BRSM 

Systems:  QMS ISO 9001 (2008) & EMS ISO 14001 (2004) 

Assessment Report/Checklist  
Form 009 

 
CLIENT‐ORGANIZATION (NAME):    Foulad Kerman

PHYSICAL LOCATION(s):   No. 14, Opposite of Be'sat Complex,


Jomhoori Eslami Blvd, Kerman, Iran 

Phase II Audit Date(s):    20,21,22,23 July 2015


Phase I Audit Date(s):    16, 17 June 2015 

NAICS (or NACE) CODE 24.20

NAICS : North America Industry Classification System (if you operate within the EC you may use NACE) 

ISO 9001 EXCLUSIONS:    7‐3, 7‐5‐4 

 
Assessment objectives: Assessing organization against QMS ISO 
9001:2008, EMS ISO14001:2004 and Iranian 
environment regulation of “Green Industry” 
 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL Bijan Rajabi 
Assessor 2 Farhang Mohajer 
Assessor 3  
Assessor 4
Assessor 5
Assessor 6
 
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
 1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 
Manufacturer of all kinds of ribbed rebar (size 8 to 32)
2  Scope of activities 
Exclusions 7.3, 7.5.4 
Ministry of Industries  and mines certificate (No. 3782645) 
3  Legal status  Department of Environment “Green Industry” (No.28363‫)ب‬  
ISIRI 3132 certificate No. 7264532-‫ب‬
4  Integrate Quality and Environment Management System  
System has been re‐established here from six month ago, but, system 
implemented three years ago. 
General 
Documents observed as below: 
Requirements – 
Quality Manual and attachments “Organization chart, process map, 
4.1  What is the 
process identification forms 

implementation / 
As “Master list of documents” date of date of issuing all procedures and 
transition date? 
work instruction is 15 March of 2015, version 3. 
Quality Manual contains EMS related procedures too. 
QMS‐EMS system based on Quality Manual, organization mentioned 
how they implemented ISO9001:2008 AND ISO14002:2004 CLAUSES in 
Documentation  their organization through their quality manual. 
4.2  Requirements  Documents contains:  
(includes records)  Level1: quality policy and quality manual 
Level2: procedures 
Level3: work instructions and forms 
QMS‐EMS system based on Quality Manual, organization mentioned 
how they implemented ISO9001:2008 AND ISO14002:2004 CLAUSES in 
their organization through their quality manual or referenced 
documents. 
IMS manual whit last revision 03 was checked. All exclusions, production 
scope,  and  history  of  organization  were  defined  in  the  manual. 
Organization chart as manual attachment was checked.  
4.2.2  Quality Manual Quality manual and attachments “Organization chart, process map,  
process identification forms has been observed. 
Exclusions:  
7.5.4 customer property, because company accepting customer property 
is not in their scope and policy 
7.3: all products have global standards and R&D is not in company 
policy, from other side line of manufacturing designed by an Italian 
company. 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 2 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Organization uses “PR-MA-01-01” as procedure of control of documents


and records, procedures contains requirement of QMS and there is
records as below:
1- Record of “master list of documents with code PR-MA-01-01”
4.2. Control of  containing last version of documents and date of issue, date of revisions
Documents  and distribution key (as 4.1) 
2- record of reviewing form “invoice with code fr-bu-01” have been
observed and from may 2015, sales department is using this form.
Organization uses manufacture execution system (MES) which will be
mention in Infrastructure section 6.3.
Procedure of control of records PR-MA-02-03, were checked. In clause
6.4 of this procedure organization documented how they should dispose
4.2.4  Control of Records   records. 
Form “PR-MA-02-01” is designed to for records and document
disposition
4.3  Environmental planning
Mr. Fathalian was interviewed. Aspect management procedure “PR-HSE-
05-02” dated 94.11.25. Aspect registered list for iron making area was
checked. Some samples like installation of sensors was asked and
Is there a  followed.
  Some more samples were checked like Mr. Kaboutari in raw material
procedure for 
  store and Mr. Shamsabadi in water treatment tested both in 94.10.19.
identifying 
  Other aspects are as below in record (FR-HSE-25):
environmental 

