You are on page 1of 40

TABLE OF CONTENTS

No. NAME SCALE No. NAME SCALE


Kokkowa Water Treatment Plant Transmission Pipe for Zone1
H=1:10,000
WTP-1 Layout Plan(1/2) 1:3000 PL-010 Plan and Longitudinal Section (7) V=2000

H=1:10,000
WTP-2 Layout Plan(2/2) 1:1500 PL-011 Plan and Longitudinal Section (8) V=2000

WTP-3 Water Level Chart NONE PL-012 Cross Section (3) 1:500

WTP-4 Flow Sheet (Intake) NONE PL-013 Hlaing River Crossing Plan and Longitudinal Section 1:1000

WTP-5 Flow Sheet (WTP) NONE PL-014 Index MAP (Yangon City) 1:30,000
H=1:10,000
WTP-6 Single Line Diagram NONE PL-015 Plan and Longitudinal Section (9) V=2000

H=1:10,000
Transmission Pipe to Zone9 PL-016 Plan and Longitudinal Section (10) V=2000

H=1:10,000
PL-001 Index MAP (Hlaing Tharyar TS) 1:80,000 PL-017 Plan and Longitudinal Section (11) V=2000

H=1:10,000 H=1:10,000
PL-002 Plan and Longitudinal Section (1) V=2000 PL-018 Plan and Longitudinal Section (12) V=2000

H=1:10,000 H=1:10,000
PL-003 Plan and Longitudinal Section (2) V=2000 PL-019 Plan and Longitudinal Section (13) V=2000

H=1:10,000 H=1:10,000
PL-004 Plan and Longitudinal Section (3) V=2000 PL-020 Plan and Longitudinal Section (14) V=2000

H=1:10,000
PL-005 Plan and Longitudinal Section (4) V=2000 PL-021 Cross Section (4) 1:500
H=1:10,000
PL-006 Plan and Longitudinal Section (5) V=2000 PL-022 Cross Section (5) 1:500
H=1:10,000
PL-007 Plan and Longitudinal Section (6) V=2000 Service Reservoirs in Zone 1

PL-008 Cross Section (1) 1:500 KSR-1 Kokine SR: General Plan 1:1200

PL-009 Cross Section (2) 1:500 CSR-1 Central SR: General Plan 1:1200

Zone 9 Service Reservoir and Relay Pump Station CSR-2 Central SR: Plan 1:1500

Z9SR-1 General Layout of Zone 9 SR and Relay Pump Station 1:1500 CSR-3 Central SR: Section 1:1500

Appendix -13
Z9SR-2 Plan of Zone 9 SR and Relay Pump Tank 1:500 Distribution Pipe
Zone9 in 2025: General Plan of Distribution Main, DMA
Z9SR-3 Section of Zone 9 SR and Relay Pump Tank 1:500 DPL-Z9 NONE
and Distribution Pipe
Zone1 in 2025: General Plan of Distribution Main, DMA
Z9SR-4 Single Line Diagram NONE DPL-Z1 NONE
and Distribution Pipe
SCADA Flow Monitoring Diagram NONE
216,801
[711'-3"]
515,989
[1,692'-11"]

20 0,
0
[6 5 6 0 0
' -2 "]

Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale A3; S=1:3000
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
WTP- 1
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE Kokkowa Water Treatment Plant
- - - - Layout Plan(1/2) Date 30 June 2016
[164'-1"]
50,000
[65'-7"]
20,000
[164'-1"]
50,000

210,000
[689']
[65'-7"]
20,000
[164'-1"]
50,000
[65'-7"]
20,000
15,000 51,650 15,000 48,900 15,000 38,000 16,000
[49'-3"] [169'-5"] [49'-3"] [160'-5"] [49'-3"] [124'-8"] [52'-6"]

Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale A3; S=1:1500
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
WTP-2
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE Kokkowa Water Treatment Plant
- - - - Layout Plan (2/2) Date 30 June 2016
[ Intake Facility ] [ Water Treatment Facility ] [ Transmission Facility ]

