Systems: QMS ISO 9001 (2008) & EMS ISO 14001 (2004)
Assessment Report/Checklist
Form 009
CLIENT‐ORGANIZATION (NAME): Iran China Clay Industries Co.
PHYSICAL LOCATION(s): 5th km of Marand‐Julfa Road, Marand, East
Azarbayjan, Iran
Stage II Audit Date(s): 16 Jan 2016
Stage I Audit Date(s): 23 to 25 Jan 2016
NAICS (or NACE) CODE 08.12 &9.90
NAICS : North America Industry Classification System (if you operate within the EC you may use NACE)
ISO 9001 EXCLUSIONS: 7.3, 7.5.2 & 7.5.4
Assessment objectives: Local regulators, ISO9001:2008 & ISO
14001:2004
ASSESSMENT TEAM INFORMATION
Assessment Team Leader, ATL Mojtaba Ramezani
Assessor 2 Faezeh Ashourzadeh
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to
1 follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to
the processes being capable of achieving desired outputs (including consumer’s well‐being).
2 Scope of activities Mining and processing of kaolin
Operation license from the Ministry of industry and trade No. 1‐389/ ل
3 Legal status
valid until 2018
4 Integrate Quality and Environment Management System
Company uses a fully integrated system, workers call it system, not QMS
OR EMS, they call it system such as Mr. Mehrwarzan in purchase
department or Mr. Asgari Dump Truck driver.
System has been established here from 4 years ago, but, first internal
General audit is for 2 years ago.
Requirements – Documents observed as below:
4.1 What is the As first stage report, company has been developed documentation
implementation / system, based on audit finding, documentation system is fit to the
transition date? organization needs based on audit objective.
As “Master list of documents” date of date of issuing all procedures and
work instruction, procedures, drawings, CPs, OPCs and related document
to this integrated system. Last update of this form is for 3/jan/2016
Integrated Manual contains EMS related procedures too.
QMS‐EMS system based on Integrated Manual, organization mentioned
how they implemented ISO9001:2008 AND ISO14002:2004 CLAUSES in
Documentation their organization through their Integrated manual.
4.2 Requirements Documents contains:
(includes records) Level1: Integrated policy and Integrated manual
Level2: procedures
Level3: executive work instructions and forms
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 2 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
QMS‐EMS system based on Quality Manual, organization mentioned
how they implemented ISO9001:2008 AND ISO14002:2004 CLAUSES in
their organization through their Integrated Manual or referenced
documents.
IMS manual with last revision 00 was checked. All exclusions, production
scope, and history of organization were defined in the manual.
Organization chart as manual attachment was checked.
Integrated Manual and attachments “Organization chart, process map,
4.2.2 Quality Manual
process identification forms has been observed.
Exclusions:
7.5.4 customer property, because company accepting customer property
is not in their scope and policy
7.3: all products have global standards and D&D is not in company
policy. Company will not define technical requirement of kaolin.
7.5.2: resulting output can be verified by subsequent monitoring or
measurement
Organization uses “PR-QA-01-00” as procedure of control of documents
and records, procedures contains requirement of QMS and there is
records as below:
1- Record of “master list of documents with code F0-QA-03 containing
last version of documents and date of issue, date of revisions and
4.2. Control of distribution key (as 4.1) upon this key, there are record of F0-QA-04 for
Documents each unite that received related documents such as record of F0‐QA‐04
for HSE department.
2- There is no review for any documents from establishment. Company
added marketing to sale department in march 2015, record of procedure
of “sales and marketing” development has been observed on 9 march
2015.
Procedure of control of records PR-QA-01-00, were checked. In clause
5.9 of this procedure organization documented how they should dispose
4.2.4 Control of Records records.
Form “PR-MA-02-01” is designed to for records and document
disposition
4.3 Environmental planning
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 3 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Pr-HSE-01-00
environmental
aspects relevant to With this system company recycles dust to kaolin dust which is usable in
system.