PR-HSE-05
 
aspects relevant to  Oil leakage from transfer pipeline (Pollution of soil and waste of energy)
  RPN is 110
4.3.1 
the activities, 
Furnace exhaust system (Noise pollution, legal requirement) RPN is 95 AR
processes, 
  Furnace chimney (air pollution, legal requirement) RPN is 150
products, and  Paper usage in administration using raw material RPN is 80
 
services of the  RPN above 300 shall be controlled urgently within one month
 
organization, et all  RPN between 150-300 shall be controlled-reduced with one year
 
considering risk?   RPN below 150 shall be discussed in Environment team.
There were no identified aspect for:
oil pollution maintenance
Ambulance air pollution
Legal Requirements identification is described in organization’s manual
and records are filled in form “FR-HSE-22’ and list of related
requirement are in form “FR-HSE-20”
Legal  Such as identifying “green industry” regulation identifying and self
4.3.2  Requirements and  assessment by EQMS team, team Leader is Mr. Khosravi Such as: air 
Others  pollution TLV which “zist azma Kerman” has been measured
environmental indexes related to “green industry” And measurement
report shows filters performance are effective.

4.4  Environmental implementation and operation

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 3 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

“PR-HSE-07-02” Procedure of Communication, Consultation &


Participation rev. 03 was checked.
Organization chart as part of system manual was checked.
Communication/  Participation of personnel were evidence via suggestion letter No.12342-2
on march of 2015 by Mr. Seyyed which mentioned to isolation of rest
4.4.1  Internal 
rooms and restaurant. 
communication 
Records of customer satisfaction evaluation and interested parties include
share holders are checked, report was for 31/3/1394 (May 2015).
Communications with suppliers are evidenced via supplier evaluation
procedure, as follow in report.
Yes, procedure with name and code “‫ روش اجرايي کنترل عمليات‬with code
PR-HSE-03-02” which contains how company controls its Environmental
aspects which should be controlled and DOE requirements controls such
as water waste control and air pollution.
Checklist of maintenance of Chimney and filtration has been checked for
date of 10 July 2015.
Change management is part of this procedure too.

PR-HSE-03
In monthly checklist Mr Fathalian should check if there is any change in
Operational 
4.4.2 
Control 
infrastructure process production or resources containing human resource. AR
There is 27 attached checklists and 8 work instruction to control wasting
and consumption.
I observed monthly checklists of chimney and 5S.
There were two broken windows above HSE office which was in the
manufacturing area and there is no record of an action.
Lift truck “technical diagnosis certificate” did not extended from 15-July
2015 and there is no record of action, as Mr. Fathalian says, this liftruck
just missed from list.
FK has provided “PR-HSE-01-02“Emergency2 Preparedness and
Response procedure
Mr. Fathalian was interviewed.
Emergency1  Emergencies had been identified by the organization whose some drills
4.4.3  Preparedness and  records were checked e.g. Asphyxia in 5th floor of furnace dated 
Response  18/4/1394, fire in control room of Iron Making and Ladle Failure on
station dated 16/5/1394.
Drill scenario: FR-HSE-05
Drill records: FR-HSE-01
4.5  Checking

                                                            
 

1
Consider that in certain global regions other terms apply (e.g. contingency, accident)
2
Consider that in certain global regions other terms apply (e.g. contingency, accident)

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 4 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

There is a work instruction for monitoring and measurement of


environmental aspects “Environmental key indexes monitoring PR-HSE-
04-02 ”
As regulation of DOE (department of Environment” FK has a contract
with “zist azma Kerman” which is an environment-test-body accredited
by DOE (Department of environment of IRAN).
Report of Green industry(regulators compliance) of year first quarter
1394 (2015 second quarter) on 15/05/1394 is observed by me, they passes
TLVs Such as:

1- Environmental noise is measured average level is 65 DB which IRAN


TLV: “less than 75 DB in open lands such as FK factory.
Environmental 
2- Fe in waste water of organization is less than 3 Mg/l and result is 2.9 as
4.5.1  Monitoring and 
TLV, because in last report, Fe was 2.1 organization anticipate a deep 
Measurement  cleaning for filtration pool, (corrective/preventive action No HSE-94-12)
which was fulfilled at audit time
3- TSS in waste water of organization is less than 40 Mg/l and result is
33.
4- CO is 7 PPM and Iran’s TLV is less than 9 PPM or 10000 Microgram /
M3
5- SO2 is 210 Microgram/M3 and Iran’s TLV 365 Microgram / M3
6- NO2 is 45 Microgram/M3 and Iran’s TLV 100 Microgram / M3
As the result of the report, they are meeting IRAN regulatory TLVs so
they should audit in next six month.
All above analysis was in FORM FR-HSE-17 written by MR Mr.
Khosravi.

