Metro-Link Exprare for Gandhinagar and Ahmedabad
TRANSMITTAL (HARD COPY)
|[PROJECTNO: | MEGA/AFP/GEC/2015 DATED 05-10-2015
MEGA Co. 1
Suwon o9 2017 a Z
pean | meca/pao/2ox7/635
suoiecr, |SUBMISSION OF GFC ORWS PKI NS = CONCRETE Dikt OF CANTILEVER, CABLE
(LEONSTRUCTION seeeeee ae
[Enronsarion, neserence
|Leommenrsy eve
ISSUED FOR: | ROC & SIGNATURE
eee
i omens - |
waa —T as encosune
PROIECT RECTOR EDRAWINGS X07 COPY — fy
eco ween
rosa orn
ey oe
3wa.—|"" pocuMeNT/ORAWING NO, | DOcuMENT/oaAWING TE —
SUD OF Gre OFWS PCL WS
| gy [occiertenno.sraere se
DATED 2-08-2017, CCABLE PROFILE FOR APMC AND JIVRAd
| station
FEMARKS: bes Retinmed oi TR NOC fs per
Let Lm No. 134935)-n- dt oroe L
mege LerNo. SEL oltsl. fe
Yes
1Josfrers
MEGA Co
GanahinagarSYSTRA-
iEGAe Rona,
RITES-O9G-AECOM
se 028
GEC I02-NSC-] FZ | FFC-A 29 August 2017
‘Managing Orector, A oer °
sonbiaetaw ontage nt nanainromesicreun ines 2 72! | 707
Hp eiciaeraee ela
Interface Point with Gyasour Depot, tat ls Abutment of Depot to APMC to
‘Motera Staton), A Hlevated Vi-dut Portions to Chuinsge () 1635.00 to
(11701700 and elevated Metra Staton [Ten Numbers] vz. APMC. Ia),
awe, Shreyas, Pa, Gandigram, Olé High Court terface Station with
‘Ashram Reson EW Corder Usmapura, iy Nag Vada, Contact et nos
"MEGA/DDCIVOT/NS/1 Supplernentay, Date: 20/02/2015,
subject Submission of GF Drawings (At Sie) PAG 1, NS Corridor
3) Concrete dimension of Cantilever Pir ARM for APMC Station t Per Ch &
20 Concur evel)
2) Cable profile for Posrssed Cantilever Pier ARM at Concours Level for
‘column Ct & C10 of APM Staton
3) Reinforcement Details fr Pretrerted Cantlver Per ARM at Concourse
Level for Column 1 & C10 of APMC Staton
4) Concrete Dimension of Cantlover Pie ARM for Sj Station at Pler C2
‘10 Concourse Level)
5) Cable profile for Prestressed Cantlver Pier ARM st Concourse Level or
Colum C8 & C1 of a Staton
6) enforcement Detal for Prestressed Cantilever Pier ARM at Concourse
Level for Colum C38 C0 ofa Station
Reference Docleter na 8108-466 ated 12.08.2017
We have reviewed and are frwardng the following drawings (Ad sto you 8 copies fe your
sceeptance and further aoorvaKnaly return 7 eps of he drain out ser your endorsement
fers taal concerned
v N|_Peien/orawingno. | Rev Desi / Drawing Tle az
s 1 | MEGA-STUP-ST-NS-APM- | R3_| Concrete Dimension of Cantilever Pier ARM for| 8
mrsup7 spc Staton st ier Cl (ance eel
7 | WesasTuPSTREAP | Wa] Gnaete Dinendon of Career Per ARN Toe] 8
misuse mic taon ster Cio oncoue eve)
7 | Mica stupSTa APM] RI | calf Pestesied Cio aNat|
sues Concur Leve fr Colmn Gof aPC San
1 | MeGASTUPSTNE RAE HE | ile protleforPresvesedCartver Par ANSE
sua ‘ance Levelfor Colm Coot eH Staten |
5 | MtGnsTuP SERA [AT evorement Des fr Pesvesed avlerer|
ras20 Fier ant at Conauce Lev! for Coun Cl
se Sao
AA-GEC Ss. eee
Gegeeaes oVsuin | waver ee5 Nos of
|, [_ meen rowing non | nev Design /Drawir Tie Drawing |
1S | HEGRSTUPSTNEAPM: | 2 | Renforeement Detls for Psresed Cantever | 8
easue-2t Fier ARM at Concoure Lee for Caurn C10 of
[MC Station
7 | MEERSTUPSTNSIVAKE: | RA |Coneete Dimension of Cantever Pier ARM for 8
Sue7 Sor] staton a hare (Conaurse evel)
7 MEGRSTUPSTREIN | RS [Concrete Dimension of Cantlever Pier ARM Yor] 8
| |reisues ‘aration st Pe C10 [concourse Level)
TEGESTUPSTRE IV | | Cable profile for Prestressed Cntilever Per ARMat| 8
pxasuB2 ‘Concourse Level for Cama lovastatin
TD] ReGASTUPSEREIW= | #3 | Gable pote for Prestressed ailever Pies ARMat|
aSuB-13 ‘Concourse evel for Colm CO ofa Sttion
Ga] HEGRSTUPSTRE-IN | #2 | Reinforcement Detls for Prestressed Cantlever| 6
PeasuB-20 Fre Aft at Concours evel Colin Xo a)
Station
12 WEGRSTURSTNE-AV- | RB | Reinforcement Oeals Tor Pestressed Cantiever | 8
Peasu8-23 Pier ARM ot Concourse Lev for Column CIO of
ira station
‘Yours since,
, Ny
DD
rte wd
‘conor fast nse at
ene
«
G
ache
1) cawings in Hrd copes (A Sie)
Mr. Sen, 013, CSD, MEGA GEC