You are on page 1of 3

Conveyor system (1)

Automation Lab. 1

automation 2018 automation 2018

Conveyor system (2) Ethernet controller


Photocell (Input)
Digital Digital
Inputs Outputs

Block (Output)

automation 2018 automation 2018

1
Conveyor system (3) Lab 1.a – The process

START
Conveyor belt 1

THE MOVIE! Lift2


Lift1

Conveyor belt 2

automation 2018 automation 2018

State graph Lab 1.b – The process


Init trigger

START
State x1
Conv. 1 The program has following parts:
1)  Initialization
2)  Definition of process states and
State x4 State x2 declaration of conditions for
Lift1 Lift2 transitions between the states
3)  Actions for different states
State x3
Conv. 2

automation 2018 automation 2018

2
T!
Before the lab

N
TA
OR
•  Read the lab manual
•  Outline a ladder program, on a piece
P
of paper, that will run the conveyor
IM

(Tip: make a state graph first)


•  Use Input/Output names provided in
the appendix (page 13)
•  Any implementation will do, as long as
it transports the job the prescribed way
in a safe and controlled manner.

automation 2018

You might also like