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 5 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Mr. Fathalian and Mr. Khosrawi were interviewed.


HSE Process Procedure PR-HSE-04-02, for Monitoring, and
Measurement were established by the organization.
Measurement of Environmental Pollutants and Harmful Agents of
Workplaces were checked which had been compared with legal values. It
had been done by “zist azma kerman” Some results were checked e.g.
Also, environmental pollutants were checked e.g. Industrial sewages:
Parameter Result Legal Value
COD 33 200
BOD 19 100
Fe 2.1 3
Evaluation and 
4.5.2 
Compliance 
and sanitary sewages: 
Parameter Result Legal Value
Coliforms 3 400
PH 7.1 6.5-8.5
CL- 145.3 600
Fe 1.94 3

As per required by Iranian DOE for environmental self-declaration,


organization self-declares its environmental performance every 3 months
whose some records were checked e.g. letters no. 94/11556 and
94/12/815 are for 4th quarter of year 1394 and 1st quarter of year 1394
respectively which I mentioned 4.5.1 and 4.5.2.
5  Management responsibilities  
Management Mr. akkaf was in both opening and closing meeting, and
during audit he was in production line monitoring staffs.
I interviewed some staff they know about quality and environmental
Management 
5.1  aspects I did check restaurant, toilets, production line, all were tidy and
Commitment 
clean which shows culture and commitment.
Management and personnel’s committed to improvement in customer
satisfaction and organization due to policy.

Customer  Focus  – 
Management committed to focus on customers in quality Policy, FK is
5.2  (may  relate  to 
installing CRM system.  
7.2.1 and 8.2.1) 

IMS policy Rev.03 QP-MA-01 and dated 1394.01.22 was evaluated.


Environmental and Objectives and targets were measureable and it cascaded from policy and
5.3 
Quality Policy strategic objectives of the organization based on BSC (Balanced Score 
Cards). 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 6 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

IMS policy Rev.03 QP-MA-01 and dated 1394.01.22 was evaluated.


Objectives and targets were measureable and it cascaded from policy and
strategic objectives of the organization based on BSC (Balanced Score
Cards).
Organization uses “PR-HSE-06-03” to set, breakdown, monitor and
measure Objectives. Such as:
Planning Objective one: Increase customer satisfaction
Quality/environme 1. Increase in delivery
5.4 
ntal Objectives and 2. The minimum standard weight 
targets Index of objective: average of customer satisfaction

Objective five: Optimizing resource consumption


1. Reduce consumption of energy resources
There are two index related to this objective:
1. Gas consumption in the production
2. The power consumption in the production
5.5  Responsibility, Authority and Communication
I checked document “FK’s jobs book” as an attachment of manual, in
this book, Mr Akkaf set Mr. Khosrawi QA manager as his representative
in QMS and EMS.
Furnace staff
Guard
Maintenance
Responsible for quality control which is ISIRI supervisor too
Responsible for environment which is DOE supervisor too
Management representative in both EMS and QMS systems
Here is job description of Furnace staffs:
Essential Responsibilities:
• Monitor, control, and qualify state of furnace equipment
Responsibility and  • Perform, and teach others how to perform, preventive maintenance
5.5.1 
Authority  activities 
• React to error messages of factory systems and/or equipment
• Process wafers using defined procedures
• Review Statistical Process Control charts for process quality and
react to Out of Control conditions including defect troubleshooting
• Perform, and teach others how to perform, visual inspections
(quality check)
And job requirement as part of the book:
Education - 2 Year Technical/Associates Degree in Science, Math,
Engineering, Semi-Conductor Manufacturing or a related discipline or
equivalent military training/experience
Which Mr. Ranjbar is BS of Metallurgy engineering and have 4 years of
experience is “Khorasan Steel Company”

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 7 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Management  Mr Akkaf set Mr. Khosrawi QA manager as his representative in QMS