Kokkowa River Leading Canal Intake Flap Gate Leading Pre-Sedimentation Lift Pump House Recieiving Well Flocculation Basin Rapid Sand Filter Clear Water Transmission
Gate Canal Pond Mixing Well Sedimentation Basin 3 Units Tank Pump Station
6 Nos. 6 Nos. 1 Unit 1 Unit 1 Unit 3 Units 6 Units 3 Units 1 Unit
for 140MGD for 140MGD for 60MGD Retention time: Pump: 5 Units Pump: 4 Units
About 48 hrs (3 duty + 2 Stand-by) (3 duty + 1 Stand-by)
for 60MGD

WL+13.60
WL+12.70 WL+12.20 WL+11.00
WL+11.70 WL+11.70
WL+9.20
Overflow L WL+9.00 HWL+8.70
+8.10 LWL+3.20
+0.80

[43'-8"]
13,300
Exist.Embankment GL+7.0(R.L+23.0')

P.GL+7.1(R.L+23.29') +7.3 P.GL+7.1(R.L+23.29')

[11'-6"]
HHWL+5.88(R.L+19.3') HWL+5.88

3,500
P.GL+4.57 (+15.0')
[18'-4"]

E.GL+3.50 ( +11.48' ) E.GL+3.60(R.L+11.81')


5,580

MWL+2.81

[28'-3"]
8,620
LLWL+0.30(R.L+1.0') +0.30 LWL+0.30

[6'-7"]
2,000
-1.20 -1.70
-2.20(-7.22') -1.70 -1.70 -2.20
-2.74
-3.70
[38'-6"]
11,730

-6.20

-11.43(R.L-37.50')
Back Wash Drainage Pipe
Sludge Removal Pipe

[ Sludge Treatment Facility ]

P.GL+7.1(R.L+23.29') WL+6.5 P.GL+7.1 P.GL+7.1

[2'-9"]
WL+6.5

850
HWL+5.88
To Thickener From Sludge Basin
E.GL+3.60(R.L+11.81') E.GL+3.60(R.L+11.81') E.GL+3.60(R.L+11.81')

LWL+0.30 Drain

To Pre-Sedimentation Pond -2.74

Wash Water Drainage Basin Sludge Basin Pre-Sedimentation Thickener Sun Drying Bed
3 Units 3Units Pond 3 Units 9 Units

60MGD=286,400m3/day
Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale None
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
WTP-3
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE Kokkowa Water Treatment Plant
- - - - Water Level Chart Date 30 June 2016
LEGEND
KOKKOWA RIVER SYMBOL NAME
M
Process Water Pipe

Utility Water Pipe

Drainage Pipe

C Chemical Pipe

Air Pipe

P Pump

Sluice Valve

Butterfly Valve

Check Valve
Overhead Crane
Pressure Reducing Valve
S
Solenoid Valve

Boll Valve

Tap

TO RECEIVING WELL (A Train)

TO RECEIVING WELL (B Train)

TO RECEIVING WELL (C Train)

M M M M M

P P P P P
M

Duty Standby Duty Standby Duty Drain Pump


DRAIN
Lift Pump
64 m3/ min x 18 m x 300 kW (VFD)

P P

LEADING CANAL INTAKE GATE PRE-SEDIMENTATION POND LIFT PUMP HOUSE

Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale A3; None
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
TITLE WTP-4
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY Kokkowa Water Treatment Plant
- - - - Flow Sheet (Intake) Date 30 June 2016
PRE-SEDIMENTATION LIFT PUMP HOUSE FLOCCULATION / RAPID SAND FILTER CLEAR WATER TANK TRANSMISSION PUMP STATION
POND SEDIMENTATION BASIN

