44 0.03 -0.03
-63.85 63.85 4077.33 0.09 -0.09
-203.08 203.08 41239.46 0.39 -0.39
201.43 201.43 40575.66 0.25 0.25
95.84 95.84 9186.07 0.12 0.12
-72.92 72.92 5317.09 0.11 -0.11
-94.23 94.23 8879.59 0.15 -0.15
151.76 151.76 23032.31 0.18 0.18
41.32 41.32 1707.01 0.05 0.05
-3.95 1560.95 181353.19 2.17 -0.27

izacion exponencial
Ft = 759.8675454545
Et (Ft+1 - Dt) Abs(Et) Et2 Abs(Et)/Dt Et/Dt

-57.13 57.13 3264.21 0.08110569 -0.08


54.46 54.46 2965.53 0.06816631 0.07
106.59 106.59 11361.36 0.12289121 0.12
-68.24 68.24 4656.32 0.09418525 -0.09
32.18 32.18 1035.81 0.0400074 0.04
41.58 41.58 1728.79 0.0504903 0.05
-57.59 57.59 3317.17 0.07816893 -0.0781689
63.78 63.78 4068.35 0.07585158 0.0758516
-80.05 80.05 6408.24 0.11177253 -0.1117725
1.04 1.04 1.09 0.00135004 0.00
-21.67 21.67 469.56 0.02885844 -0.03
-79.24 79.24 6278.73 0.11537173 -0.12
-222.03 222.03 49295.95 0.42676967 -0.43
142.11 142.11 20195.01 0.17377473 0.17
79.87 79.87 6378.96 0.10006441 0.10
-66.71 66.71 4450.51 0.0987523 -0.10
-75.70 75.70 5730.26 0.11708063 -0.12
137.80 137.80 18988.58 0.16456803 0.16
48.18 48.18 2321.44 0.0610617 0.06
-20.77 1435.96 152915.88 2.01029088 -0.2938394

Regresión

Et (Ft+1 - Dt) Abs(Et) Et2 Abs(Et)/Dt Et/Dt

-87.40 87.40 7637.92 0.12 -0.12


15.12 15.12 228.46 0.02 0.02
91.00 91.00 8281.87 0.10 0.10
-45.07 45.07 2030.93 0.06 -0.06
41.02 41.02 1682.90 0.05 0.05
65.57 65.57 4299.66 0.08 0.08
-16.27 16.27 264.71 0.02 -0.02
92.05 92.05 8472.80 0.11 0.11
-29.07 29.07 845.34 0.04 -0.04
30.94 30.94 957.42 0.04 0.04
10.84 10.84 117.48 0.01 0.01
-51.58 51.58 2659.98 0.08 -0.08
-217.12 217.12 47140.75 0.42 -0.42
80.78 80.78 6526.09 0.10 0.10

60.91 60.91 3710.17 0.08 0.08


-62.61 62.61 3920.54 0.09 -0.09
-93.16 93.16 8678.79 0.14 -0.14
95.44 95.44 9109.14 0.11 0.11
44.34 44.34 1965.79 0.06 0.06
25.74 1230.29 118530.74 1.74 -0.21

GRESION
GRESION

10.9421859119x + 830.4687142857

0 11 12 13 14 15 16 17 18 19 20 21 22

UM
23 748.1898 TN
24 752.2972 TN
25 757.045 TN
26 762.4332 TN
27 768.4618 TN
28 775.1308 TN

768.4618 775.1308
N= 20

DAM 1797.76
EMC 20964560.55
PEMA 2.34
PME -2.31
SR -19.74
N= 20

DAM 78.05
EMC 9067.66
PEMA 0.11
PME -0.01
SR -0.05

N= 20
DAM 71.80
EMC 7645.79
PEMA 0.10
PME -0.01
SR -0.29

N= 20

DAM 61.51
EMC 5926.54
PEMA 0.09
PME -0.01
SR 0.42

MOVIL SIMPLE MOVIL SUAVIZACION REGRESION


PONDERADO EXPONENCIAL POLINÓMICA
DAM 1797.76 78.05 71.80 61.51
EMC 20964560.55 9067.66 7645.79 5926.54
PEMA 2.34 0.11 0.10 0.09
PME -2.31 -0.01 -0.01 -0.01
SR -19.74 -0.05 -0.29 0.42
COSTOS DE ALMACÉN 7978
Espacio de almacenamiento 6600
Servicio de inventario
Manejo físico 433
Cargos administrativos 108
Gastos de equipos 800
Control 36
CAPACIDAD DE ALMACÉN 25920