5.5.2 
Representative  and EMS.  

5.6  Management Review
Procedure of management review PR-MA-05-03 was checked. Total
management reviews is planned to conduct at least annually.
Records of last conducted management review dated 26.04.1394 were
checked. Some inputs and out puts are included result of internal and
5.6.2  Review Inputs 
external audits, result of organization environmental performance, 
achievement to the objectives, result of corrective and preventive actions,
result of incidents and accidents, compliance with statutory and
regulatory regulation, results of customer feedback, etc.
Outputs such as:
Extending green space (garden and rose field)
5.6.3  Review Output 
Overhaul plan for next month 
Communicating to “Red Crescent” for any possible cooperation and … 


6.1  Refer to 6.2 ,6.3, 7.4 ,8.2.1
6.2  Human resources
Competence,  Due to 5.5.1 personnel meet the requirements set by organization such as
6.2.1 
6.2.2 
Awareness and  Mr. Ranjbar “furnace operator” and Mr. Khosrawi 
Training   

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 8 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Procedure of maintenance and preventive maintenance of software and


hardware PR-PM-01-03 was checked. Organization implemented
industrial automation, which is included manufacture execution system
(MES). MES also included IS-suit as a basement for other system such as
OLAP, CRM, SRM, EFQM, SEN, etc. Also customer orders and
requirement are recorded by customer via this information system and are
under control by them.
IRISA Co. is supplier of implementation, and maintenance of Industrial
automation, Net, and information technology of FK.
Back upping system was defined by determining mirror servers and tape
back upping system, which done backup every day, every week, and
every months.
Help desk was implemented on IS suit, which in it, clients requests was
recorded on this system, will be approved by related power user, after
approval request will be reviewed by IT department. If IT approved the
request, request will be sent to the supplier (IRISA Co.) for execution and
follow up.
6.3  Infrastructure  For each system an ID sheet FR-PM-11 was defined include hardware    
characteristics of each system.
Needed software maintenance including of updating of system programs,
and updating of antivirus system are done automatically via intranet
system.
Records of some request were checked such as request #CR-FND-0075
(Crane) , #CR-PUA-0131(Ambulance), #CR-WSE-0173(filtration pool),
and #CR-SAL-0264(Mr. Khosravi’s PC).
Environmental aspects are identified, analyzed and recorded in this unit
and Mr Gerkani knows about them.
Training Procedure PR-AS-01-03, implemented, I checked Regulatory
mandatory trainings for Mr. Khosrawi he passed 36 Hrs of training in
year 1393 as ISIRI requirements.
New personnel for new filtration pool has passed “onboarding courses”
48 hours successfully, Mr Seraj’s Course effectiveness is 87% and Mrs.
Nouri course effectiveness is 93%.

Company has clean and tidy environment.


manufacture execution system (MES) as an automation system
6.4  Work Environment   They have certification from Ministry of Industry and DOE.    
they have implemented industrial housekeeping system (5s)
plus certification from labor ministry
7  Product Realization 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 9 of 21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

FK has bought production line and technology from an Italian company;


working criteria are adjusted in Control room by Seyyed or Mr Ranjbar.
QC pick samples every 30 Minutes, as Mr Khosrawi says because line is
getting old and need overhaul so we tighten period of sampling so we can
ensure production quality.
FR-PR-06 is OPC for all size such as:
Size 8 is first serial of OPC (Number one) related to Control plan “FR-
QC-01” such as Operation No 101, “rolling” equipment three rollers
Planning of  Shelves, control criteria:
7.1  Product  Ampere electric (800A)    
Realization  Being healthy rollers
Being healthy conductors
Water
Rolling
Manufacturing manager Mr. Golsorkhi set annual plan, and every month
based on manufacturing line reports, they update plan and report sales
department.
I interview 5 operators they were aware and commited to their job and
policy. 
7.2  Customer related processes 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 10 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Procedure of sale PR-BU-02-08 rev. 08 was checked.


