Professional Documents
Culture Documents
Invitation to Bid
LOT
PARTICULARS ABC
NO.
CONSTRUCTION OF 1400 UNITS ARMM-BRIDGE
CORE SHELTER WITH WATER AND LIGHT
1 Php479,125,479.87
COMPONENT FOR THE PROVINCE OF
MAGUINDANAO
CONSTRUCTION OF 1750 UNITS ARMM-BRIDGE
CORE SHELTER WITH WATER AND LIGHT
2 Php598,779,967.84
COMPONENT FOR THE PROVINCE OF LANAO DEL
SUR
CONSTRUCTION OF 1400 UNITS ARMM-BRIDGE
3 CORE SHELTER WITH WATER AND LIGHT Php514,298,094.91
COMPONENT FOR THE PROVINCE OF BASILAN
CONSTRUCTION OF 1400 UNITS ARMM-BRIDGE
4 CORE SHELTER WITH WATER AND LIGHT Php526,205,150.52
COMPONENT FOR THE PROVINCE OF SULU
CONSTRUCTION OF 700 UNITS ARMM-BRIDGE
5 CORE SHELTER WITH WATER AND LIGHT Php263,459,675.63
COMPONENT FOR THE PROVINCE OF TAWI-TAWI
Bids received in excess of the ABC for each lot shall be automatically rejected at bid
opening.
2. The ORG-ARMM now invites bids for the Construction of ARMM Bangsamoro
Regional Inclusive Development for Growth and Empowerment (ARMM-
BRIDGE) Core Shelter with Water and Light Component for the Provinces of
Maguindanao, Lanao del Sur, Basilan, Sulu, and Tawi-Tawi. Completion of the
works is required within two hundred forty (240) calendar days. Bidders should have
completed, within five (5) years from the date of submission and receipt of bids, a
contract similar to the Project. The description of an eligible bidder is contained in the
Bidding Documents, particularly in Section II. Instructions to Bidders.
3. Bidding will be conducted through open competitive bidding procedures using a non-
discretionary “pass/fail” criterion as specified in the 2016 Revised Implementing Rules
and Regulations (IRR) of Republic Act (RA) 9184, otherwise known as the
“Government Procurement Reform Act”.
4. Interested bidders may obtain further information from ORG-ARMM and inspect the
Bidding Documents at the address given below from 9:00 in the morning to 5:00 in the
afternoon, Mondays to Fridays.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
Procuring Entity, provided that Bidders shall pay the applicable fee for the Bidding
Documents not later than the submission of their bids.
6. The ORG-ARMM will hold a Pre-Bid Conference on 6 March 2018 at 2:00 in the
afternoon at Bajau Hall, 2F Office of the Regional Governor-ARMM, Office of
the Bangsamoro People, Gov. Gutierrez Avenue, Cotabato City, which shall be
open to prospective bidders.
7. Bids must be duly received by the BAC Secretariat at the address below on or before 21
March 2018 (1:59AM cut-off time). All Bids must be accompanied by a bid security
in any of the acceptable forms and in the amount stated in ITB Clause 18.
Bid opening shall be on 21 March 2018 at 2:00 in the afternoon. Bids will be opened
in the presence of the bidders’ representatives who choose to attend at the address
below. Late bids shall not be accepted.
8. Interested bidders must have been issued license category “AAA” by the Philippine
Contractors Accreditation Board (PCAB) with at least Large B Size Range for
Building and Industrial Plant to participate in this procurement activity. Further they
must meet the following minimum requirements:
9. The ORG-ARMM reserves the right to reject any and all bids, declare a failure of
bidding, or not award the contract at any time prior to contract award in accordance
with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the
affected bidder or bidders.
(Sgd)
ATTY. SAHARA ALIA J. SILONGAN
Chairperson
SBAC, ORG-ARMM