Professional Documents
Culture Documents
".
Technical State Geotech. Engineer (SGE), Chief
""
5i~ +Type of Certification Designer and Reviewer or Foundation Engineer (CFE), or Chief t::
Report General Format Required Report Writer Supervisor Engineering Geologist (CEG)
!l- Preliminary Bridge Memorandum PE seal, dated but not Seal if licensed Seal Seal if acting as primary technical
[ Report signed reviewer, or if final recommendations are
influenced by the review at this level
[ Preliminary Ferry
Terminals, Docks,
Memorandum PE seal, dated but not
signed
Seal if licensed Seal
influenced by the review at this level
Seal if acting as primary technical
reviewer, or if final recommendations are
ii: etc. influenced by the review at this level
~ Final Ferry Formal bound report PE seal, signed and Seal if licensed Seal Seal if acting as primary technical
Small Foundation
Report (signals,
Memorandum,
unless otherwise
on geologic complexity
PE seal , signed and
dated
Seal if licensed Seal Seal if acting as primary technical
reviewer, or if final recommendations are
f
~
j
noise walls, etc.) requested influenced by the review at this level
Ponds , Memorandum, PE seal, signed and Seal if licensed Seal Seal if acting as primary technical
Environmental unless otherwise dated , or both PE and reviewer, or if final recommendations are
Mitigation requested LEG seals, depending influenced by the review at this level
on geologic complexity [
Ii'
~ ~
'Ii ~
WSDOT Geotechnical Report Certification and Format Requirements or
~ Table 23-1
g
i Who Certifies?
Landslide Reports Formal bound report PE or LEG seal , signed Seal if licensed Seal
influenced by the review at this level
Seal if acting as primary technical I
I
~
and dated, or both
PE and lEG seals it
reviewer, or if final recommendations are
influenced by the review at this level
g'
Pit and Quarry
~t[l,!!;;t!.m~::i sHe: i[I~Q ~e:d
Memo if review only; LEG seal, signed and Seat if licensed , Seal, as noted Seal. as noted under Certification
I
Reports and otherwise, formal dated , for report; seal as noted under under Certification Requ ired, if acting as primary technicat
Reviews bound report required for review Certification Required reviewer, or if final recommendations are
memo only if changes Required influenced by the review at this level
...~
to interpretation or
design in the report are
recommended
I
Geologic hazard Can be a format LEG seal, signed and Seal if licensed Seal Seal if acting as primary technical
assessments (e.g., report or a letter dated (also include reviewer, or if final recommendations are
for critical area report PE seal , if structures influenced by the review at this level
ordinance issues) involved)
I
~ Qe:QIQg~ and SQil:2 Usually a formal PE ~ seal, signed Seal if licensed Seal Seal if acting as primary technical
Discipline and EIS bound report and dated, or both reviewer, or if final recommendations are
'§
Reports PE and LEG seals , influenced by the review at this level
[ depending on geologic
~
~ ;C
complexity QL.jf.
struclure:s are: involve:d I9
~t
~,., WSDOT Geotechnical Report Cer1 Id Format Requirements
~
~
~"
,,~
Table 23·1 (, Q ::l
~~
f
Who Certifies?
."
g"
'1-.
~~ +Type of Certificatio n Des igner and
Primary Licensed
Technic al
Review er or
State Geot ec h. Enginee r (SGE), Chief
Foundation Engineer (CFE), or Chief tl
°1 Report General Format Required Report Writer Supervisor Engineering Geolog ist (CEG)
Consultant Report letter to consultant None, unless Seal review Seal review letter, Seal review letter if acting as
Reviews or memo. to Region changes to design letter if licensed , as noted under primary technical reviewer, or if final
are recommended, as noted under
~
Certification recommendations in review letter are
in which case review Certification Required influenced by the review at this level, as
,
00·
letter is sealed (signed Required noted under Certification Required
~ complexity
~
Emergency Work E-mail or memo. None for preliminary Seal for final Seal for final Seal for final design if acting as
assessment; for fin al design if licensed design primary technical reviewer, or if final
Si design, PE or LEG recommendations are influenced by the I
seal , signed and dated, review at this level
or both PE and LEG
seals, depending on
geologic complexity
iilDd it ~t[ld!;;t!m::~ ii![e:
iovolYe:d I
CSL Reports Memorandum PE seal, signed and
dated
Seal if licensed Seal Seal if acting as primary technical
reviewer, or if final recommendations are
influenced by the review at this level
I~
J
~
l
~
WSDOT Geotechnical Report Certification and Format Requirements
Table 23-1 (continued) I
l
I
Who Certifies?
Primary Lice ns ed
~ +Type of Ce rtification Designer and
Tec hnic al
Reviewer or
State Geotec h . Engineer (SGE), Ch ief
Foundation Engineer (CFE), or Ch ief
Report General Fonnat Required Repo rt Writer Supervisor Engineering Geolog ist (CEG)
Construction
Support resulting
in eng ineering
changes (must
Memorandum PE ~ seal, signed Seal if licensed
and dated, or both
PE and LEG seals,
depending on geologic
complexity andJ1.
Seal Seal if acting as primary technical
reviewer, or if final recommendations are
influenced by the review at this level
I
I
~
result in a change
I
:it[UQt!.![!i:::i iil[!i:: i[]~lved
I
order, and
must affect the
engineering intent of
the contract design)
Construction Memorandum None None None N/A
g
Submittals
Special Provisions Usually an PE or LEG seal, signed Seal if licensed Seal Seal if acting as primary technical I
and Summary append ix to report; and dated , or both reviewer, or if final recommendations are
of Geotechnical memorandum if sent PE and LEG seals, influenced by the review at this level
Cond itions separately depend ing on nature of
~
Special Provision
..., Construction Plans Plan sheets PE ~ seal, signed None Seal Seal if acting as primary technical I
and dated, or both reviewer
II
PE and LEG seals,
depending on nature of
plan sheets
Final Geotechnical Fonnalbound report None required, since None None N/A
Project all subdocuments have
Documentation been stamped
~
I
~ it
·Some judgment may be used on ....mether or not to use a memorandum format for 51
+Projects that require significant. non-routine, geologic interpretation to provide a co
require a LEG seal.
projects, and small rockfall or rockslope projects.
Icterization and geologic interpretation of design properties may also
~~
:g,.,
~<>
<>~
WSDOT Geotechnical Report Cert
Table 23·1 (. Ii
Id Format Requirements f
tl