Sale of product are done via two ways; via Exchange market, and based
on direct customer orders.
1) Via Exchange market:
Amount and prices of products, which will sale in the exchange market,
will be reviewed based on bazaar request, trend of price, and warehouse
reports in the share holders meeting.
After confirmation of sale between customer and organization, this
request will be changed to order, which will sent to the factory.
2) Direct customer order:
Sale department based on warehouse reports will review customer order,
if it was acceptable, it will be change to the performer, after accepting by
customer, this request will be changed to the order.
Records of sale were checked as follow:
Request Delivery
Customer Product
Determination  of  number sheet
Requirements  Tehran
7.2.1 
Related  to  the  Ferro
9401394
941006807 /    
Rebar /
Product  Dispatch 24.05.94
24.05.94
09080
Sepid 9400007
941006868 /
Farab Rebar /
25.05.94
Kavir 25.05.94

Procedure of customer feedback evaluation P-18, and work instruction of


WI-BU-02-08 were checked. Customer satisfaction was evaluated via
FR-BU-12. Customer complaints are recorded on FR-BU-13, and
followed up via corrective and preventive action if necessary.
Records of customer satisfaction evaluation related to second half of year
1394 up to first half of year 1394 was checked. Analyzing report include
comparing with last year result recorded on minute 94-1 dated 25.06.1394
were checked.
Records of received complaints dated 02, 12.05.1394, and 26.12.1394
were checked. Needed action were taken.

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 11 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Procedure of sale PR-BU-02-08 rev. 08 was checked.


Sale of product are done via two ways; via Exchange market, and based
on direct customer orders.
1) Via Exchange market:
Amount and prices of products, which will sale in the exchange market,
will be reviewed based on bazaar request, trend of price, and warehouse
reports in the share holders meeting.
After confirmation of sale between customer and organization, this
request will be changed to order, which will sent to the factory.
2) Direct customer order:
Sale department based on warehouse reports will review customer order,
Review of  if it was acceptable, it will be change to the performer, after accepting by
Requirements  customer, this request will be changed to the order.
7.2.2 
Related to the  Records of sale were checked as follow:
   
Product   Request Delivery
Customer Product
number sheet
Tehran
9401394
Ferro 941006807 /
Rebar /
Dispatch 24.05.94
24.05.94
09080
Sepid 9400007
941006868 /
Farab Rebar /
25.05.94
Kavir 25.05.94

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 12 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Procedure of sale PR-BU-02-08 rev. 08 was checked.


Sale of product are done via two ways; via Exchange market, and based
on direct customer orders.
1) Via Exchange market:
Amount and prices of products, which will sale in the exchange market,
will be reviewed based on bazaar request, trend of price, and warehouse
reports in the share holders meeting.
After confirmation of sale between customer and organization, this
request will be changed to order, which will sent to the factory.
2) Direct customer order:
Sale department based on warehouse reports will review customer order,
if it was acceptable, it will be change to the performer, after accepting by
customer, this request will be changed to the order.
Records of sale were checked as follow:
Request Delivery
Customer Product
number sheet
Customer  Tehran
7.2.3 
Communication  Ferro
9401394
941006807 /   
Rebar /
Dispatch 24.05.94
24.05.94
09080
Sepid 9400007
941006868 /
Farab Rebar /
25.05.94
Kavir 25.05.94

Procedure of customer feedback evaluation P-18, and work instruction of


WI-BU-02-08 were checked. Customer satisfaction was evaluated via
FR-BU-12. Customer complaints are recorded on FR-BU-13, and
followed up via corrective and preventive action if necessary.
Records of customer satisfaction evaluation related to second half of year
1394 up to first half of year 1394 was checked. Analyzing report include
comparing with last year result recorded on minute 94-1 dated 25.06.1394
were checked.
Records of received complaints dated 02, 12.05.1394, and 26.12.1394
were checked. Needed action were taken.
7.3  Design and Development  
Design and  NA
7.3.1  Development  COMPANY USES ISIRI 3132 and FK has bought production line and    
Planning  technology from an Italian company. 
7.3.2  D & D Inputs  NA    
7.3.3  D & D Outputs  NA    
7.3.4  D & D Reviewing  NA    
7.3.5  Verification  NA    
Control  of  (D  &  D) 
7.3.6  NA    
Changes 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 13 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Control  of  (D  &  D) 


7.3.7  NA    
Changes 
7.4  Purchasing 

7.4.1  Purchasing Process  Responsible: Mr. M. Khosrawi   


Procedure of warehousing PR-ST-01-03 was checked.
Purchasing  Work instruction of loading and delivery of products WI-ST-01-03 was
7.4.2 
Information   checked.   

