Boot reinforcement under Uniform load

Materials details
fck-concrete strength = 50 N/mm2
fy-Steel strength = 500 N/mm2

Boot geomentry details


Boot-width of the web = 150 mm
d-Boot depth = 300 mm
c-Cover of link product face = 35 mm
Exposed outer and bottom face = 35 mm
b-overall width of cross section = 500 mm
bw- top width of beam = 200 mm
Resting slab details
Thickness of slab = 250 mm
self weight of slab = 6.25 kN/m2
Span length = 8m
Super dead load = 2.5 kN/m2
Live load = 15 kN/m2

Where
v - Floor reaction
μ - coefficient of shear friction = 0.7
c= edge distance to the centroid of the steel bar in top of boot
x= ( d" - c )
b - total width of beam
Stage1-Width slabs laid dry before in situ concrete is cast
Using bar dia = 12 mm
Slab resting width = 100 mm
Length of slab = 8.2 mm
V-Ultimate slab reaction = 35.875 kN/m
a = c + ( b - bw ) - lb/2 = 279 mm
x = (d"-c) = 218 mm
ϴ - diagonal strut inclination = 52.00 degree

H-Horizontal tie force


H= V tan ϴ +( x + c / x ) μ V = 75.06 kN/m

Horizontal top Bars provided = 172.55 mm2

C-the diagonal force


C=V/ cosϴ = 58.27 kN/m
d" = 259 mm
The strut capacity is
c = 0.2 Fck d" sinϴ = 2040.87 kN/m ok

T-Total tie force


T= V ( 1 + μ (x + c / a ) ) = 58.65 kN/m
Asv1 = 134.82 mm2/m

Stage 2-After in situ concreting


Using bar dia = 12 mm
Slab resting width = 150 mm
Length of slab = 8.3 mm
V-Ultimate slab reaction = 114.125 kN/m
a = c + ( b - bw ) / 2 = 191 mm
x = (d"-c) = 218 mm
ϴ - diagonal strut inclination = 41.22 degree

H-Horizontal tie force


H= V tan ϴ +( x + c / x ) μ V = 99.99 kN/m

Ash2=Horizontal top Bars provided = 229.86 mm2

C-the diagonal force


C=V/ cosϴ = 151.73 kN/m
d" = 259 mm
The strut capacity is
c = 0.2 Fck d" sinϴ = 1706.79 kN/m ok

T-Total tie force


T= V ( 1 + μ (x + c / a ) ) = 114.13 kN/m
Asv2 = 262.36 mm2/m

Total frictional forces


Total frictional forces( μ ( V1 + V2 ) ) = 105.00 kN/m

Tie steel capacity 16 mm = 145.77 kN/m ok

Total Horizontal top bars = 402.41 mm2/m


Provide reinforcement = 471.238898 mm2/m ok
use 6 nos 10 mm dia

Total stirrup in main body beam = 397.18 mm2/m


Provide reinforcement = 452.3893421 mm2/m ok
use 4 nos 12 mm dia