Air Brower
F
Pre-chlorine

M PAC
M
KOKKOWA M Fl M M Post-chlorine
M
RIVER M M
M M
M
M A M

M
M
M M
M x3 M A
M
TO (B TRAIN)
M M
P
Inter-chlorine
M FROM (B TRAIN) T TO (A,B,C TRAIN)
M M
TO (C TRAIN) P
M
Lift Pump FROM (C TRAIN) Plant Water Pump
M

For Removing Sediment M M M M


M M

M TO Zone9 S. RESERVOIR
F
M
Transmission Pump

FROM (C TRAIN) FROM (B TRAIN) M M

M M

M M

M For Banking LEGEND

SLUDGE BASIN WASH WATER M


SYMBOL NAME

Process Water Pipe


M M M DRAINAGE BASIN
M M Utility Water Pipe

M Drainage Pipe

C Chemical Pipe
M
Air Pipe
TO DRAIN

TO DRAIN

TO DRAIN

P Pump
M M M
Sluice Valve

Butterfly Valve

Check Valve

Pressure Reducing Valve

SUN DRYING BED


S

THICKENER DRAIN Solenoid Valve

Boll Valve

Tap

Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale A3; None
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
WTP-5
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE
Kokkowa Water Treatment Plant
- - - - Flow Sheet (WTP) Date 30 June 2016
Single Line Diagram for WTP
Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale NTS
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
TITLE WTP-6
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY Kokkowa WTP
- - - - Single Line Diagram Date 30 June 2016
la

COMMITTEE
to Zone 9
June 2016
COMMITTEE
to Zone 9
June 2016
COMMITTEE
to Zone 9
June 2016
COMMITTEE
to Zone 9
June 2016
COMMITTEE
to Zone 9
June 2016
COMMITTEE
to Zone 9
June 2016
COMMITTEE
to Zone 9
June 2016
COMMITTEE
008
to Zone 9
June 2016
COMMITTEE
009
to Zone 9
June 2016
60
0+540
0+520
0+500
0+480
0+460
0+440
0+420
0+400
0+380
0+360
0+340
0+320
0+300
0+280
0+140

0+260
0+160

0+240
0+180

0+220
0+200
80
+7
20

00
+8
20

8 20
2 0+

840
+
20

0
+ 86
20

8 80
2 0+

0
+ 90
20

20
+9
20

0
94
2 0+

0
96
2 0+

0
98
2 0+

0
+ 00
21

0
02
2 1+

0
04
2 1+

0 60
2 1+

80
+0
21

General Layout of Zone 9 SR and Relay Pump Station


0
10
+
21

Scale = 1:1500
0
+ 12
21

1:1500
COMMITTEE
TRM-RP-001
Z9SR-1
General Layout of Zone 9 SR and Relay Pump Station June 2016
B
Zone 9 Service Reservoir and Relay Tank (In the Future)
Capacity: 12.2 MG
3,800
6,500 141,200

M
14,000

Zone 9 Service Reservoir and Relay Tank (Under ODA Project)


Capacity: 12.2 MG
61,200

61,200
47,200

A A

E.X.J
B

Plan of Zone 9 SR and Relay Pump Tank Scale = 1:500

1:500
COMMITTEE
Z9SR-2
TRM-RP-002

Plan of Zone 9 SR and Relay Pump Tank June 2016


5,750 140,000 Pump House

Ventilator Chamber FGL+4.500


HWL+3.000

7,000
9,250

Zone 9 Service Reservoir and Relay Tank (Under ODA Project)

E.X.J

12,750
Capacity: 12.2 MG
LWL-4.000

A - A Section

61,200 61,200

Ventilator Chamber
FGL+4.500
HWL+3.000
Zone 9 Service Reservoir and Relay Tank (Under ODA Project) Zone 9 Service Reservoir and Relay Tank (In the Future)
9,250