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 14 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Daily delivery list FR-ST-03 will be issued and sent by sale department to
the product warehouse and products will be sent to the customer based on
this list. Records of delivery will be recorded on FR-ST-04 for Normal
products and in FR-ST-05 for main products.
Products are under control via procedure of product warehousing WI-ST-
22-03
.
In raw material warehouse, Environmental aspects are identified,
analyzed and recorded
Records of daily delivery list to customer from product warehouse related
to 01.04.1394 include delivery orders #94125970 for Azarakhsh Gostar
Ilia Sepahan, #94125972 for Hamgaman Felez Kaveh, and #94125994 for
Karaj Municipality were checked.
Procedure of purchasing PR-BU-01-03 and procedure of supplier
evaluation PR-BU-01-03 were checked.
Records of warehousing, supplier evaluation, and purchasing of raw
materials were checked as follow:
QC Input / Reception Purchasing
Material Supplier
record number Order
 Dir Godaz
9300006451 / 109543 /
Dir More 45 18.11. Azar Co.
18.11.93 08.03.93
91 31.06.94
Calcium 
9400003382 / Iran
Carbide 24.06. 9400000583 /
27.06.94 Carbide
10,000 Kg 94
Verification of  Refractory 
7.4.3 
Purchases  Brick NF1 21.06.
9400003490 / 113273 / Azarakhsh 
23.06.94 01.04.94 Co
20,255 Kg 94
Refractory

Brick Parsig 9400002251 / 113281 / Nasoz Pars
31.04.
70/0 30.04.94 01.04.94 31.06.94
94
7794 Kg

Refractory 9400002877 / 113280 / Nasoz Pars
24.05.
Brick 95/S 24.05.94 01.04.94 31.06.94
94
Energy PY  Energy
9300006119 / 111711 /
5203 04.11. Semnan
04.11.93 13.10.93
20,000 Kg 91 03.04.91
Hydraulic 
9400001973 / 113012 / Behran Co.
Oil 09.05.
09.05.94 19.03.94 03.04.91
20,800 Lit 94
In raw material warehouse, Environmental aspects are identified,
analyzed and recorded
Records of supplier evaluation for contractors were checked as follow:
Hayat Afroz Sepahan: Supplier of Slag Gathering,
Asadis Co, supplier of development construction,
IRISA Co. supplier of implementation, and maintenance of Industrial
automation, Net, and information technology,
Gol Firouzeh Co. supplier of Common industrial services, dated 17.03.94
Fooladyar Co. supplier of transportation and Crain, dated 17.03.94
FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 
Kolbeh Novin Khayam (Mr. Dehnavi) supplier of kitchen and restaurant 15 of 
21  – dated 12.12.93 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

7.5  Production and Service Provision 
FK has bought production line and technology from an Italian company;
working criteria are adjusted in Control room by Seyyed or Mr Ranjbar.
QC pick samples every 30 Minutes, as Mr Khosrawi says because line is
getting old and need overhaul so we tighten period of sampling so we can
ensure production quality.
FR-PR-06 is OPC for all size such as:
Size 8 is first serial of OPC (Number one) related to Control plan “FR-
QC-01” such as Operation No 101, “rolling” equipment three rollers
Control of  Shelves, control criteria:
7.5.1  Production and  Ampere electric (800A)   
Service Provision  Being healthy rollers
Being healthy conductors
Water
Rolling
Manufacturing manager Mr. Golsorkhi set annual plan, and every month
based on manufacturing line reports, they update plan and report sales
department.
I interview 5 operators they were aware and committed to their job and
policy. 
Size 8 is first serial of OPC (Number one) related to Control plan “FR-
QC-01” such as Operation No 101, “rolling” equipment three rollers
Shelves, control criteria:
Validation of  Ampere electric (800A)
Processes for  Being healthy rollers
7.5.2 
Production and  Being healthy conductors   
Service Provision  Water
Rolling
These processes are done more than 4 years in factory and Mr. seyyed
and Mr. Ranjbar control criteria from control room.
Final product are labeled which show identification and tractability,
which contains date of manufacturing
Identification  and 
7.5.3 
Traceability 
Inspector   
Size
And Shift responsible code
7.5.4  Customer Property  NA   

