gross tons must be fitted with a standard discharge shore connection for the discharge of oily wastes to a reception 1 155 facility. The dimensions for the connection are specified in the Pollution Prevention Regulations under Part _____________________. If you observe any situation which presents a safety or Shut down the 2 pollution hazard during fuel operation. transfer operations which action should you take first? The drainage from laundry, bathroom and washbasin drains but does not include drainage 3 greywater from toilets, urinals, hospital and animal spaces is called_____. The operator of each vessel cargoes carried subject to the pollution and dates 4 regulations is NOT required to delivered, keep written records of including __________. destinations Plastic material may be Prohibited to 5 discharged overboard from a throw overboard vessel if it is __________. According to the Coast Guard Pollution Prevention Regulations (33 CFR), what is 6 the minimum number of bolts 4 bolts required in a temporarily connected standard ANSI coupling? Prohibited oil spaces” as specified in the Pollution Tanks storing oil 7 Prevention Regulations provide in the forepeak regulations, which of the compartment. following? The approval period for a 8 shipboard oil pollution five years emergency plan expires after __________. Under the Pollution Regulations, garbage disposal 9 two years records must be kept for __________. Which of the listed operations Topping off of any must be personally supervised 10 tanks being by the person-in-charge while loaded. taking on fuel? Among other restrictions, an discharging at an oil tanker may not discharge an instantaneous rate oily mixture into the sea from a 11 of oil content not cargo tank, slop tank, or cargo exceeding 30 liters pump room bilge unless the per nautical mile vessel is_________ . Which should be done with the ashes from your vessel’s discharge to shore 12 incinerator which has burned facility only packages containing plastic? To whom is the first report 13 rendered in the oil pollution Port authorities contingency plan of the vessel? Most minor spills of oil 14 human error products are caused by______. Which of the following statements is true concerning oil transfer connections? I. Any permanently connected flange coupling must have a bolt in each hole II. Approved quick- connect couplings may be used 15 I, II & III III. When a temporary connection utilizes an American National Standard Institute (ANSI) standard flange, a bolt in every other hole is accpetable if at least four bolts are used document signed by vessel and shore According to the Pollution facility persons-in- Prevention Regulations, the 16 charge declaring declaration of inspection is the that all transfer ____________. requirements have been met 17 On a tanker ship, sanitary Master and Chief inspections of the crew's Engineer quarters are the responsibility of the __________. Which list is not required to be provided as part of the A list of personnel 18 appendices of the Shipboard duty assignments. Oil Pollution Emergency Plan? In an oil pumping operation where pumping connections 19 are made up of flanged hoses hose the weakest link is the _________. Which statement is true for the 30,000 DWT tanker ship The IOPP 20 engaging in trade to another Certificate is valid country signatory to MARPOL for 5 years 73/78? The standard outside diameter pipelines to enable pipes of reception facilities to be 21 connected with the ships 215 mm discharge pipelines for residues from machinery bilges should be_________. When you notice oil on the water near your vessel while 22 stop loading taking on fuel, you should FIRST ____________. Which is a mandatory section Reporting 23 of the shipboard Oil Pollution requirements Emergency Plan? When you are at sea and a high bilge level alarm sounded, Use oily bilge 24 which of the following should separator you do ? Regulations, state that ocean going ships of 400 gross tons and above must be fitted with a standard discharge shore suitable for a connection for the discharge of 25 service pressure of oily waste from machinery 6 kg/cm2 space bilges to reception facilities. The flange of this discharge connection must be _______________. 26 According to Pollution the hose is Prevention Regulations, if a replaced cargo hose shows a small leak in its fabric, you may transfer oil after______________. Which of the following senior officers shall sign each 27 Master completed page of the oil Record Book? The Shipboard Oil Pollution an explanation and 28 Emergency Plan must include purpose of the __________. plan Which is not a mandatory part 29 of the Shipboard Oil Pollution Diagrams Emergency Plan? According to Pollution Prevention Regulations, when When authorized may a person serve as the 30 by the Captain of person-in-charge of both a the Port. vessel and a facility during oil transfer operations? The noxious substance which should remain on board until it 31 pollutant can be disposed in a reception facility ashore is called_____. When amendments are made to the Shipboard Oil Pollution and cannot be 32 Emergency Plan, the revisions implemented must be submitted to the without approval administration __________. The best way to combat an foam extinguisher engine room bilge fire is 33 and low velocity through the use of water fog a_____________ . With no environmental forces present, the center of gravity of 34 center of buoyancy an inclined vessel is vertically aligned with the . All types of food wastes generated in the living spaces 35 domestic waste on board the ship are known as_____. The regulations that were passed to implement MARPOL International 36 73/78 concerning oil pollution waters apply to a U.S. flag vessel that sails on which waters? Under the Pollution Regulations, when you dump