You are on page 1of 60

Daily Progress Report

As of April 04, 2018


LIST OF PROJECTS

A. BATTERY PROJECTS
1) PBI & RTI STEEL FENCE REPAINTING PROJECT – (On Progress)
2) MCB EMPLOYEE’S LOUNGE – (On progress)
3) PBI HR TESTING ROOM DRYWALL – (Complete)
4) PBI Bridge Repainting – (On Progress)

B. SPECIAL PROJECTS
1) AGUS DORMITORY REHABILITATION 2017 PLUMBING WORKS – (waiting for other materials prior to completion)
2) REPAINTING OF COMMON CR (Dorm1 & 2) – (waiting for advise prior to mobilization)
3) SMIP ILOILO STEEL YARD – (waiting for establish F.E.)

C. STORE PROJECTS
1) KFC TANAY – (Complete)
2) KFC SINDALAN – (Complete)
3) KFC SAN DIONISIO – (On Progress)
4) KFC CAVITE – (On Progress)

D. FABRICATION INVENTORY
1) CHB Fabrication Inventory – (On going)
2) Container Van Inventory (20 & 40 footer)
BATTERY PROJECTS UPDATE
PBI & RTI STEEL FENCE
REPAINTING PROJECT
SITE ACTIVITIES
1.0 Installation of yellow spacer prior to coating
works
2.0 On going top coating of steel fence.

Note:
1. Top coating paint already delivered as per Maam Angel
2. Top coating works started last March 23
Project Status as of March 28
Site Plan Reflecting the Accomplished
Portion of Steel Fence (PBI)
Other Site Issues & Concerns
1.0 Paint material for RTI still unserved
Site Photos (PBI)
Site Photos (PBI)
PBI MCB LOCKER EXPANSION &
EMPLOYEE’S LOUNGE
Site Status (Employee’s Lounge) as
of March 27
Site Activity
“ no activity”
Site Status (Locker Expansion) as
of February 26
Manpower
A. Civil
• Mason – 2/2
Site Activity
1. On going installation of Wall Tiles
Site Photos
Site Photos
Site Photos
Site Issues & Concerns as of March
28
Still waiting for unserved items
1. Flush Door Hallow core w/ KD Tanguile Door
Jamb 2” x 4”, size: 0.80m x 2.10m = 1 set
2. Door Knob = 1set
3. Stainless Hinges, 3” x 3” = 4pcs.
4. Stainless Sink = 3sets (needs to be installed
prior to installation of tiles)
PBI HR TESTING ROOM DRYWALL
Site Plan
PROJECT STATUS (TESTING ROOM)
as of February 24
1. Common Drywall Partition already installed –
5.61/5.61 (100%)
2. Low Drywall Partition along hallway – 3.2/3.2
(100%)
3. Flush door w/ Jamb – 2/2 (100%)
4. Painting Works for wall partition & baseboard
– 2/2 (100%)
5. Repair of existing ceiling – 1 lot (100%)
Client Purchase Material (Delivery
Status)
Site Photos
Summary of painting material used
1. Flat Latex B-701 White – 3gallons
2. Semi Gloss Latex B-715 White – 2gallons
3. Epoxy Enamel Royal Blue (Boysen)– 1quart
4. Boral Premium Mix Jointing @ 20kg./bag – 2kg only
5. Paint Roller 7“ – 2pcs.
6. Baby Paint Roller 4", with Handle – 2pcs.
7. Sand Paper #120 – 5pcs.
8. Paint Brush 2“ – 2pcs.
PBI BRIDGE REPAINTING
Manpower
1. Foreman – 1/1
2. Painter – 8/8
Site Status
Site Photos
Site Photos
Site Photos
Site Photos
STORE PROJECTS UPDATE
KFC TANAY
KFC SINDALAN
KFC SAN DIONISIO
KFC CAVITE CITY
SPECIAL PROJECTS UPDATE
DORM 1 & 2 COMMON CR
PLUMBING REPAIR
Project Status (Dorm 1 & 2) as of
February 20
Site Issues & concern
“No available manpower”
Iloilo Steel Project
Site Photos
Site Photos
Site Photos
FABRICATION INVENTORY UPDATE
Site Activity
1. On going fabrication of precast column, panel & beam for
KFC 3rd Gen.
2. On going fabrication of tobleron post 8’ long for RCA project
Site Photos
Site Photos
Site Photos
Site Photos
Precast Fab. Status
CHB Fabrication Inventory as of
February 26
1. CHB # 3” - 940pcs.
2. CHB # 4” - 7035pcs.
3. CHB # 6” Ord. - 3765pcs.
4. CHB # 6” Load Bearing - 310pcs.
5. CHB # 8” - 740pcs.
6. Turf 3-1/2” - 315pcs.
7. Turf 5” - 1840pcs.
8. Diamond 3” - 40pcs.
9. Louver - 900pcs.
CHB Fabrication Inventory as of
February 20
10. Tobleron Post 6’ - 170pcs.
11. Tobleron Post 8’ - 91pcs.
12. Tobleron Post 8’ (RCA Orchids) - 46pcs.
12. RCPipe 18” - 0pcs.
13. RCPipe 24” - 66pcs.
14. RCPipe 30” - 58pcs.
15. RCPipe 36” - 9pcs.
16. RCPipe 42” - 0pcs.
17. RCPipe 48” - 3pcs.
18. L-Block # 4” - 600pcs.
CHB Fabrication Inventory
19. Column Block 12” x 12” - 170pcs.
20. Half CHB 4” - 20pcs.
21. Column L-BLOCK 12” x 12” x 6 - 15pcs.
22. Precast Pipe Duct - 10pcs.
23. Precast Pipe Duct w/ slab - 3pcs.
24. Precast Column 1 - 28pcs.
25. Precast Column 2 - 0pcs.
26. Precast Panel - 201pcs.
27. Precast Beam - 10pcs.
20 & 40 footer CV Inventory
Remaining CV’s as of February 20
1.0 20 footer CV = 12pcs.
2.0 40 footer CV = 3pcs.
20 Footer CV Breakdown
1. Slag Block Fence Balasing Boundary (Genarro Proj.) - 1unit
2. KFC Sto. Tomas - 7units
3. KFC Cabuyao - 8units
4. KFC Solano - 9units
5. KFC Mabalacat - 8units
6. KFC Sta. Cruz, Laguna - 8units
7. KFC Malolos - 7units
8. Qesi (requested by Sir Tim) - 4units
9. Qesi (delivered last February 3, 2018) - 2units
10. Waste Water - 1unit
11. Farm 6 - 1units
12. Central Warehouse - 1units
13. Used as stock Room of PBI Admin Painting Materials - 1unit
14. Qesi new building (stock room for materials) - 1unit
15. Current Stock - 10unit
TOTAL = 69units
40 Footer CV’s
1.0 Motorpool – 2pcs.
2.0 Current Stock of 40 footer – 3pcs.
Total – 5pcs. (3pcs. From BIGHOO)
Thank you!