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 16 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Responsible: Mr. M. Khosrawi


Procedure of warehousing PR-ST-01-03 was checked.
Work instruction of loading and delivery of products WI-ST-01-03 was
checked.
Daily delivery list FR-ST-03 will be issued and sent by sale department to
the product warehouse and products will be sent to the customer based on
this list. Records of delivery will be recorded on FR-ST-04 for Normal
products and in FR-ST-05 for main products.
Products are under control via procedure of product warehousing WI-ST-
22-03.
After manufacturing rebar wait for QC confirmation and after that they

PR-MA-02 
store in their place as layout or maybe in some cases they will be loaded
Preservation of 
7.5.5 
Product 
to trailers. AR
There was no record of back up for warehouse section (control of
records)
In raw material warehouse, Environmental aspects are identified,
analyzed and recorded
Records of daily delivery list to customer from product warehouse related
to 01.04.1394 include delivery orders #94125970 for Azarakhsh Gostar
Ilia Sepahan, #94125972 for Hamgaman Felez Kaveh, and #94125994 for
Karaj Municipality were checked.
Records of warehousing, supplier evaluation, and purchasing of raw
materials were checked as follow:
In raw material warehouse, Environmental aspects are identified,
analyzed and recorded.
Mr. Mehrandish & Mr. Sharafi were interviewed. Organization have
provided procedure PR-QC-02-03 for control of monitoring and
measuring devices, organization has two kinds of calibration, Internal and
external, both records are in form fr-qc-08 and fr-qc-09
Control of  Calibration KPIs was discussed. Some external-calibration equipment
7.6  Monitoring and  was sampled and checked: Caliper coded 41346444 dated 94.04.24,   
Measuring Devices  Sieves coded AL57651 & AL57621 dated 93.11.02. Some internal-
calibration equipment was sampled and checked: 8 thermocouples in pre-
heater, PDI BB06 dated 90.03.07. Pressure gauge coded DPI-740 dated
94.05.15.

8  Measurement, Analysis and Improvement 
8.2  Monitoring and Measuring 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 17 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

“PR-HSE-07-02” Procedure of Communication, Consultation &


Participation rev. 03 was checked.
Organization chart as part of system manual was checked.
Participation of personnel were evidence via suggestion letter No.12342-2
Customer  on march of 2015 by Mr. Seyyed which mentioned to isolation of rest
8.2.1 
Satisfaction  rooms and restaurant.   
Records of customer satisfaction evaluation and interested parties include
share holders are checked, report was for 31/3/1394 (May 2015).
Communications with suppliers are evidenced via supplier evaluation
procedure, as follow in report.
Internal Audit procedure coded PR-MA-04-03 was evaluated. Internal
audits were planned and conducted with annually basis. Last internal
audit was conducted in the dates between 1394.02.25 to 1394.03.06 with
checklist “FR-MA-10” Some NC were selected as sample and related
8.2.2  Internal Audits  Corrective action were followed as bellow:   
N-03
N-05
N-02
Auditors were independent and competent
According to the Data Analysis & Process Monitoring Procedure (PR-MA-06-
03), they have developed a from for processes criteria (FR‐MA‐14‐03); the
record of data analysis and process monitoring was observed for example PPM is
Monitoring and  tollorable is 80 and in 4th quarter of 1393 is 250 and in first quarter of 1394 it
became 20, in 4th quarter of last year, there was emergency overhaul because of
8.2.3  Measurement 
rate of PPM During Corrective action #93/19.
  
Process  customer satisfaction average of 92.5% and criterial of 90%, supplier evaluation
average of 89.5% and criteria of 80%, delaye in product delivery with average of
6 working days in 6 months and criteria of 7 days in 6 months.
 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 18 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Mr. Heyhat was interviewed.


There are some laboratories within the organization including Water and
Oil, chemical and Electronics & Instrument.
ISIRI 3132 has been required to be fulfilled its requirements by products
(Round Bar).
Procedure of Inspection of In-process and finished products #P-23/05 was
established by the organization.
Records of some mechanical properties resulted from Mechanical
Properties Laboratory were checked as below:
YS UTS EL
Heat No. 400 600 16%
20.9
942994 508 654
5%
495
942940 639.6 22%
Monitoring and  .5
9134470 498 659 23%
8.2.4  Measurement of    
Product 
Control of Nonconforming Procedure PR-QC-03-03 was established by
the organization.