4.3.1
the activities,
Third high risk significant environmental aspect is waste water,
AR
processes,
company uses two lakes (dam), one of them is online second one is
products, and
offline, in any time company can use one of dam as needed.
services of the
Company calculates RPN as below:
organization, et all
RPN above 300 shall be controlled urgently within one month (high risk
considering risk?
significant environmental aspect )
RPN between 150-300 shall be controlled-reduced with one year (medum
risk environmental aspect )
RPN below 150 shall be discussed in Environment team.
There were no identified aspect for:
soil pollution because of oil leakage in maintenance
resource use (Steam water from the tailings dam)
Legal Requirements identification is described in “Pr-HSE-06-00 Legal
Requirements and Others”
(Fo‐HSE‐41), (Fo‐HSE‐42), (Fo‐HSE‐43) are records related to this
procedure.
A record for identification and self decelelaration has been observed for
“waste water treatment” on September 2015. This record verified by
Legal local DOE of east Azerbaijan on September 2015
4.3.2 Requirements and “green industry” regulation identified and self assessment by EQMS
Others team, team Leader is Mr. Navasaleh.
Finding are such as below:
air pollution TLV which “zist azma Azerbaijan” has been measured
environmental indexes related to “green industry” And measurement
report shows filters performance are effective.
This report verified by local DOE of east Azerbaijan on April 2015.
4.4 Environmental implementation and operation
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 4 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Pr-HSE-04-00
Every two month, Mr Navasaleh should check if there is any change in
Operational infrastructure process production or resources containing human resource.
4.4.2
Control There is 27 attached checklists and 8 work instruction to control wasting
AR
and consumption.
I observed monthly checklists of chimney and 7S for December 2015.
GMP was as defined in work instruction based on surveys and
observations of audit team.
There was a gasoline leakage in exploration camp No.2 while drilling.
Lift truck “Dump Truck diagnosis certificate” did not extended from
2014, as responsible says company gave a request to ISIRI of Azabayjan
and showed us the money recipe for January 2014 for this purpose, after
four times following up there is no action regarding this. In green industry
self compliance company reported such cases ( over all two cases) and
DOE accepted this because there is no another choice for company.
HSE checklists regarding observation and plans show effective
monitoring and control of EMS system.
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 5 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
1
Consider that in certain global regions other terms apply (e.g. contingency, accident)
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 6 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Nox 33 35
CO 8 9
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 7 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Customer Focus –
Management committed to focus on customers in quality Policy, ICC is
5.2 (may relate to
installing ERP system.
7.2.1 and 8.2.1)
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 8 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Planning two: Compliance with environmental laws and reduce pollution
Quality/environme
5.4
ntal Objectives and
Operational targets:
1‐ Reduce pollution from wastewater plant
targets
2‐ Reduce air pollution caused by smoke flares drains dryers
5.5 Responsibility, Authority and Communication
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 9 of 21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
5.6 Management Review
Procedure of management review Pr-QA-05-00 was checked. Total
management reviews is planned to conduct at least annually.
Records of last conducted management review dated 27.10.1394
September 2016 were checked. Some inputs and out puts are included
result of internal and external audits, result of organization environmental
performance, achievement to the objectives, result of corrective and
5.6.2 Review Inputs
preventive actions, result of incidents and accidents, compliance with
statutory and regulatory regulation, results of customer feedback, etc.
Such as:
For EMS performance, RPN mean the end of the sixth month was 11 at
the end of December was reduced to 10.4
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 10 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
6
6.1 Refer to 6.2 ,6.3, 7.4 ,8.2.1
6.2 Human resources
Competence, Due to 5.5.1 personnel meet the requirements set by organization such as
6.2.1
6.2.2
Awareness and Mr. Khansalar “Unite 2 staff’s chief” and Mr. Halimi as MR.
Training
Procedure of maintenance and preventive maintenance of software and
hardware Pr-Te-01-00 was checked. Safeguarding Environment and
delivery time is mission of this process.
Organization implemented industrial automation, which is production of
IT department, name of software is ICCPM regarding process mission.
Back upping system was defined by determining Raid 1, raid 2 and raid 5
depending on importance of data. All back up can be on servers and/or
tape back upping system, which done backup every day, every week, and
every months.
Company is installing ERP on whole organization main target is to ease
communication between main office and mine.