Capacity: 12.2 MG Capacity: 12.2 MG


LWL-4.000

B - B Section

Section of Zone 9 SR and Relay Pump Tank Scale = 1:500

1:500
COMMITTEE
Z9SR-3
TRM-RP-003

Section of Zone 9 SR and Relay Pump Tank June 2016


Single Line Diagram for Zone 9
Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale NTS
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
Z9SR-4
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE
Zone 9
- - - - Single Line Diagram Date 30 June 2016
COMMITTEE
010

June 2016
COMMITTEE
011

June 2016
COMMITTEE

June 2016
TRM-PL-013

June 2016
1:1000
Scale

Date

0+100
0+080
t
a
Sh

Preparatory Survey for Greater Yangon Water Supply


re
Departure Sha t

rtu

0+0
60
pa

0+422.1 3.06
De

Improvement Project Phase II (Kokkowa River)

0+420 2.97
0+ 0
40
-1.34
0+400
0+0 1.66
Hlaing River Crossing Plan and Longitudinal Section

2 0
-1.34
0+0
0+380
00 -4.13
0+4 01.19 9
0+4 00
0+3 98
0+3 96
0.0

-6.84
0+3 94
0+3 92
0+3 90
0+360
0+3 88
0+3 86
-10.94
0.0

0+3 84
0+3 82
0+3 80
0+3 78
0+3 76
-12.84
0+3 74
0+3 72
0+340
Transmission Pipe or Zone 1

0+3 70
0+3 68
0+3 66
-13.79
0+3 64
0+3 62
0+3 60
0+3 58
0+3 56
-18.20
0+3 54
0+3 52
0+3 50
0+320
0+3 48
0+3 46
-21.46
0+3 44
0+3 42
0+3 40
0+3 38
0+3 36

-21.78
0+3 34
0+3 32

-22.00
0+3 30
0+300
0+3 28
0+3 26
-21.18
0+3 24
Hlaing River Crossing Longitudinal Section

0+3 22
0+3 20
0+3 18
0+3 16
-20.22
0+3 14
0+3 12
0+3 10
0+280
0+3 08
0+3 06
-19.09
0+3 04
0+3 02
0+3 00
0+2 98
0+2 96
-17.97
0+2 94
0+2 92
0+260
PROJECT
0+2 90
0+2 88
0+2 86
-17.50
0+2 84
Hlaing River Crossing Plan

0+2 82
Shield Tunnel (O.D. 2350mm)

0+2 80
Shield O.D 2350mm, Transmission Pipe Dia. f1600/Steel Pipe

TITLE
Hlaing River

0+2 78
0+2 76
-17.50
Transmission Pipe (f1600)

0+2 74
0+2 72
0+2 70
0+240
0+2 68
0+2 66
-17.50
0+2 64
0+2 62
0+2 60
0+2 58
0+2 56
-17.50
0+2 54
0+2 52
0+2 50
0+220
0+2 48
0+2 46
-17.50
0+2 44
0+2 42
0+2 40
-17.50
Hlaing River

0+2 38
0+2 36
0+2 34
0+2 32
0+2 30
0+200

Scale: H=V= 1:1000


0+2 28
0+2 26
-17.57
0+2 24
Scale = 1:1000

0+2 22
0+2 20
0+2 18
0+2 16
-17.71
0+2 14

ENGINEERING DEPARTMENT (WATER & SANITATION)


0+2 12
0+180
0m

0+2 10
0+2 08
0+2 06
-17.83
.7

0+2 04
0+2 02
28

0+2 00
0+1 98
-18.11
-

0+1 96
l:

0+1 94
ve

0+1 92
0+1 90
0+160
Le

0+1 88
0+1 86
-18.90
0+1 84
er

0+1 82

APPROVED BY
0+1 80
nt

0+1 78
0+1 76
-19.16
Ce

0+1 74
0+1 72
0+1 70
0+140
0+1 68
0+1 66
-19.43
0+1 64
0+1 62
0+1 60
0+1 58
0+1 56
-19.50
0+1 54
0+1 52
0+1 50
0+120
0+1 48
0+1 46
-19.82
0+1 44
0+1 42
0+1 40
0+1 38
0+1 36