Product conformity, analysis records were checked in which capability of


Process (OPC and CP) had been calculated. Reports of fourth quarter of
year 1393 and 1st quarter of year 1394 were checked. Data related to
some parameters have been gathered and its Distribution was checked to
be Normal e.g. phosphorus percentage and weight if bars.
Steel Making Laboratory (Chemical Laboratory) was visited. Specimens
are prepared according to Instruction of Quant metering Specimen CP.
Daily Reports of laboratory were checked e.g. heat no. 940539 and
943296. Calibration of Quant meter device was checked. It is calibrated
before use (CBU). Work environment conditions have been defined as
humidity less than 60%.

Control of Nonconforming Procedure PR-QC-03-03 was established by


the organization. Conforming Product. But there is no record of NCP for
Control of Non  final product in this year (after installation of ISO) mentioned NCP in
analysis of data is for the before-ISO-implementation period.
8.3  Conforming 
But for purchasing materials there is issued forms because criteria of   
Product 
purchased items was different with order such as a cargo in date
1394/05/11 from Iraq, which have a different analysis with order, so they
reject cargo back to Iraq. Issued form serial is 3.

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 19 of 
21 
REFERENCE, AS
This Clause

APPLICABLE 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

According to the Data Analysis & Process Monitoring Procedure (PR-MA-06-


03), they have developed a from for processes criteria (FR‐MA‐14‐03); the
record of data analysis and process monitoring was observed for example PPM is
tollorable is 80 and in 4th quarter of 1393 is 250 and in first quarter of 1394 it
became 20, in 4th quarter of last year, there was emergency overhaul because of
8.4  Analysis of Data  

 
rate of PPM During Corrective action #93/19.
customer satisfaction average of 92.5% and criterial of 90%, supplier evaluation
average of 89.5% and criteria of 80%, delaye in product delivery with average of
6 working days in 6 months and criteria of 7 days in 6 months.
 
8.5  Improvement 
Continual  Continual improvement in PAP as its manual is in analysis of data and
8.5.1 
Improvement  management reviews plus monthly synchronization meetings.   

Procedure of corrective and preventive actions PR-QA-03-03. Corrective


8.5.2  Corrective Action  and preventive action requests are recorded on FR-MA-07.
Records of some determined corrective and preventive actions were
checked as follow:
 Corrective action #93/19 about quality issues,   
8.5.3  Preventive Action   Corrective action #94/03 about objectives,
 Corrective action #94/04 about environmental aspects
 PREVENTIVE action #94/07 about overhaul
 Corrective action #94/09 training issues for Mr. Bigdeli,
 

FORM‐009_V4_QMS‐EMS                                          Issued: July 9, 2003                                                       Revised: March 2013                                                       Page 20 of 
21 
By exception we indicate the specific Strengths and weakness of the organization in light of the management system of the management system, as we
perceive and seen through processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and
planning of the assessment. This aspect relates to AVA™ as it does to the protection of consumers in the client-organization’s role within their respective
supply – chain.
Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.
Strength Weakness

Control of documents (automation software) Control of records (Back Up) 

Manufacturing site   ‐ 
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

action Request Type II Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

FK-01-15: In some cases, operational control was not effective (details in form 008)

FK-02-15: some organization’s environmental aspects did not identified comprehensively.

FK-03-15: There was no record of back up for warehouse section

Observation Form-018 – with uniquely specific identification:

ATL: Bijan Rajabi Date: 23-July 2015

END of REPORT

FORM-009 – MS Reporting,
FORM-014 – Opening Meeting Checklist
FORM-008 – RA / AR, as requires
FORM-017 – Closing Meeting Checklist
FORM-018 – OBS, as requires
FORM-005 – Participants of opening & closing meetings
FORM-010 – As requires, recommendation for CoR
FORM-004 – Assessment Plan
FORM-026 – Assessment documents check-sheet,
FORM-007 – Planning onto -004, as process determined
for guidance purpose

 
 

You might also like