Professional Documents
Culture Documents
Sr. Name of Block Baseline programme details Hindrance due to Non availibility of architectural drawings and setting out p
no.
Hindrance Dates Ref. to Delay Over- Net
Architectur lapping delay
Activity Date of Date of removal al Drg. Reg.
Affected Critical
Total Period of Dates as start Page
Basic Float Archit- Archit- Date of issue
completion per activity no. or not ectural ectural of setting
baseline
drawings (Revised out plan
drg.)
Hindrance due to Non availibility of architectural drawings and setting out plan
Weight- Hindrance
age (%age)
100% 25
0% 0
35% 32
6% 1
5% 5
0% 0
0% 0
0% 0
10% 7
0% 0
0% 0
5% 1
0% 0
0% 0
0% 0
Total 71
Annexure-II
Hindrance due to shifting of HT and LT overhead electrical lines
Sr. no. Name of Block Baseline programme details Hindrance due to shifting of HT and LT overhead electrical lines
Activity Affected Critical or Hindrance Dates Delay Over- Net delay Weight- Hindranc
Total Period of lapping age e
Dates as per Activity Float Date of start Date of
completion not removal (%age)
baseline No.
Start 16/01/15 16/01/15
1 Boy's Hostel 57 0 57 0% 0
Finish 14/12/16 13/03/15
Start 24/01/15 16/01/15
2 Lecture Hall 156 57 99 3% 3
Finish 14/05/17 20/06/15
Start 27/01/15 16/01/15
3 Utility block 196 156 40 5% 2
Finish 14/05/17 30/07/15
Start 16/01/15
4 T4 (3 blocks)
Finish 14/02/17
Start 24/01/15
5 T4 (4 blocks)
Finish 14/05/17
Start 23/01/15
6 T2 (2 blocks)
Finish 14/05/17
Start 10/02/15
7 T2 (5 blocks)
Finish 14/05/17
Start 16/01/15
8 Computer Science
Finish 14/02/17
Start 24/01/15
9 Dining Hall
Finish 14/12/16
Start 24/01/15
10 SMMEE block
Finish 14/05/17
Start 16/01/15
11 EE block
Finish 14/02/17
Start 23/01/15
12 Admin Block
12 Admin Block
Finish 14/05/17
Start 24/01/15
13 Chemistry block
Finish 14/05/17
Start 17/01/15
14 Girl's Hostel
Finish 14/12/16
Start 24/01/15
15 Director's Residence
Finish 14/05/17
Total 5
Hindrance due to non availibility of Structural drawings of foundation & columns
Sr. no. Nature of hindrance Baseline programme details Hindrance due to non availibility of Structural drawings of foundation & co
Weight- Hindrance
age (%age)
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
5% 5
0% 0
Total 5
Hindrance due to non availibility of Structural drawings of Grade slab & beams
Sr. no. Nature of hindrance Baseline programme details Hindrance due to non availibility of Structural drawings of Gra
Hindrance due to non availibility of Structural drawings of Grade slab & beams
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
0 0% 0
Total 0
Hindrance due to non availibility of Structural drawings upto terrace and mumty etc.
Sr. no. Nature of hindrance Baseline programme details Hindrance due to non availibility of Structural drawings upto terrace and
Hindrance due to non availibility of Structural drawings upto terrace and mumty etc.
Weight- Hindrance
age (%age)
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
10% 0
0% 0
Total 0
Annexure-VI
Hindrance due to non availibility of Electrical service drawings
Sr. no. Nature of hindrance Baseline programme details Hindrance due to non availibility of Electrical service drawings
Activity Affected Critical or Date of start Date of Delay Over- Net Weight- Hindrance
Total Period of Dates as Activity Float removal lapping delay age (%age)
completion per not
No.
baseline
Sr. no. Nature of hindrance Baseline programme details Hindrance due to non availibility of Internal service drawings
Weight- Hindrance
age (%age)
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
0% 0
Total 0
Annexure-VIII
Hindrance due to bad whether
Sl. Nature of Hindrance Date of Delay Over-lapping Net delay Weight-age Hindrance
No. hindrance Dates removal (%age)
Total 22 0 22 25% 6