SHINRYO {MALAYSIA} SDN. BHD.

lusae:-ei F5-02-06
Unit 24.02, 24th Roor, Menara KH.
Jrlan Sultan lsmail.
50250 Kuala Lurnpur, MALAYSIA.
SUB.CONTRACT ORDER Tel: 03-2144 8966 {8 Lines) Faxr C3-2142 8955
GST Reg. No.: 000919371776
Order No. P3003405900-148 Date I 2g-Dec-u Email I purchase@shrnryo com.my

Main Works EPCC FOR UTITITY GEBEH6 COGENERATION EXPANSION


CIDB Reg. I No. rssoooe-rRosa+rs
GST Reg. No. I oora+zzrosoo
Sub-contracl rO IUPPLY LABOUR, MATERIAI.S, TOOI5, CONSUMABIES, TRANSPORTATION, SUPERVISIOH IOR ?HE EXECUTION AND COMPIENOH OF
Work rHE ETECTRICAL AIIID IfIISTRUMINTATIONWORI(S

Tax Code TX I Budqet code I r+o ooor, 343 oool


This Order confirms the appointment of as Subcontractor to undertake the Subcontract Works and 3uthorize
INDAHRAYA ENTERPRISE sDN BHD Subcontractor to proceed with all necessary activities for the design
(to the extent required by the Subcontract), execution and complelion
of the Subcontract Works and the remedvinq of anv defects therein.
Sr.:bconlractor Code I tooaz in conformity with the provlsions of the Subconlracl.
"1. Price Excl. GST lnur ?,500,000.00 a:aT 6% lnrra 150,000.o0 lncl,.GSTl nm 2,650,000.00
2. Terms of Advance Sonstruction/l nstallation 87.5 CPCllnitial Acceptanc€
Payrnent Temporary Works 10 {MOBTLTZATTON) Iest On Completion Final Acceptance 2.5
l%)
Design/Engrneering blechanical Completron Progress Retention
Procurement Limit Of Retention
3. Commencement Date a2loLlzoLs 1. Completion Date 3t/fi71?.s18 5. Time for completion 7 MONTHS
6. Sectional Completion Pa(,/ Seclion Cornpletion Date Part I Section ComDletion Date

7. Commercial Rebaie 0.2 % of Prce,day lnVt 5,000.00 /day Maximum I ro x/o


af Price
8. Defects Liabilitv Period 12 monlhs from date o, taking-over stated in Certificate of lnitial Acc€ptance
9. Performance Bond NIA % of Price valid from Commencement Date until 90 days after Final Acceptance

Marine Cargo
- - BoilerPressure Vessei -]
10. lnsurance -l Erectjon All Bisks Professional lndemnity
Submit before
-y'-) Contractor's All Risks
y Goods ln lransit /- Employei''s Liabiiity /t Workmen's Compen$ation
Commencernent
-rl Equipment All Risks d Comprehensive Motor vr- f uUtic Lrabiiily vl, Foreign Worker Compensation
p Foreign Worker Hospital & Surgical rl
- L__l

11. Working Hours AS PER SITE I PROJEfi REQUIREMENT


12. Site SHINRYO MATAYSIA. SARBA CONSORTIUM LOT 1394, GEBENG INDUSTRIALAREA FASA }II 26080 KUAI{TAN PAHANG

13 Subontract This Order, the Siandard Subcontract Agreement No.: sc-sMsB-17-099 dated r 34; 37'r\
Documenls and the following attachments are incorporated by reference and made part of the Subcontract: Total ( 135 pgs)

a Clarificatrons i Performance Bond


e Request for Qr.rotation 3 Contractor's Schedule
./
A.:
Scope oi Subcontracr Works : Employeis Collateral Warranty
[t,.)
Y Drawinos {) Specifications
t Bills of Quantities \/: Schedule of Rates
E Extracts Of Main Contraci Documents
?, Subcontractor's Proposal/Quotation Ref.: tREsB/tHc E&t TENDSR REv 05 DD L7/L212071
]{ Certificate Of Approval (COA) from CIDB (lf Applicable)

This Order is sent to yciu in duplicate. You are to retain the I / We hereby confirmed and accepted this Order and the
ORIGINAL and return the DUPLICATE copy duly signed, ORlGlt\AL has been retained.
slamped and witnessed within seven (7) days from the date Authorised Signatory:
of this Order. Name:
Position:
For and on behalf of NRIC/Passport No.:
Date:
Shinryo (Malaysia) Sdn Bhd
SH|NRYO {Mataysia} SDN. BHD.
(No: 95463.A)
Signature of Witness:
Name:
Position:
President NRlClPassport No :

Date: 29-Dec-20.1 7 Date:


^
Checked By: Nnr6rriaa lsHURRt / ) Preoared Bv' NASERI/CONNlt
, Request BY:colttrutr
i,
Date: :9-De.-2017 L 'L - Date: - 29-Dec-2017 Date: 29-Dec-2017

FILE NO: SISOIQPFORM/QP6-01 /F6-01,06 DOC ISSUE B-REV;2