COSTO ANUAL DE LLEVAR ALMACÉN 0.31

PRODUCCIÓN
Diaria 36 Tn
T.E. 34 min/Tn
Horas trabajadas 20.40 h/día
Horas contratadas 24 h/día
Eficiencia 85%

# trabajadores iniciales 5
1.2
26%
DATOS DE LA EMPRESA

Días 26
N° Trabajadores 5 Operarios
Turno 8 hrs/turno
Productividad
Inv. Inicial Enero
Inv. Final Mens. Objt
Costo Inventario
Costo Hora Normal 4.33 S/hr
Costo Hora Extra 5.41 S/hr
0.2

Contratar 1168.74 S/oper


Despedir 1800 S/oper
Calculando Costo de
Contratación
SE TRABAJA DE LUNES A SABADO
Sueldo 900
Sueldo Básico Anual 10800
Tiempo Estándar Gratificación 900
Vacaciones 450
CTS 1793.88
EsSalud 81
Salario 900 TOTAL 3224.88
% Incremento 0.25
Costo BL 0.2986

Costo BL 0.2986
3 meses Curva de Aprendizaje
Orden de pedido

COMPRAS
Descripción Agosto
M.O S/1,800.00
Equipos y mueble S/. 918.00
Articulos de Oficina S/250.00
Servicios Básicos S/180.00
S/3,148.00
349.778

Almacenamiento

Descripción Agosto
M.O S/2,400.00
Mantenimiento S/200.00
Servicios Básicos S/140.00
S/2,740.00
0.0145
EQUIPOS Muebles

Costo S/. 960.00 Costo


Vida Útil 5 Años Vida Útil
IMPRESORA SILLA
Depreciación anual S/192.00 Depreciación anu
Total S/. 192.00 Total
Costo S/. 2,640.00 Costo
COMPUTADORA Vida Útil 5 Años ESCRITORIO Vida Útil
Depreciación anual 528.00 Depreciación anu
Total S/. 528.00 Total

TOTAL EQUIPO S/. 720.00


TOTAL MUEBLE S/. 198.00
TOTAL S/. 918.00
S/. 240.00
4.00 Años
60.00
S/. 60.00
S/. 690.00
5 Años
138.00
S/. 138.00
PLAN AGREGADO CONSTANTE

Noviembre Diciembre Enero

Demanda 748.19 752.30 757.05

SI - 188 372
Unid. / HM mes 312 312 312
Hm Req  3 3 3
Hm Dispo  5 3 3
Contrato / Despido -2 0 0

Producción 936 936 936


HN 936 936 936
Hex

Costos 3,254,223 3,250,625 ###


HN 4.33 2,700 2,700 2,700
Hex 5.41 - - -
Materia Prima($/Kg)  3.47 3,247,920 3,247,920 ###
Inventarios  0.01 3 5.39 7.98
Contrato / Despido  1800 3,600 - -

Demanda Acum. - 748 1,500 2,258


Produc. Acum. - 936 1,872 2,808

4,564
Demanda

Producción 4,564 Toneladas/año

Prod. Día Prom. 29.25 Toneladas./día

Prod. Hora Prom. 4.30 Toneladas/hr

Productividad 0.57 hr-hm/toneladas →

Hm Req 2.44 3
CONSTANTE

Febrero Marzo Abril Total

762.43 768.46 775.13 4,564

550 724 892 1,052


312 312 312
3 3 3
3 3 3
0 0 0

936 936 936 5,616


936 936 936 5,616
-

### ### ### ###


2,700 2,700 2,700 16,200
- - - -
### ### ### ###
10.50 12.93 15.26 55
- - - 3,600

3,020 3,788 4,564


3,744 4,680 5,616

Monto Producción Costo Unitario

(US$) (unid) (US$/unid)