keep a record for 37 garbage in to the sea you must two years __________. According to 33 CFR Part 151, all tankships of 150 GT and above and all other ships of shipboard oil 38 400 GT and above,are required pollution to prepare and maintain an emergency plan approved __________________. Which of the following prohibits the discharge of oil to Reg. IX – Control 39 the sea if the content of the of Discharge of Oil effluent is more than 15 ppm ? Pollution Prevention valves used during Regulations require that on the 40 transfer shall be completion of oil transfer closed operations all _____________. The term "arrival ballast" refers 41 clean ballast to ___________. The scuppers had been plugged as required at the time an oil spread an spill occurs on deck. After absorbent 42 shutting down the transfer, the material, such as engineroom should first be sawdust informed and then __________. The change in its Why is it important for fuel oil specific volume 43 tank not to be topped off when when heated may loading cold oil? cause an overflow overboard only through an approved oily 44 Bilges may be pumped . water separator and oil content monitor Shipboard Oil 45 SOPEP means _______. Pollution and Emergency Plans The preferred type of pollution 46 control for oil spills on the boom water is__________. Which of the following 47 I, II & III statements is true concerning oil transfer connections? I. Any permanently connected flange coupling must have a bolt in each hole II. Approved quick- connect couplings may be used III. When a temporary connection utilizes an American National Standard Institute (ANSI) standard flange, a bolt in every other hole is accpetable if at least four bolts are used Pollution regulations require that the oil transfer procedures, which must be posted on every vessel having a capacity of 250 or more barrels of oil, must 48 I, II & III contain a description of each oil transfer system installed on the vessel including each _____________. I. valve II. pump III. vent The minimum number of bolts necessary for a standard ANSI oil transfer hose temporary 49 four bolts flange coupling (eight bolt hole flange) is ____________________. holding its slops A ocean going ship having an onboard until they inoperative oily water separator 50 can be discharged may dispose of its bilge slops to a shore side by_______________ . reception facility If a leak in an oil hose coupling notify the terminal cannot be stopped by operator, then 51 tightening the coupling bolts, shutdown and you should repair the leak ____________________. is in the immediate No person may transfer oil to vicinity and or from a vessel unless the 52 immediately person in charge available to the oil _____________. transfer personnel Is it possible to discharge No, it is prohibited 53 overboard plastic material from to discharge a vessel? According to the Coast Guard Pollution Prevention Regulations, no person may transfer oil to or from a vessel unless _____________. I. each part of the transfer system not 54 necessary for the transfer I, II & III operation is securely blanked or shut off II. the discharge containment is in place III. each scupper or drain in a discharge containment system is closed Before a vessel can pump oily water within a Special Area, it it must be more 55 has to comply with the than 12 miles from following conditions the nearest coast except_________. When completing the ballasting operation of a Back flow of 56 contaminated tank, which of contaminated the following problems must water be guarded against? According to Pollution Prevention Regulations, no person may transfer oil to or from a vessel unless _____________. I. each hose is supported in a manner that prevents strain on its coupling II. Each part of the 57 I, II & III transfer system necessary to allow the flow of oil is lined up for transfer III. each oil transfer hose has no loose covers, kinks, bulges, or soft spots, and no gouges, cuts or slahses that penetrate the hose reinforcement According to Regulations (46 CFR), no vessel can come alongside or remain alongside officer-in-charge 58 a tank vessel while it is loading of the vessel which A, B, or C grade cargo without is loading having the permission of the ____________. A precaution you should take 59 before bunkering is to plug the scuppers __________ Pollution Prevention all parts of the Regulations, state that no transfer system 60 person may transfer oil to or have been from a vessel unless properly lined up _____________. Fueling results in the collection of waste oil in drip pans and Placing it in 61 containers. Which is an proper disposal approved method of disposing facilities of the waste oil? When amendments are made to the shipboard oil pollution and cannot be 62 emergency plan, the revisions implemented must be submitted to the Coast without approval Guard __________. According to Pollution Prevention Regulations (33 CFR), the minimum number of 63 four bolts permitted in an ANSI standard flange on an oil hose is_______________. The fixed CO2 fire extinguishing system has been activated to extinguish a large After the metal 64 engine room bilge fire. When surfaces have is the best time to vent the cooled down. combustible products from the engine room? To prevent oil from escaping into the sea when ballasting start the cargo 65 through the cargo piping pump, then open system, you should FIRST sea suction valves _________. According to the Pollution Prevention Regulations, who The designated 66 makes the final decision of personin-charge when oil transfer may begin? During topping off of bunker tanks, the loading rate must be 67 person-in-charge personally supervised by the ____________. Which substance is NOT Oil mixed with 68 considered to be "Oil" under dredge spoil the pollution prevention regulations? When