Water, Garbage,
Sewage
Crisis
PTI’s Plan of Action
رکایچ ےک اسملئ اور ااکن لح
1. Garbage
2. Sewage
5. Uplifting of infrastructure
How to Estimate Water Need
3. Pipri
Undisposed
Waste
2,990 TPD (18%)
Undisposed Garbage
Burning of Garbage contributes to severe air pollution
with increase in suspended particulate matter
Electricity
RO Plant for
Steam Generator Water
Turbine Production
Sea
Water
Solid Flue Flue Flue
Waste Gases Gases Gases
Emission
Release in
Incinerator Steam Drum Control
the air
Equip
Pilot Plant Garbage to Water
Garbage to Energy to Water (1)
Environmental grants
available from Development
Finance Institutions (DFIs like
IFC)
Cost of delivery may be Rs
0.50
Time line is 2 years after
Letter of comfort from SSWMB
Garbage to Energy to Water (3)
S-III Project P T I ’s P r o p o s a l
Sewage to Water
Industry already buys water
Horticulture needs
Separate delivery
mechanism may be required
Can be scaled up as water
needs for industry rise
Time Line 2-3 years
De-Salination 1
Hubco produces 1200 MW of
Electricity
Furnace oil base, now
becoming relatively
expensive
Total energy production can
be diverted to desalination
De-Salination 1
It is a ‘Brownfield’ Project
Power Plant and Intake
channel exist
First project of 300 MGD
Scalable to 1200 MGD
Pricing Mechanism
DeSalination I
Following items are to be treated as
pass-through
Fuel cost fluctuation (Which Fuel?)
Any change in Taxes (GST etc.)
Indexation to CPI but PTI insists ‘only’
as much as it effects the plant
Pricing Mechanism De-Salination I
Issue is of Land
Guarantee ‘Take or Pay’
325 mw 300 mw 1st unit 2-3 years
Project life 25 years
Water issue in CBC/DHA NA247
DeSal-2
Setting up of
5 MGD desalination plant
that may be scalable to 10 MGD
Timeline 1 year
Land: Our proposal to CBC/DHA
for Desalination Plant
Effect of Fuel
Categorized tariff
Purely Domestic
Commercial
Industrial
Neighboring countries
Solutions & Innovations from
Pakistan & other countries
Kejriwal’s Aam Aadmi Party Adarsh Shastri & Ajay
Dutt Delhi MPs on water metering and pricing
Garbage to Water
Desalination
(2-3 yrs)
Sewage to Industrial
Recycling Water
(2-3 yrs)
Electricity Desalination
Water to
Energy Plant
Waste to Tertiary
Energy Plant Treatment