Costo Directo 19,503,720 5,616 3,472.88

Gasto Administrativo 3,655 5,616 0.65

Total 3,473.54

12.0 Toneladas/turno
PLAN AGREGADO PERSECUCIÓN

Noviembre Diciembre Enero Febrero


Demanda 748 752 757 762

SI - 84 60 30
Unid. / HM mes 104 104 104 104
Hm Req  8 7 7 8
Hm Dispo  5 8 7 7
Contrato / Despido 3 -1 0 1

Producción 832 728 728 832


HN 832 728 728 832
Hex

Costos ### ### ### ###


HN 4.33 7,200 6,300 6,300 7,200
Hex 5.41 - - - -
Materia Prima(S/Kg)  3.47 ### ### ### ###
Inventarios  0.01 1 0.86 0.44 1.45
Contrato / Despido  1800 3,600 2,000 - 1,600

Demanda Acum. - 748 1,500 2,258 3,020


Produc. Acum. - 832 1,560 2,288 3,120

Demanda 4,564

Producción 4,564 Toneladas/año


Costo Directo
Prod. Día Prom. 29.25 Toneladas./día Gasto Administrativo
Total
ÓN

Marzo Abril Total


768 775 4,564

100 60 12
104 104
7 7
8 7
-1 0

728 728 4,576


728 728 4,576
-

### ### ###


6,300 6,300 39,600
- - -
### ### ###
0.86 0.18 5
2,000 - 9,200

3,788 4,564
3,848 4,576

Monto Producción Costo Unitario


(US$) (unid) (US$/unid)
Costo Directo 15,918,320 4,576 3,478.65
Gasto Administrativo 9,205 4,576 2.01
Total 3,480.67
Costo por pedido o preparación 349.8 S//semana
Costo por llevar inventario/semana 0.014 S//unidad

Requerimientos netos por semana


NOVIEMBRE DICIEMBRE
1 2 3 4 5 6 7
187.05 187.05 187.05 187.05 188 188 188

LOTE POR LOTE (LPL)

Requer. Cant. Invent. Costo Costo


Semana Costo Total
Netos Prod. Final Prep. Invent.
1 187 187 0 349.8 0.00 349.78
2 187 187 0 349.8 0.00 349.78
3 187 187 0 349.8 0.00 349.78
4 187 187 0 349.8 0.00 349.78
5 188 188 0 349.8 0.00 349.78
6 188 188 0 349.8 0.00 349.78
7 188 188 0 349.8 0.00 349.78
8 188 188 0 349.8 0.00 349.78
1500 1500 2798.22 0.00 2798.22
Noviembre 748.19
Diciembre 752.3

BRE
TOTAL
8
188 1500

El tamaño de lote más óptimo en utilizar es el de lote por lote ya que el


costo por pedido es alto y el de llevar inventario es bajo, por eso que no se
puede hacer el lote económico de pedido, el costo total mínimo y el costo
mínimo por unidad, por lo tanto se realizara el tamaño de lote por lote para
poder hacer el plan agregado por persecución.
Barrera de 2 semanas
demanda
Tiempo de
Aprovisionami 2 semanas
ento
Lote
21 unidades
producción
SI 0 unidades
748.19 ###
735
semana semana semana semana semana semana semana
semana 2
1 3 4 5 6 7 8
Demanda 187.05 187.05 187.05 187.05 188.07 188.07 188.07 188.07
Pedidos 183.75 183.75 183.75 183.75 183.75 183.75 183.75 183.75

NOVIEMBRE DICIEMBRE
semana semana semana semana semana semana semana
semana 2
1 3 4 5 6 7 8
Demanda 187.05 187.05 187.05 187.05 188.07 188.07 188.07 188.07
Pedidos 183.75 183.75 183.75 183.75 183.75 183.75 183.75 183.75
Disponible
5.25 10.5 12.45 14.41 15.33 16.26 17.18 18.11
proyectado

Disponible
5.25 5.25 5.25 5.25 5.25 5.25 5.25 5.25
para promesa

PMP 189 189 189 189 189 189 189 189


SUMA PMP 756 756
PA MES 936 936
PA > PMP PA > PMP
Cintillo Hilo-Cono 200gr Zuncho