using mechanical foam to fight a bilge fire, the stream at a vertical 69 of foam is most effective when surface directed . Which of the following liquids can ordinarily be discharge 70 overboard without being Segregated ballast processed through an oily water separator? According to Pollution Prevention Regulations , the designated no person may connect or 71 person-incharge is engage in any other critical oil present transfer operation unless _____________. Which of the circumstances A person falls listed is an exception to the overboard, and a 72 garbage discharge requirements plastic ice chest is in Annex V to MARPOL thrown for 73/78? flotation. When amendments are made to the Shipboard Oil Pollution and cannot be 73 Emergency Plan, the revisions implemented must be submitted to the Coast without approval Guard __________. When bunkering is completed, drained, blanked 74 the hoses should be off, and stored __________. securely Oil Pollution Prevention Regulations, require that the person-in-charge of transfer operations is to insure that the _____________. I. drains and scuppers are closed by the 75 I, II & III mechanical means II. transferrer and transferee know the identity of the product to be transferred III. hose is supported to prevent kinking or damage Sanitary inspections of the Master and Chief 76 crew's quarters are the Engineer responsibility of the____. 77 Why is it important for fuel oil The change in its tank not to be topped off when specific volume loading cold oil? when heated may cause an overflow Which of the following classes 78 of fire would probably occur in Class B the engine room bilges? When discharging clean ballast, prior to entering the loading port, if the ballast is be terminated 79 determined by the oil monitor automatically to exceed 15 parts per million of oil, the deballasting must ___________________. The term 'discharge', as it applies to the pollution spilling, leaking, 80 regulations, means pumping __________. an oil tanker of A shipboard oil pollution 150 gross tons or 81 emergency plan is required of above, or other ______________. ship of 400 gross tons or above Water ballast placed in a tank that has been crude oil washed, 82 dirty ballast but not water rinsed, shall be regarded as ________. According to regulations, when loading, or discharging oil in A red flag (day), 83 bulk at a dock, which of the red light (night) following signals must be displayed? Any individual When a vessel violates the oil connected with the 84 pollution laws, who may be vessel involved in held responsible? the operation Regarding oil transfer pump, which of the following is the No connection 85 normal practice with regards to fitted connection to the bilge pump ? One of the requirements for an oil tanker operating with An oil content 86 Dedicated Clean Ballast shall meter be that it is equipped with_________. The term "segregated ballast" tank that is 87 is defined in the Pollution completely Prevention Regulations as separated from the ballast water introduced into cargo oil and fuel a/an ____________. oil systems The process of grinding, shredding, or reducing the size 88 maceration of sewage particles is known as __________. Which of the following types of ships log books where entries of the loading and A cargo record 89 unloading operation of noxious book liquid substances should be recorded? Which of the following is the minimum internal diameter of 90 the main bilge suction piping 2 ½ inches permitted by regulations on a vessel over 150 gross tons? Coast Guard Regulations be independent of 91 require the emergency bilge the main bilge system to _____. system A solid material which 92 contains synthetic polymers is plastic called_____. Pollution Prevention hoses are Regulations state that no supported so that 93 person may transfer oil to or couplings have no from a vessel strain on them unless _____________. It is visible for a Which statement is true 94 shorter time than a concerning gasoline spill? fuel oil spill. The transfer procedures for oil where they can be 95 products are required to be easily seen or posted ____________. readily available annually by the owner and submit a letter to the Shipboard oil pollution Coast Guard 96 emergency plans must be within one month reviewed ___________. of the anniversary date of the plan approval In accordance with 97 Regulations, a 25,000 gross ton I, II & III cargo vessel on an ocean route, having two 10,000 HP oil fired boilers, requires a certain quantity of hand portable and semi-portable fire extinguishing systems in the engine room. Which of the following quantities of extinguishing agents would meet these requirements? I. 100 lbs. CO2, 20 lbs. dry chemical II. 30 lbs. CO2, 40 gals. foam III. 5 gals foam, 50 lbs. dry chemical Among other restrictions, an oil tanker may not discharge an discharging at an oily mixture into the sea from a instantaneous rate 98 cargo tank, slop tank, or cargo of oil content not pump room bilge unless the exceeding 30 liters vessel is per nautical mile __________________. Remote control for stopping machinery driving fuel oil protected against 99 service pumps is required. accidental These controls shall be operation _______. An ocean going ship of over 400 gross tons must be fitted with a standard discharge shore connection. What size bolt 100 183 mm circle diameter is required for this shore connection to transfer oily ballast to a shore side reception facility? Small oil spills on deck is plugging the 101 prevented from going scuppers overboard by ______: Coast Guard regulations require a shipboard oil 102 annually only pollution emergency plan to be reviewed _____________. While loading bulk oil, you notice oil on the water near the 103 barge. Which of the following Stop loading actions should you carry out FIRST?