You are on page 1of 9

NAME OF WORK :

LOCATION :
DATE:
DAILY PROGRESS REPORT SAFETY HIGHLIGHTS
Total Man Hours
Name Of Work: Civil & Allied Works LTA

A) MATERIAL STATUS REPORT.

Previous
Today Total Today Total Closing
SR.No Description Unit Day Previous Consumption
Received Received Consumed Consumption Balance
Received

1 REINFORCEMENT STEEL
8mm dia MT
10mm dia MT
12mm dia MT
16mm dia MT
20mm dia MT
25mm dia MT
32mm dia MT
Structural steel MT

Total
2 CEMENT
P.P.C Bags
O.P.C Bags
Sand Cum
Metal(20mm) Cum
Metal(10mm) Cum
Aggregate(60-90mm) Cum
Bricks Nos

B) MANPOWER STATUS REPORT C) Progress of work


Sr.No Type Present as on date Sr.No Description
Available Required Difference

Total

C) Machinery… Planning for Next day


Sr.No Type Available Required Difference 1
1 Excavator.. 2 2 0 2
2 Mixture Machine.. 1 3 -2 3
3 Weigth Batch.. 4
4 Tractors.. 6 4 2 5
6
7
8

D) WORK STATUS REPORT AS ON DATE


Sr.No Description Total Quantity Planned Quantity Completed Quantity.

Please Refer Measurment


E) CRITICAL ITEM
Sr.No Description

F) MEASURMENT SHHET OF TODAYS EXECUTED WORK


SR.NO DESCRIPTION NOS LENGTH WIDTH HEIGTH QTY. TOTAL QTY. REMARKS.

Site Incharge
P.M.C.
NAME OF WORK :
LOCATION :
DATE:
DAILY PROGRESS REPORT SAFETY HIGHLIGHTS
Total Man Hours
Name Of Work: Civil & Allied Works LTA

A) MATERIAL STATUS REPORT.

Previous
Today Total Today Total
SR.No Description Unit Day Previous Consumption
Received Received Consumed Consumption
Received

1 REINFORCEMENT STEEL
8mm dia MT
10mm dia MT
12mm dia MT
16mm dia MT
20mm dia MT
25mm dia MT
32mm dia MT
Structural steel MT

Total
2 CEMENT
P.P.C Bags
O.P.C Bags
Sand Cum
Metal(20mm) Cum
Metal(10mm) Cum
Aggregate(60-90mm) Cum
Bricks Nos

B) MANPOWER STATUS REPORT C) Progress of work


Sr.No Type Present as on date Sr.No Description
Available Required Difference

Total

C) Machinery… Planning for Next day


Sr.No Type Available Required Difference 1
1 Excavator.. 2 2 0 2
2 Mixture Machine.. 1 3 -2 3
3 Weigth Batch.. 4
4 Tractors.. 6 4 2 5
6
7
8

D) WORK STATUS REPORT AS ON DATE


Sr.No Description Total Quantity Planned Quantity Completed Quantity.
Please Refer Measurment

E) CRITICAL ITEM
Sr.No Description

F) MEASURMENT SHHET OF TODAYS EXECUTED WORK


SR.NO DESCRIPTION NOS LENGTH WIDTH HEIGTH QTY. TOTAL QTY. REMARKS.

Site Incharge
P.M.C.
Closing
Balance