1 sem 840 und 1 sem 4 unid 1 sem

ITEM TA SF OO

SACOS ALISUR
LxL
TONELADAS
0 0 0

QUINUA
TONELADAS
LOTE= 30 TN
1 semana 0 0
1 semana 0 0

CINTILLO
UNID
LOTE=1000 UNID
1 semana 2000

CONO HILO
ROLLO
LXL
1 semana 10

ZUNCHO
ROLLO
MIN 1 ROLLO
1 semana 2

CARTON
KG
MIN=200 KG
1 semana 100

PAPEL KRAFT
KG
MIN=500 KG
2 semana 150

STRECH FILM
ROLLO
MIN=200 RLL
1 semana 20

ETIQUETAS
MILLAR
MIN= 20 MLL
1 semana 1

BOLSAS KRAFT

1 semana 200
UNID
LOTE=1000 SCS
1 semana 200

PALLETS
UND
LxL
2 semana 10 0

Tabla de Liberación de Órdenes (TLO)


Item UNID
1 SACOS ALISUR LOTE
2 QUINUA MERMA 20% TN
3 CINTILLO UND
4 CONO HILO CONO
5 ZUNCHO ROLLO
6 CARTON KG
7 PAPEL KRAFT KG
8 STRECH FILM ROLLO
9 ETIQUETAS MILLAR
10 BOLSAS KRAFT UND
11 PALLETS UND
POR UN CONTRATO DE LOTE DE QUINUA (840 SACO

Lote de Quinua
(25kg)

0 semanas 840 und

Zuncho Carton Corrugado Papel Kraf

1 sem 0.25 ROLLO 1 sem 30Kg 2 sem 10 KG

SS
0 1 2
Demanda Bruta 187
Pendiente de recepcion 0
Disponible 0
0
Requerido Neto 187
Recepcion Plan 187
Emision Orden 187
Demanda Bruta 224.46
Pendiente de recepcion 0
Disponible 0
0
Requerido Neto 224.46
Recepcion Plan 240
0

Emision Orden 240 210


Demanda Bruta 7,481.90
Pendiente de recepcion 0
Disponible 2000
0
Requerido Neto 5,482
Recepcion Plan 6000
Emision Orden 6000 7000
Demanda Bruta 35.63
Pendiente de recepcion 0
Disponible 10
Requerido Neto 25.63
Recepcion Plan 26
0 Emision Orden 26 36
Demanda Bruta 2.23
Pendiente de recepcion 0
Disponible 2
0
Requerido Neto 0.23
Recepcion Plan 1
Emision Orden 1 2
Demanda Bruta 267.21
Pendiente de recepcion 0
Disponible 100
0
Requerido Neto 167.21
Recepcion Plan 200
Emision Orden 200 235
Demanda Bruta 89.07
Pendiente de recepcion 0
Disponible 125
25
Requerido Neto -35.93
Recepcion Plan 0
Emision Orden 0 500 0
Demanda Bruta 71.26
Pendiente de recepcion 0
Disponible 0
20
Requerido Neto 71.26
Recepcion Plan 200
Emision Orden 200 0
Demanda Bruta 7.48
Pendiente de recepcion 0
Disponible 1
0
Requerido Neto 6.48
Recepcion Plan 20
Emision Orden 20 0
Demanda Bruta 7,482

100
Pendiente de recepcion 0
Disponible 100
100
Requerido Neto 7,382
Recepcion Plan 8000
Emision Orden 8000 7000
Demanda Bruta 125
Pendiente de recepcion 0
Disponible 10
0
Requerido Neto 115
Recepcion Plan 115
Emision Orden 115 125 125

0 1 2 3 4 5 6
0 0 187 187 187 187 188
0 300 262.5 300 262.5 300 262.5
0 6000 7000 8000 7000 8000 7000
0 26 36 36 36 36 36
0 1 2 2 2 3 2
0 200 235 267 267 269 269
0 500 0 0 0 0 0
0 200 0 200 0 0 200
0 20 0 20 0 0 20
0 8000 7000 8000 7000 8000 7000
115 125 125 125 126 126 126
DE QUINUA (840 SACOS DE 25 KG)