-19.98

-
0+1 34
0+1 32
0+1 30
0+1 28

0+100 -20.42
0+1 26
0+1 24
0+1 22
0+1 20
0+1 18
0+1 16
-20.03
0+1 14
0+1 12
0+1 10
0+080
0+1 08
0+1 06
-20.00
0+1 04
0+1 02
0+1 00
0+0 98
0+0 96
-20.00
0+0 94
0+0 92
0+0 90
0+060
0+0 88
0+0 86
-18.28
0+0 84
0+0 82
0+0 80

JICA Study Team


0+0 78
0+0 76
-15.67
0+0 74
0+0 72
0+0 70
0+040
0+0 68
0+0 66
-10.27
0+0 64
0+0 62
0+0 60
0+0 58
-4.77

CHECKED BY
0+0 56
0+0 54
0+0 52
0+0 50
0+020
0+0 48
0+0 46
-2.96
0+0 44
0+0 42
0+0 40
0+0 38
0+0 36
0.55
0+0 34
0+0 32
0+0 30
0+000
0+0 28
0+0 26
1.01
0+0 24
0+0 22
0+0 20
0+0 18
2.25

-
0+0 16
0+0 14
0+0 12
0+0 10
0-020
0+0 08
0+0 06
3.30
0+0 04

JAPAN INTERNATIONAL COOPERATION AGENCY


0+0 02
0+0 00
4.07
0-040
4.14

YANGON CITY DEVELOPMENT COMMITTEE


4.24

t
0-060

ha
4.34

DESIGNED BY
al
iv
0-076.6 4.45

Arrival Sha t

r
Ar
4.50

-8

-16

-24

-
DRAWN BY
-
E191000-m

E191500-m

E192000-m

E192500-m

E193000-m

E193500-m

E194000-m

E194500-m

E195000-m

E195500-m

E196000-m

E196500-m

E197000-m

E197500-m

E198000-m

E198500-m

E199000-m

E199500-m

E200000-m

E200500-m
N1865000-m

9
N1864500-m

16 16

N1864000-m

N1863500-m

N1863000-m
17
17

N1862500-m

Kokine Service Reservoior

N1862000-m

1+281

N1861500-m

25 25

8 .8
24 24

04
2+
N1861000-m

N1860500-m

11 19 19
13 23 23

22
Central Service Reservoior

22
N1860000-m
20

21
0+350

20

21

N1859500-m

ad
12

n Ro
u Sei

d t Roa
Hpo

U Tun Mya
D olph in R es tau rant

N1859000-m

Rd
San
Ka
aik
Ky
U Ht aun g B o R ound

N1858500-m
Index Map (Yangon City) .
0
1
D
N
E
Scale = 1:30000
PROJECT Scale
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply 1:30000
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
TRM-PL-014
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE
Transmission Pipe or Zone 1
- - - - Index Map (Yangon City) Date June 2016
COMMITTEE

June 2016
COMMITTEE

June 2016
COMMITTEE

June 2016
Stoppable Tapping Method)
Stoppable Tapping Method)
(F750x700)

June 2016
COMMITTEE

June 2016
Stoppable Tapping Method)

Stoppable Tapping Method)

COMMITTEE

June 2016
COMMITTEE

June 2016
COMMITTEE

June 2016
COMMITTEE
KSR-1
Legend
General Plan Target Facilities in 2025

COMMITTEE
CSR-1
B
99600 Dia. 1400 mm
350 98900 350 To High subzone
5100 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5100 18700

350 18700
18000 700

700
350
5100
5000 Pump Room

19400
5000 5000
30100

4400
3800 A
2500

3400
400

700
1300
1300
7000
5800
5000

700 EXPANSION JOINT W = 250


2500

9300
5000

400

700
60900

700
5000

Dia. 1000 mm
From Kokkowa WTP Power Generator
5000

and/or Yegu PS
5000 5000

30100
30450
5000
5100
350

700
EXPANSION JOINT W = 250

Plan

Note : The values are indicative, and detailed values shall be


decided in detailed design.