Process chief is supervising whole system through form “Process control
platform maintenance schedule Machinery Of‐The‐13‐00”
For each computer system an ID sheet Fo-Te-18-00 was defined include
hardware characteristics of each system.
Needed software maintenance including of updating of system programs,
and updating of antivirus system are done automatically via internet (vpn)
system.
There are one un-programmed overhaul for line 2 hydro cyclone on
Pr-Te-01
6.3 Infrastructure 21/4/1394 which stopped this line for a week. NC semi-Produced material
came behind mills and reproduced with mixture on 50% as MOM No-233
with signature of Mr halimi and Mr Alizadeh verified By Mr. Elahe
Soghrati.
But there is no corrective action regarding planned emergency overhaul
that should done in four working days
Records of some request were checked such as requests:
U2-112334 on 12/6/1394 (September 2015) unite 2 mills and HSE-87363
emergency repair of ambulance, D28453427 (filtration dam2), and
Management8213329 (Mr. Halimi’s PC).
Environmental aspects are identified, analyzed and recorded in this unit
and Mr kheyrollahi knows about them.
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 11 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 12 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Inquiries acquired by Direct customer order such as order No. 6123 Narin
Review of Tile needs 250 MT/ monthly 20-30 MT S1 Kaolin. Its communicated
Requirements with Mr. Aliziadeh production manager in 12/3/1392 (march 2014).
7.2.2
Related to the
Product Sale department based on warehouse reports will review customer order,
if it was acceptable, it will be change to the performer, after accepting by
customer, this request will be changed to the order.
Records of sale were checked such Narin Tile Co.
I choose Narin Tile because I audited there one years ago and they were
satisfied by their raw materials.
Procedure of sale Pr-Sa-01-00 was checked.
Sale of product are done via Mr. Kazemian’s office in Tehran.
Company uses CRM to communicate with customers.
Inquiries acquired by Direct customer order such as order No. 6123 Narin
Tile needs 250 MT/ monthly 20-30 MT S1 Kaolin. Its communicated
Customer with Mr. Aliziadeh production manager in 12/3/1392 (march 2014).
7.2.3
Communication
Sale department based on warehouse reports will review customer order,
if it was acceptable, it will be change to the performer, after accepting by
customer, this request will be changed to the order.
Records of sale were checked such Narin Tile Co.
I choose Narin Tile because I audited there one years ago and they were
satisfied by their raw materials.
7.3 Design and Development
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 13 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Design and
All products have global standards and D&D is not in company policy.
7.3.1 Development
Company will not define technical requirement of kaolin.
Planning
7.3.2 D & D Inputs NA
7.3.3 D & D Outputs NA
7.3.4 D & D Reviewing NA
7.3.5 Verification NA
Control of (D & D)
7.3.6 NA
Changes
Control of (D & D)
7.3.7 NA
Changes
7.4 Purchasing
Responsible: Mr. M. Kazemian
7.4.1 Purchasing Process For purchasing all needs shall come to general warehouse and from there
shall fill form F0-st-01 and after approving authority chain will be given
Purchasing
7.4.2
Information
to Mr. Kazemian, Mr. Kazemian will recheck inqiry specification and if
needed communicate with demander to ensure specifications. Such as
purchasing order for PPE for 12/1/1394 (march 2015) and Order No.921
6/7/1394 for Oil 60s, in this case Mr kazemian had a note behind the
purchase order which shows she confirmed brand of oil provider with Mr
Alizade Production manager the demander
Verification of Records of verification of above purchase orders have been checked.
7.4.3
Purchases
Suppliers evaluation record for “Albase Tehran tajhiz” for the PPE case is
87% and for civil supplier is 98%
Contract No. 2884/93-20 date 1394/10/22 (Nov. 2015) with Civil supplier
“Iran sole” has been observed, in the contract clause 12 “Iran soole”
committed to do HSE as DOE and ICC requirements. In NC cases there
can be up to 30% contract as a penalty.
7.5 Production and Service Provision
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 14 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
All orders come to Tehran’s Office . such as order No. 6123 Narin Tile
needs 250 MT/ monthly 20-30 MT S1 Kaolin. Its communicated with Mr.
