You are on page 1of 1

SAFETY METHOD STATEMENT

Company Name: Techno-Trade Resources, Inc.


Project Name: Installation of Roofing & Sidings at Proposed M1-Wiremesh Warehouse
Project Location: Ciudad Industria, Barrio Bahay-Pari, Meycauayan, Bulacan
Completed by:
Date:
Signature:

Probability of Severity of Risk RISK LEVEL


Exposure Consequences Rating
ITEM NO. JOB STEP HAZARD RISK Control Measures P C PxC (Hign, Medium, Low)
1 Check Equipment Faulty or poorly maintained Laceration - Regularly maintain equipment.
equipment. Soft tissue injury - Check condition of harness, rope, hardhats
Loose connection Serious injuries and other Personal Protective Equipment.
Faulty PPE - Wear suitable gloves, footwear and glasses/goggles.

2 Prepare work area Slips, trips, sprains & strains Laceration - Work area clear of all rubbish and combustible materials
Soft tissue injury - Work in a well ventilated area.
Serious injuries - Position so that off cuts/hot metals falls in safe area.
- Be in a confortable position-do not overstrech
- Mark any protrusions
- Work with fire extinguisher in proximity
- Use appropriate PPE-gloves
eyewear, earmuffs, safety shoes.

3 Start work Explosion/Fire Serious injuries - Check power source.


Death - Keep end of welding tool pointing away from body.
Electrocution

4 Joining of gutter support Slip, trip, sprains,burns, Laceration - Work or Weld only on the ground.
to purlin eyes , fumes and hot metal Soft tissue injury - Do not place hot tool next to self .
Serious injuries - When checking welding
place tool in safe place.
- Turn off power.

5 Access/egress to Roof Fall from height Serious Injury - Always Check weather.
Death - Edge protection to be in place
before commencement.
- safety footwear designed
UV rays for use on roof to be worn.
Heat Stress - PPE-hi visibility long clothing
to be worn at all times.
- Shaded rest areas and cool
potable water to be provided.

6 Lifting of roofing sheets Fall from heights Laceration - Clear of all persons working within drop zones and within
to be place on roof UV rays Soft tissue injury area of potential falling roofing panel.
Heat stress Body strain and stressing - Do not lift or pull roofing panel alone, get help.
Wind lift Musculoskeletal injuries - stop work when wind lift is too great
Manual handling Serious injuries to allow safe work.
Death - Wear proper PPE.

7 Installation of stainless gutter Handling and cutting of Laceration - Clear of all persons working within drop zones and within
Metal producing sharp edges Soft tissue injury area of potential falling gutter
Manual handling Body strain and stressing - Wear gloves and other PPE during this process
Work at heights Musculoskeletal injuries to protect from lacerations.
Serious injuries - Do not attempt to work on securing guttering
Death in windy conditions.

8 Roof Sheet Installation/ Falls from height Musculoskeletal injuries - Always check weather.
penetration UV rays Being struck by sheets or - Clear all persons working with drop zones and within
Heat stress other flying objects in are of potential falling sheets
Wind lift high winds - Do not attempt to pass or secure sheeting in windy conditions.
Manual handling Serious injury ensure tools and materials are secure at heights.
Death - When working off scaffold ensure top, mid rail and
Foreign body in eye toe boards are fitted
- appropriate PPE to be worn at all times
e.g gloves, glasses/goggles, footwaer
and high visibility clothing

9 Installation of flashing Fall from heights Soft tissue injury - Clear all persons working with drop zones and within
UV rays Body strain and stressing area of potential falling flashing
Heat stress Musculoskeletal injuries - Wear gloves and other PPE during this process
Wind lift Serious injuries to protect from lacerations.
Manual handling Death - Do not attempt to work on securing flashing
in windy conditions.

10 Clean up of site Poor housekeeping Soft tissue injury - Clean area, picking up any rubbish and
Manual handling Body strain and stressing placing in correct waste bins or return to base to dispose of.
Musculoskeletal injuries - Do final check to ensure all materials
have brought down and nothing is left behind

You might also like