You are on page 1of 2

SAP

RFID Related
Process Flow Input SAP T/code OutPut T/cod RFID data Capturing Additional Savings
Outputs/Reports
e

PPC Plan ZM50 Sequence Printing Spool Phy. Taggs & update tag Code
PPC line-wise Plan
Line wise Print
Line Load ZM51

Provide Taggs to Read Taggs as it goes into the Fitment of tagg


Line IN
Lines line

Read Taggs as it goes out of line Store for Backflushing B/F Linearity & time
Line Out
Saving

Reads Taggs as in goes into the No Manual Tracking of


Inspection
Insp. Area Aggr.

N/Ok

Reads Taggs as it goes into the No Manual Tracking of


Rework
R/W Area Aggr.

Reads Taggs as it goes into the No Manual Tracking of


OK OK Area / out of the R/W area Aggr.

Read Taggs as it goes into the Fitment of tagg


Chassis IN
line

Reads Chassis Tag & the Aggr. No Data Entry


Chassis Installation
Tags & marry those

Prints Automatically as it No Manual Printing


Veh. Card
reaches this station

Store for Backflushing B/F Linearity & time


Chassis Rollout
Saving

Reads Chassis Tag changes the No Manual Tracking of


FVI
status to FVI Aggr.

Reads Chassis Tag changes the No Manual Tracking of


Line Hold
status to Out of FVI Aggr.

Reads Chassis Tag changes the No Manual Tracking of


Road Test status to Road Testing as it Aggr.
enters in to the test track

Reads Chassis Tag changes the No Manual Tracking of


Rework status to R/W as it enters in to Aggr.
the R/W area

Offered for inspection. QC carries No Manual Tracking of


OK Tagging the handle (reader) & confirms if Aggr.
OK

Reads Chassis Tag changes the No Manual Tracking of


Mvt. To BSR
status to BSR Aggr.
SAP
RFID Related
Process Flow Input SAP T/code OutPut T/cod RFID data Capturing Additional Savings
Outputs/Reports
e
Match BSR Stk vs Loads the pending & stock rqmt
Allocation Chassis NO in the handle & move to BSR.

PDI Inspect

OK If OK confirm thru' the Handle All Documents are printed Time saving for
OK documentation &
printing
The Final Code Tagg & Print the final tagg as
print is all done along with per the allocation
other documents
BCMF / Appln

Documentation

Security Chassis movs to gate -- No security person is


automatically checks the chassis required
Gate Exit no & engine no. if in OK list
Opens the gate
Chassis reaches the gate along If matches, then all the No security person is
with the final code tagg. documents are printed required
Gate IN Reads the final tagg and the and gate opens
chassis no. tagg at gate

Mvt. To BSR

Allocation

PDI

OK

Depots / Dlrs/
Customer Billing

Documentation

Security

Gate Exit

Depot

Receive At Depot

PDI

Veh. Allocation

Billing

Receive at Dlr

PDI

You might also like