PROJECT Scale
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE
COMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
TITLE CSR-2
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY Central Service Reservoir
- - - - Plan Date April 2016
99600
350 80200 18700 350
5100 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5100 18700
13600
13200

2120

200
250

8100 300 200


2000
HWL +41.938

7000
7400
1300

3870 5030
+ 40.538
700

8000
9850
GL+ 37.39

100
5070
1300

6170
PUMP ROOM

6970
LWL +33.938

1000
700
300
400
700
EXPANSION JOINT W = 250

2400
2100
3300 18000

200
100
Dia. 1200 mm 4650
700 600
EXPANSION JOINT W = 250

SECTION A - A

60900
350 60200 350
5100 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5100

700
HWL +41.938
4570 5280

+ 40.538
9850

GL+ 37.39 GL+ 37.39


12
Clayey Silt 11

+33.89M
10 LWL +33.938
12
+32.89M Silty Sand

Clayey Silt
1000
+30.39M >50
>50
Silty Sand >50
+27.39M >50 EXPANSION JOINT W = 250
>50
>50

Silty Sand >50


>50
>50
+21.89M
>50

Silty Sand >50


>50

>50
SECTION B - B
+17.39M >50
>50
>50
Silty Sand >50
>50
>50
+11.89M

PROJECT Scale
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
COMMITTEE
YANGON CITY DEVELOPMENT COMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
TITLE CSR-3
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY Central Service Reservoir
- - - - Section Date April 2016
Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale A3; None
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
COMMITTEE
YANGON CITY DEVELOPMENT COMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
DPL-Z9
Z9 -
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE
Zone 9 in 2025
- - - - General Plan of Distribution Main, DMA and Distribution Pipe Date Oct. 2015
June 2016
Proposed DMA in Zone1 Distribution main pipe of High subzone in Zone1

Note : The values are indicative


shall be decided in detailed design. Distribution pipe-network in Zone1 Distribution main pipe of Low subzone in Zone1
PROJECT Scale A3; None
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE
COMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
Z1 -
DPL-Z1
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE
Zone 1 in 2025
- - - - General Plan of Distribution Main, DMA and Distribution Pipe Date Oct. 2015
June 2016
WTP Monitoring Room (Administration Build.) ZONE9 Monitoring Room (Relay Pump Station) ZONE1 Monitoring Room (Kokine SR)
SCADA for WTP SCADA for Transmission and Distribution (ZONE9) SCADA for Distribution (ZONE1)

HMI HMI HMI HMI HMI HMI

ADSL ADSL
Server Server Server Server Server Server

Optical Fiber Network Optical Fiber Network

Data Data
LAN LAN
LAN

PLC PLC PLC PLC PLC PLC PLC PLC PLC


Data

PLC PLC PLC GPRS


Modem
Pre-sedim.pond WTP Tr. Pump St. Zone9 SR
Relay PS
x19
Lift Pump Transmission Pump Transmission Pump

Kokine
S.Reservoir
Kokkowa WTP ZONE 9

(Low Sub-Zone)
Out of Scope
PLC
x23

x18

DMA (ZONE 9) PLC PLC PLC

From Yegu PS Central (High Sub-Zone)


S.Reservoir
Distribution Pump DMA (ZONE 1)

Flow Monitoring Diagram


Note : The values are indicative, and detailed values shall be decided in detailed design.
PROJECT Scale NTS
JAPAN INTERNATIONAL COOPERATION AGENCY JICA Study Team Preparatory Survey for Greater Yangon Water Supply
YANGON CITY DEVELOPMENT COMMITTEE ENGINEERING DEPARTMENT (WATER & SANITATION) Improvement Project Phase II (Kokkowa River)
SCADA
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY TITLE
General
- - - - Flow Monitoring Diagram Date 30 June 2016