Aliziadeh production manager in 12/3/1392 (march 2014). Order was
traceable in office and production site very easily through an excel
format.
ICC has bought production line and technology from an Chinese-Poland
joint venture company; working criteria are adjusted in Control room by
Marandi or Mr ahmad Halimi (not MR, just similarity of name with Mr
Halimi the MR) and/or Mr. Aliziadeh.
QC pick samples every 2 Hours, as Mr Halimi, when customers give
Control of special requirement through orders maybe sampling varies to every hours
7.5.1 Production and as CP.
Service Provision
There are 24 Work instruction for manufacturing Unit such as:
Crusher operation instructions and homogenized hall (Stalker
productivity claimers ()کاليمرھا )
Instructions of grinding equitability
Instructions hydro cyclones for new line
Powder manufacturer's instructions (line 2)
Filter presses by launching exploitation of line 1
CP’s included for example grading for hydro cyclones line 2 is 2‐5 Cm.
Audit team interviewed more than 14 operators they were aware and
committed to their job and policy.
Validation of
N/A
Processes for
7.5.2
Production and
all products are measurable inside company. In other word resulting
output can be verified by subsequent monitoring or measurement
Service Provision
Company uses procedure Pr-QC-01-00 for this purpose.
For tractability, Identification Code is Date and production line 1 or 2, in
case of customer complaint Narin Tile date 12/3/1394 about moister,
Number of lot was 13940312-1 Chief was Mr Alizadeh,
Identification of raw material from Mines: before laboratory test report all
Identification and
7.5.3
Traceability
un-indentified raw material is in temporary place.
Identification of semi-produced: in this case before qc approved, kaolin
will not go out of mills and hydro cyclones, it is impossible just in EM
cases that semi-produced material shall return before last bottle neck.
And for final product Identification Code is Date and production line 1 or
2
7.5.4 Customer Property NA
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 15 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Product Records of delivery will be recorded on St-Fo-04 for all products.
There are three ware houses, General, raw material and final products
warehouse which all of them using ERP system which are connected
together and sales department.
Lay outing are as planed layout verified by Mr. Mohammad Halimi, Mr.
Kazemian and Mr. Halimi the MR
ERP is a tool regarding Delivery time and EMS system together related to
objective one and two.
Instrumentation cheif is Mr. Marandi were interviewed. he knoewd about
company policy and objectives of system. He had a prize for offering a
Control of better PLC system in new hydro cyclone line.
All measurement resources are listed in Fo-Te-30, such as:
7.6 Monitoring and
Entrance digital scale (EDS-1388-01) which is calibrated by ISIRI of
Measuring Devices
Marand certification number is 84539436/23م
Pressure gauge serial 106 for new hydro cyclone certificate Number
925384/ غit shows -2 Bar, which is calibrated in PLC system.
8 Measurement, Analysis and Improvement
8.2 Monitoring and Measuring
Pr-HSE-03-00 Communication, Consultation & Participation was
checked.
Records of customer satisfaction evaluation are checked, report was for
31/6/1394 (Sep. 2015) in form Fo-QA-15-00, average was 82.6 which
Customer has a 4% growth comparing last results.
8.2.1
Satisfaction Mr Kazemian analysis was recorded behind the chart and in letter
No9353- فروشto Mr. Noroozi.
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 16 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Proceses indexes are in form “ EFQM PROCESS’S Dimention F‐Ma‐02‐00”
The process of data analysis:
The organization has 4 customer complaints in recent year.
Customer feedback has been done according to their survey, for
example, Mr. Smdbygy index is 95%.
Monitoring and analysis of customer feedback showed, the average
customer satisfaction rate of 82.6% is achieved, the session
management review the intended purpose in the future period of 1395,
90% were considered.
Analysis of monitoring and measurement processes 1394 Managing the
review meeting is proposed:
Environmental process:
Monitoring and
organization did not have any penalty this year, last year there was
8.2.3 Measurement
150000000 Rials penalty but this year is the first year they ae approved
Process
the certificate green industry.