ua

840 und

l Kraf Strech Film Etiquetas Termotransf Bolsas 19"x18"x4

10 KG 1 sem 8 rollos 1 sem 0.84 millar 1 sem 840


840 UND
unid

PERIODO
3 4 5 6 7 8 9
187 187 187 188 188 188 188
0 0 0 0 0 0 0
0 0 0 0 0 0 0
187 187 187 188 188 188 188
187 187 187 188 188 188 188
187 187 187 188 188 188 188
224.46 224.46 224.46 225.69 225.69 225.69 225.69
0 0 0 0 0 0 0
15.54 1.09 16.63 2.17 16.48 0.79 15.10
208.91 223.37 207.83 223.52 209.21 224.90 210.58
210 240 210 240 210 240 210
240 210 240 210 240 210
7,481.90 7,481.90 7,481.90 7,522.97 7,522.97 7,522.97 7,522.97
0 0 0 0 0 0 0
518 36 554 72 549 26 503
6,964 7,446 6,928 7,451 6,974 7,497 7,019
7000 8000 7000 8000 7000 8000 8000
8000 7000 8000 7000 8000 8000
35.63 35.63 35.63 35.82 35.82 35.82 35.82
0 0 0 0 0 0
0 0 0 0 0 0
35.63 35.63 35.63 35.82 35.82 35.82 35.82
36 36 36 36 36 36 36
36 36 36 36 36 36
2.23 2.23 2.23 2.24 2.24 2.24 2.24
0 0 0 0 0 0 0
0.77 0.55 0.32 0.09 0.85 0.62 0.38
1.45 1.68 1.91 2.15 1.38 1.62 1.86
2 2 2 3 2 2 2
2 2 3 2 2 2
267.21 267.21 267.21 268.68 268.68 268.68 268.68
0 0 0 0 0 0
32.79 0.58 0.37 0.16 0.48 0.80 0.12
234.42 266.63 266.84 268.52 268.20 267.88 268.55
235 267 267 269 269 268 269
267 267 269 269 268 269
89.07 89.07 89.07 89.56 89.56 89.56 89.56
0 0 0 0 0 0 0
35.93 446.86 357.79 268.72 179.16 89.60 0.04
53.14 -357.79 -268.72 -179.16 -89.60 -0.04 89.52
500 0 0 0 0 0 500
0 0 0 0 500
71.26 71.26 71.26 71.65 71.65 71.65 71.65
0 0 0 0 0 0 0
128.74 57.49 186.23 114.98 43.33 171.68 100.03
-57.49 13.77 -114.98 -43.33 28.32 -100.03 -28.39
0 200 0 0 200 0 0
200 0 0 200 0 0
7.48 7.48 7.48 7.52 7.52 7.52 7.52
0 0 0 0 0 0 0
13.52 6.04 18.55 11.07 3.55 16.03 8.50
-6.04 1.45 -11.07 -3.55 3.97 -8.50 -0.98
0 20 0 0 20 0 0
20 0 0 20 0 0
7,482 7,482 7,482 7,523 7,523 7,523 7,523
0 0 0 0 0 0 0
618 136 654 172 649 126 603
6,864 7,346 6,828 7,351 6,874 7,397 6,920
7000 8000 7000 8000 7000 8000 7000
8000 7000 8000 7000 8000 7000
125 125 125 126 126 126 126
0 0 0 0 0 0 0
0 0 0 0 0 0 0
125 125 125 126 126 126 126
125 125 125 126 126 126 126
125 126 126 126 126

7 8 9
188 188 188
300 262.5 0
8000 8000 0
36 36 0
2 2 0
268 269 0
500 0 0
0 0 0
0 0 0
8000 7000 0
126 0 0
Bolsas 19"x18"x4 Pallets 1x1x1.20 QUINUA
Tratamiento Termico

840
840 UND
unid 2 sem 14 unidad 1 sem 25 TN
7,560

1 sem
$ S/ Detalle
Programación embarque 40795.33 S/135,848.45 5%

Trasiegos 18

Tn Total
Toneladas Trasegadas x Sem 63 S/1,134.00

# Veces x Sem Total


Reprogramaciones Emb. 2 S/13,584.84

TOTAL S/14,718.84 x Semana


Detalle Costo Op.
Valor de Venta S/6,792.42

S/ x Tn