RPN mean the end of the sixth month was 11 at the end of December
were reduced to 10.4
Sales process:
Customer order delivery through business units and management is
carried out according to the survey 94% of customers are satisfied with
the delivery. Record of process analysis is behind the chart by Mr.
Kazemian.
Quality control process:
There is no customer complaints regarding QC.
There is no rejected production by customers.
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 17 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Daily quality control form - line 1 - line 2 was observed for first week of
January 2015 average size of 1/11/1394 was 126 Micrometer which was
acceptable
Daily report form Depew raw materials which is some kind of inventory
control for production line such as:
Mining Code (extraction mine)
The first of the day inventory
The amount of the mine
Consumer Crusher inventory
Buy in bulk inventory
End of day inventory
Procedure “Pr-QC-01-00 “
As nature of manufacturing line, NC will become just in two cases:
1- Emergency maintenance
There are one un-programmed overhaul for line 2 hydro cyclone on
Control of Non 21/4/1394 which stopped this line for a week. NC semi-Produced material
came behind mills and reproduced with mixture on 50% as MOM No-233
8.3 Conforming
with signature of Mr halimi and Mr Alizadeh verified By Mr. Elahe
Product
Soghrati.
2- Laboratory false results: Company send 4 sample to ISIRI’s
laboratories to cross check result of Lab.
There where one record of Control of Non Conforming Product in 1394
which I mentioned above.
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 18 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Proceses indexes are in form “ EFQM PROCESS’S Dimention F‐Ma‐02‐00”
The process of data analysis:
The organization has 4 customer complaints in recent year.
Customer feedback has been done according to their survey, for
example, Mr. Smdbygy index is 95%.
Monitoring and analysis of customer feedback showed, the average
customer satisfaction rate of 82.6% is achieved, the session
management review the intended purpose in the future period of 1395,
90% were considered.
Analysis of monitoring and measurement processes 1394 Managing the
review meeting is proposed:
Environmental process:
organization did not have any penalty this year, last year there was
8.4 Analysis of Data
150000000 Rials penalty but this year is the first year they ae approved
the certificate green industry.
RPN mean the end of the sixth month was 11 at the end of December
were reduced to 10.4
Sales process:
Customer order delivery through business units and management is
carried out according to the survey 94% of customers are satisfied with
the delivery. Record of process analysis is behind the chart by Mr.
Kazemian.
Quality control process:
There is no customer complaints regarding QC.
There is no rejected production by customers.
8.5 Improvement
Procedure “Pr-QA-04-00” regarding continual improvement, as MR says
there no way for organization to survive except continual improvement
and reducing cost and enhancing quality,
Continual Company is enhancing ERP in whole organization
8.5.1
Improvement EFQM
Updating EFQM PROCESS’S Dimension F‐Ma‐02‐00 criteria to a higher
level for next year
Making a Park in Marand
Procedure of corrective and preventive actions Pr-QA-03-00. Corrective
8.5.2 Corrective Action
and preventive action requests are recorded on Pr-QA-03-00.
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 19 of
21
REFERENCE, AS
This Clause
APPLICABLE
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_QMS‐EMS Issued: July 9, 2003 Revised: March 2013 Page 20 of
21
By exception we indicate the specific Strengths and weakness of the organization in light of the management system of the management system, as we
perceive and seen through processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and
planning of the assessment. This aspect relates to AVA™ as it does to the protection of consumers in the client-organization’s role within their respective
supply – chain.
Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.
Strength Weakness
‐
action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008: N/A
action Request Type II Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:
ICC -03-15: Emergency overhaul in year 21/41394 (12 July 2015) for line two was in 7 days, but there were no corrective
action about it
END of REPORT
FORM-009 – MS Reporting,
FORM-014 – Opening Meeting Checklist
FORM-008 – RA / AR, as requires
FORM-017 – Closing Meeting Checklist
FORM-018 – OBS, as requires
FORM-005 – Participants of opening & closing meetings
FORM-010 – As requires, recommendation for CoR
FORM-004 – Assessment Plan
FORM-026 – Assessment documents check-sheet,
FORM-007 – Planning onto -004, as process determined
for guidance purpose